CN204920266U - Novel building protection network - Google Patents
Novel building protection network Download PDFInfo
- Publication number
- CN204920266U CN204920266U CN201520682127.6U CN201520682127U CN204920266U CN 204920266 U CN204920266 U CN 204920266U CN 201520682127 U CN201520682127 U CN 201520682127U CN 204920266 U CN204920266 U CN 204920266U
- Authority
- CN
- China
- Prior art keywords
- protective frame
- protective
- connecting rod
- fixed
- frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a novel building protection network, it contains a protective frame (1), the 2nd protective frame (2) and the 3rd protective frame (3), a protective frame (1), the 2nd protective frame (2) and the 3rd protective frame (3) all be by the mutual welding rectangle structure of encircling a city of root section bar pole, a protective frame (1), the 2nd protective frame (2) and the 3rd protective frame (3) between connect through connecting rod (4) fixed, the inside of a protective frame (1) is fixed with the first protection network of one deck (5), lies in on these first protection network (5) to have offered first small opening (6) near the middle part of connecting rod (4) one side. The utility model discloses a three -layer protection network structure, intensity is higher, can offset the impact force that the heavy object falls, plays the cushioning effect to the impact force of heavy object, and buffering effect is better, has solved the slump phenomenon, and emergence in that to a great extent has reduced the accident improves the construction security.
Description
Technical field
The utility model relates to the realm of building construction, is specifically related to a kind of novel building protective screening.
Background technology
If highrise building protects the generation of the improper accident that just easily causes casualties when constructing; so when constructing for guaranteeing that construction speed is normally carried out; therefore in building construction process; especially the construction of highrise building; need to arrange protective screening around construction thing; to accept the article that building may fall; current protective screening insufficient strength; when accepting the larger object of weight; protective screening slump may be caused; make it lose corresponding protective effect, cause the generation of accident, in the process of construction, there is larger potential safety hazard.
Utility model content
The utility model object is to provide a kind of novel building protective screening, and the landing of building material can be avoided to injure constructor and prevent the landing of constructor.
In order to solve problem existing in background technology, it comprises the first protective frame 1, second protective frame 2 and the 3rd protective frame 3, the first described protective frame 1, second protective frame 2 and the 3rd protective frame 3 are all be welded to each other encircled a city rectangle structure by tree root profiled bars, the first described protective frame 1, be connected and fixed by connecting rod 4 between second protective frame 2 and the 3rd protective frame 3, the inside of described first protective frame 1 is fixed with one deck first protective screening 5, this first protective screening 5 is positioned at and offers the first small opening 6 near the middle part of connecting rod 4 side, the inside of described second protective frame 2 is fixed with one deck second protective screening 7, this second protective screening 7 is positioned at and offers the second small opening 8 near the middle part of the relative side of connecting rod 4, the inside of described 3rd protective frame 3 is fixed with one deck the 3rd protective screening 9, the first bracing piece 10 is fixed with respectively between described first protective frame 1 and the both sides of the second protective frame 2, one end of this first bracing piece 10 withstands on the first protective frame 1, its other end withstands on the junction of connecting rod 4 and the second protective frame 2, the second bracing piece 11 is fixed with respectively between described second protective frame 2 and the both sides of the 3rd protective frame 3, one end of this second bracing piece 11 withstands on the second protective frame 2, its other end withstands on the junction of connecting rod 4 and the 3rd protective frame 3.
The back side place that described first protective frame 1 and the 3rd protective frame 3 are positioned at connecting rod 4 side is respectively arranged with hanger 13.
Owing to have employed above technical scheme, the utility model has following beneficial effect: adopt three-layer protection web frame, intensity is higher, the impact force that weight falls can be offset, play cushioning effect to the impact force of weight, buffering effect is better, solves slump phenomenon, decrease the generation of accident to a great extent, improve working security.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model, below in conjunction with accompanying drawing, embodiment is briefly described.
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
The technological means realized to make the utility model, creation characteristic, reaching object and effect is easy to understand, below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment being clearly and completely described.
Referring to Fig. 1, this detailed description of the invention is achieved by the following technical solutions, it comprises the first protective frame 1, second protective frame 2 and the 3rd protective frame 3, the first described protective frame 1, second protective frame 2 and the 3rd protective frame 3 are all be welded to each other encircled a city rectangle structure by tree root profiled bars, the first described protective frame 1, be connected and fixed by connecting rod 4 between second protective frame 2 and the 3rd protective frame 3, the inside of described first protective frame 1 is fixed with one deck first protective screening 5, this first protective screening 5 is positioned at and offers the first small opening 6 near the middle part of connecting rod 4 side, the inside of described second protective frame 2 is fixed with one deck second protective screening 7, this second protective screening 7 is positioned at and offers the second small opening 8 near the middle part of the relative side of connecting rod 4, the inside of described 3rd protective frame 3 is fixed with one deck the 3rd protective screening 9, the first bracing piece 10 is fixed with respectively between described first protective frame 1 and the both sides of the second protective frame 2, one end of this first bracing piece 10 withstands on the first protective frame 1, its other end withstands on the junction of connecting rod 4 and the second protective frame 2, the second bracing piece 11 is fixed with respectively between described second protective frame 2 and the both sides of the 3rd protective frame 3, one end of this second bracing piece 11 withstands on the second protective frame 2, its other end withstands on the junction of connecting rod 4 and the 3rd protective frame 3.
The back side place that described first protective frame 1 and the 3rd protective frame 3 are positioned at connecting rod 4 side is respectively arranged with hanger 13.
Owing to have employed above technical scheme, this detailed description of the invention has following beneficial effect: adopt three-layer protection web frame, intensity is higher, the impact force that weight falls can be offset, play cushioning effect to the impact force of weight, buffering effect is better, solves slump phenomenon, decrease the generation of accident to a great extent, improve working security.
Last it is noted that above embodiment is only in order to illustrate the technical solution of the utility model, be not intended to limit; Although be described in detail the utility model with reference to previous embodiment, those of ordinary skill in the art is to be understood that, it still can be modified to the technical scheme described in foregoing embodiments, or carries out equivalent replacement to wherein portion of techniques feature; And these amendments or replacement, do not make the essence of appropriate technical solution depart from the spirit and scope of each embodiment technical scheme of the utility model.
Claims (2)
1. a novel building protective screening, it is characterized in that it comprises the first protective frame (1), second protective frame (2) and the 3rd protective frame (3), described the first protective frame (1), second protective frame (2) and the 3rd protective frame (3) are all be welded to each other encircled a city rectangle structure by tree root profiled bars, described the first protective frame (1), be connected and fixed by connecting rod (4) between second protective frame (2) and the 3rd protective frame (3), the inside of described first protective frame (1) is fixed with one deck first protective screening (5), this first protective screening (5) is positioned at and offers the first small opening (6) near the middle part of connecting rod (4) side, the inside of described second protective frame (2) is fixed with one deck second protective screening (7), this second protective screening (7) is positioned at and offers the second small opening (8) near the middle part of the relative side of connecting rod (4), the inside of described 3rd protective frame (3) is fixed with one deck the 3rd protective screening (9), the first bracing piece (10) is fixed with respectively between described first protective frame (1) and the both sides of the second protective frame (2), one end of this first bracing piece (10) withstands on the first protective frame (1), its other end withstands on the junction of connecting rod (4) and the second protective frame (2), the second bracing piece (11) is fixed with respectively between the both sides of described second protective frame (2) and the 3rd protective frame (3), one end of this second bracing piece (11) withstands on the second protective frame (2), its other end withstands on the junction of connecting rod (4) and the 3rd protective frame (3).
2. a kind of novel building protective screening according to claim 1, is characterized in that the back side place that described first protective frame (1) and the 3rd protective frame (3) are positioned at connecting rod (4) side is respectively arranged with hanger (13).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520682127.6U CN204920266U (en) | 2015-09-01 | 2015-09-01 | Novel building protection network |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520682127.6U CN204920266U (en) | 2015-09-01 | 2015-09-01 | Novel building protection network |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204920266U true CN204920266U (en) | 2015-12-30 |
Family
ID=54969404
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520682127.6U Expired - Fee Related CN204920266U (en) | 2015-09-01 | 2015-09-01 | Novel building protection network |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204920266U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107017034A (en) * | 2017-06-07 | 2017-08-04 | 四川省守望信息科技有限责任公司 | The reactor pressure vessel safety guard quickly laid |
CN107893545B (en) * | 2017-10-11 | 2020-08-14 | 湖南远大建工股份有限公司 | External protector of assembled building |
CN112663980A (en) * | 2020-12-27 | 2021-04-16 | 广东正升建筑有限公司 | High-rise building construction protection device |
-
2015
- 2015-09-01 CN CN201520682127.6U patent/CN204920266U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107017034A (en) * | 2017-06-07 | 2017-08-04 | 四川省守望信息科技有限责任公司 | The reactor pressure vessel safety guard quickly laid |
CN107893545B (en) * | 2017-10-11 | 2020-08-14 | 湖南远大建工股份有限公司 | External protector of assembled building |
CN112663980A (en) * | 2020-12-27 | 2021-04-16 | 广东正升建筑有限公司 | High-rise building construction protection device |
CN112663980B (en) * | 2020-12-27 | 2022-06-10 | 广东正升建筑有限公司 | High-rise building construction protection device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204920266U (en) | Novel building protection network | |
CN204185061U (en) | Home lift beaming device | |
CN204060011U (en) | Tool-type construction safety protection canopy | |
CN102704828A (en) | Multifunctional hook ladder | |
CN203808580U (en) | Hoist driving steel wire rope lifting and fixing device | |
CN203977300U (en) | A kind of attaching protection canopy of cradle construction continuous beam | |
CN210127010U (en) | Tail rope anti-winding device of coal mine vertical shaft lifter | |
CN203938311U (en) | Construction elevator wall-attaching equipment | |
CN204199535U (en) | Can the log cabin trusses of effective load-bearing | |
CN204266607U (en) | A kind of high-voltage line protective frame | |
CN102874655A (en) | Multifunctional wiring harness frame | |
CN203903847U (en) | Pull rod installation structure of long-suspension-arm tower crane | |
CN206179987U (en) | Equipartition current board gate electrode suitable for short type battery | |
CN205231620U (en) | FRP pipe bracing piece of built -in two nose wire rope covers | |
CN204419249U (en) | A kind of rake cash machine protective guard | |
CN208918077U8 (en) | A kind of steel wood composite shear wall | |
CN202989760U (en) | A wind resisting structure of a flatwise tensile rope bridge | |
CN203904849U (en) | Double-girder gantry type bridge erection machine | |
CN203079467U (en) | Machine-room elevator counter-weight rope head structure | |
CN203855301U (en) | Suspension connecting device | |
CN203903846U (en) | Pull rod mounting structure of short-hoisting-arm tower crane | |
CN204038810U (en) | A kind of reinforcing vertical beam | |
CN206052482U (en) | A kind of GSZ | |
CN107419915A (en) | A kind of architectural engineering protection network | |
CN203384291U (en) | Bidirectional connector |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151230 Termination date: 20160901 |