CN204914255U - Profound hole processingequipment of graphite material - Google Patents
Profound hole processingequipment of graphite material Download PDFInfo
- Publication number
- CN204914255U CN204914255U CN201520434378.2U CN201520434378U CN204914255U CN 204914255 U CN204914255 U CN 204914255U CN 201520434378 U CN201520434378 U CN 201520434378U CN 204914255 U CN204914255 U CN 204914255U
- Authority
- CN
- China
- Prior art keywords
- drill
- drill bit
- spitting
- bushing
- graphite material
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Drilling And Boring (AREA)
Abstract
The utility model discloses a profound hole processingequipment of graphite material, including drill bit assembly, positioning mechanism and location bracket, positioning mechanism sets up in location on the bracket, and positioning mechanism includes a locating rack, the fixed location drill bushing that is provided with of locating rack, drill bit assembly includes: first drill bit is at least for to drill out a location drill bushing hole on the drill bushing of location, it is the same with a diameter of bit, and length is greater than the second drill bit of first drill bit, is used for at least replacing first drill bit, and the front end passes all the time location drill bushing hole to can freely advance and retreat at the downthehole boring direction of following of location drill bushing, the direction receives the restraint of location drill bushing can not remove the erroneous tendency about from top to bottom. The utility model has the advantages of simple and reasonable structure, it has fine concentricity with the drill press spindle to guarantee to fix a position the drill bushing hole, and when boring the batch hole, the location drill bushing is followed the drill press spindle and is controlled synchronous motion from top to bottom, can swiftly accurately fix a position the second drill bit, and durable, long service life, and production efficiency is high.
Description
Technical field
The utility model relates to a kind of Drilling operation device of graphite material, and particularly a kind of graphite material deep and long hole processing unit (plant), belongs to graphite-made chemical industry technical field of processing equipment.
Background technology
Graphite-made chemical industry equipment needs to bore processing deep and long hole in process of production usually, its aperture is long than being everlasting more than 1: 20 with hole, and when using the bit bore of overlength, drill bit itself there will be obvious shake, need accurately location, slightly deviation will affect quality and the accuracy of boring and product.
On the other hand, because Delanium is nonmetallic materials, inside also exists non-uniform phenomenon to a certain degree, to crawl after drill bit pierces graphite material inside phenomenon, the hole after processing is caused to produce deviation, cause workpiece to scrap time serious, therefore, conventional drilling equipment can not reach industrial requirement.
Moreover when adopting conventional drill jig location drilling, process velocity is slow, causes production efficiency lower, and production capacity reduces.
Utility model content
In order to solve the defect existed in above-mentioned prior art, the purpose of this utility model is to provide a kind of graphite material deep and long hole processing unit (plant), and it is simple and reasonable, can fast locate exactly, and carries out high efficiency boring, sturdy and durable.
To achieve these goals, the technical scheme that adopts of the utility model is as follows:
A kind of graphite material deep and long hole processing unit (plant), be fixedly connected with drilling machine, it comprises: drill bit assembly, detent mechanism and detent bracket;
Described detent mechanism is arranged on detent bracket, and near an end of graphite workpiece, described detent mechanism comprises a locating rack, and described locating rack is fixedly installed a spitting drill bushing;
Described drill bit assembly comprises:
One first drill bit, at least in order to be fixedly connected with drilling machine, before boring, spitting drill bushing gets out a spitting drill bushing hole;
One is identical with the first bit diameter, and length is greater than the second drill bit of the first drill bit, at least in order to replace the first drill bit when holing, front end is all the time through described spitting drill trepanning, and freely can retreat along boring direction in spitting drill trepanning, the constraint in direction up and down by spitting drill bushing can not move deflection.
Preferably, described spitting drill bushing is fixedly connected with by least one set bolt with locating rack.
Preferred, described set bolt is provided with three.
As one of preferred version of the present utility model, described drilling machine is provided with drill press spindle, described drill press spindle is provided with drill chuck, described first drill bit or the second drill bit are fixedly connected with drill chuck.
Further, described drilling machine is fixedly connected with one end away from graphite workpiece of detent bracket.
Preferably, a gap is installed with between described locating rack and graphite workpiece.
Preferred, the described center of spitting drill trepanning and the axis coinciding of drill press spindle, spitting drill bushing is with drill press spindle synchronizing moving up and down.
Concrete, described spitting drill bushing is formed from steel.
Compared with prior art, the beneficial effects of the utility model are at least:
The utility model is simple and reasonable, by arranging detent mechanism and drill bit assembly, ensure that spitting drill trepanning and drill press spindle have good concentricity, when boring batch hole, spitting drill bushing follows drill press spindle synchronizing moving up and down, fast can locate the second drill bit exactly, and the utility model is durable in use, long service life, production efficiency is high.
Accompanying drawing explanation
For structure of the present utility model is described, below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is described in more detail.
Fig. 1 is the structural representation of a kind of graphite material deep and long hole processing unit (plant) disclosed in the utility model;
Fig. 2 is the structure for amplifying cross-sectional schematic of detent mechanism disclosed in the utility model;
Fig. 3 is the axle diagram of detent mechanism disclosed in the utility model.
Description of reference numerals: 1-detent bracket, 2-detent mechanism, 21-locating rack, 22-spitting drill bushing, 22a-spitting drill trepanning, 23-set bolt, 32-second drill bit, 4-drill press spindle, 5-drill chuck, 6-graphite workpiece, 60-machining hole.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the present embodiment, carry out specifically, clearly and completely describing to the technical scheme in embodiment.
Shown in Figure 1, the graphite material deep and long hole processing unit (plant) of the present embodiment, be fixedly connected with integral with drilling machine, it comprises: drill bit assembly, detent mechanism 2 and detent bracket 1.
Shown in Fig. 2 and Fig. 3, described detent mechanism 2 is arranged on detent bracket 1, and near an end of graphite workpiece 6, described detent mechanism 2 comprises a locating rack 21, described locating rack 21 is fixedly installed a spitting drill bushing 22, both are fixedly connected with by least one set bolt 23, and preferably, set bolt 23 is provided with three.
Described drill bit assembly comprises: one first drill bit, at least in order to be fixedly connected with drilling machine, before boring, spitting drill bushing 22 gets out a spitting drill bushing hole 22a;
One is identical with the first bit diameter, and length is greater than the second drill bit 32 of the first drill bit, at least in order to replace the first drill bit when holing, front end is all the time through described spitting drill trepanning 22a, and freely can retreat along boring direction in spitting drill trepanning, the constraint in direction up and down by spitting drill bushing 22 can not move deflection.
Described drilling machine is provided with drill press spindle 4, described drill press spindle 4 is provided with drill chuck 5, described first drill bit or the second drill bit 32 are fixedly connected with drill chuck 5.Described drilling machine is fixedly connected with one end away from graphite workpiece 8 of detent bracket 1.
On drill chuck of drilling machine 5, first load onto one before using with processing aperture with the first drill bit of diameter, spitting drill bushing 22 gets out spitting drill trepanning 22a, and spitting drill trepanning 22a and drill press spindle 4 have good concentricity to adopt this method to ensure; Then change the outfit the front end of the second drill bit 32, second drill bit 32 of processing graphite through the aforementioned spitting drill trepanning 22a processed, between locating rack 21 and graphite workpiece 6, keep suitable gap.
During production and processing, the second drill bit 32 is feeding drilling processing vertically under the drive of drill press spindle 4, and the second drill bit 32 freely can be retreated along boring direction in spitting drill trepanning 22a, is subject to the constraint of spitting drill bushing 22 to move deflection in direction up and down.After boring what a hole, drill bit exits graphite workpiece, but chisel edge should be kept still to be enclosed within spitting drill trepanning 22a.Because locating rack 21 is joined together by detent bracket 1 and drilling machine, ensure spitting drill trepanning 22a center and auger spindle axis coinciding, spitting drill bushing 22 follows drill press spindle 4 synchronizing moving up and down, fast can locate the second drill bit 32 exactly.
When processing the hole of different-diameter, need synchronous replacing spitting drill bushing 22, the hole on spitting drill bushing 22 processes by aforesaid method, drill bit and spitting drill bushing should be kept to match and use.For ensureing that spitting drill bushing is durable in use, preferably adopt the processing of more than 40# high-quality steel.
In sum, the utility model is simple and reasonable, by arranging detent mechanism and drill bit assembly, ensure that spitting drill trepanning and drill press spindle have good concentricity, when boring batch hole, spitting drill bushing follows drill press spindle synchronizing moving up and down, fast can locate the second drill bit exactly, and the utility model is durable in use, long service life, production efficiency is high.
Above-mentioned detailed description of the invention is a better embodiment, and be only and technical conceive of the present utility model and design feature are described, object is person skilled in the art can be implemented according to this, does not limit protection domain of the present utility model with this.Every any equivalence done according to Spirit Essence of the present utility model changes or modifies, and all should be encompassed in protection domain of the present utility model.
Claims (8)
1. a graphite material deep and long hole processing unit (plant), is fixedly connected with drilling machine, it is characterized in that, this graphite material deep and long hole processing unit (plant) comprises: drill bit assembly, detent mechanism and detent bracket;
Described detent mechanism is arranged on detent bracket, and near an end of graphite workpiece, described detent mechanism comprises a locating rack, and described locating rack is fixedly installed a spitting drill bushing;
Described drill bit assembly comprises:
One first drill bit, at least in order to be fixedly connected with drilling machine, before boring, spitting drill bushing gets out a spitting drill bushing hole;
One is identical with the first bit diameter, and length is greater than the second drill bit of the first drill bit, at least in order to replace the first drill bit when holing, front end is all the time through described spitting drill trepanning, and freely can retreat along boring direction in spitting drill trepanning, the constraint in direction up and down by spitting drill bushing can not move deflection.
2. a kind of graphite material deep and long hole processing unit (plant) according to claim 1, it is characterized in that, described spitting drill bushing is fixedly connected with by least one set bolt with locating rack.
3. a kind of graphite material deep and long hole processing unit (plant) according to claim 2, it is characterized in that, described set bolt is provided with three.
4. a kind of graphite material deep and long hole processing unit (plant) according to claim 1, it is characterized in that, described drilling machine is provided with drill press spindle, described drill press spindle is provided with drill chuck, described first drill bit or the second drill bit are fixedly connected with drill chuck.
5. a kind of graphite material deep and long hole processing unit (plant) according to claim 4, it is characterized in that, described drilling machine is fixedly connected with one end away from graphite workpiece of detent bracket.
6. a kind of graphite material deep and long hole processing unit (plant) according to claim 1, is characterized in that, be installed with a gap between described locating rack and graphite workpiece.
7. a kind of graphite material deep and long hole processing unit (plant) according to claim 1, it is characterized in that, the described center of spitting drill trepanning and the axis coinciding of drill press spindle, spitting drill bushing is with drill press spindle synchronizing moving up and down.
8. a kind of graphite material deep and long hole processing unit (plant) according to claim 1, it is characterized in that, described spitting drill bushing is formed from steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520434378.2U CN204914255U (en) | 2015-06-24 | 2015-06-24 | Profound hole processingequipment of graphite material |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520434378.2U CN204914255U (en) | 2015-06-24 | 2015-06-24 | Profound hole processingequipment of graphite material |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204914255U true CN204914255U (en) | 2015-12-30 |
Family
ID=54963429
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520434378.2U Expired - Fee Related CN204914255U (en) | 2015-06-24 | 2015-06-24 | Profound hole processingequipment of graphite material |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204914255U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117139684A (en) * | 2023-10-30 | 2023-12-01 | 成都天科航空制造股份有限公司 | Hinge drilling device and drilling method for wing part |
-
2015
- 2015-06-24 CN CN201520434378.2U patent/CN204914255U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117139684A (en) * | 2023-10-30 | 2023-12-01 | 成都天科航空制造股份有限公司 | Hinge drilling device and drilling method for wing part |
CN117139684B (en) * | 2023-10-30 | 2023-12-29 | 成都天科航空制造股份有限公司 | Hinge drilling device and drilling method for wing part |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203156098U (en) | Improved deep-hole drilling machine | |
CN103949687A (en) | Ultrasonic vibration drilling device for trepanning and machining large-diameter hole | |
CN203184702U (en) | Drill jig with fast rotating template | |
CN203418337U (en) | Fixture suitable for rapid drilling of rope clip | |
CN204711261U (en) | Bull puncher | |
CN204914255U (en) | Profound hole processingequipment of graphite material | |
CN205571968U (en) | Pipe pole class work piece auxiliary clamping mechanism | |
CN102784943A (en) | Blind hole machining device | |
CN204234753U (en) | A kind of main axle structure of upright drill | |
CN203343755U (en) | Big shaft deep hole precision boring device | |
CN205074535U (en) | Oil development drill bit 3D printing apparatus | |
CN204486848U (en) | Drum sieve hole machined special equipment | |
CN201529791U (en) | Centre hole correcting apparatus | |
CN202921971U (en) | Guide device for machining deep hole of nuclear power driving tube base | |
CN203621574U (en) | Inclined hole auxiliary machining structure | |
CN203471438U (en) | Tool for processing thin-walled long hole piece on lathe | |
CN106513844A (en) | Multi-caliber tube cutting machine | |
CN205309384U (en) | A device is milled to high -speed boring for sheet metal processing | |
CN202270988U (en) | Tool for processing excircle of gantry frame shaft of continuous casting equipment | |
CN205599969U (en) | Hydrovalve piece deep hole processing device | |
CN206415956U (en) | It is a kind of to bore the feed mechanism for attacking centre axis Z | |
CN205571936U (en) | Slender piece assistance -localization real -time frock | |
CN205183817U (en) | Tool post for trenchless drill rod thread processing | |
CN203426501U (en) | Fast spotting drill jig for round flange | |
CN205764966U (en) | Coiling machine sleeve integrated tooling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151230 Termination date: 20170624 |