CN204901059U - Pipeline subsides protector - Google Patents

Pipeline subsides protector Download PDF

Info

Publication number
CN204901059U
CN204901059U CN201520688110.1U CN201520688110U CN204901059U CN 204901059 U CN204901059 U CN 204901059U CN 201520688110 U CN201520688110 U CN 201520688110U CN 204901059 U CN204901059 U CN 204901059U
Authority
CN
China
Prior art keywords
pipe
load
housing
cam
sedimentation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520688110.1U
Other languages
Chinese (zh)
Inventor
陈光辉
李福强
谭延晓
谭延伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Canon Polytron Technologies Inc
Original Assignee
ZIBO JIANENG PETROCHEMICAL INDUSTRY MACHINE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZIBO JIANENG PETROCHEMICAL INDUSTRY MACHINE Co Ltd filed Critical ZIBO JIANENG PETROCHEMICAL INDUSTRY MACHINE Co Ltd
Priority to CN201520688110.1U priority Critical patent/CN204901059U/en
Application granted granted Critical
Publication of CN204901059U publication Critical patent/CN204901059U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to a pipe protection device is connected to the storage tank, concretely relates to pipeline subsides protector, which comprises a housin, be equipped with the load board in the casing, connect on the main spring under the load board, main spring bracket is connected to the main spring lower extreme, the casing top is equipped with the pipe support, the pipe support has the loading board, the load pipe is connected to the loading board, the load pipe passes the load board and links to each other with the load board, be connected with wheel components on the load board, be equipped with the cam in the casing, the cam passes through the camshaft and installs in the casing, cam and wheel components cooperation, connect auxiliary spring one end on the cam, the auxiliary spring other end is connected on the casing, the device is storage tank and perpendicular and horizontal migration of pipeline while when taking place earthquake or ground and subside, holding power to the pipeline does not change because of the pipeline moves, ensure security needs under the special conditions.

Description

Pipe sedimentation protector
Technical field
The utility model relates to a kind of storage tank connecting tube protective gear, is specifically related to a kind of pipe sedimentation protector.
Background technique
Pipe sedimentation device is a kind of sedimentation safety protection device of novel storage tank connecting tube, can be widely used in petrochemical plant and store tank field connecting tube with storage tank field material conveying pipe, oil, liquid gas.Large-scale storage tank is larger in generation earthquake or occur sedimentation because of ground instability due to ground local pressure, can cause connecting tube and storage tank can not be synchronous and cause pipeline and storage tank connection part to ftracture making material excessive when sedimentation, and the security incident of initiation.Storage tank and connecting tube install additional pipe sedimentation device can play and to support the elastic stress of pipeline and sedimentation deformation compensates.
Due at present for petrochemical plant with store tank field material conveying pipe, oil, liquid gas stores tank field conveyance conduit does not have sedimentation safety protection device; generation earthquake or when there is sedimentation because Pipeline damage leaks, cause fire, atmospheric pollution, casualties and economic loss.
Model utility content
According to above deficiency of the prior art; the technical problems to be solved in the utility model is: provide a kind of pipe sedimentation protector; when there is earthquake or foundation settlement storage tank and pipeline simultaneously vertical with move horizontally; the support force of pipeline is not changed because pipeline moves, guarantees security needs under specific condition.
Pipe sedimentation protector described in the utility model, comprise housing, load plate is provided with in housing, main spring upper end is connected under load plate, main spring lower end connects main spring bracket, and be provided with pipe support above housing, pipe support has loading plate, loading plate connects load pipe, and load pipe is connected with load plate through load plate; Load plate is connected with roll wheel assembly, is provided with cam in housing, cam is arranged in housing by camshaft, and cam coordinates with roll wheel assembly, auxiliary connection spring one end on cam, and the auxiliary spring the other end is connected on housing; Housing is provided with screw lock device.
The utility model adopts moment synthesis, compensation principle, utilizes the major and minor spring of housing, cam, roller composite structure to realize its function.Be provided with by housing the height that sedimentation protector to be locked in requirement by screw lock device when mounted, pipe support bottom be placed on loading plate, by pipe support top bolt fixing and locking after pipe laying, before putting into operation, fixing and locking device unlocked.
Preferably, be set with guide plate outside load pipe, guide plate is contained on housing, guarantees the vertical movement of load pipe.
Preferably, main spring bracket is provided with adjusting bolt, for regulating the load of main spring.
Preferably, auxiliary spring is provided with equalising torque controlling device, for regulating the carrying of auxiliary spring.
Preferably, be threaded connection between load pipe and loading plate, the height of adjustable loading plate.
Preferably, loading plate is provided with low friction pair, and pipe support does not increase additional stress to pipeline when moving horizontally.
Preferably, housing is provided with mobile instruction and observes scale, is convenient to observe displacement amount intuitively.
Preferably, cam is strip, and side is curved surface, coordinates with roll wheel assembly, and opposite side coordinates with equalising torque controlling device, and equalising torque controlling device is connected with auxiliary spring.
Preferably, pipe support is insulation pipe support, and existing insulation possesses again the function of support force.
Preferably, camshaft, cam, auxiliary spring and torque balance device are two groups and are arranged symmetrically with in housing, make stress yielding support more stable.
Working principle and process:
Support force acts directly on main spring by load pipe, load plate, auxiliary spring acts on load pipe by equalising torque controlling device, cam, roller, loading plate, and according to the change of main spring and the spring performance of auxiliary spring and the tracing pattern of cam and angle of swing, the moment of main spring and auxiliary spring be constantly change with joint efforts in running, act on support force on main spring and be constant by cam, auxiliary spring making a concerted effort of being formed.
When storage tank is because of earthquake with when there is foundation settlement, when pipeline is moved down with the roller in dynamic load pipe, load plate downwards by peak, reducing gradually with joint efforts of auxiliary spring, the power of main spring increases gradually, and it is made a concerted effort for the power of main spring deducts making a concerted effort of auxiliary spring.
When neutral position, bear load by main spring, making a concerted effort of auxiliary spring is zero.
When lower position, the direction of making a concerted effort of auxiliary spring is contrary with the resultant direction of main spring, acts on making a concerted effort for the power of main spring deducts making a concerted effort of auxiliary spring in load plate.
According to above principle, pipeline occurs to driving the load pipe of pipe sedimentation protector also to move down during bottom offset simultaneously, but is constant to the supporting force of pipeline.
The beneficial effect that the utility model is compared with prior art had is:
1. pipe sedimentation protector support force is 10KN-200KN, stroke 0-300mm, covers the whole possible needs of storage tank connecting tube.
2. support force is less than 3% in total travel change.
3. when installing, support force is adjustable within the specific limits.
4. be quick on the draw, during action, additional stress can not be produced to pipeline.
5. be incubated pipe support, prevent pipe self-energy from leaking, and meet the requirement of support force.
6. be incubated pipe support and can ensure moving horizontally when there is earthquake.
7. compact structure, volume is little, lightweight, easy for installation.
8. safe and reliable to operation, Long-Time Service is non-maintaining.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
In figure: 1, housing; 2, adjusting bolt; 3, main spring bracket; 4, main spring; 5, auxiliary spring; 6, equalising torque controlling device; 7, cam; 8, roll wheel assembly; 9, camshaft; 10, load plate; 11, guide plate; 12, load pipe; 13, loading plate; 14, screw lock device; 15, pipe support.
Embodiment
Below in conjunction with accompanying drawing, embodiment of the present utility model is described further:
As shown in Figure 1, a kind of pipe sedimentation protector comprises housing 1, load plate 10 is provided with in housing 1, load plate connects main spring 4 upper end 10 times, main spring 4 lower end connects main spring bracket 3, and be provided with pipe support 15 above housing 1, pipe support 15 has loading plate 13, loading plate 13 connects load pipe 12, and load pipe 12 is connected with load plate 10 through load plate 10; Load plate 10 is connected with roll wheel assembly 8, cam 7 is provided with in housing 1, cam 7 is arranged in housing 1 by camshaft 9, cam 7 coordinates with roll wheel assembly 8, auxiliary connection spring 5 one end on cam 7, auxiliary spring 5 the other end is connected on housing 1, and auxiliary spring 5 is vertical with the elastic displacement direction of main spring 4; Housing 1 is provided with screw lock device 14.
Be set with guide plate 11 outside load pipe 12, guide plate 11 is contained on housing 1.
Main spring bracket 3 is provided with adjusting bolt 2.
Auxiliary spring 5 is provided with equalising torque controlling device 6.
Be threaded connection between load pipe 12 and loading plate 13.
Loading plate 13 is provided with low friction pair.
Housing 1 is provided with mobile instruction and observes scale.
Cam 7 is strip, and side is curved surface, coordinates with roll wheel assembly 8, and opposite side is connected with auxiliary spring 5 by equalising torque controlling device 6.
Pipe support 15 is insulation pipe support.
Camshaft 9, cam 7, auxiliary spring 5 and equalising torque controlling device 6 are two groups and are arranged symmetrically with in housing.
After installation is complete, screw lock device 14 is in lock state to pipe sedimentation protector, and now pipe sedimentation protector is rigid support, should first be unlocked by screw lock device 14 before putting into operation, pipe sedimentation protector is in and treats operating state.
Generation earthquake and when there is foundation settlement pipeline masterpiece for being incubated pipe support, loading plate 13, load plate 10, load pipe 12, main spring 4 is compressed, load pipe 12, load plate 10, roll wheel assembly 8 move down together simultaneously, roll wheel assembly 8 rolls on the curved surface of cam 7, cam 7 is compressed around camshaft 9 revolute pair spring 5, in whole stroke main spring 4 and auxiliary spring 5 act on power on load pipe 12 to make a concerted effort be impartial, the supporting force with pipeline is identical.

Claims (10)

1. a pipe sedimentation protector, it is characterized in that: comprise housing (1), load plate (10) is provided with in housing (1), main spring (4) upper end is connected under load plate (10), main spring (4) lower end connects main spring bracket (3), housing (1) top is provided with pipe support (15), pipe support (15) has loading plate (13), loading plate (13) connects load pipe (12), and load pipe (12) is connected with load plate (10) through load plate (10); Load plate (10) is connected with roll wheel assembly (8), cam (7) is provided with in housing (1), cam (7) is arranged in housing (1) by camshaft (9), cam (7) coordinates with roll wheel assembly (8), upper auxiliary connection spring (5) one end of cam (7), auxiliary spring (5) the other end is connected on housing (1); Housing (1) is provided with screw lock device (14).
2. pipe sedimentation protector according to claim 1, is characterized in that: be set with guide plate (11) outside described load pipe (12), guide plate (11) is contained on housing (1).
3. pipe sedimentation protector according to claim 1 and 2, is characterized in that: described main spring bracket (3) is provided with adjusting bolt (2).
4. pipe sedimentation protector according to claim 3, is characterized in that: described auxiliary spring (5) is provided with equalising torque controlling device (6).
5. the pipe sedimentation protector according to claim 1 or 4, is characterized in that: be threaded connection between described load pipe (12) and loading plate (13).
6. pipe sedimentation protector according to claim 5, is characterized in that: described loading plate (13) is provided with low friction pair.
7. the pipe sedimentation protector according to claim 1 or 6, is characterized in that: described housing (1) is provided with mobile instruction and observes scale.
8. the pipe sedimentation protector according to claim 1 or 6; it is characterized in that: described cam (7) is strip; side is curved surface; coordinate with roll wheel assembly (8); opposite side coordinates with equalising torque controlling device (6), and equalising torque controlling device (6) is connected with auxiliary spring (5).
9. the pipe sedimentation protector according to claim 1 or 6, is characterized in that: described pipe support (15) is insulation pipe support.
10. the pipe sedimentation protector according to claim 4 or 6, is characterized in that: described camshaft (9), cam (7), auxiliary spring (5) and equalising torque controlling device (6) are two groups and are arranged symmetrically with in housing.
CN201520688110.1U 2015-09-08 2015-09-08 Pipeline subsides protector Withdrawn - After Issue CN204901059U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520688110.1U CN204901059U (en) 2015-09-08 2015-09-08 Pipeline subsides protector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520688110.1U CN204901059U (en) 2015-09-08 2015-09-08 Pipeline subsides protector

Publications (1)

Publication Number Publication Date
CN204901059U true CN204901059U (en) 2015-12-23

Family

ID=54923233

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520688110.1U Withdrawn - After Issue CN204901059U (en) 2015-09-08 2015-09-08 Pipeline subsides protector

Country Status (1)

Country Link
CN (1) CN204901059U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105042182A (en) * 2015-09-08 2015-11-11 淄博佳能石化机械有限公司 Protector for pipeline sediment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105042182A (en) * 2015-09-08 2015-11-11 淄博佳能石化机械有限公司 Protector for pipeline sediment
CN105042182B (en) * 2015-09-08 2018-08-10 山东佳能科技股份有限公司 Pipe sedimentation protector

Similar Documents

Publication Publication Date Title
CN103215890A (en) Novel seismic mitigation and absorption support and changing method thereof
CN201785758U (en) Foundation pit supporting system
CN103527858B (en) Spring bracket allowing on-spot adjustment
CN103292047B (en) A kind of Multifunctional pipeline support structure
CN203549137U (en) Field adjustable spring bracket
CN204901059U (en) Pipeline subsides protector
CN105042182A (en) Protector for pipeline sediment
CN207091637U (en) A kind of stable frame of textile machine of novel damping
CN104964098A (en) Two-way buffer pipeline support-hanger
CN201715095U (en) Guiding type heat insulation saddle pipe carrier
CN203063915U (en) Supporting leg roller device, supporting leg and engineering machinery
CN102328196B (en) Vibration type pin pulling device
CN201715093U (en) Leg-type heat-insulating pipe bracket
CN210484817U (en) Hydraulic engineering pipeline bracket
CN203395399U (en) Horizontal adjustable guide pipeline hanging bracket
CN201461843U (en) Double-action damper of hydraulic shock absorption device
CN211667382U (en) A antidetonation support for engineering pipeline is fixed
CN202137564U (en) Rapping type pin pulling device
CN206412455U (en) A kind of cacheable convenient radar antenna fixing device installed
CN204690595U (en) A kind of multi-point self-balancing hydraulic pressure slide carriage device for large-scale component slippage
CN204828957U (en) A two -way buffering pipeline gallows
CN201787205U (en) Supporting leg type heat insulation pipe support
CN209510274U (en) Linkage on a kind of drilling rod can be realized automatic angle adjusting
CN207378399U (en) A kind of adjustable-pressure spring support
CN202991068U (en) Support force self-adjusting type tunnel top plate hydraulic support monitoring system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 255100 No. 562, Zichuan, Zibo District, Shandong, Jianshe Road

Patentee after: Shandong Canon Polytron Technologies Inc

Address before: 255100 No. 562, Zichuan, Zibo District, Shandong, Jianshe Road

Patentee before: ZIBO JIANENG PETROCHEMICAL INDUSTRY MACHINE CO., LTD.

AV01 Patent right actively abandoned

Granted publication date: 20151223

Effective date of abandoning: 20180810

AV01 Patent right actively abandoned