CN204914479U - Shaping gas blowing device is assisted to gas and forming die is assisted to gas - Google Patents

Shaping gas blowing device is assisted to gas and forming die is assisted to gas Download PDF

Info

Publication number
CN204914479U
CN204914479U CN201520656710.XU CN201520656710U CN204914479U CN 204914479 U CN204914479 U CN 204914479U CN 201520656710 U CN201520656710 U CN 201520656710U CN 204914479 U CN204914479 U CN 204914479U
Authority
CN
China
Prior art keywords
gas
assisted molding
assisted
blowning installation
product
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520656710.XU
Other languages
Chinese (zh)
Inventor
蒋映娥
王冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG MEIDI PRECISION DIE TECHNOLOGY Co.,Ltd.
Original Assignee
SHUNDE CENTURY S&T CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHUNDE CENTURY S&T CO Ltd filed Critical SHUNDE CENTURY S&T CO Ltd
Priority to CN201520656710.XU priority Critical patent/CN204914479U/en
Application granted granted Critical
Publication of CN204914479U publication Critical patent/CN204914479U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Moulds For Moulding Plastics Or The Like (AREA)

Abstract

The utility model discloses a shaping gas blowing device is assisted to gas and forming die is assisted to gas, gas is assisted shaping gas blowing device and is included the sliding block, sliding block one side is equipped with the the pipe connection who connects the air supply, the opposite side of sliding block is equipped with the air tube of blowing, be equipped with the intercommunication in the sliding block the pipe connection with the air flue of air tube, the utility model is used for the shaping is assisted to the gas of aviation baffle product, through to aviation baffle product wall thickness the design optimize, adopt whole wall thickness reduction, the design of local material level thickening through shaping gas blowing device is assisted to gas and forming die is assisted to gas, adopts gas to assist fashioned method, blows toward the central zone in thick material level district, obtains the effect that the wall thickness is thin, more closely knit of interior tissue structure of actual product nevertheless for aviation baffle overall product wall thickness is thin, in the proof strength, overall light in weight, is out of shape little, thereby reduce the cost of product, and the quality of improvement product.

Description

Gas assisted molding blowning installation and gas-assisted forming mold
Technical field
The utility model relates to the gas assisted molding technology of wind deflector product, is specifically related to gas assisted molding blowning installation and gas-assisted forming mold.
Background technology
Wind deflector is the necessary component of air-conditioning products, and it can control the angle of air-out, also can arrange and sweep wind up and down.As the summer in sweltering heat, want whole room fast-refrigerating, wind deflector should be transferred to horizontal direction, the effect of fast-refrigerating can be played like this, also can play energy-conservation effect.
For air-conditioning products, the quality of wind deflector directly affects the air output of air-conditioning, the power of motor, the effect of refrigeration.In prior art, the main Problems existing of wind deflector product has: intensity is not enough, is easily out of shape.Main cause is, that is designed by wind deflector product wall thickness is too thick, and wind deflector weight increases, and need large driven by motor wind deflector, cost is higher; Thus general wind deflector product wall thickness is designed thinner, but the intensity of whole product can be affected, and there is distortion, impact assembling effect.
Utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art, be provided in proof strength good while, wind deflector lighter in weight, lower-cost gas assisted molding blowning installation and gas-assisted forming mold.
To achieve these goals, the technical solution adopted in the utility model is:
Gas assisted molding blowning installation, comprises sliding shoe, and described sliding shoe side is provided with the gas-tpe fitting connecting source of the gas, and the opposite side of described sliding shoe is provided with air blowing air tube, is provided with the air flue being communicated with described gas-tpe fitting and described air tube in described sliding shoe.
Described gas-tpe fitting is connected by tracheae with source of the gas, and tracheae is provided with control valve.
Described sliding shoe is connected by slide rail with the die holder of gas assisted molding mould.
Described sliding shoe is provided with driving lever.
Described sliding shoe is made up of slide block and the slide block insert that is connected with slide block; Described slide block is connected by slide rail with the die holder of gas assisted molding mould; Described driving lever is located on slide block; Described air tube is located in slide block insert.
Gas inject mouth on the inner core of described air tube and gas assisted molding mould is tightly connected.
Described gas inject mouth is communicated with charging aperture, or described gas inject mouth is communicated with the die cavity of gas assisted molding mould.
Blowning installation condition of work is that the die cavity charging of gas assisted molding mould reaches 75% ~ 99.9%.
Gas-assisted forming mold, comprises above-mentioned gas assisted molding blowning installation.
The utility model has the advantage of: gas assisted molding blowning installation and gas-assisted forming mold, for the assisted injection molding techniques of wind deflector product, by being optimized the design of wind deflector product wall thickness, adopting overall wall thickness reduction, the design that local material level thickeies; Time shaping, first fill the sizing material of melting, then under certain air pressure, carry out airs blowing process to thick region, local by gas assisted molding blowning installation, guarantee colloidal sol can better be fitted die cavity, under the influence of air pressure, the institutional framework of interiors of products is more closely knit, reduce the distortion of product, ensure that product strength is good, lower product weight, thus reduce the cost of product, and improve the quality of product.
Accompanying drawing explanation
Mark in the content expressed each width accompanying drawing of the utility model description below and figure is briefly described:
Fig. 1 is the working state schematic representation of the utility model gas assisted molding blowning installation.
Fig. 2 is the A-A schematic cross-section of Fig. 1 gas assisted molding blowning installation.
Fig. 3 is the view after each parts of Fig. 1 gas assisted molding blowning installation separate.
Fig. 4 is the A portion partial enlarged drawing of Fig. 3 gas assisted molding blowning installation.
Fig. 5 is the assembling schematic diagram of the utility model gas assisted molding blowning installation on gas assisted molding mould.
Fig. 6 and Fig. 7 is the schematic diagram of the blowing method of gas assisted molding blowning installation.
Mark in above-mentioned figure is:
1, gas-tpe fitting, 2, slide block, 3, slide block insert, 4, inner core, 5, air tube, 6, sliding shoe, 7, wind deflector product, 8, driving lever, 9, die holder.
Detailed description of the invention
Contrast accompanying drawing below, by the description to optimum embodiment, detailed description of the invention of the present utility model is described in further detail.
As Figure 1-Figure 4, gas assisted molding blowning installation, comprises sliding shoe 6, and sliding shoe 6 side is provided with the gas-tpe fitting 1 connecting source of the gas, and sliding shoe 6 opposite side is provided with air blowing air tube 5, is provided with the air flue of connectivity trachea joint 1 and air tube 5 in sliding shoe 6.The design of wind deflector product 7 wall thickness is optimized, adopts overall wall thickness reduction, the design that local material level thickeies.Time shaping, first fill the sizing material of melting, then under certain air pressure, carry out airs blowing process to thick region, local by gas assisted molding blowning installation, guarantee colloidal sol can better be fitted die cavity, under the influence of air pressure, the institutional framework of interiors of products is more closely knit, reduce the distortion of product, ensure that product strength is good, lower product weight, thus reduce the cost of product, and improve the quality of product.
Source of the gas is inertia high pressure nitrogen, and gas-tpe fitting 1 is connected by tracheae with source of the gas, and tracheae is provided with control valve.Control valve controls the opening and closing of source of the gas, to realize the job control of gas assisted molding blowning installation.
As shown in Figure 5, sliding shoe 6 is connected by slide rail with the die holder 9 of gas assisted molding mould; During blowning installation work, promote sliding shoe 6 to operating position, open source of the gas; After blowning installation quits work, during the die sinking of gas assisted molding mould, sliding shoe 6 is pushed to off-position, to facilitate the die sinking of gas assisted molding mould.
Sliding shoe 6 is provided with driving lever 8, and driving lever 8 facilitates the movement of sliding shoe 6, to increase work efficiency.
Gas inject mouth on the inner core 4 of air tube 5 and gas assisted molding mould is tightly connected; Gas is blown into from gas inject mouth by the inner core 4 of air tube 5, realizes the blowing operation of gas assisted molding.
Gas inject mouth is communicated with charging aperture, or gas inject mouth is communicated with the die cavity of gas assisted molding mould; As shown in FIG. 6 and 7, adopt two kinds of blowing methods, one is synchronously carried out for gas and charging, and another is directly to die cavity blowing, to realize the gas assisted molding of product.
Blowning installation condition of work is that the die cavity charging of gas assisted molding mould reaches 75% ~ 99.9%; When plastic cement is filled to die cavity 75% ~ 99.9%, inject inertia high pressure nitrogen, gas push melting plastic cement continues to be filled with die cavity, replaces plastic cement pressure maintaining period with gas pressurize, realizes the injection mo(u)lding of product.
Sliding shoe 6 is made up of slide block 2 and the slide block insert 3 that is connected with slide block 2; Slide block 2 is connected by slide rail with the die holder 9 of gas assisted molding mould; Driving lever 8 is located on slide block 2, and air tube 5 is located in slide block insert 3.The through slide block 2 of air flue and slide block insert 3, sliding shoe 6 adopts the structure of slide block 2 and slide block insert 3, is convenient to the assembling of sliding shoe 6.
Gas-assisted forming mold, comprises above-mentioned gas assisted molding blowning installation.
Gas assisted molding blowning installation, for realizing the gas assisted molding of wind deflector product, by being optimized the design of wind deflector product wall thickness, adopt overall wall thickness reduction, the design that local material level thickeies, by gas assisted molding blowning installation and gas-assisted forming mold, adopts the method for gas assisted molding, blowing in central area toward thick material level district, obtains the effect that wall thickness is thinner; But the internal organizational structure of actual product is more closely knit, make wind deflector Total Product wall thickness thin, while proof strength, overall weight is light, is out of shape little, thus reduces the cost of product, and improves the quality of product.
Obvious the utility model specific implementation is not subject to the restrictions described above, as long as have employed the improvement of the various unsubstantialities that method of the present utility model is conceived and technical scheme is carried out, all within protection domain of the present utility model.

Claims (9)

1. gas assisted molding blowning installation, it is characterized in that: comprise sliding shoe, described sliding shoe side is provided with the gas-tpe fitting connecting source of the gas, and the opposite side of described sliding shoe is provided with air blowing air tube, is provided with the air flue being communicated with described gas-tpe fitting and described air tube in described sliding shoe.
2. gas assisted molding blowning installation as claimed in claim 1, is characterized in that: described gas-tpe fitting is connected by tracheae with source of the gas, and tracheae is provided with control valve.
3. gas assisted molding blowning installation as claimed in claim 1, is characterized in that: described sliding shoe is connected by slide rail with the die holder of gas assisted molding mould.
4. gas assisted molding blowning installation as claimed in claim 3, is characterized in that: described sliding shoe is provided with driving lever.
5. gas assisted molding blowning installation as claimed in claim 4, is characterized in that: described sliding shoe is made up of slide block and the slide block insert that is connected with slide block; Described slide block is connected by slide rail with the die holder of gas assisted molding mould; Described driving lever is located on slide block; Described air tube is located in slide block insert.
6. the gas assisted molding blowning installation as described in any one of claim 1-5, is characterized in that: the gas inject mouth on the inner core of described air tube and gas assisted molding mould is tightly connected.
7. gas assisted molding blowning installation as claimed in claim 6, it is characterized in that: described gas inject mouth is communicated with charging aperture, or described gas inject mouth is communicated with the die cavity of gas assisted molding mould.
8. the gas assisted molding blowning installation as described in any one of claim 1-5, is characterized in that: blowning installation condition of work is that the die cavity charging of gas assisted molding mould reaches 75% ~ 99.9%.
9. gas-assisted forming mold, is characterized in that: comprise the gas assisted molding blowning installation described in any one of claim 1-8.
CN201520656710.XU 2015-08-27 2015-08-27 Shaping gas blowing device is assisted to gas and forming die is assisted to gas Active CN204914479U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520656710.XU CN204914479U (en) 2015-08-27 2015-08-27 Shaping gas blowing device is assisted to gas and forming die is assisted to gas

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520656710.XU CN204914479U (en) 2015-08-27 2015-08-27 Shaping gas blowing device is assisted to gas and forming die is assisted to gas

Publications (1)

Publication Number Publication Date
CN204914479U true CN204914479U (en) 2015-12-30

Family

ID=54963652

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520656710.XU Active CN204914479U (en) 2015-08-27 2015-08-27 Shaping gas blowing device is assisted to gas and forming die is assisted to gas

Country Status (1)

Country Link
CN (1) CN204914479U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108127866A (en) * 2017-12-19 2018-06-08 长春富维安道拓汽车饰件系统有限公司 The integrated auxiliary automobile door plate forming method with loudspeaker net pore structure of gas
CN109278272A (en) * 2018-10-17 2019-01-29 广东鑫美精密机械有限公司 A kind of automatic air cushioning machine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108127866A (en) * 2017-12-19 2018-06-08 长春富维安道拓汽车饰件系统有限公司 The integrated auxiliary automobile door plate forming method with loudspeaker net pore structure of gas
CN109278272A (en) * 2018-10-17 2019-01-29 广东鑫美精密机械有限公司 A kind of automatic air cushioning machine

Similar Documents

Publication Publication Date Title
CN205660111U (en) Planet carrier rising head structure
CN204914479U (en) Shaping gas blowing device is assisted to gas and forming die is assisted to gas
CN204672786U (en) A kind of punching mechanism be arranged in injection mold
CN110802812A (en) Automatic silica gel button injection mold of drawing of patterns
CN102166064A (en) Hollow brush handle of toothbrush and production method thereof
CN106113382A (en) A kind of injection-moulding device of automatic cleaning mould
CN206392708U (en) One kind self-control coaster and reverse wedge interdynamic mechanism
CN203782016U (en) Forward-blowing mechanism of individual section forming machine
CN202741671U (en) Automatic feeding device of motor casing lost foam mold
CN204894379U (en) Car horn covers injection mold
CN203256664U (en) Road snow melting vehicle
CN206510309U (en) A kind of foam beads spray gun of quick filler
CN205343553U (en) Automatic clearance system of mould
CN103195010B (en) Road snow melting vehicle
CN206644236U (en) Band beam foaming multi-slide follower box body foaming mould
CN204914437U (en) Air conditioner face frame injection mold's gluing of advancing constructs
CN205310789U (en) Air hose setting device
CN202043803U (en) Hollow brush handle of toothbrush
CN201233170Y (en) Thermal insulation energy-conserving apparatus on oven of production line for automobile inner decoration member
CN206983133U (en) A kind of mould structure of turn on automatically tracheae
CN208288913U (en) It is a kind of for producing the cold headers of electrical contact
CN204022647U (en) The closed flame-cutting plant of automatic turning
CN217265412U (en) Glass cup production is with design frock
CN204975291U (en) Set up heating device's sand box conveyer
CN204243657U (en) A kind of heat radiating type communication pipe

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 528311 Foshan, Shunde District, Guangdong City, Beijiao Town, Penglai Road, Midea industrial city

Patentee after: GUANGDONG MEIDI PRECISION DIE TECHNOLOGY Co.,Ltd.

Address before: 528311 Foshan, Shunde District, Guangdong City, Beijiao Town, Penglai Road, Midea industrial city

Patentee before: FOSHAN SHUNDE BAINIAN TECHNOLOGY Co.,Ltd.

CP01 Change in the name or title of a patent holder