CN204897954U - Device that leaks out and detect hot -blast furnace burning valve - Google Patents

Device that leaks out and detect hot -blast furnace burning valve Download PDF

Info

Publication number
CN204897954U
CN204897954U CN201520651024.3U CN201520651024U CN204897954U CN 204897954 U CN204897954 U CN 204897954U CN 201520651024 U CN201520651024 U CN 201520651024U CN 204897954 U CN204897954 U CN 204897954U
Authority
CN
China
Prior art keywords
base
sleeve pipe
coal gas
valve
burning valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520651024.3U
Other languages
Chinese (zh)
Inventor
刘根
王彩永
黄立明
容敬元
白建龙
张双辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shijiazhuang Iron and Steel Co Ltd
Original Assignee
Shijiazhuang Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shijiazhuang Iron and Steel Co Ltd filed Critical Shijiazhuang Iron and Steel Co Ltd
Priority to CN201520651024.3U priority Critical patent/CN204897954U/en
Application granted granted Critical
Publication of CN204897954U publication Critical patent/CN204897954U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Examining Or Testing Airtightness (AREA)

Abstract

The utility model provides a device that leaks out and detect hot -blast furnace burning valve, belongs to blast funnace hot blast stove test equipment technology field for to the detection of leaking out of blast funnace hot blast stove burning valve. Its technical scheme is: the welding of its base has the inspection hole of perpendicular to coal gas nozzle stub pipe wall on the base on the outer wall of the coal gas nozzle stub in the burning valve outside, have the trompil and the inspection hole of base to be linked together on the pipe wall of coal gas nozzle stub, is connected on sleeve pipe and the base, and the temperature measurement thermal resistance is placed in the sleeve pipe, and the temperature measurement thermal resistance is connected with hot -blast furnace PLC template through the wire. The utility model discloses the temperature measurement thermal resistance of installation can detect the interior temperature of coal gas nozzle stub in the burning valve outside to this can judge whether the burning valve leaks out, reminds operating personnel in time to handle burning valve trouble, avoids the emergence of gas explosion accident. The utility model discloses simple structure, the installation is all very convenient with the use, and detection effect is reliable and stable, can replace traditional artifical detection method, effective safety of guaranteeing production.

Description

A kind of device Combustion of Hot Air Furnace valve being carried out to air leak test
Technical field
The utility model is a kind of device blast furnace and hot blast cupola combustion valve being carried out to air leak test, belongs to blast funnace hot blast stove test set technical field.
Background technology
Blast furnace is in smelting process, and the impurity of a part of blast furnace raw material enters gaspipe network with blast furnace gas, and hotblast stove is when using pipe network coal gas to burn stove, and the impurity part in blast furnace gas is deposited in combustion valve valve seat, and a part sticks on the valve plate of combustion valve.The effect of combustion valve is that combustion valve is opened when hot blast stove burning, and coal gas enters hotblast stove combustion, and during hotblast stove air-supply, combustion valve is in the closed position, seals the hot blast in hotblast stove, cuts off with gas line.If the impurity sticked in combustion valve is too much, combustion valve will be caused poorly sealed, make hotblast stove when blowing, in stove, hot blast leaks from combustion valve and enters branch gas tube, gas stop valve before combustion valve be not closed completely leakage gas, will mix at hotblast stove branch gas tube, form explosive mixed gas, very likely gas explosion accident occur.Traditional inspection method, is all generally post operation personnel on site spot check, listens pipeline with or without the sound that leaks out, or touches pipeline sensible temperature.The main drawback one that this traditional method exists is labor intensive material resources, and two is that when post personnel are few or the changing-over stove frequency increases, on-the-spot spot check easily occurs undetected or leaks situation about finding not in time.Therefore, how can leak out by Timeliness coverage combustion valve fast, accident of stopping occurs, and becomes and ensures problem demanding prompt solution in safety in production.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of device Combustion of Hot Air Furnace valve being carried out to air leak test, whether this proofing unit can detect combustion valve quickly and easily and leak out, to find combustion valve fault rapidly, processed in time, stopped the generation of gas explosion accident.
The technical scheme solved the problems of the technologies described above is:
A kind of device Combustion of Hot Air Furnace valve being carried out to air leak test; it comprises base, sleeve pipe, thermometric hot resistance, tin hat; base is welded on the outer wall of the coal gas short tube outside combustion valve; base there is the inspection window perpendicular to coal gas short tube tube wall; the tube wall of coal gas short tube has perforate be connected with the inspection window of base, sleeve pipe is connected with base upper end, and thermometric hot resistance is placed in sleeve pipe; tin hat is sleeved on the rear end of sleeve pipe, and thermometric hot resistance is connected with hotblast stove PLC template by wire.
Above-mentioned device Combustion of Hot Air Furnace valve being carried out to air leak test, the front end of described sleeve pipe for being threaded, the tube wall of sleeve pipe has top wire hole with base upper end, and thermometric hot resistance is fixed in sleeve pipe through top wire hole by jackscrew.
The beneficial effects of the utility model are:
The utility model is arranged on the coal gas short tube outside combustion valve, thermometric hot resistance can detect the temperature in the coal gas short tube outside combustion valve, in hotblast stove punching course, leak out if combustion valve is not closed tight, temperature outside combustion valve in coal gas short tube will rise, the temperature measurement signal of thermometric hot resistance will remind operator's combustion valve to there is air leakage phenomena, so that operator process combustion valve fault in time, avoids the generation of gas explosion accident.The utility model structure is simple, and install and use all very convenient, Detection results is reliable and stable, can replace traditional manual detection method, effectively ensures the safety of producing.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
In figure, mark is as follows: hotblast stove 1, combustion valve 2, gas stop valve 3, coal gas short tube 4, coal gas diffusion pipe 5, base 6, sleeve pipe 7, thermometric hot resistance 8, tin hat 9, inspection window 10, top wire hole 11, jackscrew 12.
Embodiment
The utility model is made up of base 6, sleeve pipe 7, thermometric hot resistance 8, tin hat 9, jackscrew 12.
Show in figure, base 6 is welded on the outer wall of the coal gas short tube 4 outside combustion valve, base 6 has the inspection window 10 perpendicular to coal gas short tube 4 tube wall, the tube wall of coal gas short tube 4 has perforate be connected with the inspection window 10 of base 6, the warm air in coal gas short tube 4 can enter in inspection window 10.
Show in figure, the front end of sleeve pipe 7 is with base 6 upper end for being threaded, and thermometric hot resistance 8 is placed in sleeve pipe 7, and thermometric hot resistance 8 is connected with hotblast stove PLC template by wire, is transported in the operation room of hotblast stove by temperature measurement signal.Tin hat 9 is sleeved on the rear end of sleeve pipe 7, needs to turn on tin hat 9 when placing and take out thermometric hot resistance 8.
Show in figure, the tube wall of sleeve pipe 7 has top wire hole 11, thermometric hot resistance 8 is fixed in sleeve pipe 7 through top wire hole 11 by jackscrew 12.
The model of the thermometric hot resistance 8 of an embodiment of the present utility model is WZP-240PT100.
Working process of the present utility model is as follows:
Before at hotblast stove 1, by burning, stove transfers air-supply to, combustion valve 2 is closed, if combustion valve 2 is not closed tight and leaked out in hotblast stove 1 punching course, the temperature outside combustion valve 2 in coal gas short tube 4 will rise.Warm air enters in sleeve pipe 7 by the inspection window 10 be connected with coal gas short tube 4, and the thermometric hot resistance 8 in sleeve pipe 7 will be transferred to master control room by temperature signal, and prompting master control room operator, combustion valve 2 exists the phenomenon do not closed tight.If constant temperature rises, operator stop this hotblast stove 1 to run immediately, check processing after blowing out.

Claims (2)

1. one kind is carried out the device of air leak test to Combustion of Hot Air Furnace valve, it is characterized in that: it comprises base (6), sleeve pipe (7), thermometric hot resistance (8), tin hat (9), base (6) is welded on the outer wall of the coal gas short tube (4) in combustion valve (2) outside, base (6) there is the inspection window (10) perpendicular to coal gas short tube (4) tube wall, the tube wall of coal gas short tube (4) there is perforate be connected with the inspection window (10) of base (6), sleeve pipe (7) is connected with base (6) upper end, thermometric hot resistance (8) is placed in sleeve pipe (7), tin hat (9) is sleeved on the rear end of sleeve pipe (7), thermometric hot resistance (8) is connected with hotblast stove PLC template by wire.
2. device Combustion of Hot Air Furnace valve being carried out to air leak test according to claim 1, it is characterized in that: the front end of described sleeve pipe (7) with base (6) upper end for being threaded, the tube wall of sleeve pipe (7) has top wire hole (11), thermometric hot resistance (8) is fixed in sleeve pipe (7) through top wire hole (11) by jackscrew (12).
CN201520651024.3U 2015-08-27 2015-08-27 Device that leaks out and detect hot -blast furnace burning valve Expired - Fee Related CN204897954U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520651024.3U CN204897954U (en) 2015-08-27 2015-08-27 Device that leaks out and detect hot -blast furnace burning valve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520651024.3U CN204897954U (en) 2015-08-27 2015-08-27 Device that leaks out and detect hot -blast furnace burning valve

Publications (1)

Publication Number Publication Date
CN204897954U true CN204897954U (en) 2015-12-23

Family

ID=54920145

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520651024.3U Expired - Fee Related CN204897954U (en) 2015-08-27 2015-08-27 Device that leaks out and detect hot -blast furnace burning valve

Country Status (1)

Country Link
CN (1) CN204897954U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107782501A (en) * 2016-08-31 2018-03-09 广东韶钢松山股份有限公司 A kind of heat pipe-type faults of preheater diagnostic method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107782501A (en) * 2016-08-31 2018-03-09 广东韶钢松山股份有限公司 A kind of heat pipe-type faults of preheater diagnostic method

Similar Documents

Publication Publication Date Title
CN106097667A (en) Combustible gas leakage detection method, equipment and combustion gas household electrical appliances
CN104390804A (en) Performance test system and test method for explosion suppression and explosion resistance mining device
CN204269392U (en) Mining datonation-inhibition device of blast prevention Performance Test System
CN104482415B (en) A kind of family's natural gas automatic alarm system
CN204897954U (en) Device that leaks out and detect hot -blast furnace burning valve
CN103574292B (en) The online method for rapidly positioning of non-oxidation heat processing furnace radiation pipe leak source
CN110846452B (en) Device and method for searching leakage points of damaged cooling wall of blast furnace
CN202947124U (en) Combustion device applied to flammability test of roof covering material
CN109115831A (en) A kind of fire-proof sealing material fire resistance experimental rig
CN207487433U (en) A kind of online reconstruction structure for searching the furnace radiating pipe breakage of non-oxidation continuous heat
CN205782003U (en) A kind of hyperthermia tunnel Kiln natural gas line with protection device
CN205279170U (en) Safe gas -cooker of high -efficient intelligence warning
CN102062719A (en) Method for detecting air permeability of sintering mixture and sintering device
CN205091282U (en) Experimental device for survey infusibility bituminous material softening point
CN102853976B (en) Online leakage detection method and device thereof for heat treatment furnace radiant tube
CN202948021U (en) Guide seal sleeve
CN206280648U (en) A kind of pipeline heater
CN207263675U (en) A kind of sintered cup experimental provision
CN207738768U (en) A kind of blast furnace gas baking equipment of hot blast stove
CN203365010U (en) Temperature measuring device provided with leakage alarm of thermocouple of boiler
CN205207928U (en) Heat preservation pipe who contains alarming line
CN212134608U (en) Refractory furnace testing device
CN203938689U (en) The residual hydrogen burning device of high-temperature annealing furnace for a kind of test
CN205166210U (en) Large -scale pipe fitting butt welding heating device
CN106247334A (en) A kind of distributed natural gas heater

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151223

Termination date: 20190827

CF01 Termination of patent right due to non-payment of annual fee