CN204880494U - Hydroelectric power plant's heat sink in summer - Google Patents

Hydroelectric power plant's heat sink in summer Download PDF

Info

Publication number
CN204880494U
CN204880494U CN201520649453.7U CN201520649453U CN204880494U CN 204880494 U CN204880494 U CN 204880494U CN 201520649453 U CN201520649453 U CN 201520649453U CN 204880494 U CN204880494 U CN 204880494U
Authority
CN
China
Prior art keywords
outlet
pipeline
water
pipe
cooling device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520649453.7U
Other languages
Chinese (zh)
Inventor
姚春风
姚茹玲
吾斯曼江
雍百炼
柴雪莉
刘建刚
韩珂
杨志斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiang Nan Electric Co Of Guo Wang Xinjiang Power Co
State Grid Corp of China SGCC
Original Assignee
Jiang Nan Electric Co Of Guo Wang Xinjiang Power Co
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiang Nan Electric Co Of Guo Wang Xinjiang Power Co, State Grid Corp of China SGCC filed Critical Jiang Nan Electric Co Of Guo Wang Xinjiang Power Co
Priority to CN201520649453.7U priority Critical patent/CN204880494U/en
Application granted granted Critical
Publication of CN204880494U publication Critical patent/CN204880494U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Motor Or Generator Cooling System (AREA)

Abstract

<b>本实用新型涉及水电厂降温装置技术领域,是一种水电厂夏季降温装置,其包括水泵、水塔、主管道和冷风机;水泵通过管路与水塔相连通,水塔通过管路与主管道相连通,主管道上设有至少一个第一出口,每个第一出口对应连有一个冷风机;冷风机包括箱体、翅片式散热管、进水管、出水管和电机,箱体为前后面均有开口的四面箱体,翅片式散热管呈弯折状并固定在箱体内。本实用新型结构合理而紧凑,使用方便,其将水电厂机组冷却水引至冷风机,通过弯折状翅片式散热管、电机和风扇叶片配合有效进行管内降温用水和厂房高温气体的热交换,达到厂房内降温的目的,具有结构简单,</b><b>改造成本低,</b><b>维护次数</b><b>少,合理充分利用水电厂现有资源的优点</b><b>。</b>

<b>The utility model relates to the technical field of cooling devices for hydropower plants. It is a summer cooling device for hydropower plants. It includes water pumps, water towers, main pipes and air coolers; The pipes are connected, and the main pipe is provided with at least one first outlet, and each first outlet is correspondingly connected with a cooling fan; There are four-sided boxes with openings on the back, and the finned heat dissipation pipes are bent and fixed in the box. The utility model has a reasonable and compact structure and is easy to use. It guides the cooling water of the hydropower plant unit to the air cooler, and effectively performs heat exchange between the cooling water in the tube and the high-temperature gas in the plant through the cooperation of the bent finned heat dissipation tube, the motor and the fan blades. To achieve the purpose of cooling in the plant, it has the advantages of simple structure, </b><b>low transformation cost, </b><b>less maintenance times</b><b>, reasonable and full use of the existing resources of the hydropower plant </b><b>. </b>

Description

水电厂夏季降温装置Cooling device for hydropower plant in summer

技术领域 technical field

本实用新型涉及水电厂降温装置技术领域,是一种水电厂夏季降温装置。The utility model relates to the technical field of a cooling device for a hydropower plant, in particular to a cooling device for a hydropower plant in summer.

背景技术 Background technique

水电厂为充分利用水头,一般将水电厂厂房建在地势较四周低的地方。在炎热的夏季,厂房空气不流通,再加上设备散发的热量,造成厂房温度较高(室外温度37摄氏度,室内温度35.2摄氏度),值班人员长时间在高温的厂房内值班、巡视,易引起烦躁、身体不适,不能专心工作。为了保证工作人员的身体健康,需做降温处理。如在厂房内安装一台3匹空调,由于厂房空间较大,门窗密封效果不好,降温效果不明显,而且空调价格昂贵,维护成本高。In order to make full use of the water head in hydropower plants, the hydropower plants are generally built on lower ground than the surrounding areas. In the hot summer, the air in the factory building is not circulated, coupled with the heat emitted by the equipment, the temperature of the factory building is high (outdoor temperature 37 degrees Celsius, indoor temperature 35.2 degrees Celsius), and the on-duty personnel are on duty and patrolling in the high-temperature factory building for a long time, which is easy to cause Irritability, physical discomfort, and inability to concentrate on work. In order to ensure the health of the staff, cooling treatment is required. If a 3-horsepower air conditioner is installed in the factory building, due to the large space of the factory building, the sealing effect of the doors and windows is not good, the cooling effect is not obvious, and the air conditioner is expensive and the maintenance cost is high.

发明内容 Contents of the invention

本实用新型提供了一种水电厂夏季降温装置,克服了上述现有技术之不足,其能有效解决降温效果不明显,设施价格昂贵,维护成本高的问题。The utility model provides a summer cooling device for a hydropower plant, which overcomes the above-mentioned deficiencies in the prior art, and can effectively solve the problems of insignificant cooling effect, expensive facilities and high maintenance costs.

本实用新型的技术方案是通过以下措施来实现的:一种水电厂夏季降温装置,包括水泵、水塔、主管道和冷风机;水泵通过管路与水塔相连通,水塔通过管路与主管道相连通,主管道上设有至少一个第一出口,每个第一出口对应连有一个冷风机;冷风机包括箱体、翅片式散热管、进水管、出水管和电机,箱体为前后面均有开口的四面箱体,翅片式散热管呈弯折状并固定在箱体内,翅片式散热管两端分别与进水管和出水管相连通,位于翅片式散热管的正后方的电机上安装有能随电机输出轴旋转并使空气从箱体后方流向前方的风扇叶片,所述进水管通过管路与对应的第一出口相连通。The technical scheme of the utility model is realized through the following measures: a summer cooling device for a hydropower plant, including a water pump, a water tower, a main pipeline and a cooling fan; the water pump is connected to the water tower through a pipeline, and the water tower is connected to the main pipeline through a pipeline There is at least one first outlet on the main pipeline, and each first outlet is connected to a cooling fan; There is a four-sided box with openings, and the finned heat dissipation pipe is bent and fixed in the box. The two ends of the finned heat dissipation pipe are respectively connected with the water inlet pipe and the water outlet pipe. Fan blades that can rotate with the output shaft of the motor and allow air to flow from the rear of the box to the front are installed on the top, and the water inlet pipe communicates with the corresponding first outlet through a pipeline.

下面是对上述实用新型技术方案的进一步优化或/和改进:Below is the further optimization or/and improvement to above-mentioned utility model technical scheme:

上述弯折状的翅片式散热管的轴线所在平面可与箱体的开口面平行。The plane where the axes of the above-mentioned bent finned heat dissipation pipes are located may be parallel to the opening surface of the box body.

上述箱体左右侧壁的前端可沿纵向安装有可开合的百叶窗。The front ends of the left and right side walls of the above-mentioned box body can be longitudinally equipped with shutters that can be opened and closed.

上述箱体下端可固定有至少三个不共线的支腿。The lower end of the box body may be fixed with at least three non-collinear legs.

上述主管道上可设有备用进口,备用进口通过管路连通有压力管。The above-mentioned main pipeline may be provided with a backup inlet, and the backup inlet is connected with a pressure pipe through the pipeline.

上述主管道上可设有至少一个第二出口,第二出口通过管路连接有对应的机组冷却装置。The main pipeline may be provided with at least one second outlet, and the second outlet is connected to a corresponding unit cooling device through a pipeline.

上述出水管可通过管路连通有绿化装置。The above-mentioned outlet pipe can be connected with a greening device through a pipeline.

上述水泵与水塔间、水塔与主管道间、第一出口与冷风机间的管路上均可设有开关阀门。On-off valves can be arranged on the pipelines between the water pump and the water tower, between the water tower and the main pipeline, and between the first outlet and the cooling fan.

本实用新型结构合理而紧凑,使用方便,其将水电厂机组冷却水引至冷风机,通过弯折状翅片式散热管、电机和风扇叶片配合有效进行管内降温用水和厂房高温气体的热交换,达到厂房内降温的目的,具有结构简单,改造成本低,维护次数少,合理充分利用水电厂现有资源的优点。The utility model has a reasonable and compact structure and is easy to use. It guides the cooling water of the hydropower plant unit to the air cooler, and effectively performs heat exchange between the cooling water in the tube and the high-temperature gas in the plant through the cooperation of the bent finned heat dissipation tube, the motor and the fan blades. To achieve the purpose of cooling the plant, it has the advantages of simple structure, low transformation cost, less maintenance times, and reasonable and full use of the existing resources of the hydropower plant.

附图说明 Description of drawings

附图1为本实用新型最佳实施例的流程示意图。Accompanying drawing 1 is the schematic flow chart of the preferred embodiment of the utility model.

附图2为本实用新型中冷风机的主视结构示意图。Accompanying drawing 2 is the front structural diagram of the intercooler fan of the utility model.

附图3为附图2中冷风机的右侧视结构示意图。Accompanying drawing 3 is the right view structural diagram of the air cooler in accompanying drawing 2.

附图中的编码分别为:1为水泵,2为水塔,3为主管道,4为第一出口,5为箱体,6为翅片式散热管,7为进水管,8为出水管,9为电机,10为风扇叶片,11为百叶窗,12为支腿,13为压力管,14为第二出口,15为机组冷却装置,16为绿化装置,17为开关阀门,18为备用进口,19为深井。The codes in the drawings are: 1 is the water pump, 2 is the water tower, 3 is the main pipeline, 4 is the first outlet, 5 is the box, 6 is the finned heat pipe, 7 is the water inlet pipe, 8 is the water outlet pipe, 9 is a motor, 10 is a fan blade, 11 is a louver, 12 is a leg, 13 is a pressure pipe, 14 is a second outlet, 15 is a unit cooling device, 16 is a greening device, 17 is a switch valve, 18 is a spare inlet, 19 is a deep well.

具体实施方式 Detailed ways

本实用新型不受下述实施例的限制,可根据本实用新型的技术方案与实际情况来确定具体的实施方式。The utility model is not limited by the following examples, and the specific implementation manner can be determined according to the technical scheme of the utility model and actual conditions.

在本实用新型中,为了便于描述,各部件的相对位置关系的描述均是根据说明书附图2的布图方式来进行描述的,如:上、下、左、右等的位置关系是依据说明书附图的布图方向来确定的。In this utility model, for the convenience of description, the description of the relative positional relationship of each component is described according to the layout method of the accompanying drawing 2 of the specification, such as: the positional relationship of upper, lower, left, right, etc. is based on the specification It is determined by the layout direction of the attached drawing.

下面结合实施例及附图对本实用新型作进一步描述:Below in conjunction with embodiment and accompanying drawing, the utility model is further described:

如附图1、2、3所示,该水电厂夏季降温装置包括水泵1、水塔2、主管道3和冷风机;水泵1通过管路与水塔2相连通,水塔2通过管路与主管道3相连通,主管道3上分布有至少一个第一出口4,每个第一出口4对应连有一个冷风机;冷风机包括箱体5、翅片式散热管6、进水管7、出水管8和电机9,箱体5为前后面均有开口的四面箱体5,翅片式散热管6呈弯折状并固定在箱体5内,翅片式散热管6两端分别与进水管7和出水管8相连通,位于翅片式散热管6的正后方的电机9上安装有能随电机9输出轴旋转并使空气从箱体5后方流向前方的风扇叶片10,所述进水管7通过管路与对应的第一出口4相连通。水泵1可从深井19抽取降温用水(也可用河水代替);冷风机数量可根据厂房实际情况及降温效果确定;翅片式散热管6为现有公知公用技术,是气体与液体热交换器中使用最为广泛的一种换热设备,通过在普通的基管上加装翅片来达到强化传热的目的;翅片式散热管6也可通过钢管外缠绕导热性优良的金属板代替;电机9配合风扇叶片10能将冷风送出,加速翅片式散热管6内降温用水与厂房内高温气体的热交换;电机9和风扇叶片10也可用现有公知的鼓风机代替。As shown in accompanying drawings 1, 2, and 3, the summer cooling device of the hydropower plant includes a water pump 1, a water tower 2, a main pipeline 3 and a cooling fan; the water pump 1 communicates with the water tower 2 through a pipeline, and the water tower 2 communicates with the main pipeline through a pipeline. 3 connected, at least one first outlet 4 is distributed on the main pipe 3, and each first outlet 4 is correspondingly connected with a cooling fan; 8 and the motor 9, the box body 5 is a four-sided box body 5 with openings on the front and back sides, the finned heat dissipation pipe 6 is bent and fixed in the box body 5, and the two ends of the finned heat dissipation pipe 6 are respectively connected to the water inlet pipe 7 communicates with the water outlet pipe 8, and the motor 9 positioned directly behind the finned cooling pipe 6 is equipped with a fan blade 10 that can rotate with the output shaft of the motor 9 and make the air flow from the rear of the casing 5 to the front. 7 communicates with the corresponding first outlet 4 through pipelines. The water pump 1 can extract cooling water from the deep well 19 (it can also be replaced by river water); the number of air coolers can be determined according to the actual situation of the factory building and the cooling effect; The most widely used heat exchange equipment is to enhance the heat transfer by adding fins to the common base pipe; the finned heat dissipation pipe 6 can also be replaced by a metal plate with excellent thermal conductivity wrapped around the steel pipe; 9 cooperates fan blade 10 and cold wind can be sent out, accelerates the heat exchange of cooling water and high-temperature gas in the workshop in the finned heat pipe 6; Motor 9 and fan blade 10 also can replace with existing known air blower.

可根据实际需要,对上述水电厂夏季降温装置作进一步优化或/和改进:According to actual needs, the summer cooling devices of the above-mentioned hydropower plants can be further optimized or/and improved:

如附图2、3所示,弯折状的翅片式散热管6的轴线所在平面与箱体5的开口面平行。这样可使翅片式散热管6内降温用水与厂房内高温气体的热交换效率最大化。As shown in Figures 2 and 3 , the plane where the axis of the bent finned heat dissipation pipe 6 is located is parallel to the opening surface of the box body 5 . In this way, the heat exchange efficiency between the cooling water in the finned cooling tube 6 and the high-temperature gas in the workshop can be maximized.

如附图3所示,箱体5左右侧壁的前端沿纵向安装有可开合的百叶窗11。这样在冬季时,可通过关闭百叶窗11防止尘土进入箱体5。As shown in Figure 3, the front ends of the left and right side walls of the box body 5 are longitudinally equipped with shutters 11 that can be opened and closed. Like this when in winter, can prevent dust from entering casing 5 by closing shutter 11.

如附图2、3所示,箱体5下端固定有至少三个不共线的支腿12。As shown in Figures 2 and 3, at least three non-collinear legs 12 are fixed at the lower end of the box body 5 .

如附图1所示,主管道3上设有备用进口18,备用进口18通过管路连通有压力管13。压力管13内储有水电厂发电用水,可作为备用降温用水。As shown in FIG. 1 , the main pipeline 3 is provided with a backup inlet 18 , and the backup inlet 18 is connected with a pressure pipe 13 through the pipeline. The pressure pipe 13 stores water for power generation in a hydropower plant, which can be used as standby cooling water.

如附图1所示,主管道3上分布有至少一个第二出口14,第二出口14通过管路连接有对应的机组冷却装置15。第二出口14供机组各部轴承冷却使用,在原有主管道3上再开设第一出口4用于厂房降温,这样改造简单,节约成本。As shown in FIG. 1 , at least one second outlet 14 is distributed on the main pipeline 3 , and the second outlet 14 is connected to a corresponding unit cooling device 15 through pipelines. The second outlet 14 is used for cooling the bearings of each part of the unit, and the first outlet 4 is opened on the original main pipe 3 for cooling the factory building, so that the transformation is simple and the cost is saved.

如附图1所示,出水管8通过管路连通有绿化装置16。这样降温后的水可用于厂内绿化;降温后的水也可引回深井19中。As shown in Figure 1, the water outlet pipe 8 is connected with a greening device 16 through a pipeline. The water after cooling like this can be used for greening in the factory; The water after cooling also can lead back in the deep well 19.

如附图1所示,水泵1与水塔2间、水塔2与主管道3间、第一出口4与冷风机间的管路上均设有开关阀门17。这样便于设备的安装、维护,也便于单个冷风机的使用。As shown in accompanying drawing 1, switch valves 17 are provided on the pipelines between the water pump 1 and the water tower 2, between the water tower 2 and the main pipeline 3, and between the first outlet 4 and the cooling fan. This facilitates the installation and maintenance of the equipment, and also facilitates the use of a single cooling fan.

以上技术特征构成了本实用新型的最佳实施例,其具有较强的适应性和最佳实施效果,可根据实际需要增减非必要的技术特征,来满足不同情况的需求。The above technical features constitute the best embodiment of the utility model, which has strong adaptability and best implementation effect, and non-essential technical features can be increased or decreased according to actual needs to meet the needs of different situations.

本实用新型最佳实施例的使用过程:The use process of the most preferred embodiment of the present utility model:

深井19夏季出水温度为十七摄氏度左右(河水温度一般在二十二摄氏度左右)。通过水泵1抽至水塔2,再由主管道3上的第一出口4将降温用水引至厂房内发电机层,通过弯折状翅片式散热管6有效进行管内降温用水和厂房高温气体的热交换,再通过电机9和风扇叶片10配合将冷风吹出,如一组冷风机降温不明显,可安装多组冷风机。降温后,厂房温度由三十五摄氏度降至二十七摄氏度左右。使用过的水可以用于电厂绿化,也可以返还至深井19中,补充深井19水量。本实用新型结构简单,改造方便,维护次数少,充分利用水电厂现有资源,能以低成本降低厂房温度,单人即可快速完成整个操作,给值班人员提供了一个舒适的值班环境。The temperature of the outlet water in Shenjing 19 in summer is about 17 degrees Celsius (the temperature of the river water is generally about 22 degrees Celsius). The cooling water is pumped to the water tower 2 through the water pump 1, and then the cooling water is led to the generator layer in the plant through the first outlet 4 on the main pipe 3, and the cooling water in the tube and the high-temperature gas of the plant are effectively carried out through the bent finned heat dissipation tube 6. After heat exchange, the cold wind is blown out by the cooperation of the motor 9 and the fan blade 10. If the cooling of one group of air coolers is not obvious, multiple groups of air coolers can be installed. After cooling down, the temperature of the plant dropped from 35 degrees Celsius to around 27 degrees Celsius. The used water can be used for greening the power plant, and can also be returned to the deep well 19 to supplement the deep well 19 water volume. The utility model has the advantages of simple structure, convenient transformation, less maintenance times, fully utilizes the existing resources of the hydropower plant, can reduce the temperature of the plant at low cost, and can quickly complete the entire operation by a single person, providing a comfortable duty environment for the on-duty personnel.

Claims (10)

1.一种水电厂夏季降温装置,其特征在于包括水泵、水塔、主管道和冷风机;水泵通过管路与水塔相连通,水塔通过管路与主管道相连通,主管道上设有至少一个第一出口,每个第一出口对应连有一个冷风机;冷风机包括箱体、翅片式散热管、进水管、出水管和电机,箱体为前后面均有开口的四面箱体,翅片式散热管呈弯折状并固定在箱体内,翅片式散热管两端分别与进水管和出水管相连通,位于翅片式散热管的正后方的电机上安装有能随电机输出轴旋转并使空气从箱体后方流向前方的风扇叶片,所述进水管通过管路与对应的第一出口相连通。 1. A cooling device for a hydropower plant in summer is characterized in that it comprises a water pump, a water tower, a main pipeline and an air cooler; the water pump communicates with the water tower through a pipeline, and the water tower communicates with the main pipeline through a pipeline, and the main pipeline is provided with at least one first One outlet, each first outlet is connected to a cooling fan; the cooling fan includes a box body, a finned heat dissipation pipe, a water inlet pipe, a water outlet pipe and a motor. The box body is a four-sided box body with openings on the front and back, and The finned heat dissipation pipe is bent and fixed in the box. The two ends of the finned heat dissipation pipe are respectively connected with the water inlet pipe and the water outlet pipe. The motor located directly behind the finned heat dissipation pipe is equipped with a And make the air flow from the rear of the box to the fan blades in the front, and the water inlet pipe communicates with the corresponding first outlet through a pipeline. 2.根据权利要求1所述的水电厂夏季降温装置,其特征在于弯折状的翅片式散热管的轴线所在平面与箱体的开口面平行。 2. The summer cooling device for a hydropower plant according to claim 1, characterized in that the plane where the axis of the bent-shaped finned heat dissipation pipe is located is parallel to the opening surface of the box. 3.根据权利要求1或2所述的水电厂夏季降温装置,其特征在于箱体左右侧壁的前端沿纵向安装有可开合的百叶窗;或/和,箱体下端固定有至少三个不共线的支腿。 3. The summer cooling device for hydropower plants according to claim 1 or 2, characterized in that the front ends of the left and right side walls of the box are longitudinally equipped with shutters that can be opened and closed; or/and, the lower end of the box is fixed with at least three different Collinear outriggers. 4.根据权利要求1或2所述的水电厂夏季降温装置,其特征在于主管道上设有备用进口,备用进口通过管路连通有压力管;或/和,主管道上设有至少一个第二出口,第二出口通过管路连接有对应的机组冷却装置。 4. The summer cooling device of a hydropower plant according to claim 1 or 2, characterized in that the main pipeline is provided with a backup inlet, and the backup inlet is connected to a pressure pipe through a pipeline; or/and, the main pipeline is provided with at least one second outlet , the second outlet is connected to the corresponding unit cooling device through the pipeline. 5.根据权利要求3所述的水电厂夏季降温装置,其特征在于还包括压力管,压力管通过管路与主管道相连通;或/和,主管道上设有至少一个第二出口,第二出口通过管路连接有对应的机组冷却装置。 5. The summer cooling device of a hydropower plant according to claim 3, characterized in that it also includes a pressure pipe, and the pressure pipe communicates with the main pipeline through a pipeline; or/and, the main pipeline is provided with at least one second outlet, the second The outlet is connected to the corresponding unit cooling device through the pipeline. 6.根据权利要求1或2所述的水电厂夏季降温装置,其特征在于出水管通过管路连通有绿化装置。 6. The summer cooling device for a hydropower plant according to claim 1 or 2, characterized in that the outlet pipe is connected with a greening device through a pipeline. 7.根据权利要求3所述的水电厂夏季降温装置,其特征在于出水管通过管路连通有绿化装置。 7. The summer cooling device of a hydropower plant according to claim 3, characterized in that the outlet pipe is connected with a greening device through a pipeline. 8.根据权利要求5所述的水电厂夏季降温装置,其特征在于出水管通过管路连通有绿化装置。 8. The summer cooling device of a hydropower plant according to claim 5, characterized in that the outlet pipe is connected with a greening device through a pipeline. 9.根据权利要求1或2所述的水电厂夏季降温装置,其特征在于水泵与水塔间、水塔与主管道间、第一出口与冷风机间的管路上均设有开关阀门。 9. The summer cooling device of a hydropower plant according to claim 1 or 2, characterized in that switch valves are provided on the pipelines between the water pump and the water tower, between the water tower and the main pipeline, and between the first outlet and the cooling fan. 10.根据权利要求8所述的水电厂夏季降温装置,其特征在于水泵与水塔间、水塔与主管道间、第一出口与冷风机间的管路上均设有开关阀门。 10. The summer cooling device of a hydropower plant according to claim 8, characterized in that switch valves are provided on the pipelines between the water pump and the water tower, between the water tower and the main pipeline, and between the first outlet and the cooling fan.
CN201520649453.7U 2015-08-26 2015-08-26 Hydroelectric power plant's heat sink in summer Expired - Fee Related CN204880494U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520649453.7U CN204880494U (en) 2015-08-26 2015-08-26 Hydroelectric power plant's heat sink in summer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520649453.7U CN204880494U (en) 2015-08-26 2015-08-26 Hydroelectric power plant's heat sink in summer

Publications (1)

Publication Number Publication Date
CN204880494U true CN204880494U (en) 2015-12-16

Family

ID=54824861

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520649453.7U Expired - Fee Related CN204880494U (en) 2015-08-26 2015-08-26 Hydroelectric power plant's heat sink in summer

Country Status (1)

Country Link
CN (1) CN204880494U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105066305A (en) * 2015-08-26 2015-11-18 国网新疆电力公司疆南供电公司 Summer cooling device for hydraulic power plant
CN113842850A (en) * 2021-10-25 2021-12-28 安徽星鑫材料科技股份有限公司 Automatic adjusting system of chlorination reaction kettle cooling water
CN114111120A (en) * 2021-11-18 2022-03-01 珠海格力电器股份有限公司 Falling film type finned tube heat exchanger and air conditioning system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105066305A (en) * 2015-08-26 2015-11-18 国网新疆电力公司疆南供电公司 Summer cooling device for hydraulic power plant
CN113842850A (en) * 2021-10-25 2021-12-28 安徽星鑫材料科技股份有限公司 Automatic adjusting system of chlorination reaction kettle cooling water
CN113842850B (en) * 2021-10-25 2024-07-12 安徽星鑫材料科技股份有限公司 Automatic cooling water adjusting system of chlorination reaction kettle
CN114111120A (en) * 2021-11-18 2022-03-01 珠海格力电器股份有限公司 Falling film type finned tube heat exchanger and air conditioning system

Similar Documents

Publication Publication Date Title
CN205137762U (en) Low energy consumption building new trend system
TW201202543A (en) Ventilation system for tunnel engineering
WO2014201973A1 (en) Energy-saving water-cooled air-conditioner
CN204880494U (en) Hydroelectric power plant&#39;s heat sink in summer
CN111336069A (en) Air-cooled wind generating set
CN103410549A (en) System and method by means of power plant waste heat for conducting aeration cooling on mine
CN206707945U (en) A kind of cooling system of wind turbine power generation unit
CN105781900A (en) Wind turbine generator set and ventilation cooling system
CN203239491U (en) Cooling tower circulating cooling water power generation system
CN102401441A (en) Semiconductor water temperature air conditioner
CN204419461U (en) A kind of wind power generating set and aeration radiation system
CN203722094U (en) Ground temperature constant temperature circulator
CN105066305A (en) Summer cooling device for hydraulic power plant
JP3209302U (en) Unit cooler for well-water ducts using well water
CN204186413U (en) Mine water pump house aeration-cooling device
CN203757923U (en) Integrated air conditioning plant based on combination of solar energy chimney power generation and evaporative cooling
CN210948999U (en) Be applied to wind generating set&#39;s wheel hub water cooling circulation system
CN203116192U (en) Soil source auxiliary plate-fin indirect-direct two-stage evaporative cooling air conditioner unit
CN209214064U (en) A heat recovery device for a central air-conditioning main engine room
CN207555726U (en) A kind of heating heating equipment
CN203271794U (en) Mining air cooler
CN207963534U (en) A kind of new and effective cooling tower
CN105070467B (en) Downside air supply mechanical ventilation system of bridge arm electric reactor chamber and construction method thereof
CN204884781U (en) Mechanical draft system supplys air under bridge arm reactor room
CN201463141U (en) Geothermal energy-saving air conditioner

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151216