CN204876568U - Can set up inspection hole stand design mould of built -in fitting - Google Patents
Can set up inspection hole stand design mould of built -in fitting Download PDFInfo
- Publication number
- CN204876568U CN204876568U CN201520636654.3U CN201520636654U CN204876568U CN 204876568 U CN204876568 U CN 204876568U CN 201520636654 U CN201520636654 U CN 201520636654U CN 204876568 U CN204876568 U CN 204876568U
- Authority
- CN
- China
- Prior art keywords
- fitting
- built
- bracket
- inspection hole
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model provides a can set up inspection hole stand design mould of built -in fitting. It includes two regulation brackets, two locating levers, two regulating plates, four adjusting bolt and four nuts, wherein two regulation brackets set up in two relative stand template upper end outsides to be equipped with the location scale on the lateral surface, the both ends of two locating levers are fixed respectively at two regulation bracket medial surface both sides positions, are formed with a locating hole on every locating lever for set up pre -buried nylon sleeve, the both ends of two regulating plates utilize the one end of an adjusting bolt and a nut and two regulation brackets to link together respectively. The utility model provides a can set up inspection hole stand design mould of built -in fitting has that structural design is reasonable, simple, convenient to use, with low costs and can save a large amount of manual works and shorten advantage such as construction period by a wide margin.
Description
Technical field
The utility model belongs to subway work facility technology field, particularly relates to a kind of inspection hole column shaper that can arrange built-in fitting.
Background technology
At present, in the construction of metro depot column check pit, column often adopts hanger rail method to construct, the method first pre-buried nylon sleeve is fixed on the model of the column upper port place installed, then plank is utilized to substitute rubber cushion, attachment rail backing plate again, undertaken measuring by total powerstation and track forces after finally rail and track plates being installed and adjust nylon sleeve position again, after treating column construction, also need to remove the rail on it and backing plate, plank is replaced to rubber cushion, billet and rail are installed again, need the artificial of at substantial as can be seen here, and the construction period is long.
Summary of the invention
In order to solve the problem, the purpose of this utility model is to provide a kind of inspection hole column shaper that can arrange built-in fitting.
In order to achieve the above object, the inspection hole column shaper of what the utility model provided can be arranged built-in fitting comprises two bracket, two backstays, two pieces of adjustable plates, four adjusting bolts and four nuts; Wherein two bracket are arranged on outside two pieces of relative model of the column upper ends, and lateral surface is provided with location graduation; The two ends of two backstays are separately fixed at position, two bracket medial surface both sides, each backstay are formed with a locating hole, for arranging pre-buried nylon sleeve; The two ends of two pieces of adjustable plates utilize one end of an adjusting bolt and a nut and two bracket to link together respectively.
The middle part of described bracket is tabular, and two ends are outwards bent to form, and both ends are formed with a bolt through hole respectively.
What the utility model provided can be arranged built-in fitting inspection hole column shaper has reasonable in design, simple, easy to use, cost is low and can save and manually and significantly shorten the advantages such as construction period in a large number.
Accompanying drawing explanation
The inspection hole column shaper structural perspective of what Fig. 1 the utility model provided can be arranged built-in fitting.
Column shaper and model of the column bonding state stereogram are cheated in the inspection that can arrange built-in fitting that Fig. 2 provides for the utility model.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the inspection hole column shaper that can arrange built-in fitting that the utility model provides is described in detail.
As shown in Fig. 1-Fig. 2, the inspection hole column shaper of what the utility model provided can be arranged built-in fitting comprises two bracket, 1, two backstays, 2, two pieces of adjustable plates, 3, four adjusting bolts 4 and four nuts 5; Wherein two bracket 1 are arranged on outside two pieces of relative model of the column 6 upper ends, and lateral surface is provided with location graduation; The two ends of two backstays 2 are separately fixed at position, two bracket 1 medial surface both sides, each backstay 2 are formed with a locating hole 7, for arranging pre-buried nylon sleeve; The two ends of two pieces of adjustable plates 3 utilize one end of an adjusting bolt 4 and a nut 5 and two bracket 1 to link together respectively.
The middle part of described bracket 1 is tabular, and two ends are outwards bent to form, and both ends are formed with a bolt through hole respectively.
The inspection hole column shaper using method that can arrange built-in fitting now provided by the utility model is described below: during use, this mould is placed on the model of the column 6 upper port place installed, then the medial surface of two bracket 1 is made to be close to outside two pieces of relative model of the column 6 upper ends, make two pieces of adjustable plates 3 be close to outside another two pieces of relative model of the column 6 upper ends simultaneously, a pre-buried nylon sleeve is placed afterwards in each locating hole 7, then utilize the method for location graduation in total station survey bracket 1 to determine the position of pre-buried nylon sleeve, and the position of method to bracket 1 of adjustment adjusting bolt 4 degree of tightness can be utilized to adjust, to finely tune the position of pre-buried nylon sleeve, concreting in model of the column 6 afterwards, after forming column until concrete setting, on shaper, directly installation backing plate and rail just can complete whole work progress.
Claims (2)
1. an inspection hole column shaper for built-in fitting can be set, it is characterized in that: it comprises two bracket (1), two backstays (2), two pieces of adjustable plates (3), four adjusting bolts (4) and four nuts (5); Wherein two bracket (1) are arranged on outside two pieces of relative model of the column (6) upper ends, and lateral surface is provided with location graduation; The two ends of two backstays (2) are separately fixed at position, two bracket (1) medial surface both sides, each backstay (2) are formed with a locating hole (7), for arranging pre-buried nylon sleeve; The two ends of two pieces of adjustable plates (3) utilize an adjusting bolt (4) and a nut (5) to link together with one end of two bracket (1) respectively.
2. the inspection hole column shaper that built-in fitting can be set according to claim 1, it is characterized in that: the middle part of described bracket (1) is tabular, two ends are outwards bent to form, and both ends are formed with a bolt through hole respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520636654.3U CN204876568U (en) | 2015-08-20 | 2015-08-20 | Can set up inspection hole stand design mould of built -in fitting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520636654.3U CN204876568U (en) | 2015-08-20 | 2015-08-20 | Can set up inspection hole stand design mould of built -in fitting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204876568U true CN204876568U (en) | 2015-12-16 |
Family
ID=54820959
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520636654.3U Expired - Fee Related CN204876568U (en) | 2015-08-20 | 2015-08-20 | Can set up inspection hole stand design mould of built -in fitting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204876568U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109112903A (en) * | 2018-09-27 | 2019-01-01 | 中建安装工程有限公司 | Solid concrete roabed trackless construction technology is cheated in a kind of phase library inner column formula inspection |
-
2015
- 2015-08-20 CN CN201520636654.3U patent/CN204876568U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109112903A (en) * | 2018-09-27 | 2019-01-01 | 中建安装工程有限公司 | Solid concrete roabed trackless construction technology is cheated in a kind of phase library inner column formula inspection |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202031179U (en) | Centre line aligning and elevation adjusting device of basic embedded bolts | |
CN103174166B (en) | A kind of recreation facility built-in fitting of complete integral installation and mounting method thereof | |
CN206268622U (en) | A kind of adjustable oil field pipe support frame | |
CN202577336U (en) | Positioner for square column foundation bolts | |
CN102912693B (en) | Floating track bed precast slab and construction method for precast slab assembled floating track bed | |
CN104404882A (en) | Assistant mounting die for support and construction method thereof | |
CN201297030Y (en) | Movable template | |
CN204876568U (en) | Can set up inspection hole stand design mould of built -in fitting | |
CN202414979U (en) | Base-adjustable track connecting device on concrete base | |
CN201756667U (en) | Ballastless track slab regulator | |
CN202194037U (en) | Laterally adjusting and positioning device for ballastless turnouts of high-speed railways | |
CN201756666U (en) | Ballastless track slab regulator | |
CN203846357U (en) | Novel die for double-block-type ballastless track base plate | |
CN103572774A (en) | Leveling ruler flat underboarding mortar bedding method | |
CN203792305U (en) | Device for leveling T-shaped groove ground rail quickly | |
CN205116036U (en) | Permanent support of continuous bridge system of turning conversion slide system of sliding | |
CN204282137U (en) | Adjustable many gauges operating desk position | |
CN202985773U (en) | Counter-vault adjusting device of bridge beam prefabricating forming external mould base plate | |
CN203470475U (en) | Roller vehicle rail fine adjustment device | |
CN104929375A (en) | Large-span truss short-stroke hydraulic jack synchronous slide method and device | |
CN105586810A (en) | Steel rail track with adjustable gauges and adjustable steel rails | |
CN205276166U (en) | Guardrail stand positioner | |
CN205088537U (en) | A track adjuster for urban rail transit burys formula track system construction | |
CN204690513U (en) | A kind of combined orbit adjustment means | |
CN202594597U (en) | Positioning device of inclined handrail supports of moving pavement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151216 |
|
CF01 | Termination of patent right due to non-payment of annual fee |