CN204886030U - Bury to severe cold area cable quick -operation joint construction equipment - Google Patents

Bury to severe cold area cable quick -operation joint construction equipment Download PDF

Info

Publication number
CN204886030U
CN204886030U CN201520517170.7U CN201520517170U CN204886030U CN 204886030 U CN204886030 U CN 204886030U CN 201520517170 U CN201520517170 U CN 201520517170U CN 204886030 U CN204886030 U CN 204886030U
Authority
CN
China
Prior art keywords
chi body
depression bar
cable
bury
snap ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520517170.7U
Other languages
Chinese (zh)
Inventor
韩友喜
巴清华
黄立新
徐猛
傅求华
张兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Construction Group Co Ltd
Original Assignee
Ceec Anhui Electric Power Construction First Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ceec Anhui Electric Power Construction First Engineering Co Ltd filed Critical Ceec Anhui Electric Power Construction First Engineering Co Ltd
Priority to CN201520517170.7U priority Critical patent/CN204886030U/en
Application granted granted Critical
Publication of CN204886030U publication Critical patent/CN204886030U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a bury to severe cold area cable quick -operation joint construction equipment has: the chi body (1), wherein, the chi body (1) one side is equipped with scale (11), the setting is at the snap ring of cable lower extreme, one end is fixed at the chi body (1) lower extreme, outside depression bar (2) of extending of the other end, wherein, depression bar (2) lower extreme is equipped with buckle (21) with snap ring looks adaptation, and the tip can be fixed on the cable, and it is accurate to measure buried depth, can conveniently dismantle after the measurement contact.

Description

A kind of ice box underground cable snap joint constructing device
Technical field
The utility model belongs to wind power foundation Facilities Construction technical field, particularly relates to a kind of ice box underground cable snap joint constructing device.
Background technology
Wind energy resources is clean regenerative resource, and wind power generation is one of generation mode of the most ripe, the on the largest scale exploit condition of technology and Commercial Prospect in new energy field.
Realizing in process of the present utility model, inventor finds that prior art at least exists following problem: prior art does not have the embedded depth of suitable equipment Measurement accuracy cable, and use conventional tape measure to fix, measurement result is inaccurate.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of one end and can be fixed on cable, measures embedded depth accurate, ice box underground cable snap joint constructing device that can be for convenience detach after measuring contact.
In order to solve the problems of the technologies described above, the technical scheme that the utility model adopts is: a kind of ice box underground cable snap joint constructing device, has:
Chi body; Wherein, described chi body side is provided with scale;
Be arranged on the snap ring of cable lower end;
One end is fixed on chi body lower end, the outward extending depression bar of the other end; Wherein, described depression bar lower end is provided with the buckle suitable with described snap ring.
The groove can receiving described depression bar is provided with in the middle part of described chi body.
The length of described depression bar is greater than the length of chi body.
A technical scheme tool in technique scheme has the following advantages or beneficial effect, and when measuring beginning, the buckle on depression bar buckles in the snap ring of cable, ensure fixing, read scale dimensional measurement cable embedded depth, because chi body is fixed on cable lower end, measurement result is accurate.After measurement terminates, be pressed into by depression bar in the groove of chi body, the buckle on depression bar also shrinks in groove, thus buckle is departed from from snap ring, conveniently takes out measurement mechanism.
Accompanying drawing explanation
The structural representation of ice box underground cable snap joint constructing device of Fig. 1 for providing in the utility model embodiment;
Mark in above-mentioned figure is: 1, chi body, and 11, scale, 2, depression bar, 21, buckle.
Embodiment
For making the purpose of this utility model, technical scheme and advantage clearly, below in conjunction with accompanying drawing, the utility model execution mode is described in further detail.
See Fig. 1, a kind of ice box underground cable snap joint constructing device, has:
Chi body 1; Wherein, chi body 1 side is provided with scale 11;
Be arranged on the snap ring of cable lower end;
One end is fixed on chi body 1 lower end, the outward extending depression bar 2 of the other end; Wherein, depression bar 2 lower end is provided with the buckle 21 suitable with snap ring.
The groove can receiving depression bar 2 is provided with in the middle part of chi body 1.
The length of depression bar 2 is greater than the length of chi body 1, and handled easily depression bar 2 is taken in chi body.
After adopting above-mentioned structure, when measuring beginning, the buckle 21 on depression bar 2 buckles in the snap ring of cable, ensures fixing, and read scale 11 dimensional measurement cable embedded depth, because chi body 1 is fixed on cable lower end, measurement result is accurate.After measurement terminates, be pressed into by depression bar 2 in the groove of chi body 1, the buckle 21 on depression bar 2 also shrinks in groove, thus buckle 21 is departed from from snap ring, conveniently takes out measurement mechanism.
By reference to the accompanying drawings the utility model is exemplarily described above; obvious the utility model specific implementation is not subject to the restrictions described above; as long as have employed the improvement of the various unsubstantialities that method of the present utility model is conceived and technical scheme is carried out; or design of the present utility model and technical scheme directly applied to other occasion, all within protection range of the present utility model without to improve.

Claims (3)

1. an ice box underground cable snap joint constructing device, is characterized in that having:
Chi body (1); Wherein, described chi body (1) side is provided with scale (11);
Be arranged on the snap ring of cable lower end;
One end is fixed on chi body (1) lower end, the outward extending depression bar of the other end (2); Wherein, described depression bar (2) lower end is provided with the buckle (21) suitable with described snap ring.
2. ice box underground cable snap joint constructing device as claimed in claim 1, is characterized in that, described chi body (1) middle part is provided with the groove can receiving described depression bar (2).
3. ice box underground cable snap joint constructing device as claimed in claim 2, it is characterized in that, the length of described depression bar (2) is greater than the length of chi body (1).
CN201520517170.7U 2015-07-15 2015-07-15 Bury to severe cold area cable quick -operation joint construction equipment Active CN204886030U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520517170.7U CN204886030U (en) 2015-07-15 2015-07-15 Bury to severe cold area cable quick -operation joint construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520517170.7U CN204886030U (en) 2015-07-15 2015-07-15 Bury to severe cold area cable quick -operation joint construction equipment

Publications (1)

Publication Number Publication Date
CN204886030U true CN204886030U (en) 2015-12-16

Family

ID=54830362

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520517170.7U Active CN204886030U (en) 2015-07-15 2015-07-15 Bury to severe cold area cable quick -operation joint construction equipment

Country Status (1)

Country Link
CN (1) CN204886030U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104979780A (en) * 2015-07-15 2015-10-14 中国能源建设集团安徽电力建设第一工程有限公司 Severe cold area buried cable quick joint construction device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104979780A (en) * 2015-07-15 2015-10-14 中国能源建设集团安徽电力建设第一工程有限公司 Severe cold area buried cable quick joint construction device

Similar Documents

Publication Publication Date Title
CN204886030U (en) Bury to severe cold area cable quick -operation joint construction equipment
CN202329686U (en) Environment detection device
CN203349955U (en) Corrosion resisting object internal thermometer
CN104979780A (en) Severe cold area buried cable quick joint construction device
CN201382761Y (en) Convenient-used tape measure
CN204944498U (en) The multiplex dip stick of engineering management
CN204631276U (en) Environment-friendly type weather environment monitor
CN202903188U (en) Remote navigation channel detecting system
CN202928729U (en) Novel soil pressure gauge
CN203349954U (en) Object internal thermometer with alarm device
CN202994139U (en) Box staff
CN201540083U (en) Depth calipers with double claws
CN203349950U (en) Multi-direction object internal thermometer
CN204346445U (en) GPS-RTK centering rod Level Change suggestion device
CN203025187U (en) Concrete shrinking percentage detection device
CN204177977U (en) A kind of GPS positioning system for earth mat current by pass proving installation
CN202697956U (en) Key ring convenient for picking and placing key
CN203956864U (en) A kind of nail positioner for irregular metope
CN203445879U (en) Infrared optical fiber fault finding tester
CN203758630U (en) Internal temperature change measuring device for tunnel
CN202630858U (en) Sliding scale of middle peeling machine
CN202202277U (en) Guide post
CN201660818U (en) Protective device for CPIII surveying mark embedded part
CN203349963U (en) Object internal thermometer with indicating lamp
CN202723900U (en) Light source drag hook for enterocoelia

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 230000 no.218, Xiangzhang Avenue, hi tech Development Zone, Hefei City, Anhui Province

Patentee after: China Energy Construction Group Co.,Ltd.

Address before: 230000 no.218, Xiangzhang Avenue, hi tech Development Zone, Hefei City, Anhui Province

Patentee before: China Energy Engineering Group Anhui No.1 Electric Power Construction Co.,Ltd.