CN204891130U - Three just stakes - Google Patents
Three just stakes Download PDFInfo
- Publication number
- CN204891130U CN204891130U CN201520563447.XU CN201520563447U CN204891130U CN 204891130 U CN204891130 U CN 204891130U CN 201520563447 U CN201520563447 U CN 201520563447U CN 204891130 U CN204891130 U CN 204891130U
- Authority
- CN
- China
- Prior art keywords
- pile body
- stakes
- chain
- sand hill
- footing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
The utility model provides a three just stakes, including the base, there is at least three pile body on the base immediately, it has first sand hill to suspend in midair in the space that the pile body centers on, it has the second sand hill to suspend in midair in the upper portion outside of at least one pile body, lower part in at least one pile body is provided with down the pile body, the pile body includes the footing down, in being connected with chain / connecting pipe between two pile bodies. Can know from above -mentioned description, be different from the single defect of traditional wushu stake structural function, the utility model has the advantages of a wushu stake that one comprises a plurality of pile bodies, and is equipped with a plurality of sand hills, chain / connecting pipe and lower pile body is provided to make to strike the exercise from the single -point, expand to a region on a small quantity, it is also more abundant that the position is beaten to hitting of can practising in the region, fine has satisfied the demand that the health coordination ability was taken exercise.
Description
Technical field
The utility model relates to a kind of wushu equipment, refers in particular to a kind of three just stakes.
Background technology
Wushu stake (most typical is exactly person stub pile prepared from wood, and modern age also produces iron man's stake) is the apparatus of training Chinese boxing, gimmick, bodily movement of practising Wushu.Method of attacking gimmick in wushu, footwork, leg position can merge by it, and then are combined into the people that does weapon practice together and provide and do simulated exercises, and by the stake of exercise wushu, all gimmick footworks of hand position can be integrated in free-fighting.
But existing wushu stake product function is single, usually all only simulate a humanoid hand, the spud leg of arranging for exercise.Due to this type of humanoid wushu stake simple structure, therefore hit exercise position also by larger limitation, the demand to coordination of body exercising ability cannot be met.
Utility model content
Technical problem to be solved in the utility model is: provide a kind of multi-functional, wide three just stakes hitting exercise position.
In order to solve the problems of the technologies described above, the technical solution adopted in the utility model is: just a kind of three stakes, comprise base, and vertical on base have at least three pile bodies, in pile body around space in suspend in midair and have the first sand hill; Upper outside suspention at least one pile body has the second sand hill; The bottom of at least one pile body is provided with lower pile body, and lower pile body comprises footing; Chain/tube connector is connected with between two pile bodies.
Lower pile body also comprises revolving part, and the footing of lower pile body is connected with pile body by revolving part.
Described revolving part is bearing; Bearing and pile body socket-connect.
Described footing comprises three, three 120 degree, footing horizontal interval settings.
Described chain/tube connector comprises spaced at least two, and described chain/tube connector is connected to two pile body tops.
Also comprise brace, described brace connects each pile body upper end; Described first sand hill is suspended on brace.
The upper outside of at least one pile body described is connected with extension rod, and extension rod connects described second sand hill by chain/tube connector.
Also comprise protection integument; Described protection integument is wrapped in the one or more outer surface in pile body, chain/tube connector, footing.
Described first sand hill is bar shaped, described second sand hill globulate.
From foregoing description, be different from the defect of traditional martial art pilework function singleness, the beneficial effects of the utility model are: provide one and be made up of multiple pile body, and be provided with the wushu stake of multiple sand hill, chain/tube connector and lower pile body, thus make strike exercise expand to a region from single-point, a small amount of point, the impact position can practised in region also more horn of plenty, well meets the demand of coordination of body ability education.
Accompanying drawing explanation
Below in conjunction with accompanying drawing in detail concrete structure of the present utility model is described in detail
Fig. 1 is overall structure schematic diagram of the present utility model;
Fig. 2 is understructure schematic diagram of the present utility model;
Fig. 3 is brace structural representation of the present utility model.
1-base; 2-first pile body; 3-second pile body; 4-prism of third order body; 5-brace; 6-extension rod; 7,9,11-chain/tube connector; 8-first sand hill; 10-second sand hill; 12-revolving part; 13-footing; 14-connecting portion.
Detailed description of the invention
By describing technology contents of the present utility model, structural feature in detail, realized object and effect, accompanying drawing is coordinated to be explained in detail below in conjunction with embodiment.
A kind of three just stakes, comprise base, and vertical on base have at least three pile bodies, in pile body around space in suspention have the first sand hill; Upper outside suspention at least one pile body has the second sand hill; The bottom of at least one pile body is provided with lower pile body, and lower pile body comprises footing; Chain/tube connector is connected with between two pile bodies.
See the specific embodiment that Fig. 1-3 is the stake of this patent three, in the present embodiment, base 1 is provided with three connecting portions 14, each connecting portion 14 connects a pile body, namely vertical on base 1 have the first pile body 2, second pile body 2, prism of third order body 3 three pile bodies, three pile bodies, around an orange triangle space, are hung with the first sand hill 10 in changing in space by chain/tube connector 9.The second sand hill 8 is then hung with in the upper outside of the second pile body 3.Between the first sand hill 8 and the second sand hill 10, be connected with chain/tube connector 11, be then provided with the footing 13 of lower pile body in the bottom of prism of third order body 4.
From foregoing description, be different from the defect of traditional martial art pilework function singleness, the beneficial effects of the utility model are: provide one and be made up of multiple pile body, and be provided with the wushu stake of multiple sand hill, chain/tube connector and lower pile body, thus make strike exercise expand to a region from single-point, a small amount of point, the impact position can practised in region also more horn of plenty, well meets the demand of coordination of body ability education.
Lower pile body also comprises revolving part 12, and the footing 13 of lower pile body is connected with pile body by revolving part 12.
Described revolving part 12 is bearing; Bearing and pile body socket-connect.
Described footing 13 comprises three, three 120 degree, footing 13 horizontal interval settings.
Described chain/tube connector 11 comprises spaced at least two, and described chain/tube connector 11 is connected to the top of two pile bodies.As in above-described embodiment, chain/tube connector 11 is connected to the top of the first pile body 2 and the second pile body 3.Chain/tube connector 11 can for the impact of tempering above-below direction in four training herein.
Three ability stakes also comprise brace 5, and described brace 5 connects each pile body upper end; Described first sand hill 8 is suspended on brace 5.Brace 5 is that multiple pile body top provides a connection, thus guarantees its steadiness installed and take into account conveniently to arrange the first sand hill 8.
The upper outside of at least one pile body described is connected with extension rod 6, and extension rod 6 connects described second sand hill 8 by chain/tube connector 7.
Three ability stakes also comprise protection integument; Described protection integument is wrapped in the one or more outer surface in pile body (the first pile body 2, second pile body 3, prism of third order body 4), chain/tube connector (being mainly connected to the chain/tube connector 11 between two pile bodies), footing 13.Protection integument can be exercise people and provides strike to be labeled as and provide further protection, and protection end user is not by unexpected injury.
Described first sand hill 10 is bar shaped, described second sand hill 8 globulate.The second spherical sand hill 8 can conveniently be boxed contact, the exercise of the first sand hill 10 of bar shaped then applicable boxing or savate.
The foregoing is only embodiment of the present utility model; not thereby the scope of the claims of the present utility model is limited; every utilize the utility model description and accompanying drawing content to do equivalent structure or equivalent flow process conversion; or be directly or indirectly used in other relevant technical fields, be all in like manner included in scope of patent protection of the present utility model.
Claims (9)
1. three just stakes, is characterized in that: comprise base, and vertical on base have at least three pile bodies, in pile body around space in suspention have the first sand hill; Upper outside suspention at least one pile body has the second sand hill; The bottom of at least one pile body is provided with lower pile body, and lower pile body comprises footing; Chain/tube connector is connected with between two pile bodies.
2. as claimed in claim 1 three just stakes, it is characterized in that: lower pile body also comprises revolving part, the footing of lower pile body is connected with pile body by revolving part.
3. as claimed in claim 2 three just stakes, is characterized in that: described revolving part is bearing; Bearing and pile body socket-connect.
4. as claimed in claim 2 or claim 3 three just stakes, is characterized in that: described footing comprises three, three 120 degree, footing horizontal interval settings.
5. as claimed in claim 1 three just stakes, it is characterized in that: described chain/tube connector comprises spaced at least two, described chain/tube connector is connected to two pile body tops.
6. as claimed in claim 1 three just stakes, it is characterized in that: also comprise brace, described brace connects each pile body upper end; Described first sand hill is suspended on brace.
7. as claimed in claim 1 three just stakes, is characterized in that: the upper outside of at least one pile body described is connected with extension rod, and extension rod connects described second sand hill by chain/tube connector.
8. as claimed in claim 1 three just stakes, is characterized in that: also comprise protection integument; Described protection integument is wrapped in the one or more outer surface in pile body, chain/tube connector, footing.
9. as claimed in claim 1 three just stakes, is characterized in that: described first sand hill is bar shaped, described second sand hill globulate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520563447.XU CN204891130U (en) | 2015-07-30 | 2015-07-30 | Three just stakes |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520563447.XU CN204891130U (en) | 2015-07-30 | 2015-07-30 | Three just stakes |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204891130U true CN204891130U (en) | 2015-12-23 |
Family
ID=54913347
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520563447.XU Expired - Fee Related CN204891130U (en) | 2015-07-30 | 2015-07-30 | Three just stakes |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204891130U (en) |
-
2015
- 2015-07-30 CN CN201520563447.XU patent/CN204891130U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106621265A (en) | Freestyle swimming land training device and swimming training system | |
CN208448584U (en) | A kind of multi-functional wushu training equipment | |
CN201519444U (en) | Badminton swing exercising machine | |
CN204891130U (en) | Three just stakes | |
CN204972970U (en) | Tennis training machine | |
CN203425439U (en) | Physical teaching used parallel bars | |
CN207545776U (en) | A kind of combined type wushu training employment stake | |
CN204034214U (en) | A kind of basketball shot training device | |
CN205127346U (en) | Football vibrating top ball exerciser | |
CN104225887B (en) | A kind of two-dimentional coordinated type basketball stands | |
CN204864841U (en) | Stake of circling round | |
CN203436792U (en) | Multifunctional badminton training device | |
CN208694212U (en) | A kind of tennis racket swinging movement locus training auxiliary device | |
CN201840848U (en) | Basketball exerciser | |
CN207266761U (en) | A kind of table tennis table | |
CN102188791B (en) | Waist-wriggling legs-swinging device | |
CN204637502U (en) | There is the football training device of collapsible adjusting device | |
CN206391491U (en) | A kind of football rebounding goal | |
CN205964930U (en) | Height -adjustable's table tennis exercise equipment | |
CN206642270U (en) | The physical training device that a kind of physical education uses | |
CN205683527U (en) | A kind of table tennis training apparatus | |
CN204563529U (en) | There is the football training device of collapsible adjusting device | |
CN205460851U (en) | Martial arts training device | |
CN203389303U (en) | Training basketball stand | |
CN204637414U (en) | A kind of chin-up booster and chin-up trainer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151223 Termination date: 20190730 |