CN204901077U - Petroleum pipeline support frame - Google Patents

Petroleum pipeline support frame Download PDF

Info

Publication number
CN204901077U
CN204901077U CN201520682212.2U CN201520682212U CN204901077U CN 204901077 U CN204901077 U CN 204901077U CN 201520682212 U CN201520682212 U CN 201520682212U CN 204901077 U CN204901077 U CN 204901077U
Authority
CN
China
Prior art keywords
support
fixed block
fixedly connected
strut
dunnage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520682212.2U
Other languages
Chinese (zh)
Inventor
周午贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520682212.2U priority Critical patent/CN204901077U/en
Application granted granted Critical
Publication of CN204901077U publication Critical patent/CN204901077U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buffer Packaging (AREA)

Abstract

The utility model provides a petroleum pipeline support frame includes first backup pad, strutting arrangement, a fixing device, the 2nd fixing device and air cylinder device, a strutting arrangement includes the supporting legs, the device is leaned on on the top, the rotating part, the screw thread post, the piece is leaned on on the top, first fixed block, first bracing piece, head rod and first support, strutting arrangement includes the support frame, the second support, second bracing piece and third bracing piece, a fixing device includes the second fixed block, first movable block, first recess, second movable block and first spring, the 2nd fixing device includes the third fixed block, the second recess, the lug, the second connecting rod, the second spring, horizontal plate and draw the pole, air cylinder device includes the third support, the baffle, first support column, the portion of gripping, the cylinder, catch bar and slurcam, strutting arrangement is located first backup pad top. The utility model discloses can carry out effectual fixing to petroleum pipeline, it is fixed effectual, and it is lasting, prevent that petroleum pipeline from damaging.

Description

A kind of petroleum pipeline supporting frame
Technical field
The present invention relates to petroleum technology field, particularly relate to a kind of petroleum pipeline supporting frame.
Background technique
In petroleum transportation process, petroleum pipeline is all liftoff laying usually, therefore, every a segment distance, is provided with petroleum pipeline supporting frame and supports petroleum pipeline.But in petroleum transportation, the supporting frame of petroleum pipeline is generally erected at the position of distance ground certain altitude, if the height that will adjust petroleum pipeline needs to reinstall support usually, wastes time and energy; By arranging tube seat on current support of pipelines, being placed in tube seat by pipeline and supporting, the sectional shape of tube seat is generally the same with the sectional shape of pipeline, is roughly circular shape.But the surface of contact of tube seat and petroleum pipeline is comparatively large in this case, causes the difficulty of processing of tube seat large, if process bad, there will be petroleum pipeline and place jiggly situation.
Therefore, need to provide a kind of new technological scheme to solve the problems of the technologies described above.
Summary of the invention
The object of this invention is to provide a kind of petroleum pipeline supporting frame that can effectively solve the problems of the technologies described above.
In order to solve the problems of the technologies described above, the present invention adopts following technological scheme:
A kind of petroleum pipeline supporting frame, described petroleum pipeline supporting frame comprises the first dunnage, be positioned at the support device above described first dunnage, be positioned at the first fixing device above described first dunnage, the cylinder assembly being positioned at the second fixing device above described first fixing device and being positioned at above described second fixing device, described first dunnage comprises the supporting foot being positioned at the left and right sides, what be positioned at the left and right sides leans device, rotary part, be positioned at the screw column above rotary part, be positioned at and lean block above described screw column, be positioned at the first fixed block of the left and right sides, be positioned at the first strut of the left and right sides, the head rod being positioned at the left and right sides and the first support being positioned at the left and right sides, described support device comprises the supporting frame being positioned at described first support plate upper surface, be positioned at second support on the right surface of support frame as described above, the second strut being positioned at described second rack upper surface and the 3rd strut being positioned at the left and right sides, described first fixing device comprises the second fixed block being positioned at the left and right sides, be positioned at the first moving block of the left and right sides, be positioned at the first groove of described first moving block upper surface, be positioned at the second moving block of described first moving block side and be positioned at the first spring of described first support plate upper surface, described second fixing device comprises the 3rd fixed block, be positioned at the second groove of described 3rd fixed block upper surface, be positioned at the projection of described second groove, be positioned at the second connecting rod of the left and right sides, be positioned at the second spring of described projection upper surface, be positioned at the level board of described second connecting rod upper end and be positioned at the drawing bar of described level board upper surface, described cylinder assembly comprises the 3rd support being positioned at support frame as described above upper surface, baffle plate, be positioned at the first supporting post of support frame as described above upper surface, be positioned at the grip part of described baffle plate left surface, be positioned at the cylinder of described 3rd support lower surface, be positioned at the catch bar of described cylinder lower surface and be positioned at the slurcocks of described catch bar lower surface.
Described first dunnage is cuboid, described first dunnage horizontal positioned, described supporting foot is cuboid, and described supporting foot is vertically placed, and described supporting foot upper surface is fixedly connected with the lower surface of described first dunnage, described rotary part is cylindrical body, described rotary part horizontal positioned, described screw column is cylindrical body, and described screw column is vertically placed, described screw column side is provided with screw thread, and described screw column is threaded with described first dunnage.
The described block that leans is cylindrical body, describedly lean block horizontal positioned, the upper end of described screw column is fixedly connected with the described lower surface leaning block, the lower surface of described screw column is fixedly connected with the upper surface of described rotary part, described first fixed block is cuboid, described first fixed block is vertically placed, described first fixed block lower surface is fixedly connected with the upper surface of described first dunnage, described first strut is cuboid, and described first strut is vertically placed lower surface and is fixedly connected with the upper surface of described first dunnage.
Described head rod is cuboid, described head rod horizontal positioned, described head rod one end is fixedly connected with the side of described first strut, described first support is L-type, described first support one end is fixedly connected with the upper surface of described first dunnage, and described head rod is fixedly connected with described first support.
Support frame as described above is L-type, described second support is L-type, the described second support the other end straight down, described second strut is cuboid, described second strut is vertically placed, and described second post upper is fixedly connected with support frame as described above, and described 3rd strut is cuboid, described 3rd strut is vertically placed, and described 3rd post upper is fixedly connected with support frame as described above.
The upper end of described first strut is fixedly connected with the lower surface of described second fixed block, described first support is fixedly connected with described second fixed block, described second fixed block is cuboid, the side of described first moving block is connected with the side slip of described second fixed block, and the upper surface of described second moving block is curved shape.
Described 3rd fixed block is cuboid, described 3rd fixed block horizontal positioned, and the lower surface of described 3rd strut is fixedly connected with the upper surface of described second fixed block, and described projection is fixedly connected with described 3rd fixed block.
Described second connecting rod is cylindrical body, described second connecting rod is vertically placed, described second connecting rod lower surface is fixedly connected with the upper surface of described 3rd fixed block, described second connecting rod and support frame as described above are slidably connected, described second spring is vertically placed, and described second spring upper end is fixedly connected with support frame as described above.
Described 3rd support is L-type, described 3rd support one end is horizontal, described baffle plate is cuboid, described baffle plate horizontal positioned, described baffle plate is connected with described 3rd bracket slide, and described first supporting post is cuboid, described first supporting post is vertically placed, the lower surface of described first supporting post upper end and described baffle plate is slidably connected, and described grip part is cylindrical body, and described grip part is vertically placed.
After adopting technique scheme, tool of the present invention has the following advantages:
Petroleum pipeline support frame structure of the present invention is simple, easy to use, effectively can fix petroleum pipeline, good fixing effect, and lastingly, prevent petroleum pipeline from damaging, fully ensure the stability of petroleum pipeline, decreased the generation of petroleum transportation accident, ensure national wealth safety.
Accompanying drawing explanation
Be described further below in conjunction with the embodiment of accompanying drawing to petroleum pipeline supporting frame of the present invention:
Fig. 1 is the structural representation of petroleum pipeline supporting frame of the present invention;
Embodiment
As shown in Figure 1, the petroleum pipeline supporting frame of the present invention cylinder assembly 5 that comprises the first dunnage 1, be positioned at support device 2 above described first dunnage 1, be positioned at the first fixing device 3 above described first support device 1, be positioned at the second fixing device 4 above described first fixing device 3 and be positioned at above described second fixing device 4.
As shown in Figure 1, described first support device 1 comprises the supporting foot 11 being positioned at the left and right sides, what be positioned at the left and right sides leans device 12, rotary part 121, be positioned at the screw column 122 above rotary part 121, be positioned at and lean block 123 above screw column 122, be positioned at the first fixed block 13 of the left and right sides, be positioned at the first strut 14 of the left and right sides, the head rod 15 being positioned at the left and right sides and the first support 16 being positioned at the left and right sides, described first dunnage 1 is in cuboid, described first dunnage 1 horizontal positioned, described supporting foot 11 is provided with two and lays respectively at the left and right sides, described supporting foot 11 is in cuboid, described supporting foot 11 is vertically placed, described supporting foot 11 upper surface is fixedly connected with the lower surface of described first dunnage 1, the described device 12 that leans is provided with two while lay respectively at the left and right sides, the described device 12 that leans comprises rotary part 121, be positioned at the screw column 122 above described rotary part 121 and be positioned at and lean block 123 above described screw column 122, described rotary part 121 is in cylindrical body, described rotary part 121 horizontal positioned, described rotary part 121 is positioned at the below of described first dunnage 1, described screw column 122 is in cylindrical body, described screw column 122 is vertically placed, described screw column 122 side is provided with screw thread, described screw column 122 runs through the upper and lower surface of described first dunnage 1, described screw column 122 is threaded with described first dunnage 1, can move up and down when described screw column 122 is rotated, the described block 123 that leans is in cylindrical body, describedly lean block 123 horizontal positioned, the upper end of described screw column 122 is fixedly connected with the described lower surface leaning block 123, the lower surface of described screw column 122 is fixedly connected with the upper surface of described rotary part 121, described first fixed block 13 is provided with two and lays respectively at the left and right sides, described first fixed block 13 is in cuboid, described first fixed block 13 is vertically placed, described first fixed block 13 lower surface is fixedly connected with the upper surface of described first dunnage 1, described first strut 14 is provided with two and lays respectively at the left and right sides, described first strut 14 is in cuboid, described first strut 14 is vertically placed lower surface and is fixedly connected with the upper surface of described first dunnage 1, described head rod 15 is provided with two and lays respectively at the left and right sides, described head rod 15 is in cuboid, described head rod 15 horizontal positioned, described head rod 15 one end is fixedly connected with the side of described first strut 14, described first support 16 is provided with two and lays respectively at the left and right sides, described first support 16 is in L-type, described first support 16 one end is fixedly connected with the upper surface of described first dunnage 1, described head rod 15 is fixedly connected with described first support 16.
As shown in Figure 1, described support device 2 comprises the supporting frame 21 being positioned at described first dunnage 1 upper surface, be positioned at second support 22 on the right surface of support frame as described above 21, be positioned at the second strut 23 of described second support 22 upper surface and be positioned at the 3rd strut 24 of the left and right sides, described support device 2 is positioned at the top of described first dunnage 1, support frame as described above 21 is in L-type, support frame as described above 21 one end is fixedly connected with the upper surface of described first dunnage 1, support frame as described above 21 the other end horizontal positioned, described second support 22 is in L-type, described second support 22 one end is fixedly connected with support frame as described above 21, described second support 22 the other end straight down, described second strut 23 is in cuboid, described second strut 23 is vertically placed, described second strut 23 lower end is fixedly connected with described second support 22, described second strut 23 upper end is fixedly connected with support frame as described above 21, described 3rd strut 24 is provided with two and lays respectively at the left and right sides, described 3rd strut 24 is in cuboid, described 3rd strut 24 is vertically placed, described 3rd strut 24 upper end is fixedly connected with support frame as described above 21.
As shown in Figure 1, described first fixing device 3 comprises the second fixed block 31 being positioned at the left and right sides, be positioned at the first moving block 32 of the left and right sides, be positioned at the first groove of described first moving block 32 upper surface, be positioned at the second moving block 33 of described first moving block 32 side and be positioned at the first spring 34 of described first dunnage 1 upper surface, described first fixing device 3 is positioned at the top of described first dunnage 1, described second fixed block 31 is provided with two and lays respectively at the left and right sides, the upper end of described first strut 14 is fixedly connected with the lower surface of described second fixed block 31, described first support 16 is fixedly connected with described second fixed block 31, described second fixed block 31 is in cuboid, described first moving block 32 is provided with two and lays respectively at the left and right sides, the side of described first moving block 32 is connected with the side slip of described second fixed block 31, the upper surface of described first moving block 32 is provided with the first groove, described second moving block 33 side is connected with the side slip of described first moving block 32, the upper surface of described second moving block 33 is curved shape, described second moving block 33 is between described first moving block 32, described first moving block 32 forms a circular groove with the upper surface of described second moving block 33, described first spring 34 is provided with three and left and right is arranged in order, described first spring 34 lower end is fixedly connected with the upper surface of described first dunnage 1, described first spring 34 upper end is fixedly connected with the lower surface of described first moving block 32 with described second moving block 33.
As shown in Figure 1, described second fixing device 4 comprises the 3rd fixed block 41, be positioned at the second groove 411 of described 3rd fixed block 41 upper surface, be positioned at the projection 42 of described second groove 411, be positioned at the second connecting rod 43 of the left and right sides, be positioned at the second spring 44 of described projection 42 upper surface, be positioned at the level board 45 of described second connecting rod 43 upper end and be positioned at the drawing bar 46 of described level board upper surface, described second fixing device 4 is positioned at the top of described first fixing device 3, described 3rd fixed block 41 is in cuboid, described 3rd fixed block 41 horizontal positioned, described 3rd fixed block 41 lower surface is provided with the second groove 411, described second groove 411 semicircular in shape, described second groove 411 is positioned at the top of described first moving block 32 and described second moving block 33, the lower surface of described 3rd strut 24 is fixedly connected with the upper surface of described second fixed block 31, described projection 42 is provided with several and left and right is arranged in order, described projection 42 is positioned at 411, described projection 42 is fixedly connected with described 3rd fixed block 41, described second connecting rod 43 is provided with two and lays respectively at the left and right sides, described second connecting rod 43 is in cylindrical body, described second connecting rod 43 is vertically placed, described second connecting rod 43 lower surface is fixedly connected with the upper surface of described 3rd fixed block 41, described second connecting rod 43 runs through the upper and lower surface of support frame as described above 21, described second connecting rod 43 is slidably connected with support frame as described above 21, described second spring 44 is provided with three and left and right is arranged in order, described second spring 44 is vertically placed, described second spring 44 upper end is fixedly connected with support frame as described above 21, described second spring 44 lower end is fixedly connected with the upper surface of described projection 42, described level board 45 is in cuboid, described level board 45 horizontal positioned, the upper end of described second connecting rod 43 is fixedly connected with the lower surface of described level board 45, described drawing bar 46 is in concave shape, described drawing bar 46 two ends are fixedly connected with the upper surface of described level board 45.
As shown in Figure 1, described cylinder assembly 5 comprises the 3rd support 51 being positioned at support frame as described above 21 upper surface, baffle plate 52, be positioned at the first supporting post 53 of support frame as described above 21 upper surface, be positioned at the grip part 54 of described baffle plate 52 left surface, be positioned at the cylinder 55 of described 3rd support 51 lower surface, be positioned at the catch bar 56 of described cylinder 55 lower surface and be positioned at the slurcocks 57 of described catch bar 56 lower surface, described cylinder assembly 5 is positioned at the top of described second fixing device 4, described 3rd support 51 is in L-type, described 3rd support 51 one end is fixedly connected with support frame as described above 21 upper surface, described 3rd support 51 the other end is horizontal, described baffle plate 52 is in cuboid, described baffle plate 52 horizontal positioned, described baffle plate 52 runs through the surface, left and right of described 3rd support 51, described baffle plate 52 is slidably connected with described 3rd support 51, described first supporting post 53 is in cuboid, described first supporting post 53 is vertically placed, described first supporting post 53 lower surface is fixedly connected with support frame as described above 21 upper surface, the lower surface of described first supporting post 53 upper end and described baffle plate 52 is slidably connected, described grip part 54 is in cylindrical body, described grip part 54 is vertically placed, right surface, described grip part 54 is fixedly connected with the left surface of described baffle plate 52, described cylinder 55 upper surface is fixedly connected with described 3rd support 51 lower surface, described catch bar 56 is in cuboid, described catch bar 56 is vertically placed, described catch bar 56 upper end is connected with described cylinder 55 lower surface, make described cylinder 55 can promote described catch bar 56 to move up and down, described slurcocks 57 is in cuboid, described slurcocks 57 horizontal positioned, the lower surface of described catch bar 56 is fixedly connected with the upper surface of described slurcocks 57, described slurcocks 57 is positioned at the top of described baffle plate 52.
As shown in Figure 1, first petroleum pipeline is placed on the top of the first moving block 32 and the second moving block 33, then the first spring 34 is compressed, then rotary part 121 is rotated, the upper surface leaning block 123 is contacted with the lower surface of the first moving block 32 and the second moving block 33, thus effective support is played to it, then hold drawing bar 46 to press downwards, 3rd fixed block 41 is moved down, petroleum pipeline is made to be contained in the second groove 411, and the 3rd fixed block 41 can play good fixation, then hold grip part 54 to move to the left, baffle plate 52 is moved to the left, baffle plate 52 is made no longer to block slurcocks 57, then cylinder 55 is started, slurcocks 57 is moved down, and lean on drawing bar 46, thus the position of the 3rd fixed block 41 is fixed, thus effectively can fix petroleum pipeline.So far, using process of the present invention is described.
The above; be only the specific embodiment of the present invention, but protection scope of the present invention is not limited thereto, any those skilled in the art are in the technical scope that the present invention discloses; change can be expected easily or replace, all should be encompassed within protection scope of the present invention.Therefore, protection scope of the present invention should be as the criterion with the protection domain of described claim.

Claims (9)

1. a petroleum pipeline supporting frame, is characterized in that: described petroleum pipeline supporting frame comprises the first dunnage, be positioned at the support device above described first dunnage, be positioned at the first fixing device above described first dunnage, the cylinder assembly being positioned at the second fixing device above described first fixing device and being positioned at above described second fixing device, described first dunnage comprises the supporting foot being positioned at the left and right sides, what be positioned at the left and right sides leans device, rotary part, be positioned at the screw column above rotary part, be positioned at and lean block above described screw column, be positioned at the first fixed block of the left and right sides, be positioned at the first strut of the left and right sides, the head rod being positioned at the left and right sides and the first support being positioned at the left and right sides, described support device comprises the supporting frame being positioned at described first support plate upper surface, be positioned at second support on the right surface of support frame as described above, the second strut being positioned at described second rack upper surface and the 3rd strut being positioned at the left and right sides, described first fixing device comprises the second fixed block being positioned at the left and right sides, be positioned at the first moving block of the left and right sides, be positioned at the first groove of described first moving block upper surface, be positioned at the second moving block of described first moving block side and be positioned at the first spring of described first support plate upper surface, described second fixing device comprises the 3rd fixed block, be positioned at the second groove of described 3rd fixed block upper surface, be positioned at the projection of described second groove, be positioned at the second connecting rod of the left and right sides, be positioned at the second spring of described projection upper surface, be positioned at the level board of described second connecting rod upper end and be positioned at the drawing bar of described level board upper surface, described cylinder assembly comprises the 3rd support being positioned at support frame as described above upper surface, baffle plate, be positioned at the first supporting post of support frame as described above upper surface, be positioned at the grip part of described baffle plate left surface, be positioned at the cylinder of described 3rd support lower surface, be positioned at the catch bar of described cylinder lower surface and be positioned at the slurcocks of described catch bar lower surface.
2. petroleum pipeline supporting frame according to claim 1, it is characterized in that: described first dunnage is cuboid, described first dunnage horizontal positioned, described supporting foot is cuboid, described supporting foot is vertically placed, described supporting foot upper surface is fixedly connected with the lower surface of described first dunnage, described rotary part is cylindrical body, described rotary part horizontal positioned, described screw column is cylindrical body, described screw column is vertically placed, and described screw column side is provided with screw thread, and described screw column is threaded with described first dunnage.
3. petroleum pipeline supporting frame according to claim 2, it is characterized in that: described in lean block be cylindrical body, describedly lean block horizontal positioned, the upper end of described screw column is fixedly connected with the described lower surface leaning block, the lower surface of described screw column is fixedly connected with the upper surface of described rotary part, described first fixed block is cuboid, described first fixed block is vertically placed, described first fixed block lower surface is fixedly connected with the upper surface of described first dunnage, described first strut is cuboid, described first strut is vertically placed lower surface and is fixedly connected with the upper surface of described first dunnage.
4. petroleum pipeline supporting frame according to claim 3, it is characterized in that: described head rod is cuboid, described head rod horizontal positioned, described head rod one end is fixedly connected with the side of described first strut, described first support is L-type, described first support one end is fixedly connected with the upper surface of described first dunnage, and described head rod is fixedly connected with described first support.
5. petroleum pipeline supporting frame according to claim 4, it is characterized in that: support frame as described above is L-type, described second support is L-type, straight down, described second strut is cuboid to the described second support the other end, and described second strut is vertically placed, described second post upper is fixedly connected with support frame as described above, described 3rd strut is cuboid, and described 3rd strut is vertically placed, and described 3rd post upper is fixedly connected with support frame as described above.
6. petroleum pipeline supporting frame according to claim 5, it is characterized in that: the upper end of described first strut is fixedly connected with the lower surface of described second fixed block, described first support is fixedly connected with described second fixed block, described second fixed block is cuboid, the side of described first moving block is connected with the side slip of described second fixed block, and the upper surface of described second moving block is curved shape.
7. petroleum pipeline supporting frame according to claim 6, it is characterized in that: described 3rd fixed block is cuboid, described 3rd fixed block horizontal positioned, the lower surface of described 3rd strut is fixedly connected with the upper surface of described second fixed block, and described projection is fixedly connected with described 3rd fixed block.
8. petroleum pipeline supporting frame according to claim 7, it is characterized in that: described second connecting rod is cylindrical body, described second connecting rod is vertically placed, described second connecting rod lower surface is fixedly connected with the upper surface of described 3rd fixed block, described second connecting rod and support frame as described above are slidably connected, described second spring is vertically placed, and described second spring upper end is fixedly connected with support frame as described above.
9. petroleum pipeline supporting frame according to claim 8, it is characterized in that: described 3rd support is L-type, described 3rd support one end is horizontal, and described baffle plate is cuboid, described baffle plate horizontal positioned, described baffle plate is connected with described 3rd bracket slide, described first supporting post is cuboid, and described first supporting post is vertically placed, and the lower surface of described first supporting post upper end and described baffle plate is slidably connected, described grip part is cylindrical body, and described grip part is vertically placed.
CN201520682212.2U 2015-09-05 2015-09-05 Petroleum pipeline support frame Expired - Fee Related CN204901077U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520682212.2U CN204901077U (en) 2015-09-05 2015-09-05 Petroleum pipeline support frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520682212.2U CN204901077U (en) 2015-09-05 2015-09-05 Petroleum pipeline support frame

Publications (1)

Publication Number Publication Date
CN204901077U true CN204901077U (en) 2015-12-23

Family

ID=54923251

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520682212.2U Expired - Fee Related CN204901077U (en) 2015-09-05 2015-09-05 Petroleum pipeline support frame

Country Status (1)

Country Link
CN (1) CN204901077U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105135062A (en) * 2015-09-05 2015-12-09 周午贤 Supporting frame for petroleum pipeline
CN106241387A (en) * 2016-08-29 2016-12-21 夏爱玉 A kind of strip material transport fixing device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105135062A (en) * 2015-09-05 2015-12-09 周午贤 Supporting frame for petroleum pipeline
CN105135062B (en) * 2015-09-05 2017-07-25 盐城市锦瑞石油机械有限公司 A kind of petroleum pipeline support frame
CN106241387A (en) * 2016-08-29 2016-12-21 夏爱玉 A kind of strip material transport fixing device
CN106241387B (en) * 2016-08-29 2018-06-22 周漪楠 A kind of strip material transports fixing device
CN108861388A (en) * 2016-08-29 2018-11-23 夏爱玉 A kind of fixed device of strip material transport

Similar Documents

Publication Publication Date Title
CN204249329U (en) Adjustable sink structure
CN204901081U (en) Place petroleum pipeline's vibration damping mount
CN204901077U (en) Petroleum pipeline support frame
CN106594396A (en) Petroleum pipeline damping base
CN105135062A (en) Supporting frame for petroleum pipeline
CN204056689U (en) A kind of drum of crane storing unit
CN205136825U (en) Petroleum pipeline supporting frame
CN104019283A (en) Oil pipeline support
CN208605838U (en) A kind of fixation device of engineering detecting
CN204840127U (en) Fixing device is used in medical treatment operation
CN105234142A (en) Clamping device for facilitating cleaning of petroleum drilling rod
CN104758007A (en) Detecting device used for neurology department
CN204708882U (en) A kind of department of neurology checkout gear
CN205198830U (en) Board of lying on back of protection neck
CN203880238U (en) Petroleum pipeline support
CN206054940U (en) A kind of tubular type suspension and support being easily installed
CN104939998B (en) Fixing device for medical operations
CN205123080U (en) Electric shock billy gate is put in special shock attenuation of transformer substation
CN204723182U (en) A kind of fixture used when performing the operation
CN204996077U (en) Foldable hanging dance barre
CN204360759U (en) A kind of arc electronic drum bracket
CN205250984U (en) Terraced chair of rolling over can turn over
CN104122743A (en) Double-tube curtain support
CN203709637U (en) Operation chair with tool kit
CN209339651U (en) A kind of civil engineering support device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151223

Termination date: 20160905

CF01 Termination of patent right due to non-payment of annual fee