CN204816910U - Groove double - circuit mineralize mineralization composite set is scanned in positive flotation of bauxite - Google Patents

Groove double - circuit mineralize mineralization composite set is scanned in positive flotation of bauxite Download PDF

Info

Publication number
CN204816910U
CN204816910U CN201520520227.9U CN201520520227U CN204816910U CN 204816910 U CN204816910 U CN 204816910U CN 201520520227 U CN201520520227 U CN 201520520227U CN 204816910 U CN204816910 U CN 204816910U
Authority
CN
China
Prior art keywords
wake flow
pipe
slide valve
scavenger flotation
mineralising
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520520227.9U
Other languages
Chinese (zh)
Inventor
王秀峰
李民菁
别富军
李少帅
张松茂
李新华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Dongda Technology Co ltd
Original Assignee
HENAN DONGDA MINING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN DONGDA MINING CO Ltd filed Critical HENAN DONGDA MINING CO Ltd
Priority to CN201520520227.9U priority Critical patent/CN204816910U/en
Application granted granted Critical
Publication of CN204816910U publication Critical patent/CN204816910U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a groove double - circuit mineralize mineralization composite set is scanned in positive flotation of bauxite, it is big that wake flow aluminium oxide content is roughly selected in effective solution, the operation aluminium oxide rate of recovery of scanning the groove is low, it is high to scan wake flow aluminium oxide content, the product is not up to standard, the relatively poor problem of flotation effect, roughly select wake flow feed inlet and first slide valve, second slide valve intercommunication, first slide valve with roughly select the wake flow dashpot and be connected, the import intercommunication of second slide valve and mineralize mineralization device, the bottom discharge pipe of roughly selecting the wake flow dashpot inserts in the pipeline near the import of scavenger flotation circuit pump, scavenger flotation circuit delivery side of pump and pulp distributor's access connection, pulp distributor's outlet pipe outer end has stretches into the mineralize mineralization organ pipe of scanning the inslot, every mineralize mineralization organ pipe lower extreme has the branch pipe, the outlet pipe of mineralize mineralization device inserts pulp distributor's outlet pipe upper portion, scan the bottom outlet pipe in groove and the import pipe intercommunication of scavenger flotation circuit pump, the utility model provides the high bauxite ore dressing aluminium oxide rate of recovery has reduced tailing pulp aluminium oxide content.

Description

A kind of bauxite forward flotation scavenger flotation cell two-way mineralising combination unit
Technical field
The utility model relates to a kind of bauxite forward flotation scavenger flotation cell two-way mineralising combination unit.
Background technology
Bauxite concentrate is process low-grade bauxite waste residue as raw material in producing, and bauxite waste residue alumina content is 52 ~ 58%, and alumina silica ratio is 2.2 ~ 2.8, and the concentrate product alumina silica ratio produced is 5.0 ~ 6.5.High-efficiency self-circulation is used to inflate mineralising flotation cell in production, qualified raw ore slurry is squeezed in the high-efficiency self-circulation inflation mineralising flotation cell of three ladders layouts through flotation feed pump, through Aerated stirring, reach solid-liquid-gas three-phase equilibrium, carry out the flow process operation of one roughing, once purging selection, primary cleaning, realize fast-flotation.Roughly select wake flow at present and enter flow process that scavenger flotation cell adopts for entering roughly select wake flow dashpot by roughly selecting wake flow, enter in scavenger flotation circuit pump inlet pipeline through roughly selecting dashpot bottom discharge pipe, pulp distributer is entered with scavenger flotation circuit pump, pulp distributer separates multichannel mineralising organ pipe, go deep in bottom scavenger flotation cell, carrying out the operation of flotation mineralising, due to the problem on device structure, in use there is following problem: the difference of bauxite head grade and the ore thing phase origin cause of formation, the floatability of bauxite raw ore has larger difference.In flotation normal operation process, to the technical requirement of roughly selecting wake flow be alumina content at 46%-48%, the operation alumina recovery rate of scavenger flotation cell, at 65%-70%, scans wake flow alumina content at 41.5%-42.5%.But, in current flotation operation process, when often occurring that roughly selecting wake flow alumina content is greater than 48%, the operation alumina recovery rate of scavenger flotation cell is dropping to less than 62%, scan wake flow alumina content more than 42.5%, do not reach technical requirement, finally cause scavenger flotation cell mineralising flotation effect poor, thus affect production production capacity.
Summary of the invention
For above-mentioned situation, for overcoming prior art defect, the object of the utility model is just to provide a kind of bauxite forward flotation scavenger flotation cell two-way mineralising combination unit, can effectively solve in flotation operation process, roughly select wake flow alumina content large, the operation alumina recovery rate of scavenger flotation cell is low, scans wake flow alumina content high, cause product not up to standard, the problem that flotation effect is poor.
The technical scheme that the utility model solves is, comprise and roughly select wake flow charging aperture, roughly select wake flow dashpot, slide valve, mineralization device, pulp distributer, scavenger flotation cell and scavenger flotation circuit pump, roughly select wake flow charging aperture respectively with the first slide valve, second slide valve is connected, first slide valve with roughly select wake flow dashpot and be connected to form main road structure, second slide valve forms bypass structure through the inlet communication of pipeline and mineralization device, the bottom discharge pipe roughly selecting wake flow dashpot inserts in the pipeline of scavenger flotation circuit pump inlet, scavenger flotation circuit delivery side of pump is connected with the import of pulp distributer, pulp distributer has multi-way outlet pipe, the outer end of outlet is connected with the mineralising organ pipe extend in scavenger flotation cell downwards, all there are two arms in inverted V-shaped the lower end of each mineralising organ pipe, the outlet of mineralization device is inserted into the outlet top of pulp distributer, the outlet at bottom pipe of scavenger flotation cell is communicated with the inlet tube of scavenger flotation circuit pump.
The utility model substantially increases ore concentration of bauxite alumina recovery rate, reduces Tailings Slurry alumina content, is the innovation on bauxite flotation equipment.
Accompanying drawing explanation
Fig. 1 is structural front view of the present utility model.
Detailed description of the invention
Below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is elaborated.
Provided by Fig. 1, the utility model comprises roughly selects wake flow charging aperture, roughly select wake flow dashpot, slide valve, mineralization device, pulp distributer, scavenger flotation cell and scavenger flotation circuit pump, roughly select wake flow charging aperture 1 respectively with the first slide valve 4, second slide valve 3 is connected, first slide valve 4 with roughly select wake flow dashpot 2 and be connected to form main road structure, second slide valve 3 forms bypass structure through the inlet communication of pipeline and mineralization device 5, the bottom discharge pipe roughly selecting wake flow dashpot inserts in the pipeline of scavenger flotation circuit pump 9 import, scavenger flotation circuit delivery side of pump is connected with the import of pulp distributer 6, pulp distributer has multi-way outlet pipe, the outer end of outlet is connected with the mineralising organ pipe 7 extend in scavenger flotation cell 8 downwards, all there are two arms in inverted V-shaped the lower end of each mineralising organ pipe, the outlet of mineralization device 5 is inserted into the outlet top of pulp distributer, the outlet at bottom pipe of scavenger flotation cell is communicated with the inlet tube of scavenger flotation circuit pump 9.
Described mineralising organ pipe 7 and arm connect and compose " Y " shape structure of handstand.
Described mineralization device 5 is that each outlet communicates with each outlet of pulp distributer respectively by two export mixes on steel pipe and steel pipe sidewall.
The quantity of described mineralization device 5 is 1/4 of arm quantity.
Described wake flow dashpot of roughly selecting is dashpot.
The utility model is also not limited in above-described embodiment, the change that those skilled in the art make in essential scope of the present utility model, remodeling, interpolation or replacement, also should belong to protection domain of the present utility model.
Service condition of the present utility model is: in ore concentration of bauxite process, old process is to be roughly selected wake flow and enters and roughly select wake flow dashpot 2 and enter pulp distributer 6 by scavenger flotation circuit transport pump in the lump with scavenger flotation cell 8 underflow and enter in mineralising organ pipe 7, be input to again in scavenger flotation cell 8 by mineralising organ pipe 7 and carry out mineralising operation, when the alumina content roughly selecting wake flow through assay reaches more than 48%, now roughly select wake flow alumina content higher, show that initial separatory cell separating effect is poor, now should enable bypass flow process, first slide valve 3 is opened, then slide valve 4 is closed, roughly select wake flow to be assigned in each mineralising organ pipe 7 through mineralization device 5 and to carry out mineralising operation.
The utility model, compared with present equipment, has following advantage:
Use the utility model, in flotation operation process, when the alumina content roughly selecting wake flow is greater than 48%, the operation alumina recovery rate of scavenger flotation cell can be made to be stabilized in 65%-70%, scan wake flow alumina content and be stabilized in 41.5%-42.5%, meet the requirement of production completely.
The utility model is conducive to improving ore concentration of bauxite alumina recovery rate, and reducing Tailings Slurry alumina content, is the innovation on bauxite flotation equipment, and structure is simple, and easy to install, effective, production efficiency is high, has good economic and social benefit.

Claims (4)

1. a bauxite forward flotation scavenger flotation cell two-way mineralising combination unit, comprise and roughly select wake flow charging aperture, roughly select wake flow dashpot, slide valve, mineralization device, pulp distributer, scavenger flotation cell and scavenger flotation circuit pump, it is characterized in that, roughly select wake flow charging aperture (1) respectively with the first slide valve (4), second slide valve (3) is connected, first slide valve (4) with roughly select wake flow dashpot (2) and be connected to form main road structure, second slide valve (3) forms bypass structure through the inlet communication of pipeline and mineralization device (5), the bottom discharge pipe roughly selecting wake flow dashpot inserts in the pipeline of scavenger flotation circuit pump (9) import, scavenger flotation circuit delivery side of pump is connected with the import of pulp distributer (6), pulp distributer has multi-way outlet pipe, the outer end of outlet is connected with the mineralising organ pipe (7) extend in scavenger flotation cell (8) downwards, all there are two arms in inverted V-shaped the lower end of each mineralising organ pipe, the outlet of mineralization device (5) is inserted into the outlet top of pulp distributer, the outlet at bottom pipe of scavenger flotation cell is communicated with the inlet tube of scavenger flotation circuit pump (9).
2. bauxite forward flotation scavenger flotation cell two-way mineralising combination unit according to claim 1, is characterized in that, described mineralising organ pipe (7) and arm connect and compose " Y " shape structure of handstand.
3. bauxite forward flotation scavenger flotation cell two-way mineralising combination unit according to claim 1, it is characterized in that, described mineralization device (5) is that each outlet communicates with each outlet of pulp distributer respectively by two export mixes on steel pipe and steel pipe sidewall.
4. bauxite forward flotation scavenger flotation cell two-way mineralising combination unit according to claim 1, it is characterized in that, the quantity of described mineralization device (5) is 1/4 of arm quantity.
CN201520520227.9U 2015-07-17 2015-07-17 Groove double - circuit mineralize mineralization composite set is scanned in positive flotation of bauxite Expired - Fee Related CN204816910U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520520227.9U CN204816910U (en) 2015-07-17 2015-07-17 Groove double - circuit mineralize mineralization composite set is scanned in positive flotation of bauxite

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520520227.9U CN204816910U (en) 2015-07-17 2015-07-17 Groove double - circuit mineralize mineralization composite set is scanned in positive flotation of bauxite

Publications (1)

Publication Number Publication Date
CN204816910U true CN204816910U (en) 2015-12-02

Family

ID=54674553

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520520227.9U Expired - Fee Related CN204816910U (en) 2015-07-17 2015-07-17 Groove double - circuit mineralize mineralization composite set is scanned in positive flotation of bauxite

Country Status (1)

Country Link
CN (1) CN204816910U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107377235A (en) * 2017-08-11 2017-11-24 石磊 Spraying cycle formula flotation column

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107377235A (en) * 2017-08-11 2017-11-24 石磊 Spraying cycle formula flotation column

Similar Documents

Publication Publication Date Title
CN102294296B (en) Floatation and enrichment process for silicon-calcium mass type fluorite ores
CN204338316U (en) The Mineral separation device of barite, fluorite, calcite mineral intergrowth
CN207521145U (en) Coal synthesis sorting assembly line
CN102631994A (en) Column-machine combined separation method of difficultly-separated low-grade copper-molybdenum ore
CN205323969U (en) From selecting equipment of retrieving low -grade marmatite and tin quarry thing in copper tailing
CN201702028U (en) Quick micro-bubble floatation integrated mechanism
CN110899001B (en) Two-stage flotation process for difficult-to-float coal slime
CN107476821A (en) A kind of ultra-fine crude tailings Paste-filling System and method
CN201659030U (en) Efficient flotation separation integrated system
CN204816910U (en) Groove double - circuit mineralize mineralization composite set is scanned in positive flotation of bauxite
CN103157558A (en) Beneficiation method of recovering sulfur from copper sulfide ore flotation tailings
CN206996817U (en) Grinding attachment
CN203874891U (en) Backwater feed device with fractional concentration function
CN204656753U (en) A kind of system guaranteeing fine coal properties matter cyclone pan feeding flow and pressure stability
CN202921415U (en) Quality-promoting and impurity-reducing combined device for tinstone multi-metal sulfide mineral tin concentrate
CN204448259U (en) A kind of ultrafine grinding for super low-grade vanadium titano-magnetite selects titanium device
CN203866038U (en) Phosphoric acid production device system
CN206304893U (en) A kind of sorting unit of the red mixed type iron ore weakly magnetic tailingses of magnetic
CN201739771U (en) Lime milk storage tank capable of avoiding pipeline blockage
CN103506226B (en) High-sulfur bauxite reverse flotation product High-efficiency dehydration technology
CN212263543U (en) Gravity sorting system
CN104154419A (en) Double-concentration-basin slurry pipeline conveying system
CN202848645U (en) Conveying system of tailing secondary pump station
CN202921429U (en) Novel flotation machine
CN202752100U (en) Foam transferring pipeline structure of integration flotation system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: Dengfeng City, Henan province 452470 city of Zhengzhou Tang Zhuang Xiang Tang Dong Cun Bei River

Patentee after: HENAN DONGDA TECHNOLOGY CO.,LTD.

Address before: Dengfeng City, Henan province 452470 city of Zhengzhou Tang Zhuang Xiang Tang Dong Cun Bei River

Patentee before: HENAN DONGDA MINING Co.,Ltd.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151202

Termination date: 20210717

CF01 Termination of patent right due to non-payment of annual fee