CN204892235U - Automatic assembly line that dusts in steel floor - Google Patents

Automatic assembly line that dusts in steel floor Download PDF

Info

Publication number
CN204892235U
CN204892235U CN201520650875.6U CN201520650875U CN204892235U CN 204892235 U CN204892235 U CN 204892235U CN 201520650875 U CN201520650875 U CN 201520650875U CN 204892235 U CN204892235 U CN 204892235U
Authority
CN
China
Prior art keywords
steel floor
room
automatic powder
powder spraying
trickle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520650875.6U
Other languages
Chinese (zh)
Inventor
周喜梅
曹文明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Xiangli Anti-Static Decoration Materials Co Ltd
Original Assignee
Jiangsu Xiangli Anti-Static Decoration Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Xiangli Anti-Static Decoration Materials Co Ltd filed Critical Jiangsu Xiangli Anti-Static Decoration Materials Co Ltd
Priority to CN201520650875.6U priority Critical patent/CN204892235U/en
Application granted granted Critical
Publication of CN204892235U publication Critical patent/CN204892235U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Application Of Or Painting With Fluid Materials (AREA)

Abstract

The utility model relates to an automatic assembly line that dusts in steel floor, including preceding processing system, drying device, automatic powder spray device, solidification equipment, conveying system, conveying system runs through preceding processing system in proper order, drying device, automatic powder spray device, solidification equipment, preceding processing apparatus drenches degrease room, spray degreasing room, soaks that the trickle is washed a room, is sprayed a washing room, room, bonderizing room are transferred to the table, soak the trickle washes two rooms, sprays two rooms of washing including soaking of setting gradually. Connect by conveying system between each system, finishing line manufacturing equipment is advanced, and working strength is little.

Description

A kind of steel floor automatic powder spraying streamline
Technical field
The utility model relates to a kind of steel floor Surface-micromachining process, especially relates to a kind of steel floor automatic powder spraying streamline.
Background technology
Dusting is electrostatic spraying treatment process for steel floor surface, and some factories adopt different operation to produce, cleaning, need a dead lift, and such mode of operation to comparatively clumsy, and wastes a large amount of manpowers, affects operating efficiency.In addition, steel floor, in process of manufacture, needs to dust process to steel floor surface, needs to carry out phosphorating treatment to steel floor before process of dusting, the surface of the steel floor of conventional production lines can not phosphorating treatment completely, causes the treatment effect that dusts in later stage poor.
Utility model content
The purpose of this utility model is the defect overcoming prior art existence, provides a kind of steel floor automatic powder spraying streamline, automatically completes dust pre-treatment and baking, improve the productivity effect of steel floor.
The utility model solves the technical scheme that its technical problem adopts:
A kind of steel floor automatic powder spraying streamline, comprises preprocessing system, drying unit, automatic powder spraying device, solidification equipment, induction system; Described induction system runs through preprocessing system successively, drying unit, automatic powder spraying device, solidification equipment;
Described pretreating device comprises that degreasing room is drenched in the leaching that sets gradually, spray degreasing room, leaching trickle wash a Room, spray washing one Room, table adjust room, phosphatization room, leaching trickle to wash two Room, spray washing two Room;
Described induction system is annular suspension carrier chain, and described annular suspension carrier chain is provided with fixture; Steel floor automatic transport on science and engineering position is throughout made by annular suspension carrier chain.
Temperature in described drying unit is between 140-200 DEG C.
Temperature in described solidification equipment is between 180-220 DEG C.
First steel floor enters leaching pouring degreasing room, spray degreasing cleans in room, the grease on removing steel floor surface and foreign material; Trickle washes a Room, spray washing one cleans in Room to enter leaching again, removes the solvent of steel floor surface attachment; Enter table again and adjust room, can be adjusted by table and the surface of steel floor is adjusted, overcome surperficial epithelium coarsening phenomenon; Enter phosphatization room phosphorating treatment again; Enter leaching trickle again and wash two Room, spray washing two Room is washed; Enter drying unit drying and processing again; Enter automatic powder spraying device again and carry out process of dusting, after preprocessing system, surface of steel plate absorption powder evenly; Enter the powder of solidification equipment to steel floor surface to be again heating and curing process, steel floor surface color, thickness is more even.
A kind of steel floor automatic powder spraying technique, comprises the following steps:
1, charging, hangs on steel floor, carries out leaching drench ungrease treatment to steel floor, steel floor is immersed in temperature is between 65-80 DEG C, pH value is 5-15 minute in alkaline solution between 10-13, slightly wash away except the dust on surface, aluminium bits and grease; Spray degreasing process is carried out to steel floor, steel floor is immersed in temperature is between 65-80 DEG C, pH value is 5-15 minute in alkaline solution between 10-13;
2, carry out leaching trickle to steel floor to wash, at 65-80 DEG C, steel floor is immersed in neutral solution 5-15 second; Spray washing is carried out to steel floor, at 25-40 DEG C, with circulating water, is carried out to steel floor spray washing 60-120 second;
3, carry out table to steel floor and mediate reason, the adjustment of employing table is carried out table and is mediated reason, and described table is adjusted as mass percent concentration is 1.5-2 ‰ iron and steel degreasing agent, and the table tune processing time is 1-2 minute, and pH value is 8-10;
4, carry out phosphorating treatment to steel floor, phosphorating treatment temperature is 33-37 DEG C, and the time is 8-15 minute;
5, carry out leaching trickle to steel floor to wash, at 25-40 DEG C, steel floor is immersed in neutral solution 5-15 second; Spray washing is carried out to steel floor, at 25-40 DEG C, with circulating water, is carried out to steel floor spray washing 60-120 second;
6, steel floor is carried out to the drying and processing of 140-200 DEG C, baking time is 15-20 minute;
7, dusted process in steel floor surface;
8, steel floor is carried out between 180-220 DEG C to the baking process of 15-20 minute, the powder of steel floor surface attachment is cured.
Beneficial effect: the utility model solves the defect existed in background technology, production line automation degree of the present utility model is high, cost is low; Connected by induction system between each system; Finishing line process equipment is advanced, and working strength is little.Simultaneously carry out pre-treatment before phosphorating treatment, improve the phosphatization degree on steel floor surface, make steel floor surface color, thickness evenly.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
Fig. 1 is the structural representation of preferred embodiment of the present utility model.
Wherein: 1, preprocessing system; 2, drying unit; 3, automatic powder spraying device; 4, solidification equipment; 5, induction system; 6, degreasing room is drenched in leaching; 7, spray degreasing room; 8, soak trickle and wash a Room; 9, spray washing one Room; 10, room adjusted by table; 11, phosphatization room; 12, soak trickle and wash two Room; 13, spray washing two Room.
Detailed description of the invention
Below in conjunction with accompanying drawing, preferred embodiment of the present utility model is described in detail, to make advantage of the present utility model and feature more easily be understood by those skilled in the art, thus more explicit defining is made to protection domain of the present utility model.
As shown in Figure 1, embodiment of the present utility model comprises:
A kind of steel floor automatic powder spraying streamline, comprises preprocessing system 1, drying unit 2, automatic powder spraying device 3, solidification equipment 4, induction system 5; Described induction system 5 runs through preprocessing system 1 successively, drying unit 2, automatic powder spraying device 3, solidification equipment 4;
Described pretreating device 1 comprises that degreasing room 6 is drenched in the leaching that sets gradually, spray degreasing room 7, leaching trickle wash a Room 8, spray washing one Room 9, table adjust room 10, phosphatization room 11, leaching trickle to wash two Room 12, spray washing two Room 13;
Described induction system 5 is annular suspension carrier chain, and described annular suspension carrier chain is provided with fixture; Steel floor automatic transport on science and engineering position is throughout made by annular suspension carrier chain.
Temperature in described drying unit 2 is between 140-200 DEG C.
Temperature in described solidification equipment 4 is between 180-220 DEG C.
Embodiment 1:
A kind of steel floor automatic powder spraying technique, comprises the following steps:
1, charging, hangs on steel floor, carries out leaching drench ungrease treatment to steel floor, steel floor is immersed in temperature is between 65 DEG C, pH value is in alkaline solution between 10 5 minutes, slightly wash away except the dust on surface, aluminium bits and grease; Spray degreasing process is carried out to steel floor, steel floor is immersed in temperature is between 65 DEG C, pH value is in alkaline solution between 10 5 minutes;
2, carry out leaching trickle to steel floor to wash, at 65 DEG C, steel floor to be immersed in neutral solution 5 seconds; Spray washing is carried out to steel floor, at 25 DEG C, with circulating water, spray washing is carried out 60 seconds to steel floor;
3, carry out table to steel floor and mediate reason, the adjustment of employing table is carried out table and is mediated reason, and described table is adjusted as mass percent concentration is 1.5 ‰ iron and steel degreasing agents, and the table tune processing time is 1 minute, and pH value is 8;
4, carry out phosphorating treatment to steel floor, phosphorating treatment temperature is 33 DEG C, and the time is 8 minutes;
5, carry out leaching trickle to steel floor to wash, at 25 DEG C, steel floor to be immersed in neutral solution 5 seconds; Spray washing is carried out to steel floor, at 25 DEG C, with circulating water, spray washing is carried out 60 seconds to steel floor;
6, steel floor is carried out to the drying and processing of 140 DEG C, baking time is 15 minutes;
7, dusted process in steel floor surface;
8, steel floor is carried out between 180 DEG C to the baking process of 15 minutes, the powder of steel floor surface attachment is cured.
Embodiment 2:
A kind of steel floor automatic powder spraying technique, comprises the following steps:
1, charging, hangs on steel floor, carries out leaching drench ungrease treatment to steel floor, steel floor is immersed in temperature is between 80 DEG C, pH value is in alkaline solution between 13 15 minutes, slightly wash away except the dust on surface, aluminium bits and grease; Spray degreasing process is carried out to steel floor, steel floor is immersed in temperature is between 80 DEG C, pH value is in alkaline solution between 13 15 minutes;
2, carry out leaching trickle to steel floor to wash, at 80 DEG C, steel floor to be immersed in neutral solution 15 seconds; Spray washing is carried out to steel floor, at 40 DEG C, with circulating water, spray washing is carried out 120 seconds to steel floor;
3, carry out table to steel floor and mediate reason, the adjustment of employing table is carried out table and is mediated reason, and described table is adjusted as mass percent concentration is 2 ‰ iron and steel degreasing agents, and the table tune processing time is 2 minutes, and pH value is 10;
4, carry out phosphorating treatment to steel floor, phosphorating treatment temperature is 37 DEG C, and the time is 15 minutes;
5, carry out leaching trickle to steel floor to wash, at 40 DEG C, steel floor to be immersed in neutral solution 15 seconds; Spray washing is carried out to steel floor, at 40 DEG C, with circulating water, spray washing is carried out 120 seconds to steel floor;
6, steel floor is carried out to the drying and processing of 200 DEG C, baking time is 20 minutes;
7, dusted process in steel floor surface;
8, steel floor is carried out between 220 DEG C to the baking process of 20 minutes, the powder of steel floor surface attachment is cured.
Embodiment 3:
A kind of steel floor automatic powder spraying technique, comprises the following steps:
1, charging, hangs on steel floor, carries out leaching drench ungrease treatment to steel floor, steel floor is immersed in temperature is between 70 DEG C, pH value is in alkaline solution between 11 10 minutes, slightly wash away except the dust on surface, aluminium bits and grease; Spray degreasing process is carried out to steel floor, steel floor is immersed in temperature is between 70 DEG C, pH value is in alkaline solution between 11 10 minutes;
2, carry out leaching trickle to steel floor to wash, at 70 DEG C, steel floor to be immersed in neutral solution 10 seconds; Spray washing is carried out to steel floor, at 30 DEG C, with circulating water, spray washing is carried out 80 seconds to steel floor;
3, carry out table to steel floor and mediate reason, the adjustment of employing table is carried out table and is mediated reason, and described table is adjusted as mass percent concentration is 1.8 ‰ iron and steel degreasing agents, and the table tune processing time is 1.5 minutes, and pH value is 9;
4, carry out phosphorating treatment to steel floor, phosphorating treatment temperature is 35 DEG C, and the time is 10 minutes;
5, carry out leaching trickle to steel floor to wash, at 30 DEG C, steel floor to be immersed in neutral solution 10 seconds; Spray washing is carried out to steel floor, at 30 DEG C, with circulating water, spray washing is carried out 100 seconds to steel floor;
6, steel floor is carried out to the drying and processing of 160 DEG C, baking time is 18 minutes;
7, dusted process in steel floor surface;
8, steel floor is carried out between 200 DEG C to the baking process of 18 minutes, the powder of steel floor surface attachment is cured.
Should be appreciated that specific embodiment described above only for explaining the utility model, and be not used in restriction the utility model.Still be among protection domain of the present utility model by spirit institute's apparent change of extending out of the present utility model or change.

Claims (4)

1. a steel floor automatic powder spraying streamline, is characterized in that: comprise preprocessing system, drying unit, automatic powder spraying device, solidification equipment, induction system; Described induction system runs through preprocessing system successively, drying unit, automatic powder spraying device, solidification equipment; Described pretreating device comprises that degreasing room is drenched in the leaching that sets gradually, spray degreasing room, leaching trickle wash a Room, spray washing one Room, table adjust room, phosphatization room, leaching trickle to wash two Room, spray washing two Room.
2. a kind of steel floor automatic powder spraying streamline according to claim 1, is characterized in that: described induction system is annular suspension carrier chain, described annular suspension carrier chain is provided with fixture.
3. a kind of steel floor automatic powder spraying streamline according to claim 1, is characterized in that: the temperature in described drying unit is between 140-200 DEG C.
4. a kind of steel floor automatic powder spraying streamline according to claim 1, is characterized in that: the temperature in described solidification equipment is between 180-220 DEG C.
CN201520650875.6U 2015-08-26 2015-08-26 Automatic assembly line that dusts in steel floor Expired - Fee Related CN204892235U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520650875.6U CN204892235U (en) 2015-08-26 2015-08-26 Automatic assembly line that dusts in steel floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520650875.6U CN204892235U (en) 2015-08-26 2015-08-26 Automatic assembly line that dusts in steel floor

Publications (1)

Publication Number Publication Date
CN204892235U true CN204892235U (en) 2015-12-23

Family

ID=54914449

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520650875.6U Expired - Fee Related CN204892235U (en) 2015-08-26 2015-08-26 Automatic assembly line that dusts in steel floor

Country Status (1)

Country Link
CN (1) CN204892235U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105013655A (en) * 2015-08-26 2015-11-04 江苏向利防静电装饰材料股份有限公司 Automatic powder spraying assembly line and technology for steel floors
CN105457820A (en) * 2016-01-14 2016-04-06 东莞丰卓机电设备有限公司 Intelligent production line with segmental speed change and flexible butt-joint spraying

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105013655A (en) * 2015-08-26 2015-11-04 江苏向利防静电装饰材料股份有限公司 Automatic powder spraying assembly line and technology for steel floors
CN105457820A (en) * 2016-01-14 2016-04-06 东莞丰卓机电设备有限公司 Intelligent production line with segmental speed change and flexible butt-joint spraying

Similar Documents

Publication Publication Date Title
CN201799369U (en) Surface joint pre-treatment spray cleaning device
CN201930885U (en) Production system for seamless connection of coating production line and coating piece cleaning production line
CN203778247U (en) Automatic spraying production line integrating pretreatment and spraying
CN105729065A (en) Surface treatment process for flywheel production
CN202951598U (en) Coating assembly line for intelligent metal parts of computer
CN105149193A (en) Metal surface coating pretreatment process
CN105964510A (en) Varnish-baking surface coating technology
CN204892235U (en) Automatic assembly line that dusts in steel floor
CN104289401A (en) Dacromet treatment technological process
CN205436171U (en) A paint finishing for stove covering
CN104028430A (en) Clean metal powder spraying process
CN107779935B (en) A kind of metalwork electrophoresis painting method and apparatus
CN105032746A (en) Rust-preventing baking varnish treatment process of surfaces of clutches
CN104668165A (en) Coating pretreatment process for electric bicycles
CN105013655A (en) Automatic powder spraying assembly line and technology for steel floors
CN105274542A (en) Cleaning method of aluminum alloy wheel
CN204276217U (en) A kind of spraying line for sheet metal component product
CN104014467A (en) Metal surface modification method based on varnish baking technology
CN104357862A (en) Metal surface cleaning method
CN105624655A (en) Chemical nickel-plating process of iron workpiece
CN106000808A (en) Intermittent static spraying method and system
CN106694345A (en) Metal piece paint spraying process
CN112481570A (en) Novel galvanizing process flow and assembly line used by same
CN105964507B (en) A kind of high-speed rail EMU vibration damping helical spring surface-treatment line and technique
CN104889038A (en) Co-curing double-spraying production method and device thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151223