CN204854071U - Two source heat pump vermicelli drying and dehumidification heat recovery units - Google Patents

Two source heat pump vermicelli drying and dehumidification heat recovery units Download PDF

Info

Publication number
CN204854071U
CN204854071U CN201520592315.XU CN201520592315U CN204854071U CN 204854071 U CN204854071 U CN 204854071U CN 201520592315 U CN201520592315 U CN 201520592315U CN 204854071 U CN204854071 U CN 204854071U
Authority
CN
China
Prior art keywords
heat
module
dehumidification
evaporation
air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520592315.XU
Other languages
Chinese (zh)
Inventor
丁德华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520592315.XU priority Critical patent/CN204854071U/en
Application granted granted Critical
Publication of CN204854071U publication Critical patent/CN204854071U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P60/00Technologies relating to agriculture, livestock or agroalimentary industries
    • Y02P60/80Food processing, e.g. use of renewable energies or variable speed drives in handling, conveying or stacking
    • Y02P60/85Food storage or conservation, e.g. cooling or drying

Abstract

The utility model relates to a dry energy -conserving combination equipment of food specifically is a two source heat pump vermicelli drying and dehumidification heat recovery units, is applicable to dry or other products dryings of slice class food. The compression heat the refrigerant exit linkage evaporation heat switching module of dehumidification in the module, pipe laying water evaporation module entry, evaporation heat switching module, the refrigerant export of pipe laying water evaporation module connect the compressor that the compression heated the dehumidification module through the cross valve. Provided is an advantage embodies: energy -conserving, does not have any waste gas, waste residue etc. And have pest emission, long service life, a tractor serves several purposes, cold and hot antithetical couplet to supply.

Description

A kind of double-source heat pump vermicelli drying dehumidification recuperation of heat unit
Technical field
This patent relates to food drying energy-saving equipment, is specially a kind of double-source heat pump vermicelli drying dehumidification recuperation of heat unit, is applicable to the drying of slice based food or other product dryings.
Background technology
China is the cradle of vermicelli technology, has the history of more than 2000 year, in history the multiplex manual production of vermicelli, and daylight airing, yields poorly, of poor quality.Until the twenties in 20th century starts just to adopt mechanization production.Vermicelli be add salt by wheat flour, noodles that alkali, water are made, after loft dried, cut into the dried noodles of certain length.It is a most important ring during vermicelli are produced that vermicelli are dried, and baking room, as controlled bad easy generation noodle rupture or turning sour, causes vermicelli defective work.Thus select rational noodle drying process and thermal source control mode extremely important.Current vermicelli drying room can be divided into low temperature drying room, middle temperature drying room, high temperature drying room by bake out temperature, and high temperature drying room controls because of difficulty or ease, and thus the most common is at present low temperature drying room and middle temperature drying room.Cableway-type drying room and tunnel type drying room can be divided into again by drying room structure.The heat source way that current vermicelli are dried is mainly from several as follows: natural gas boiler, coal-burning boiler, bavin boiler, oil burning boiler, electric boiler.Heat transfer type in drying room has warm-air pipe heat radiation, heat-conducting oil pipes heat radiation, hot-water line heat radiation.The heat source way energy consumption cost of electric boiler is the highest, and operating cost is generally 2-4 times of other heat source way, general little employing.The raw material problem of oil burning boiler and bavin boiler and firewood too high because of fuel cost respectively again, adopts also relatively less.Because the unit price of coal is relatively low, the heat source way of current vermicelli oven dry more than 90% all adopts coal-burning boiler, also has small part to adopt natural gas boiler.How vermicelli are at drying course in economize energy expense simultaneously of improving the quality of products, and are difficult problems for vermicelli industry always.The heat source way of traditional burning type such as combustion gas, fire coal is adopted to expose all deficiencies gradually: the mode 1, obtaining thermal source by burning coal, combustion gas, burning bavin etc., consume a large amount of primary energy, effectively utilizing of the energy is low, heat energy is wasted greatly, produce CO2 isothermal chamber gas simultaneously, be the arch-criminal of greenhouse effects, generation nitride and sulfide cause the disaster such as haze, acid rain.The firing equipments such as 2, traditional coal-burning boiler, gas fired-boiler, electric boiler, have strict instructions for use, boiler plant all needs annual test every year.The service life of equipment is relatively short in addition, and general 3-6 replacing service life once, causes equipment overlapping investment.3, input drying room after the thermal source produced by modes such as fire coal, combustion gas, burning materials carries out secondary heat exchange by conduction oil or recirculated water to use, the stability of drying room temperature derives from the stability of thermal source.Heat source way that is coal-fired and burning material is very large by the rate of fuel combustion, and the temperature fluctuation of thermal source directly causes the warm and humid control difficulty of drying room to strengthen, and in drying course, temperature contrast is comparatively large, and vermicelli oven dry quality stability is poor.The crisp bar that noodles stoving easily produces and the defective work such as to turn sour.The labour intensity of operating personnel is quite large simultaneously.4, all need hydrofuge in vermicelli drying course, traditional hydrofuge mode be by the damp-heat air in drying room by outside the direct discharge chamber of wet-emitting blower, cause a large amount of heat loss, add the energy consumption of vermicelli baking needed.5, in drying course, without the consumption primary energy of cut-off, cause resource transition to exploit, some place is when coal resources anxiety, and felling mountain forest causes landslide, causes significant impact to the productive life of people.The drying plants such as traditional fire coal, burning material to be not suitable with the policy of national sustainable development, need reliable energy-conserving product to substitute in drying course.
Summary of the invention
This patent, for above technical problem, provides a kind of double-source heat pump vermicelli drying dehumidification recuperation of heat unit.Object is to realize energy-conservation, automatic control, without the need to manual operation, waste gas, waste residue zero-emission, long service life, a tractor serves several purposes, cold and heat combined supply.
The concrete technical scheme of this patent is as follows:
A kind of double-source heat pump vermicelli drying dehumidification recuperation of heat unit, comprise compression pyrogenic dehumidification module, heat of evaporation Switching Module, underground pipe water evaporation module composition, refrigerant outlet in compression pyrogenic dehumidification module connects heat of evaporation Switching Module, underground pipe water evaporation mold block entrance, and the refrigerant outlet of heat of evaporation Switching Module, underground pipe water evaporation module connects the compressor of compression pyrogenic dehumidification module by cross valve.
The evaporimeter of described heat of evaporation Switching Module arranges heat exchanger, heat exchanger is arranged respectively fresh inlet pipeline, hot air dehumidifying outlet conduit, ambient air inlet pipeline.
The side that described underground pipe water evaporation module changes evaporimeter by plate arranges refrigerant inlet, outlet, and the opposite side that plate changes evaporimeter connects ground heat exchanger by water circulating pump.
In described compression pyrogenic dehumidification module, the refrigerant outlet of compressor connects cross valve, the back flow of refrigerant mouth of cross valve connects compressor by separator, the refrigerant outlet of cross valve connects the entrance of condenser, the refrigerant outlet of condenser connects filter, heating power expansion valve by fluid reservoir, the outlet of heating power expansion valve connects heat of evaporation Switching Module, underground pipe water evaporation module, dehumidifying evaporator inlet respectively, and the condenser working gas of compression pyrogenic dehumidification module enters side and arranges dehumidifying evaporimeter.
The condenser working gas of compression pyrogenic dehumidification module enters side and arranges dehumidifying evaporimeter, its effect is to use drying work air being reduced by the humidity realizing control air by the evaporimeter that dehumidifies before heating, and then carried out drying work by the heating of compression high temperature refrigerant, and then improve equipment drying effect.
Refrigerant outlet in compression pyrogenic dehumidification module connects heat of evaporation Switching Module, underground pipe water evaporation mold block entrance, and the refrigerant outlet of heat of evaporation Switching Module, underground pipe water evaporation module connects the compressor of compression pyrogenic dehumidification module by cross valve.This of equipment is characterised in that, when outside air temperature is sufficiently high time, heat of evaporation Switching Module works, and utilizes the cold-producing medium of the heat heating and gasifying of air or refrigeration employee indoor circulation air to reach the effect of air-conditioning.And work as winter approached, outdoor air is very low, outdoor air cannot provide the Carbureted heat energy of cold-producing medium, underground pipe water evaporation module is used this time to provide heat energy, generally, underground water temperature maintains 16 degrees centigrade, and underground recirculated water provides heat energy to realize refrigerant vapor periodic duty.
Another feature of heat of evaporation Switching Module is, when needs upgrade oven dry air, to be carried out twice thermal energy exchange by the humidity air swapped out, one is to needing the cold-producing medium gasified to provide heat energy in heat of evaporation Switching Module, and two is improve heat service efficiency to newly entering air heat.
This patent has the following advantages:
1) energy-conservation: double-source heat pump vermicelli drying dehumidification recuperation of heat unit just fully takes into account the environmental difference handling characteristics of different regions when designing, air source heat pump technology, ground source heat pump technology and heat recovery technology are perfectly combined.Directly accurately controlled the humiture in drying room by the mode of a heat exchange, such as: when environment temperature is higher than 16 degree, adopt air-source mode operation, carry out heat exchange by outdoor air.When environment temperature is lower than 16 degree, double-source heat pump vermicelli drying dehumidification recuperation of heat unit adopts ground source module to run, and carries out heat exchange by underground water or ground earth.Simultaneously during double-source heat pump vermicelli drying dehumidification recuperation of heat unit operation, can also by the evaporimeter on main frame, a large amount of latent heat and sensible heat in the damp-heat air that absorption drying room is discharged when hydrofuge.Thus the Energy Efficiency Ratio of double-source heat pump vermicelli drying dehumidification recuperation of heat unit operation can remain at more than 350%.Reach the most energy-conservation object, also save more than 30% energy expenditure than fire coal.
2), without hazardous emissions such as any waste gas, waste residues, be the energy saving environmental protection product that country advocates.
3), service life of double-source heat pump vermicelli drying dehumidification recuperation of heat unit can reach more than 15 years, avoids the overlapping investment of equipment in short-term.
4), a tractor serves several purposes: double-source heat pump vermicelli drying dehumidification recuperation of heat unit not only may be used for vermicelli dries, and also can be used for the oven dry of the foodstuff such as rice-noodles, bean vermicelli, drug class.
5), cold and heat combined supply: double-source heat pump vermicelli drying dehumidification recuperation of heat unit, while drying room heat supply, can provide free cold air in summer, can have in workshop, cooling that office building, dormitory etc. are local.Comprehensive energy efficiency ratio is up to more than 700%.
Accompanying drawing explanation
Fig. 1 is the structural representation of patent.
Wherein, 1---compressor, 2---cross valve, 3---condenser, 4---condenser fan, 5---fluid reservoir, 6---filter, 7---heating power expansion valve, 8---magnetic valve, 9---magnetic valve, 10---plate changes evaporimeter, 11---water circulating pump, 12---gate valve, 13---gate valve, 14---gate valve, 15---gate valve, 16---ground heat exchanger, 17---water pipe, 18---coil pipe, 19---magnetic valve, 20---magnetic valve, 21---magnetic valve, 22---evaporimeter, 23---evaporator fan, 24---separator, 25---copper pipe, 26---new wind blower fan, 27---wet-emitting blower, 28---heat exchanger, 29---hot air dehumidifying mouth, 30---fresh inlet, 31---console controller, 32---dehumidifying evaporimeter, 33---magnetic valve, 34---magnetic valve.
Detailed description of the invention
Below in conjunction with detailed description of the invention, this patent is described further.
A kind of double-source heat pump vermicelli drying dehumidification recuperation of heat unit, comprise compression pyrogenic dehumidification module, heat of evaporation Switching Module, underground pipe water evaporation module composition, refrigerant outlet in compression pyrogenic dehumidification module connects heat of evaporation Switching Module, underground pipe water evaporation mold block entrance, and the refrigerant outlet of heat of evaporation Switching Module, underground pipe water evaporation module connects the compressor of compression pyrogenic dehumidification module by cross valve.
The evaporimeter of described heat of evaporation Switching Module arranges heat exchanger, heat exchanger is arranged respectively fresh inlet pipeline, hot air dehumidifying outlet conduit, ambient air inlet pipeline.
The side that described underground pipe water evaporation module changes evaporimeter by plate arranges refrigerant inlet, outlet, and the opposite side that plate changes evaporimeter connects ground heat exchanger by water circulating pump.
In described compression pyrogenic dehumidification module, the refrigerant outlet of compressor connects cross valve, the back flow of refrigerant mouth of cross valve connects compressor by separator, the refrigerant outlet of cross valve connects the entrance of condenser, the refrigerant outlet of condenser connects filter, heating power expansion valve by fluid reservoir, the outlet of heating power expansion valve connects heat of evaporation Switching Module, underground pipe water evaporation module, dehumidifying evaporator inlet respectively, and the condenser working gas of compression pyrogenic dehumidification module enters side and arranges dehumidifying evaporimeter.
The condenser working gas of compression pyrogenic dehumidification module enters side and arranges dehumidifying evaporimeter, its effect is to use drying work air being reduced by the humidity realizing control air by the evaporimeter that dehumidifies before heating, and then carried out drying work by the heating of compression high temperature refrigerant, and then improve equipment drying effect.
Refrigerant outlet in compression pyrogenic dehumidification module connects heat of evaporation Switching Module, underground pipe water evaporation mold block entrance, and the refrigerant outlet of heat of evaporation Switching Module, underground pipe water evaporation module connects the compressor of compression pyrogenic dehumidification module by cross valve.This of equipment is characterised in that, when outside air temperature is sufficiently high time, heat of evaporation Switching Module works, and utilizes the cold-producing medium of the heat heating and gasifying of air or refrigeration employee indoor circulation air to reach the effect of air-conditioning.And work as winter approached, outdoor air is very low, outdoor air cannot provide the Carbureted heat energy of cold-producing medium, underground pipe water evaporation module is used this time to provide heat energy, generally, underground water temperature maintains 16 degrees centigrade, and underground recirculated water provides heat energy to realize refrigerant vapor periodic duty.
Another feature of heat of evaporation Switching Module is, when needs upgrade oven dry air, to be carried out twice thermal energy exchange by the humidity air swapped out, one is to needing the cold-producing medium gasified to provide heat energy in heat of evaporation Switching Module, and two is improve heat service efficiency to newly entering air heat.
Equipment according to user demand, can realize 3 kinds of different methods of operation, be respectively in running: air-source operational mode, source operational mode, dehumidification operating mode.Its flow process run explains orally as follows respectively:
Air-source operational mode: when needs are dried, when outdoor environment temperature is higher, magnetic valve 20, magnetic valve 21 synchronously energising is opened, cross again 10 second finisher blower fan 23 startup optimization, after spending again for 10 seconds, condenser fan 4 is opened, after spending again for 60 seconds, compressor 1 brings into operation, the closed-loop refrigeration Ji that copper pipe 25 connects by compressor 1 is compressed into the gaseous state of HTHP, its refrigeration Ji temperature can reach 125 degree, release heat is started the gaseous refrigerant Ji of HTHP is by flowing through condenser 3 after cross valve 2 time, the air of condenser fan 4 in the process run in continuous drive drying room is through condenser 3, because the air in drying room is in normal temperature state.Re Jiaore is carried out in the effect of helping in the temperature difference of freezing of 125 degree of high pressure gaseous in air in drying room and condenser 3, air themperature in drying room raises, refrigeration Ji heat release in condenser 3 of HTHP forms gas-liquid mixture phase, the refrigeration Ji flowed out from condenser 3 gets back to fluid reservoir 5, fluid reservoir stores fraction liquid refrigeration device, major part gaseous refrigerant Ji is when flowing through filter 6, and the impurity in refrigeration Ji cleans further, strengthens the stability of system.Refrigeration Ji is dammed under the effect of heating power expansion valve 7, the refrigeration Ji of HTHP becomes the liquid state of low-temp low-pressure under the effect of damming, liquid refrigeration Ji minimum temperature can reach-25 degree, cryogenic refrigeration Ji flows in evaporimeter 22 by magnetic valve 20, evaporator fan 23 constantly drives outdoor air in evaporator 22 in the process run, outdoor air is normal temperature state, in outdoor air and evaporimeter 22-25 spend cryogenic refrigeration helps and to exchange under the effect of the temperature difference, drains after outdoor air cooling through evaporator fan 23.Heat in refrigeration Ji absorption chamber outer air in evaporimeter 22 becomes the liquid state of low-temp low-pressure again.The refrigeration Ji of liquid state gets back to separator 24 through cross valve 2, fraction liquid refrigeration Ji is stored in separator 24, major part low-temp low-pressure gaseous refrigerant Ji gets back to the gaseous state that compressor 1 is compressed into HTHP again, and circulation stops heating after reaching the temperature of baking room setting and so forth.Stopping order is successively: after compressor 1 stops 10 seconds, evaporator fan 23 is out of service, and after 30 seconds, optional maintenance runs or stops condenser fan 4, as choosing keeps running condenser fan 4, can not shut down.Shut electromagnetic valve 20 and magnetic valve 21 after 60 seconds.Step more than repeating is poly-can air-source operational mode.
Source operational mode, ground (not reclaiming cold air) :when needs are dried, when outdoor environment temperature is lower, open gate valve 12, gate valve 13, console controller 31 is main frame and switches on power after being energized.5 second rear electromagnetic valve 9, magnetic valve 19 synchronously energising is opened, cross again 10 second Posterior circle water pump 11 startup optimization, after spending again for 60 seconds, condenser fan 4 is opened, after spending again for 60 seconds, compressor 1 brings into operation, the closed-loop refrigeration Ji that copper pipe 25 connects by compressor 1 is compressed into the gaseous state of HTHP, its refrigeration Ji temperature can reach 125 degree, release heat is started the gaseous refrigerant Ji of HTHP is by flowing through condenser 3 after cross valve 2 time, the air of condenser fan 4 in the process run in continuous drive drying room is through condenser 3, because the air in drying room is in normal temperature state.Re Jiaore is carried out in the effect of helping in the temperature difference of freezing of 125 degree of high pressure gaseous in air in drying room and condenser 3, air themperature in drying room raises, refrigeration Ji heat release in condenser 3 of HTHP forms gas-liquid mixture phase, the refrigeration Ji flowed out from condenser 3 gets back to fluid reservoir 5, fluid reservoir stores fraction liquid refrigeration device, major part gaseous refrigerant Ji is when flowing through filter 6, and the impurity in refrigeration Ji cleans further, strengthens the stability of system.Refrigeration Ji is dammed under the effect of heating power expansion valve 7, the refrigeration Ji of HTHP becomes the liquid state of low-temp low-pressure under the effect of damming, liquid refrigeration Ji minimum temperature can reach-25 degree, cryogenic refrigeration Ji flows through plate by magnetic valve 9 and changes in evaporimeter 10, water circulating pump 11 constantly drives the recirculated water in ground heat exchanger 16 to change evaporimeter 10 from underground extraction through plate in the process run, water temperature in ground heat exchanger 16 and underground water temperature are all 16 degree mutually, the recirculated water that ground heat exchanger is 16 degree and plate change-25 in evaporimeter 10 and spend cryogenic refrigeration and help and to exchange under the effect of the temperature difference, send back to again in the ground heat exchanger 16 of under ground portion through water circulating pump 11 after circulating water cooling in ground heat exchanger 16.At this moment the recirculated water in ground heat exchanger 16 is lower than the temperature of underground water, thus, under the effect of the temperature difference, recirculated water in ground heat exchanger is delivered to plate by water circulating pump 11 again after absorbing the temperature of underground water and is changed in evaporimeter 10 to help with-25 cryogenic refrigerations of spending and exchange.Circulate and so forth.The plate refrigeration Ji of changing in evaporimeter 10 absorbs the heat of recirculated water in ground heat exchanger 16 and becomes the liquid state of low-temp low-pressure again.The refrigeration Ji of liquid state gets back to separator 24 through magnetic valve 19 to cross valve 2, fraction liquid refrigeration Ji is stored in separator 24, major part low-temp low-pressure gaseous refrigerant Ji gets back to the gaseous state that compressor 1 is compressed into HTHP again, and circulation stops heating after reaching the temperature of baking room setting and so forth.Stopping order is successively: after compressor 1 stops 10 seconds, water circulating pump 11 is out of service, and after 30 seconds, optional maintenance runs or stops condenser fan 4, as choosing keeps running condenser fan 4, can not shut down.Shut electromagnetic valve 9 and magnetic valve 19 after 60 seconds.Step more than repeating is poly-can water source operational mode.
Source operational mode, ground (recovery cold air) :when needs are dried, when outdoor environment temperature is higher, open gate valve 14, gate valve 15, console controller 31 is main frame and switches on power after being energized.5 second rear electromagnetic valve 9, magnetic valve 19 synchronously energising opens, cross again 10 second Posterior circle water pump 11 startup optimization, after spending for 60 seconds again, condenser fan 4 opens operation, and after spending 60 seconds again, indoor coil 18 opens operation.After spending again for 60 seconds, compressor 1 brings into operation, the closed-loop refrigeration Ji that copper pipe 25 connects by compressor 1 is compressed into the gaseous state of HTHP, its refrigeration Ji temperature can reach 125 degree, release heat is started the gaseous refrigerant Ji of HTHP is by flowing through condenser 3 after cross valve 2 time, condenser fan 4 constantly drives air in drying room through condenser 3 in the process run, because the air in drying room is in normal temperature state.Re Jiaore is carried out in the effect of helping in the temperature difference of freezing of 125 degree of high pressure gaseous in air in drying room and condenser 3, air themperature in drying room raises, refrigeration Ji heat release in condenser 3 of HTHP forms gas-liquid mixture phase, the refrigeration Ji flowed out from condenser 3 gets back to fluid reservoir 5, fluid reservoir stores fraction liquid refrigeration device, major part gaseous refrigerant Ji is when flowing through filter 6, and the impurity in refrigeration Ji cleans further, strengthens the stability of system.Refrigeration Ji is dammed under the effect of heating power expansion valve 7, the refrigeration Ji of HTHP becomes the liquid state of low-temp low-pressure under the effect of damming, liquid refrigeration Ji minimum temperature can reach-25 degree, cryogenic refrigeration Ji flows through plate by magnetic valve 9 and changes in evaporimeter 10, water circulating pump 11 constantly drives the recirculated water in indoor coil 18 to change in evaporimeter 10 through plate in the process run, water temperature in coil pipe 18 is identical with indoor temperature, recirculated water in coil pipe 18 and plate change-25 in evaporimeter 10 and spend cryogenic refrigeration and help and to exchange under the effect of the temperature difference, send again coil pipe back to through water circulating pump 11 after circulating water cooling in coil pipe 18 to change in 18.At this moment the recirculated water in coil pipe 18 is lower than the temperature of room air, now built-in in coil pipe 18 blower fan under operation, constantly by the recirculated water of room air drive in coil pipe, under the effect of the temperature difference, water temperature in coil pipe 18 raises after absorbing the heat in room air, the temperature of contrary room air reduces, and the water in coil pipe 18 is delivered to plate by water circulating pump 11 again and changed in evaporimeter 10 and carry out heat exchange, circulates and so forth.Indoor air temperature is lowered, and serves and freely enjoys the effect of air conditioner refrigerating in summer.Plate changes the heat of recirculated water in the refrigeration Ji absorption coil 18 in evaporimeter 10 and becomes the liquid state of low-temp low-pressure again.The refrigeration Ji of liquid state gets back to separator 24 by cross valve 2 after magnetic valve 19, fraction liquid refrigeration Ji is stored in separator 24, major part low-temp low-pressure gaseous refrigerant Ji gets back to the gaseous state that compressor 1 is compressed into HTHP again, and circulation stops heating after reaching the temperature of baking room setting and so forth.Stopping order is successively: after compressor 1 stops 10 seconds, water circulating pump 11 is out of service, and after 30 seconds, optional maintenance runs or stops condenser fan 4, as choosing keeps running condenser fan 4, can not shut down.Shut electromagnetic valve 9 and magnetic valve 19 after 60 seconds.The optional maintenance of airduct 18 runs or stops.Keeping running wind dish 18 as selected, can not shut down.Step more than repeating is poly-can water source operational mode (reclaim and freeze).
Dehumidification operating mode:
When the humidity in drying room is greater than setting humidity, magnetic valve 33, magnetic valve 34 synchronously energising are opened, cross again 10 second post-condenser fan 4 to open, after spending again for 60 seconds, compressor 1 brings into operation, the closed-loop refrigeration Ji that copper pipe 25 connects by compressor 1 is compressed into the gaseous state of HTHP, its refrigeration Ji temperature can reach 125 degree, release heat is started the gaseous refrigerant Ji of HTHP is by flowing through condenser 3 after cross valve 2 time, condenser fan 4 constantly drives air in drying room through condenser 3 in the process run, because the air in drying room is in normal temperature state.Re Jiaore is carried out in the effect of helping in the temperature difference of freezing of 125 degree of high pressure gaseous in air in drying room and condenser 3, air themperature in drying room raises, refrigeration Ji heat release in condenser 3 of HTHP forms gas-liquid mixture phase, the refrigeration Ji flowed out from condenser 3 gets back to fluid reservoir 5, fluid reservoir stores fraction liquid refrigeration device, major part gaseous refrigerant Ji is when flowing through filter 6, and the impurity in refrigeration Ji cleans further, strengthens the stability of system.Refrigeration Ji is dammed under the effect of heating power expansion valve 7, the refrigeration Ji of HTHP becomes the liquid state of low-temp low-pressure under the effect of damming, liquid refrigeration Ji minimum temperature can reach-25 degree, cryogenic refrigeration Ji flows in dehumidifying evaporimeter 32 by magnetic valve 33, condenser fan 4 constantly drives the air in drying room to pass through dehumidifying evaporimeter 32 in the process run, air in drying room has just been condensed and has spent cryogenic refrigeration with-25 in dehumidifying evaporimeter 32 after device 3 heats and help and to exchange under the effect of the temperature difference, there is condensation of water after air cooling-down in drying room existing to, drain through condenser fan 4 after air themperature in drying room and humidity are lowered.The refrigeration Ji heat absorbed in drying room in air in dehumidifying evaporimeter 32 becomes the liquid state of low-temp low-pressure again.The refrigeration Ji of liquid state flows to cross valve 2 and gets back to separator 24 after magnetic valve 34, fraction liquid refrigeration Ji is stored in separator 24, major part low-temp low-pressure gaseous refrigerant Ji gets back to the gaseous state that compressor 1 is compressed into HTHP again, and circulation stops dehumidifying after reaching the humidity of baking room setting and so forth.Stopping order is successively: after compressor 1 stops 10 seconds, condenser fan 5 is out of service, shut electromagnetic valve 33 and magnetic valve 34 after 60 seconds.Step more than repeating is poly-gets final product dehumidification operating mode.
Heat recovery system: heat recovery system is made up of new wind blower fan 26, wet-emitting blower 27, heat exchanger 28, and wet-emitting blower 27 is connected with heat exchanger 28 and drying room successively.New wind blower fan 26 is connected with heat exchanger 28.Wet-emitting blower 27 is newly equal with the design wind of new wind blower fan 26, and its objective is and make the interior air quantity of discharging of baking room equal with the air quantity sending into drying room, reach air balance in drying room, humiture is controlled.Wet-emitting blower 27 and new wind blower fan 26 are two air channels of mutually reporting to the leadship after accomplishing a task simultaneously.Heat recovery system is, its operation is that the humidity of foundation baking room is to control start-stop.Its operational process is as follows: when the air humidity in drying room exceedes setting value, and new wind blower fan 26, wet-emitting blower 27 are synchronously opened.Now the damp-heat air of drying room is discharged on evaporimeter 22 under the drive of wet-emitting blower 27 after over-heat-exchanger 28, if damp-heat air is now 40 degree, outdoor air drives and delivers to baking room through heat exchanger 28 by synchronous operated new wind blower fan 26 therewith, if outdoor new wind is 0 degree entering heat exchanger 28, when 40 degree of damp-heat airs and 0 degree of new wind are when heat exchanger 28 is crossing, because the exchange efficiency of heat exchanger 28 can reach more than 50%.That is when 40 degree of damp-heat air outflow heat exchangers 28, temperature can drop to 20 degree, and new wind temperature when outflow heat exchanger 28 of 0 degree can rise to 20 degree simultaneously.EAT is improved, and thus reaches energy-conservation effect.Also have 20 degree from temperature during 40 degree of damp-heat air outflow heat exchangers 28, higher than the environment temperature of 0 degree, when the damp-heat airs of 20 degree are through evaporator 22, improve the heat exchange efficiency of evaporimeter, the Energy Efficiency Ratio allowing main frame run is higher simultaneously.Reach the double advantage of hydrofuge recuperation of heat and the raising of main frame efficiency.Synthesis energy saving is better.
The main function of magnetic valve 8 is protect extension system stable, and when system pressure is greater than 28 kilograms, magnetic valve 8 can open release automatically, and main frame all can not be produced high voltage protective at above several modes runtime system and shut down.The drying procedure of simultaneously console controller is built-in vermicelli, rice noodles, ground rice, bean vermicelli four kinds of different materials, only needing checks the number selects corresponding material drying program, can run by main control system, carries out a tractor serves several purposes.

Claims (4)

1. a double-source heat pump vermicelli drying dehumidification recuperation of heat unit, comprise compression pyrogenic dehumidification module, heat of evaporation Switching Module, underground pipe water evaporation module composition, it is characterized in that: the refrigerant outlet in compression pyrogenic dehumidification module connects heat of evaporation Switching Module, underground pipe water evaporation mold block entrance, the refrigerant outlet of heat of evaporation Switching Module, underground pipe water evaporation module connects the compressor of compression pyrogenic dehumidification module by cross valve.
2. a kind of double-source heat pump vermicelli drying dehumidification recuperation of heat unit according to claim 1, it is characterized in that: the evaporimeter of described heat of evaporation Switching Module arranges heat exchanger, heat exchanger is arranged respectively fresh inlet pipeline, hot air dehumidifying outlet conduit, ambient air inlet pipeline.
3. a kind of double-source heat pump vermicelli drying dehumidification recuperation of heat unit according to claim 1, it is characterized in that: the side that described underground pipe water evaporation module changes evaporimeter by plate arranges refrigerant inlet, outlet, and the opposite side that plate changes evaporimeter connects ground heat exchanger by water circulating pump.
4. a kind of double-source heat pump vermicelli drying dehumidification recuperation of heat unit according to claim 1, it is characterized in that: in described compression pyrogenic dehumidification module, the refrigerant outlet of compressor connects cross valve, the back flow of refrigerant mouth of cross valve connects compressor by separator, the refrigerant outlet of cross valve connects the entrance of condenser, the refrigerant outlet of condenser connects filter by fluid reservoir, heating power expansion valve, the outlet of heating power expansion valve connects heat of evaporation Switching Module respectively, underground pipe water evaporation module, dehumidifying evaporator inlet, the condenser working gas of compression pyrogenic dehumidification module enters side and arranges dehumidifying evaporimeter.
CN201520592315.XU 2015-08-10 2015-08-10 Two source heat pump vermicelli drying and dehumidification heat recovery units Expired - Fee Related CN204854071U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520592315.XU CN204854071U (en) 2015-08-10 2015-08-10 Two source heat pump vermicelli drying and dehumidification heat recovery units

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520592315.XU CN204854071U (en) 2015-08-10 2015-08-10 Two source heat pump vermicelli drying and dehumidification heat recovery units

Publications (1)

Publication Number Publication Date
CN204854071U true CN204854071U (en) 2015-12-09

Family

ID=54744612

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520592315.XU Expired - Fee Related CN204854071U (en) 2015-08-10 2015-08-10 Two source heat pump vermicelli drying and dehumidification heat recovery units

Country Status (1)

Country Link
CN (1) CN204854071U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105783472A (en) * 2016-05-03 2016-07-20 河南佰衡节能科技股份有限公司 Heat pump-type vermicelli drying equipment
CN108759328A (en) * 2018-06-28 2018-11-06 江苏必领能源科技有限公司 The enclosed dehumidifying more drying chamber drying systems of water-water heat pump
CN108955224A (en) * 2018-08-20 2018-12-07 天津商业大学 A kind of enclosed earth source heat pump drying system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105783472A (en) * 2016-05-03 2016-07-20 河南佰衡节能科技股份有限公司 Heat pump-type vermicelli drying equipment
CN108759328A (en) * 2018-06-28 2018-11-06 江苏必领能源科技有限公司 The enclosed dehumidifying more drying chamber drying systems of water-water heat pump
CN108955224A (en) * 2018-08-20 2018-12-07 天津商业大学 A kind of enclosed earth source heat pump drying system

Similar Documents

Publication Publication Date Title
CN204963517U (en) Air source constant temperature and humidity vermicelli stoving heat recovery unit
CN104728979B (en) A kind of Renovation of air-conditioning system method and apparatus of application all-weather solar heat supply
CN103423917A (en) Air-source central air-conditioning hot water triple-generation heat pump unit
CN202133180U (en) Integrated supply system for cold and warm air or water
CN204854071U (en) Two source heat pump vermicelli drying and dehumidification heat recovery units
CN103776199B (en) There is the soil source gas engine heat pump system of thermal balance Active recovery function
KR20110109352A (en) Airconditining and hot water supplying applratus for heat pump system using geothermy
CN204063403U (en) A kind of heat pump water heater system
CN204902523U (en) Super high temperature heat pump drying system
CN202476421U (en) Double heat source drying device applied to tobacco flue-curing
CN202101331U (en) Heat pump water-heating system using central air-conditioner cooling water and low-temperature flue gas afterheat
CN203657274U (en) Ground source gas heat pump system with heat balance active recovery function
CN203572093U (en) Hot water CCHP heat pump unit of air-source central air conditioner
CN206269289U (en) By the use of combustion gas as the heat pump of thermal source
CN103557633B (en) A kind of air source low-temperature trilogy supply heat-pump hot-water unit and implementation method thereof
CN105258379A (en) Heat pump solar evaporative condensation air conditioning unit
CN106440401A (en) Solar energy and double source heat pump fine dried noodle drying machine applied to fine dried noodle drying integrated system and preparation process
CN201514078U (en) Solar energy air energy combination heating refrigerator
CN112747585B (en) Open heat pump drying system based on soil source, air source and solar energy coupling
CN201218633Y (en) Solar energy-accumulation and energy-exchange dual-effect air conditioner
CN104110915A (en) Water heating method and device through coupling of refrigerating unit condensation heat and collected solar heat
CN203501546U (en) Direct-fired triple-purpose lithium bromide absorption cold and hot water set with dual-energy-saving device
CN203413820U (en) Water heating unit of double-source high-temperature heat pump
CN202419805U (en) Heat recovery air conditioner
CN108518891B (en) Direct-fired lithium bromide absorption type cold and hot water unit with sanitary hot water for eliminating white smoke

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151209

Termination date: 20180810