CN204817607U - Aligning is used during steel pipe bears device - Google Patents
Aligning is used during steel pipe bears device Download PDFInfo
- Publication number
- CN204817607U CN204817607U CN201520483346.1U CN201520483346U CN204817607U CN 204817607 U CN204817607 U CN 204817607U CN 201520483346 U CN201520483346 U CN 201520483346U CN 204817607 U CN204817607 U CN 204817607U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- screw rod
- shelf
- curved plate
- guide rail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Warehouses Or Storage Devices (AREA)
- Buffer Packaging (AREA)
Abstract
The utility model discloses an aligning is used during steel pipe bears device, including the shelf of rectangle, the shelf is improved level and is equipped with the guide rail of a pair of parallel of each other, is equipped with the slider with guide rail sliding connection on the guide rail respectively, a horizontally screw rod is all worn to be equipped with by every slider, screw rod and slider threaded connection, and the front end of two screw rods is equipped with an arc steel sheet respectively, and the concave surface of arc steel sheet is relative, and the back of arc steel sheet is rotated with the front end of screw rod and is connected, and the axial direction line of screw rod is perpendicular with the steel pipe central line, and the axial direction line of arc steel sheet is parallel with the steel pipe central line. The utility model discloses can restrict the swing of steel pipe, need not the workman and hold up surely at the edge, not have the steel pipe and wound workman's the condition and take place. The utility model discloses the distance between the arc steel sheet can be adjusted, the steel pipe of different specifications can be adapted to.
Description
Technical field
The utility model relates to steel pipe process equipment, particularly a kind of bogey when aligning steel pipe.
Background technology
Straightener is the equipment aligned shape, bar, tubing, wire rod etc.When being sent into by steel pipe and aligning in straightener, because steel pipe is not straight, so the part staying straightener outside when aligning can swing up and down, in order to prevent amplitude of fluctuation excessive, workman is needed to hold up surely at side.But the dynamics operationally produced due to straightener is very large, and the swing of steel pipe is violent, easily encounters equipment, both damages steel tube surface, again injury device.In addition, the careless slightly workman that just can wound, danger coefficient is very large.
Utility model content
In order to overcome above-mentioned defect, the utility model provides a kind of bogey when aligning steel pipe, and steel pipe is put into straightener by carrier, can prevent steel pipe double swerve and hurt workman when aligning.
The utility model is achieved through the following technical solutions:
Align bogey during steel pipe, comprise the shelf of rectangle, on shelf, level is provided with a pair guide rail parallel to each other, guide rail is respectively equipped with the slide block be connected with slide; Each slide block is all equipped with the screw rod of a level, screw rod is threaded with slide block, the front end of two screw rods is respectively equipped with a curved plate, the concave surface of curved plate is relative, the back side of curved plate and the front end of screw rod are rotationally connected, the longitudinal center line of screw rod and steel pipe central axis, the longitudinal center line of curved plate and steel pipe centerline parallel; Sheathed one section of circular sleeve on the side side of steel pipe feeding, is connected by bearing between circular sleeve with shelf on the top of the shelf.
Described curved plate side elevation is semicircle.
The end of described screw rod is provided with handle.
The beneficial effects of the utility model:
The utility model structure is simple, straightener is put into by the utility model by needing the steel pipe of aligning, by two curved steel tubes be arranged on carrier, steel pipe is clipped in the middle, therefore the swing of steel pipe can be limited, hold up on limit surely without the need to workman, do not have steel pipe wound workman situation occur.Because the curved plate in the utility model is fixed by the bolt rotary of level, so distance between curved plate can be adjusted, so can adapt to the steel pipe of different size by rotary screw.Screw rod connects guide rail on the top of the shelf by slide block, slide block can move along the centerline direction of steel pipe, the distance between curved plate and straightener is adjusted with this, prevent the steel pipe length between curved plate and straightener long and cause steel pipe self gravitation to be bent downwardly, wearing and tearing device, reduces flattening precision.Sleeve on shelf can reduce shock between steel pipe and bogey and friction, protection steel pipe and equipment.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation.
Detailed description of the invention
As shown in Figure 1, the utility model comprises the shelf 1 of rectangle, and on shelf 1, level is provided with a pair guide rail 2 parallel to each other, guide rail 2 is respectively equipped with the slide block 3 be slidably connected with guide rail 2; Each slide block 3 is all equipped with the screw rod 4 of a level, screw rod 4 is threaded with slide block 3, the front end of two screw rods 4 is respectively equipped with a curved plate 5, the concave surface of curved plate 5 is relative, the back side of curved plate 5 and the front end of screw rod 4 are rotationally connected, the longitudinal center line of screw rod 4 and steel pipe central axis, the longitudinal center line of curved plate 5 and steel pipe centerline parallel.
Described curved plate 5 side elevation is semicircle.
The end of described screw rod 4 is provided with handle 6.
Size, the diameter of steel pipe differ, therefore conveniently different steel pipes, by handle 6 rotating screw bolt 4, make curved plate 5 can rectilinear motion, thus the distance between adjustment two curved plates 5.
Steel pipe is in the process sent into, steel pipe can teetertotter and may produce shock to shelf, this shock can damage steel tube surface, in order to prevent this from occurring, in the present embodiment, sheathed one section of circular sleeve 7 on the side side that close steel pipe is sent on shelf 1, is connected by bearing (not shown) between circular sleeve 7 with shelf 1.
Claims (3)
1. align bogey during steel pipe, it is characterized in that: the shelf comprising rectangle, on shelf, level is provided with a pair guide rail parallel to each other, guide rail is respectively equipped with the slide block be connected with slide; Each slide block is all equipped with the screw rod of a level, screw rod is threaded with slide block, the front end of two screw rods is respectively equipped with a curved plate, the concave surface of curved plate is relative, the back side of curved plate and the front end of screw rod are rotationally connected, the longitudinal center line of screw rod and steel pipe central axis, the longitudinal center line of curved plate and steel pipe centerline parallel; Sheathed one section of circular sleeve on the side side of steel pipe feeding, is connected by bearing between circular sleeve with shelf on the top of the shelf.
2. a kind of bogey when aligning steel pipe according to claim 1, is characterized in that: described curved plate side elevation is for semicircle.
3. a kind of bogey when aligning steel pipe according to claim 1 and 2, is characterized in that: the end of described screw rod is provided with handle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520483346.1U CN204817607U (en) | 2015-07-07 | 2015-07-07 | Aligning is used during steel pipe bears device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520483346.1U CN204817607U (en) | 2015-07-07 | 2015-07-07 | Aligning is used during steel pipe bears device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204817607U true CN204817607U (en) | 2015-12-02 |
Family
ID=54675249
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520483346.1U Expired - Fee Related CN204817607U (en) | 2015-07-07 | 2015-07-07 | Aligning is used during steel pipe bears device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204817607U (en) |
-
2015
- 2015-07-07 CN CN201520483346.1U patent/CN204817607U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2015020757A3 (en) | Pipe/conduit hanging device | |
CN202845514U (en) | Electric bicycle clothes rack aluminum tube bending device | |
CN204892611U (en) | Device that bears of usefulness is aligned to steel pipe | |
CN204817560U (en) | Holding frame of using during aligning steel pipe | |
CN204817607U (en) | Aligning is used during steel pipe bears device | |
CN204817759U (en) | Clamping device who uses during aligning steel pipe | |
CN204842729U (en) | Aligning is used during steel pipe bears frame | |
CN201871592U (en) | Pipe clamp for processing of boiler coils | |
CN204842537U (en) | Support frame of using during aligning steel pipe | |
CN204817790U (en) | Support arrangement for use during aligning steel pipe | |
CN106185022A (en) | A kind of tube support arrangement | |
CN204866923U (en) | Frame that bears of usefulness is aligned to steel pipe | |
CN204892612U (en) | Clamping device of steel pipe aligning usefulness | |
CN204866922U (en) | Holding frame of steel pipe aligning usefulness | |
CN204866921U (en) | Support arrangement for steel pipe aligning is used | |
CN205772355U (en) | A kind of rubber tube wire actinobacillus device | |
CN204867141U (en) | Support frame of steel pipe aligning usefulness | |
CN104929127B (en) | Shaped steel positioning clamp | |
CN108723685B (en) | Straight pipe welding supporting unit | |
CN204365729U (en) | A kind of device for clamping for drawbench | |
CN204778078U (en) | Cable crab winch | |
CN204312501U (en) | A kind of Novel U-shaped bolt | |
CN204982268U (en) | Yarn stand pipe structure | |
CN208322587U (en) | A kind of positioning device for Pipe installing docking | |
CN203981092U (en) | The checkout equipment of steel pipe radian |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151202 Termination date: 20160707 |
|
CF01 | Termination of patent right due to non-payment of annual fee |