CN204919527U - A pre -compaction device for soft soil foundation - Google Patents

A pre -compaction device for soft soil foundation Download PDF

Info

Publication number
CN204919527U
CN204919527U CN201520661069.9U CN201520661069U CN204919527U CN 204919527 U CN204919527 U CN 204919527U CN 201520661069 U CN201520661069 U CN 201520661069U CN 204919527 U CN204919527 U CN 204919527U
Authority
CN
China
Prior art keywords
water
geotextile tube
tube bag
geotechnique
bag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520661069.9U
Other languages
Chinese (zh)
Inventor
李光范
张小龙
胡伟
赵记领
谭杰
刘顺凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hainan Wantai Engineering Co Ltd
Hainan University
Original Assignee
Hainan Wantai Engineering Co Ltd
Hainan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hainan Wantai Engineering Co Ltd, Hainan University filed Critical Hainan Wantai Engineering Co Ltd
Priority to CN201520661069.9U priority Critical patent/CN204919527U/en
Application granted granted Critical
Publication of CN204919527U publication Critical patent/CN204919527U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a pre -compaction device for soft soil foundation, including there being several layers of geotechnique pipe bag, several layers of geotechnique's pipe bag are piled up on the soft soil foundation, all are equipped with the raceway on every layer of geotechnique's pipe bag, can carry out filling water and turning on the water in geotechnique's pipe bag through the raceway. The water bag that geotechnique's pipe bag was made for combined material. The raceway is connected with geotechnique's pipe bag through detachable construction. Beneficial effect: novel structure, the low price brings too many economic burden can for construction side, convenient to use, convenient to detach, the aufbau principle is simple, and the practicality is strong.

Description

A kind of prepressing device for soft foundation
Technical field
The utility model relates to a kind of prepressing device, particularly a kind of prepressing device for soft foundation.
Background technology
At present, there is serious technical deficiency problem in the precompressed of soft foundation, it mostly follows traditional approach, based on cumulose soil, by the builder's road built grogs transported on soft foundation and carry out precompressed, transport after reaching certain effect, so not only cost is high and increase the duration, more causes the destruction of ecological environment.
Summary of the invention
The purpose of this utility model is that the precompressed in order to solve soft foundation exists serious technical deficiency problem and a kind of prepressing device for soft foundation provided.
The prepressing device for soft foundation that the utility model provides includes several layers of geotextile tube bag, and several layers of geotextile tube bag are deposited on soft foundation, and every layer of geotextile tube bag is equipped with water-supply-pipe, can carry out the water-filling in geotextile tube bag and discharge water by water-supply-pipe.
Geotextile tube bag is the water bag that composite material is made.
Water-supply-pipe is connected with geotextile tube bag by demountable structure.
Use principle of the present utility model:
The geotextile tube bag of certain number of plies is chosen according to the concrete condition of soft foundation, first floor geotextile tube bag is placed on sand bedding course top, water-supply-pipe is placed in geotextile tube bag top, by water-supply-pipe, water is poured in geotextile tube bag during precompressed, then second layer geotextile tube bag placed on the first layer and inject water, by that analogy.After precompressed reaches certain effect, by water-supply-pipe, the water in geotextile tube bag is directly bled off.Water in prepressing device can take from river, city tap-water, or underground water, so water intaking more for convenience, and geotextile tube bag can repeatedly utilize.So just reach time saving and energy saving effect, reduce engineering cost.
The beneficial effects of the utility model:
Novel structure, cheap, too many financial burden can not be brought to construction party; Easy to use, be convenient to dismounting, aufbauprinciple is simple, practical.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation.
1, geotextile tube bag 2, soft foundation 3, water-supply-pipe 4, sand bedding course.
Detailed description of the invention
Refer to shown in Fig. 1:
The prepressing device for soft foundation that the utility model provides includes several layers of geotextile tube bag 1, several layers of geotextile tube bag 1 are deposited on soft foundation 2, every layer of geotextile tube bag 1 is equipped with water-supply-pipe 3, the water-filling in geotextile tube bag 1 can be carried out by water-supply-pipe 3 and discharge water.
The water bag that geotextile tube bag 1 is made for composite material.
Water-supply-pipe 3 is connected with geotextile tube bag 1 by demountable structure.
Use principle of the present utility model:
The geotextile tube bag 1 of certain number of plies is chosen according to the concrete condition of soft foundation 2, first floor geotextile tube bag 1 is placed on sand bedding course 4 top, water-supply-pipe 3 is placed in geotextile tube bag 1 top, by water-supply-pipe 3, water is poured in geotextile tube bag 1 during precompressed, then second layer geotextile tube bag 1 is placed on the first layer and injected water, by that analogy.After precompressed reaches certain effect, by water-supply-pipe 3, the water in geotextile tube bag 1 is directly bled off.Water in prepressing device can take from river, city tap-water, or underground water, so water intaking more for convenience, and geotextile tube bag 1 can repeatedly utilize.So just reach time saving and energy saving effect, reduce engineering cost.

Claims (3)

1. for a prepressing device for soft foundation, it is characterized in that: include several layers of geotextile tube bag, several layers of geotextile tube bag are deposited on soft foundation, and every layer of geotextile tube bag is equipped with water-supply-pipe, can carry out the water-filling in geotextile tube bag and discharge water by water-supply-pipe.
2. a kind of prepressing device for soft foundation according to claim 1, is characterized in that: described geotextile tube bag is the water bag that composite material is made.
3. a kind of prepressing device for soft foundation according to claim 1, is characterized in that: described water-supply-pipe is connected with geotextile tube bag by demountable structure.
CN201520661069.9U 2015-08-28 2015-08-28 A pre -compaction device for soft soil foundation Expired - Fee Related CN204919527U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520661069.9U CN204919527U (en) 2015-08-28 2015-08-28 A pre -compaction device for soft soil foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520661069.9U CN204919527U (en) 2015-08-28 2015-08-28 A pre -compaction device for soft soil foundation

Publications (1)

Publication Number Publication Date
CN204919527U true CN204919527U (en) 2015-12-30

Family

ID=54968671

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520661069.9U Expired - Fee Related CN204919527U (en) 2015-08-28 2015-08-28 A pre -compaction device for soft soil foundation

Country Status (1)

Country Link
CN (1) CN204919527U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106400689A (en) * 2016-09-13 2017-02-15 陈凯 Sealed water bag prepressing construction technology
CN106436686A (en) * 2016-10-21 2017-02-22 南通大学 Device used for collecting electroosmosis drainage and soft clay foundation treatment device and method
CN110067216A (en) * 2019-05-15 2019-07-30 中国电建集团中南勘测设计研究院有限公司 A kind of construction method of weak soil section culvert

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106400689A (en) * 2016-09-13 2017-02-15 陈凯 Sealed water bag prepressing construction technology
CN106436686A (en) * 2016-10-21 2017-02-22 南通大学 Device used for collecting electroosmosis drainage and soft clay foundation treatment device and method
CN110067216A (en) * 2019-05-15 2019-07-30 中国电建集团中南勘测设计研究院有限公司 A kind of construction method of weak soil section culvert

Similar Documents

Publication Publication Date Title
CN202450537U (en) Composite dewatering device of vacuum tube well
CN204919527U (en) A pre -compaction device for soft soil foundation
CN103967026B (en) A kind of city tidal river concrete flood protection wall maintenance Temporary Cofferdam and construction method
CN204163092U (en) Dewatering well bamboo cage chimney filter
CN202108038U (en) Solid drainage body used for processing soft soil foundation with preloading method
CN202691311U (en) Waterproof structure for wall group tubes
CN205823286U (en) In a kind of water, shield machine arrives and receives structure
CN204174577U (en) The combined type blockwork of hydraulic engineering
CN204510861U (en) Whole building mobile route ground anti-settling structure
CN210737544U (en) Pile cleaning device
CN206385459U (en) A kind of portable bridge cleaning device
CN202280048U (en) Leakage pipe
CN201857607U (en) Construction casing for compacted sand pile
CN206173942U (en) Non -sand vacuum preloading vacuum system
CN204060733U (en) One is applicable to embedded portal section of jurisdiction, shield construction tunnel plucking device
CN204568744U (en) A kind of sandstone feedway
CN202787228U (en) Loose earth body anchor pipe grouting device
CN202117564U (en) Underground traveling type slurry pumping construction device for small-sized construction passageway
CN204098053U (en) A kind of steel bridge is without pile foundation
CN211446818U (en) Concrete panel rock-fill dam
CN205530312U (en) Compound french drain
CN210104797U (en) Horizontal transportation device for construction of cover-excavation top-down construction method subway station
CN202913425U (en) Underground reservoir constitutive structure
CN204023576U (en) Prefabricated assembled Metro Station Structure tongue-and-groove grouting equipment
CN207003455U (en) Water cofferdam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151230

Termination date: 20160828

CF01 Termination of patent right due to non-payment of annual fee