CN204876684U - Form of arranging of mine coal bunker and waste bin - Google Patents

Form of arranging of mine coal bunker and waste bin Download PDF

Info

Publication number
CN204876684U
CN204876684U CN201520008385.6U CN201520008385U CN204876684U CN 204876684 U CN204876684 U CN 204876684U CN 201520008385 U CN201520008385 U CN 201520008385U CN 204876684 U CN204876684 U CN 204876684U
Authority
CN
China
Prior art keywords
waste bin
belt
lane
cash
coal bunker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520008385.6U
Other languages
Chinese (zh)
Inventor
李顺峰
梁雷
王利伟
贾亮亮
李爱军
张振虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yongcheng Coal and Electricity Holding Group Co Ltd
Original Assignee
Yongcheng Coal and Electricity Holding Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yongcheng Coal and Electricity Holding Group Co Ltd filed Critical Yongcheng Coal and Electricity Holding Group Co Ltd
Priority to CN201520008385.6U priority Critical patent/CN204876684U/en
Application granted granted Critical
Publication of CN204876684U publication Critical patent/CN204876684U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a factories and miness form of arranging especially relates to a form of arranging of mine coal bunker and waste bin. By the big lane of track (1), the big lane of belt (2), belt go down the hill (3), coal bunker (4), swift current cash passageway (5), waste bin (6), dress cash passageway (7), ventilation lane (8), electricity distribution room (9) and branch cash way (10) are constituteed, can provide a simple structure, convenient to use's form of arranging of mine coal bunker and waste bin, energy is saved, the change of reduction equipment, and make the exploiting field waste bin possess certain reserve capabillity, can continuous transportation of effectual series connection sticky tape and the transportation of being interrupted nature of track.

Description

The arrangement form of a kind of fuzzy controller and waste bin
Technical field
This utility model relates to a kind of factories and miness arrangement form, particularly relates to the arrangement form of a kind of fuzzy controller and waste bin.
Background technology
Current coal excavates and in transportation, the positional alignment of coal bunker and waste bin is chaotic, the complexity that Orbital Transport Systems becomes, the bad grasp of the degree of depth of waste bin, ventilation system imperfection, and the effect of attrition that point cash device causes exploiting field adhesive tape is serious.
Utility model content
The utility model overcomes deficiency of the prior art, the fuzzy controller providing a kind of structure simple, easy to use and the arrangement form of waste bin, the replacing of energy energy conservation, minimizing equipment, and make exploiting field waste bin possess certain reserve capabillity, can effectively connect adhesive tape continuative transport and the transport of track discontinuity.Concrete technical scheme is as follows:
An arrangement form for fuzzy controller and waste bin, comprises the large lane of track, the large lane of belt, belt is gone down the hill, coal bunker, slips cash passage, waste bin, dress cash passage, ventilation lane, switchgear house and Fen Gan road.Belt is gone down the hill and to be connected through coal bunker Hou Hefengan road, Fen Gan road is connected with waste bin by slipping cash passage, the bottom of coal bunker is connected with the large lane of belt, the large lane of belt is by ventilation lane and the cash expanding channels that slips, the cash channel end that slips is connected with one end of dress cash passage, and being connected with switchgear house, the other end of dress cash passage is connected with the large lane of track.
Further, the described angle slipping cash passage and horizontal plane is α, and α >=30 °.
Further, dress cash passage and the large lane of track are positioned at same level, and belt large lane horizontal level is higher than dress cash passage and the large lane of track.
Beneficial effect:
1. coal bunker conventional at present and waste bin, along belt in mining area lane straight line, are adjusted to now apportion and arrange.Belt is gone down the hill large lane and track large lane graded crossing with belt, to be contacted by coal bunker with the large lane of belt and realize Coal Transport, with the large lane of track by slipping cash passage and fill the annular connection roadway that cash passage and switchgear house formed and contact, the cash passage that slips is contacted by waste bin with dress cash passage and forms exploiting field spoil transportation system, slips cash passage and the large lane of belt to be contacted by ventilation lane and improve ventilation system.
2. utilize the gravity of spoil self, realized the gravity haulage of exploiting field spoil by the change of roadway gradient.
3. dress cash passage and the large lane of track are in same absolute altitude all the time, and Orbital Transport Systems is simple and reliable.
4. exploiting field waste bin possesses certain reserve capabillity, adhesive tape continuative transport and the track discontinuity of can effectively connecting is transported, play the effect of intermediate buffering, create conditions for realizing Belt transport spoil during rock gangway goes down the hill to tunnel, stone drifting work plane spoil is directly transported to through adhesive tape and slips cash passage, then from slipping into into waste bin, putting cash mouth through waste bin bottom and directly loading in mine car.
5, realize exploiting field coal and spoil to share same adhesive tape and carry out dividing load and carry, connect coal bunker with slip cash passage Fen Gan road in arrange that is reprinted a belt, exploiting field spoil is gone down the hill by belt, reprint belt unloading is loaded onto and slips cash passage, then from slipping into into waste bin, effectively prevent and go down the hill to arrange at belt the effect of attrition that traditional bastard coal shunting mode that scraper plate carries out point cash causes exploiting field adhesive tape.
Accompanying drawing explanation
Fig. 1 is the arrangement form structural representation of the utility model fuzzy controller and waste bin;
Fig. 2 is the utility model I-I cross section structure schematic diagram;
1 is the large lane of track; 2 is the large lanes of belt; 3 is that belt is gone down the hill; 4 is coal bunkers; 5 is slip cash passage; 6 is waste bins; 7 is dress cash passages; 8 is ventilation lanes; 9 is switchgear houses; 10 Shi Fengan roads.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail:
As shown in Figure 1 and Figure 2, the arrangement form of a kind of fuzzy controller and waste bin in the present embodiment, comprises the large lane of track 1, the large lane 2 of belt, belt goes down the hill 3, coal bunker 4, slips cash passage 5, waste bin 6, dress cash passage 7, ventilation lane 8, switchgear house 9 and Fen Gan road 10.Belt is gone down the hill and 3 to be connected through coal bunker 4 Hou Hefengan road 10, Fen Gan road 10 is connected with waste bin 6 by slipping cash passage 5, the bottom of coal bunker 4 is connected with the large lane 2 of belt, the large lane 2 of belt by ventilation lane 8 with slip cash passage 5 and be connected, cash passage 5 end that slips is connected with one end of dress cash passage 7, and being connected with switchgear house 9, the other end of dress cash passage 7 is connected with the large lane 1 of track.
Further, the described cash passage 5 that slips is α with the angle of horizontal plane, and α >=30 °.
Further, dress cash passage 7 and the large lane 1 of track are positioned at same level, and belt large lane 2 horizontal level is higher than dress cash passage 7 and the large lane 1 of track.
Although the utility model and some advantages thereof are described in detail in the above-described embodiment; but; person of ordinary skill in the field should be realized that; outside spirit of the present utility model and principle; can make any amendment, improvement, expansion etc., these amendments, improvement, expansion are all encompassed within protection domain of the present utility model.

Claims (3)

1. the arrangement form of a fuzzy controller and waste bin, it is characterized in that, comprise the large lane of track (1), the large lane of belt (2), belt are gone down the hill (3), coal bunker (4), slip cash passage (5), waste bin (6), dress cash passage (7), ventilation lane (8), switchgear house (9) and Fen Gan road (10); Belt is gone down the hill (3) is connected through coal bunker (4) Hou Hefengan road (10), Fen Gan road (10) is connected with waste bin (6) by slipping cash passage (5), the bottom of coal bunker (4) is connected with the large lane of belt (2), the large lane of belt (2) by ventilation lane (8) with slip cash passage (5) and be connected, cash passage (5) end that slips is connected with one end of dress cash passage (7), and being connected with switchgear house (9), the other end of dress cash passage (7) is connected with the large lane of track (1).
2. the arrangement form of a kind of fuzzy controller according to claim 1 and waste bin, other are characterised in that, the described cash passage (5) that slips is α with the angle of horizontal plane, and α >=30 °.
3. the arrangement form of a kind of fuzzy controller according to claim 1 and waste bin, other are characterised in that, dress cash passage (7) and the large lane of track (1) are positioned at same level, and the large lane of belt (2) horizontal level is higher than dress cash passage (7) and the large lane of track (1).
CN201520008385.6U 2015-01-07 2015-01-07 Form of arranging of mine coal bunker and waste bin Expired - Fee Related CN204876684U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520008385.6U CN204876684U (en) 2015-01-07 2015-01-07 Form of arranging of mine coal bunker and waste bin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520008385.6U CN204876684U (en) 2015-01-07 2015-01-07 Form of arranging of mine coal bunker and waste bin

Publications (1)

Publication Number Publication Date
CN204876684U true CN204876684U (en) 2015-12-16

Family

ID=54821073

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520008385.6U Expired - Fee Related CN204876684U (en) 2015-01-07 2015-01-07 Form of arranging of mine coal bunker and waste bin

Country Status (1)

Country Link
CN (1) CN204876684U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107218077A (en) * 2017-06-26 2017-09-29 永城煤电控股集团有限公司 Rock gangway multimode combines cash technique
CN109516145A (en) * 2019-01-03 2019-03-26 淮南矿业(集团)有限责任公司 Relay-type coal bunker system
CN110878706A (en) * 2019-12-16 2020-03-13 徐永佳 Coal mine rapid tunneling gangue transportation system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107218077A (en) * 2017-06-26 2017-09-29 永城煤电控股集团有限公司 Rock gangway multimode combines cash technique
CN107218077B (en) * 2017-06-26 2019-04-30 永城煤电控股集团有限公司 Rock gangway multimode combines cash technique out
CN109516145A (en) * 2019-01-03 2019-03-26 淮南矿业(集团)有限责任公司 Relay-type coal bunker system
CN109516145B (en) * 2019-01-03 2024-03-19 淮南矿业(集团)有限责任公司 Relay type coal bunker system
CN110878706A (en) * 2019-12-16 2020-03-13 徐永佳 Coal mine rapid tunneling gangue transportation system

Similar Documents

Publication Publication Date Title
CN103742148B (en) The soft coal-mining method covering the descending waste filling of supporting of a kind of half-edge coal seam
CN204876684U (en) Form of arranging of mine coal bunker and waste bin
CN106121646A (en) Underground mine exploiting field formula without digging laneway without coal column coal-mining method
CN104500070B (en) Continuous coal mining machine paste filling mining method
CN103742165A (en) Long distance slag discharging method for inclined shaft
CN104358574B (en) The horizontal room-and-pillar stoping of gently inclined orebody
CN104234714B (en) A kind of underground coal mine green high-efficient transporting method
CN102979532B (en) A kind of assistance with hill road coordinates the development method of belt inclined shaft haulage
CN103754589B (en) The continuous shaft transport method of bulk material height drop and transportation system
CN208633835U (en) A kind of Mechanized that equipment train is separated with glue fortune crossheading
CN205101032U (en) Branch cash system is arranged in crossheading two storehouses in colliery
CN203729998U (en) Integrated rock drift tunneling production line
CN102322290A (en) Adhesive tape inclined shaft exploitation way for large-scale underground metal mine
Brannon et al. Development of and production update for the Grasberg Block Cave mine–PT Freeport Indonesia
CN104929682B (en) Method for discharging downhole gangue in coal mine
CN103043077B (en) Quick shunting system for tunneling slag discharge mining cars in underground roadway of mine
CN105221184A (en) A point cash system is arranged in crossheading two storehouse in colliery
CN203728096U (en) High-fall continuous shaft transportation system for bulk materials
CN204113288U (en) A kind of New Coal Mine down-hole green high-efficient haulage device
CN205135643U (en) Special waste bin of two rock gangway sharing discharge refuse systems in colliery
CN107218077B (en) Rock gangway multimode combines cash technique out
CN205837650U (en) A kind of coal storage device for train loading station
CN103939132B (en) A kind of mineral deposit underground mining transportation resources of continuous and automatic
CN203127759U (en) Automated underground pipeline logistics transportation system for solid cargoes
CN212985228U (en) Coal mine working face crossheading mining area lane structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151216

Termination date: 20170107

CF01 Termination of patent right due to non-payment of annual fee