CN204851303U - Drawhole supporting construction - Google Patents
Drawhole supporting construction Download PDFInfo
- Publication number
- CN204851303U CN204851303U CN201520589917.XU CN201520589917U CN204851303U CN 204851303 U CN204851303 U CN 204851303U CN 201520589917 U CN201520589917 U CN 201520589917U CN 204851303 U CN204851303 U CN 204851303U
- Authority
- CN
- China
- Prior art keywords
- steel
- crossbeam
- drawhole
- rail
- supporting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title abstract description 7
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 47
- 239000010959 steel Substances 0.000 claims abstract description 47
- 239000004567 concrete Substances 0.000 claims abstract description 20
- 239000011378 shotcrete Substances 0.000 claims abstract description 8
- 230000002787 reinforcement Effects 0.000 claims abstract description 6
- 239000000835 fiber Substances 0.000 claims abstract description 5
- 239000011347 resin Substances 0.000 claims abstract description 4
- 229920005989 resin Polymers 0.000 claims abstract description 4
- 238000007747 plating Methods 0.000 claims abstract description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 16
- 229910052742 iron Inorganic materials 0.000 claims description 8
- 238000003466 welding Methods 0.000 claims description 5
- 238000007493 shaping process Methods 0.000 abstract description 2
- 239000002965 rope Substances 0.000 abstract 2
- 210000004709 Eyebrows Anatomy 0.000 abstract 1
- -1 stock Substances 0.000 abstract 1
- 239000011435 rock Substances 0.000 description 11
- 239000011324 bead Substances 0.000 description 4
- 238000005299 abrasion Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 238000005065 mining Methods 0.000 description 3
- 239000004570 mortar (masonry) Substances 0.000 description 2
- 238000004873 anchoring Methods 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 229910052802 copper Inorganic materials 0.000 description 1
- 239000010949 copper Substances 0.000 description 1
- RYGMFSIKBFXOCR-UHFFFAOYSA-N copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 230000003014 reinforcing Effects 0.000 description 1
- 230000002040 relaxant effect Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
- 230000000087 stabilizing Effects 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 230000005641 tunneling Effects 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Abstract
The utility model belongs to the building field specifically is a drawhole supporting construction, its characterized in that includes well long anchor rope, stock, steel fiber concrete layer, crossbeam, bottom plate rail and bottom plate connecting reinforcement, wherein: tunnel two help with the vault steel fiber shotcrete of portion to close plating net, beat the stock and well long anchor rope is strutted, and the bottom sets up dress ore deposit admission passage bottom plate, adorns and lays the rail on the admission passage bottom plate of ore deposit, set up the crossbeam in drawhole eyebrow line department, the crossbeam adopts the angle steel to weld in succession to form in the lower flange on by two rows of I -steel, outside both sides of crossbeam and middle part set up the bearing diagonal, and the bearing diagonal is the channel -section steel, and both ends are connected with crossbeam and steel sheet respectively, and the steel sheet is fixed with the resin stock at tunnel lateral wall and top respectively. The utility model discloses a drawhole supporting construction, the maintenance cost is low, and the shaping is rapid, and is safe practical.
Description
Technical field
The utility model belongs to building field, is specially a kind of drawhole supporting and protection structure.
Background technology
Supporting is the stable and construction safety after underground chamber excavation, and the support taked, reinforcement or the component of coating country rock or the general name of other measures.When adopting New Austrian Tunneling Method construction, temporary lining and permanent support two class can be divided by support action effect, comprise the polytype such as combined bolting and shotcrete, steel wood support, concrete lining, grouting support.
Combined bolting and shotcrete refers to by means of pressure-injected cement concrete and the synergy reinforcing rock stratum squeezing into the anchor metal in rock stratum, is divided into temporary supporting structure and permanent supporting and protection structure.Sprayed mortar can as the preliminary bracing of surrounding rock of chamber, also can as permanent supporting.Combined bolting and shotcrete makes anchor pole, concrete spray coating and country rock form coefficient system, prevents rock-mass relaxing, separation.Certain thickness country rock is transformed into self-supporting arch, stabilizing surrounding rock effectively.When rock mass is more broken, steel mesh reinforcement can also be utilized to draw the little sillar kept off between anchor pole, Concrete Structure spray-up, auxiliary combined bolting and shotcrete.
Some mining area is positioned at weak structural belt, in future mining process, due to the increasing of chamber section, will cause the bad stability of surrounding rock of chamber, and the structural belt along mutual meet produces large-scale distortion, and collapse breakoff phenomenon.For the mining area adopting Block caving system, the vertical orebody trend in ore removal horizontal Chuan Mai tunnel is arranged, the stress that polycrystalline substance bears is comparatively large, and existing supporting and protection structure can not meet the requirement of stability.
The supporting of natural caving method in China drawhole mainly adopts builds plain concrete supporting (domestic only Tongkuangyu copper one adopts natural caving method), it is a kind of passive protecting form, and working procedure is long, complicated construction technique, and after being subject to stress easily there is deformation failure in plain concrete.Steel fibrous shotcrete+anchor pole+wire lath+middle long anchor cable that our supporting adopts, making full use of bearing capacity of the wall rock, is a kind of positive support form.And adopting the construction of concrete ejection chassis, rock bolting jumbo, anchor cable chassis, speed of application is fast, and intensity is high.
Summary of the invention
The problem of stability requirement can not be met for existing supporting and protection structure under extreme terrain requirement, the utility model proposes a kind of drawhole supporting and protection structure.
Drawhole supporting and protection structure of the present utility model, is characterized in that comprising middle long anchor cable, anchor pole, steel fibrous concrete layer, crossbeam, base plate rail and base plate connecting reinforcement, wherein:
At roadway's sides and dome portions steel fiber shotcrete, and close plating net, beat anchor pole and middle long cable supporting, bottom arranges dress ore deposit route base plate, steel rail laying on the route base plate of dress ore deposit;
At drawhole open wiring, place arranges crossbeam, and crossbeam adopts angle steel continuous welding to form by bottom flange on two row's i iron; Crossbeam both sides external and middle part arrange bearing diagonal, and bearing diagonal is channel-section steel, and two ends are connected with steel plate with crossbeam respectively, and steel plate is fixed with the resin anchor at tunnel sidewall and top respectively.
Long cable supporting in increase is helped, strengthening supporting intensity in arch, tunnel and two.Two help two anchor cable length 6.0m (side wall anchor cable length, depending on condition, is avoided punching tunnel), and arch anchor cable length 8.0m, cable interval is 1.5m, and array pitch is 2.0m.Anchor cable is made up of the 1X7 standard steel section twisted wire (GB/T5224-2003) of two 15.20mm, and adopt the mortar total length bonding of cement-sand ratio 2:1, anchor head adopts the ground tackle of MJ-1 type.
Described crossbeam towards ore stream side welded high-strength wear-resisting steel plate, to strengthen the abrasion resistance of crossbeam.
Described dress ore deposit route base plate adopts the concrete that 300mm is thick, above parallel laid 5 one steel rail, rail spacing 800mm, is fixed by bar connecting between rail, rebar spacing 500mm.
Towards ore stream side welded high-strength wear-resisting steel plate, effectively can reduce the wearing and tearing of ore flowing to open wiring component, strengthen the abrasion resistance of crossbeam.Dress ore deposit route base plate adopts the thick concrete of 300mm, and be conducive to scraper and run and shovel dress, steel rail laying on concrete simultaneously, rail exceeds concrete surface, can effectively prevent scraper scraper bowl to the wearing and tearing of roadway floor.
Drawhole supporting and protection structure of the present utility model, maintenance cost is low, rapidly shaping, safe and practical.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Wherein, middle long anchor cable 1, anchor pole 2, steel fibrous concrete layer 3, crossbeam 4, base plate rail 5, base plate connecting reinforcement 6.
Detailed description of the invention
Embodiment 1: drawhole open wiring support unit crossbeam 4 adopts two row's H-shaped steel supportings, the pre-buried degree of depth 350mm of i iron, i iron model is 40a, and the two row edges of a wing, i iron upper and lower part adopt angle steel to carry out continuous welding, angle steel model is 100*10, and weld bead height is 10mm.
In order to web beam 4 abrasion resistance, inside the i iron towards ore stream, increase high-strength abrasion-proof steel plate, between wear-resisting steel plate and i iron, adopt continuous welding, weld bead height 16mm.Wear-resisting steel plate and upper and lower part angle steel welding edges are linked to be entirety, weld bead height 10mm.
Increase bearing diagonal in crossbeam 4 both sides external and middle part, strengthen the impact resistance of crossbeam 4, bearing diagonal is made up of a channel-section steel, and channel-section steel model is 18a.Channel-section steel one end and Plate Welding, plate size is 400mm*300mm*20mm, and steel plate adopts resin anchor 2 to carry out anchoring with tunnel sidewall and top respectively, and anchor pole 2 body uses the secondary screw-thread steel of 22mm, and length is 2.25m; The other end welds with i iron, weld bead height 8mm.
After crossbeam 4 sets up, the employing of crossbeam 4 top is built steel fibrous concrete and is reinforced, concrete strength C30.Steel fibre recommended parameter is diameter 0.5mm, length 25mm, and tensile strength is greater than 1000MPa, and addition is 40kg/m concrete, and actual addition suitably can adjust according to field condition.
Dress ore deposit route base plate thickness 300mm, lay 5 one steel rails, rail level exceeds concrete floor 5mm, rail spacing 800mm.Utilize Φ 26mm bar connecting to be entirety between rail, rebar spacing is 500mm.
Claims (3)
1. drawhole supporting and protection structure, is characterized in that comprising middle long anchor cable (1), anchor pole (2), steel fibrous concrete layer (3), crossbeam (4), base plate rail (5) and base plate connecting reinforcement (6), wherein:
At roadway's sides and dome portions steel fiber shotcrete, and close plating net, play anchor pole (2) and middle long anchor cable (1) supporting, bottom arranges dress ore deposit route base plate, steel rail laying on the route base plate of dress ore deposit;
Arrange crossbeam (4) at drawhole open wiring place, crossbeam (4) adopts angle steel continuous welding to form by bottom flange on two row's i iron; Crossbeam (4) both sides external and middle part arrange bearing diagonal, and bearing diagonal is channel-section steel, and two ends are connected with steel plate with crossbeam (4) respectively, and steel plate is fixed with the resin anchor (2) at tunnel sidewall and top respectively.
2. drawhole supporting and protection structure as claimed in claim 1, is characterized in that described crossbeam (4) is towards ore stream side welded high-strength wear-resisting steel plate.
3. drawhole supporting and protection structure as claimed in claim 1, is characterized in that described dress ore deposit route base plate adopts the concrete that 300mm is thick, above parallel laid 5 one steel rail, rail spacing 800mm, is fixed by bar connecting between rail, rebar spacing 500mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520589917.XU CN204851303U (en) | 2015-08-07 | 2015-08-07 | Drawhole supporting construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520589917.XU CN204851303U (en) | 2015-08-07 | 2015-08-07 | Drawhole supporting construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204851303U true CN204851303U (en) | 2015-12-09 |
Family
ID=54741861
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520589917.XU Active CN204851303U (en) | 2015-08-07 | 2015-08-07 | Drawhole supporting construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204851303U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106401601A (en) * | 2016-11-10 | 2017-02-15 | 中国恩菲工程技术有限公司 | Support device for eyebrow line of ore drawing opening |
-
2015
- 2015-08-07 CN CN201520589917.XU patent/CN204851303U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106401601A (en) * | 2016-11-10 | 2017-02-15 | 中国恩菲工程技术有限公司 | Support device for eyebrow line of ore drawing opening |
CN106401601B (en) * | 2016-11-10 | 2019-06-11 | 中国恩菲工程技术有限公司 | Drawhole open wiring suspension device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102562075B (en) | Large cross-section weak surrounding rock tunnel three-step and six-part short-distance construction method | |
CN104533446B (en) | Construction method and its structure that a kind of big cross section Support System in Soft Rock Tunnels bilayer pre- Geological disaster prevention of preliminary bracing occurs | |
CN208280965U (en) | Coal mine deep well tunnel smooth surface concrete spraying support structure | |
CN102777182B (en) | Rapid end extracting method of large mining height working face | |
CN102226407A (en) | Four-line large-span tunnel cable-arch combined primary support structure | |
CN108005675A (en) | The dynamic superposition coupling supporting method and supporting construction in a kind of fault belt tunnel | |
CN103306289A (en) | Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof | |
CN110821537B (en) | Support method for fully-mechanized coal mining face pre-digging single-withdrawing channel | |
CN109026099A (en) | A kind of soft-rock tunnel full length fastening supporting construction and its construction method | |
CN108930543A (en) | A kind of big cross section gob side entry driving coupling supporting structure and construction method | |
CN107965341A (en) | A kind of large-section underground pipe canopy pipe network concrete support method | |
CN201746840U (en) | Foundation pit support system equipped with a plurality of inclined rear anchors capable of recycling | |
CN103032080A (en) | Support method of weak and broken surrounding rock tunnel | |
CN102425422B (en) | Method for constructing cross-over chambers with full-coal outsize cross section under host lane ceaseless transportation condition | |
CN106593497A (en) | Supporting treatment method for coal working face when passing through top-coal caving region of gateway | |
CN109083682A (en) | A kind of construction method of mine working antiseepage high intensity fire dam | |
CN206000543U (en) | A kind of supporting construction protecting lane for gob side entry retaining | |
CN103485794B (en) | Composite ingate supporting structure and construction method thereof | |
CN104481552B (en) | Super-huge karst cave hole roof fall stone protection construction method | |
CN210948737U (en) | Efficient and rapid tunneling roadway support facility for inclined small-section half-coal-rock roadway with thin coal seam | |
CN206280090U (en) | High-dipping surrounding rock of actual mining roadway stabilization supporting facility | |
CN105544562A (en) | Jet anchor net protection construction process for renovating rock heaps on high and steep slope | |
CN105156111B (en) | The method for protecting support of high working face lane formula filling Striping noise | |
CN204851303U (en) | Drawhole supporting construction | |
CN205100993U (en) | Ore removal level drift section supporting construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |