CN204876814U - Building construction safety rail guard - Google Patents
Building construction safety rail guard Download PDFInfo
- Publication number
- CN204876814U CN204876814U CN201520485281.4U CN201520485281U CN204876814U CN 204876814 U CN204876814 U CN 204876814U CN 201520485281 U CN201520485281 U CN 201520485281U CN 204876814 U CN204876814 U CN 204876814U
- Authority
- CN
- China
- Prior art keywords
- vertical bar
- bar
- protective net
- montant
- left vertical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Emergency Lowering Means (AREA)
Abstract
本实用新型公开了一种建筑施工安全防护栏,它包括左竖杆、右竖杆、上横杆、下横杆和防护网,上横杆的两端分别与左竖杆和右竖杆连接,下横杆的两端分别与左竖杆和右竖杆连接,防护网设置在上横杆与下横杆之间,所述的右竖杆上固定连接有两根弹性绳索,两根弹性绳索上下间隔分布,每根弹性绳索的自由端均连接有一挂钩,左竖杆上设置有两个挂钩钩孔,两个挂钩钩孔上下间隔分布;所述的防护网的两侧均设置有半圆形扣环,防护网左侧的半圆形扣环与左竖杆扣接配合,防护网右侧的半圆形扣环与右竖杆扣接配合。本实用新型相互连接较为方便,而且防护网可以更换。
The utility model discloses a safety protection fence for building construction, which comprises a left vertical bar, a right vertical bar, an upper horizontal bar, a lower horizontal bar and a protective net, and the two ends of the upper horizontal bar are respectively connected with the left vertical bar and the right vertical bar , the two ends of the lower cross bar are respectively connected with the left vertical bar and the right vertical bar, the protective net is arranged between the upper cross bar and the lower cross bar, and the right vertical bar is fixedly connected with two elastic ropes, two elastic The ropes are distributed at intervals up and down, and the free end of each elastic rope is connected with a hook. Two hook holes are arranged on the left vertical bar, and the two hook holes are arranged at intervals up and down; Circular buckle, the semicircular buckle on the left side of the protective net is buckled and matched with the left vertical rod, and the semicircular buckled ring on the right side of the protective net is buckled and matched with the right vertical rod. The utility model is relatively convenient to connect with each other, and the protective net can be replaced.
Description
技术领域 technical field
本实用新型涉及一种建筑施工安全防护栏。 The utility model relates to a building construction safety protection fence.
背景技术 Background technique
在建筑施工过程中,经常会需要使用防护栏,防护栏不仅能够对建筑施工的外围进行防御,而且还能保障施工人员的安全。防护栏在使用时,一般需要将多个防护栏相互连接并围合成一圈,目前的防护栏,其相互连接较为麻烦,且两个防护栏相互连接后,就无法调整两个防护栏的相对位置,较为不便;而且防护栏中的防护网一般采用焊接固定,无法更换,较为不便。 In the process of building construction, it is often necessary to use guardrails. The guardrails can not only defend the periphery of the building construction, but also ensure the safety of the construction personnel. When the guardrail is in use, it is generally necessary to connect multiple guardrails to each other and form a circle. The current guardrails are more troublesome to connect to each other, and after the two guardrails are connected to each other, the relative position of the two guardrails cannot be adjusted. The location is inconvenient; and the protective net in the fence is generally fixed by welding and cannot be replaced, which is inconvenient.
实用新型内容 Utility model content
本实用新型所要解决的技术问题是,提供一种建筑施工安全防护栏,其相互连接较为方便,而且防护网可以更换。 The technical problem to be solved by the utility model is to provide a construction safety protection fence, which is relatively convenient to connect with each other, and the protection net can be replaced.
为解决上述技术问题,本实用新型提供的建筑施工安全防护栏,它包括左竖杆、右竖杆、上横杆、下横杆和防护网,上横杆的两端分别与左竖杆和右竖杆连接,下横杆的两端分别与左竖杆和右竖杆连接,防护网设置在上横杆与下横杆之间,所述的右竖杆上固定连接有两根弹性绳索,两根弹性绳索上下间隔分布,每根弹性绳索的自由端均连接有一挂钩,左竖杆上设置有两个挂钩钩孔,两个挂钩钩孔上下间隔分布; In order to solve the above technical problems, the utility model provides a building construction safety guardrail, which includes a left vertical bar, a right vertical bar, an upper cross bar, a lower cross bar and a protective net, and the two ends of the upper cross bar are respectively connected with the left vertical bar and the left vertical bar. The right vertical bar is connected, the two ends of the lower horizontal bar are respectively connected with the left vertical bar and the right vertical bar, the protective net is arranged between the upper horizontal bar and the lower horizontal bar, and the right vertical bar is fixedly connected with two elastic ropes , the two elastic ropes are distributed at intervals up and down, the free ends of each elastic rope are connected with a hook, the left vertical bar is provided with two hook holes, and the two hook holes are distributed at intervals up and down;
所述的防护网的两侧均设置有半圆形扣环,防护网左侧的半圆形扣环与左竖杆扣接配合,防护网右侧的半圆形扣环与右竖杆扣接配合。 Both sides of the protective net are provided with semicircular buckles, the semicircular buckle on the left side of the protective net is fastened with the left vertical bar, and the semicircular buckle on the right side of the protective net is buckled with the right vertical bar. Then cooperate.
作为优选,所述的左竖杆和右竖杆的底部均为尖削的圆锥形部分。 Preferably, the bottoms of the left vertical bar and the right vertical bar are both tapered conical parts.
作为优选,所述的防护网由不锈钢制成。 Preferably, the protective net is made of stainless steel.
采用以上结构后,本实用新型与现有技术相比,具有以下的优点: After adopting the above structure, the utility model has the following advantages compared with the prior art:
在将本实用新型的防护栏相互连接时,只需要用两个挂钩分别钩住两个挂钩钩孔,这样就将两个防护栏相互连接,连接较为方便,然后将多个防护栏依次连接并围合成一圈,即可对建筑施工的外围进行防御;而且弹性绳索设置在两个防护栏之间,可以阻挡外人进入建筑施工现场;而且由于弹性绳索可以随意拉伸和扭曲,这样,两个防护栏可以随意移动位置,这样就可以根据需要随意调节两个防护栏的相对位置,较为方便;而且防护网通过半圆形扣环与左竖杆和右竖杆扣接固定,这样,使得防护网可以拆卸,在防护网损坏时可以更换,较为方便。 When the guardrails of the present utility model are connected to each other, it is only necessary to hook two hook holes with two hooks, so that the two guardrails are connected to each other, and the connection is relatively convenient, and then a plurality of guardrails are connected sequentially and The perimeter of the building construction can be defended in a circle; and the elastic rope is set between the two guardrails, which can prevent outsiders from entering the construction site; and because the elastic rope can be stretched and twisted at will, so that the two The position of the guardrail can be moved at will, so that the relative position of the two guardrails can be adjusted at will according to the needs, which is more convenient; and the guardrail is fastened and fixed with the left vertical bar and the right vertical bar through a semicircular buckle, so that the protective net The net can be disassembled and can be replaced when the protective net is damaged, which is more convenient.
附图说明 Description of drawings
图1是本实用新型的结构示意图。 Fig. 1 is a structural representation of the utility model.
具体实施方式 Detailed ways
下面结合附图和具体实施方式对本实用新型作进一步详细地说明。 Below in conjunction with accompanying drawing and specific embodiment the utility model is described in further detail.
由图1所示,本实用新型建筑施工安全防护栏包括左竖杆1、右竖杆2、上横杆3、下横杆4和防护网5,上横杆3的两端分别与左竖杆1和右竖杆2连接,下横杆4的两端分别与左竖杆1和右竖杆2连接,防护网5设置在上横杆3与下横杆4之间,所述的右竖杆2上固定连接有两根弹性绳索6,两根弹性绳索6上下间隔分布,每根弹性绳索6的自由端均连接有一挂钩601,左竖杆1上设置有两个挂钩钩孔101,两个挂钩钩孔101上下间隔分布。 As shown in Figure 1, the utility model building construction safety fence comprises a left vertical bar 1, a right vertical bar 2, an upper cross bar 3, a lower cross bar 4 and a protective net 5, and the two ends of the upper cross bar 3 are connected with the left vertical bar respectively. The rod 1 is connected with the right vertical rod 2, the two ends of the lower horizontal rod 4 are respectively connected with the left vertical rod 1 and the right vertical rod 2, and the protective net 5 is arranged between the upper horizontal rod 3 and the lower horizontal rod 4. Two elastic ropes 6 are fixedly connected to the vertical bar 2, and the two elastic ropes 6 are distributed at intervals up and down. The free ends of each elastic rope 6 are connected with a hook 601, and the left vertical bar 1 is provided with two hook holes 101. The two hook holes 101 are spaced up and down.
所述的防护网5的两侧均设置有半圆形扣环501,防护网5左侧的半圆形扣环501与左竖杆1扣接配合,防护网5右侧的半圆形扣环501与右竖杆2扣接配合。 Both sides of the protective net 5 are provided with a semicircular buckle 501, the semicircular buckle 501 on the left side of the protective net 5 is engaged with the left vertical bar 1, and the semicircular buckle on the right side of the protective net 5 The ring 501 is snap-fitted with the right vertical bar 2 .
所述的左竖杆1和右竖杆2的底部均为尖削的圆锥形部分7,这样,可以将圆锥形部分7插入到泥土中固定,这样就可以使得防护栏固定牢固,不易倾倒。 The bottoms of the left vertical rod 1 and the right vertical rod 2 are tapered conical parts 7, so that the conical part 7 can be inserted into the soil and fixed, so that the guardrail can be fixed firmly and not easy to topple over.
所述的防护网5由不锈钢制成,这样使得防护网5强度较高,不易损坏,且被雨水淋湿后不会生锈。 The protective net 5 is made of stainless steel, so that the protective net 5 has high strength, is not easy to be damaged, and will not rust after being wet by rain.
以上仅就本实用新型应用较佳的实例做出了说明,但不能理解为是对权利要求的限制,本实用新型的结构可以有其他变化,不局限于上述结构。总之,凡在本实用新型的独立权利要求的保护范围内所作的各种变化均在本实用新型的保护范围内。 The above is only a description of the preferred examples of the application of the utility model, but it should not be understood as a limitation on the claims. The structure of the utility model can have other changes and is not limited to the above structure. In a word, all the various changes made within the scope of protection of the independent claims of the utility model are within the scope of protection of the utility model.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520485281.4U CN204876814U (en) | 2015-07-08 | 2015-07-08 | Building construction safety rail guard |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520485281.4U CN204876814U (en) | 2015-07-08 | 2015-07-08 | Building construction safety rail guard |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204876814U true CN204876814U (en) | 2015-12-16 |
Family
ID=54821202
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520485281.4U Expired - Lifetime CN204876814U (en) | 2015-07-08 | 2015-07-08 | Building construction safety rail guard |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204876814U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106538313A (en) * | 2016-11-17 | 2017-03-29 | 金乡县金平湖黄桃培育基地 | A kind of fruit tree protection net device |
| CN112431476A (en) * | 2020-11-28 | 2021-03-02 | 中实翊(福建)建设工程有限公司 | Municipal engineering protection structure and construction method |
-
2015
- 2015-07-08 CN CN201520485281.4U patent/CN204876814U/en not_active Expired - Lifetime
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106538313A (en) * | 2016-11-17 | 2017-03-29 | 金乡县金平湖黄桃培育基地 | A kind of fruit tree protection net device |
| CN112431476A (en) * | 2020-11-28 | 2021-03-02 | 中实翊(福建)建设工程有限公司 | Municipal engineering protection structure and construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2018028159A1 (en) | External fixing device of protective net body, externally fixed protective net and application thereof | |
| CN104027908A (en) | Hanger of anti-falling rope and tower with anti-falling device | |
| CN204752026U (en) | Tower crane escape way | |
| CN203898986U (en) | Hanger for anti-falling rope and pole/tower with anti-falling device | |
| CN101550803B (en) | Safe guarding cage vertical ladder | |
| CN103334595B (en) | Electric transmission line erection group tower activity safety net | |
| CN202802569U (en) | Electric power tower climbing protector | |
| CN202731270U (en) | Movable platform for aerial installation operation of space steel structure | |
| CN204059925U (en) | Total sub-semigroup safety climbing ladder | |
| CN205954904U (en) | Board house prevent overtum equipment | |
| CN204728739U (en) | Flexible construction safety protective guard | |
| CN203998680U (en) | Factory building Qiao Ji track People's Bank of China safety protective mechanisms | |
| CN203403660U (en) | Indoor scaffold | |
| CN204899258U (en) | Building construction safety rail guard | |
| CN204186085U (en) | A kind of high-rise building safe protector | |
| CN207513146U (en) | Shear wall outrigger drawknot structure | |
| CN207728011U (en) | A kind of regularization construction floor inner circumferential bound defence rail | |
| CN204876611U (en) | Building construction safety rail guard with illumination function | |
| CN204024098U (en) | Construction safety protective screening | |
| CN204663372U (en) | A kind of vertical safety climbing ladder device preventing current personnel from falling | |
| CN206267512U (en) | A kind of movable operating platform | |
| CN202945858U (en) | Rapid-installing safety protection fence for electric power rush-repair work site | |
| CN209308454U (en) | A New Type of Dense Mesh Safety Vertical Net | |
| CN204851035U (en) | Power transmission line tower detecting system | |
| CN204419249U (en) | A kind of rake cash machine protective guard |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C41 | Transfer of patent application or patent right or utility model | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20160121 Address after: 325100 Zhejiang Oubei town of Yongjia County, Rome City, building 13, room 307 Patentee after: WEALD FIELDS LANDSCAPE ENGINEERING CO.,LTD. Address before: Yang Jia Cun town Shaoxing city Shengzhou City, Zhejiang province 312452 Patentee before: Yang Xuefei |
|
| CP03 | Change of name, title or address | ||
| CP03 | Change of name, title or address |
Address after: 325000 Zhejiang province Wenzhou Yongjia County Sanjiang Street 104 National Road south side field farm Patentee after: Zhejiang Yuanye Construction Co.,Ltd. Address before: 325100 Room 307, 13 Rome Town, Oubei Town, Yongjia County, Zhejiang Province Patentee before: WEALD FIELDS LANDSCAPE ENGINEERING CO.,LTD. |
|
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20151216 |