CN204807636U - Automatic test platform of medium and small power inverter performance - Google Patents

Automatic test platform of medium and small power inverter performance Download PDF

Info

Publication number
CN204807636U
CN204807636U CN201520264281.1U CN201520264281U CN204807636U CN 204807636 U CN204807636 U CN 204807636U CN 201520264281 U CN201520264281 U CN 201520264281U CN 204807636 U CN204807636 U CN 204807636U
Authority
CN
China
Prior art keywords
inverter
source
test
power
testing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520264281.1U
Other languages
Chinese (zh)
Inventor
王一鸣
程琨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ginlong Technologies Co Ltd
Original Assignee
NINGBO GINLONG TECHNOLOGIES Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGBO GINLONG TECHNOLOGIES Co Ltd filed Critical NINGBO GINLONG TECHNOLOGIES Co Ltd
Priority to CN201520264281.1U priority Critical patent/CN204807636U/en
Application granted granted Critical
Publication of CN204807636U publication Critical patent/CN204807636U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Inverter Devices (AREA)

Abstract

The utility model relates to a medium and small power inverter's the automatic test platform of performance. An automatic test platform of medium and small power inverter performance, has testing power supply, power analyzer, by PC control, adorns dc -to -ac converter and relevant test equipment on a test jig, relevant test equipment include testing power supply, power analyzer, load resistance case, place different sashes respectively in, testing power supply and power analyzer are controlled respectively to an assembly PC on this test jig, to the test items give -out order of dc -to -ac converter, wherein, the testing power supply be AC source and DC source. The utility model discloses take up an area of for a short time, can directly assemble the dc -to -ac converter workshop, can practice thrift the capability test time of product.

Description

Middle low power inverter performance automatic test platform
Technical field
The utility model relates to a kind of performance automatic test platform of middle low power inverter.
Background technology
General inverter Testing Platform is all fill an AC source, a DC source and relevant testing tool.Need when measuring inverter two or several people together non-productive operation just can complete, and need some utility appliance to carry out logging test results.
Its shortcoming is:
1, operating process is more complicated, the running time is longer, the more error rate that causes of repetitive operation increases; 2, the operating personnel needed are more, well can not save human capital;
3, workshop can not easily be installed to, the inverter that batch testing is produced.
Chinese Patent Application No. 201110043797.X relates to one for testing the test platform of photovoltaic combining inverter property indices.This test platform uses photovoltaic battery array analog power as the input source of inverter, instead of original real photovoltaic battery array; Electrical network simulated behavior power supply is used to replace high-power resistance load.Photovoltaic battery array analog power can arrange the weather conditions such as required illumination, environment temperature, wind speed easily, exports satisfactory V-I curve, overcomes true photovoltaic battery array uncontrollable factor many, the shortcoming of installation and maintenance inconvenience.Electrical network simulated behavior power supply can the feature such as simulating grid voltage, frequency, background harmonics, the serviceability of inverter under different electric network states can be detected, the output back electrical energy of inverter can also be returned public electric wire net by electrical network simulated behavior power supply in addition, reduces electric energy loss.
China Patent No. ZL201220139826.2 provides a kind of grid-connected micro-inverter automatic test platform, comprising: photovoltaic array analog power; Power analyzer, the output terminal of photovoltaic array analog power is connected by the input end of micrometer inverter by power analyzer; Programmable AC Power Source, its output terminal is connected by the output terminal of micrometer inverter by power analyzer; Control system, is connected with photovoltaic array analog power, power analyzer and Programmable AC Power Source respectively.This utility model can implement comprehensive selectable automatic test to the properties of grid-connected micro-inverter.
Summary of the invention
The purpose of this utility model is to provide a kind of middle low power inverter performance automatic test platform.
The purpose of this utility model is achieved in that a kind of middle low power inverter performance automatic test platform, there are testing power supply, power analyzer, controlled by PC, inverter and associated test devices are contained on a testing jig, described associated test devices comprises testing power supply, power analyzer, load resistance box, be placed in different sashes respectively, this testing jig assembles a PC, control testing power supply and power analyzer respectively, instruction is sent to the test event of inverter, wherein, described testing power supply is AC source and DC source.
On such scheme basis, described PC uses 485 or other order wire connection AC source, DC source, power analyzer and inverter.
Described AC source is connected with electrical network.
Superiority of the present utility model is:
1, by inverter and associated test devices device on a testing jig, as a whole test platform, take up an area little, save space.
2, this platform is furnished with PC, can automatically control all peripheral test apparatus.
3, this platform is according to the technical indicator of inverter, is completed the test of every technology by operating personnel on PC, as comprised: efficiency, harmonic wave, power factor, mistake/under-frequency point etc.
4, this platform can directly be assembled to inverter workshop, can save the performance test time of product (inverter).
5, this platform operations is simple, and measuring accuracy is high, can improve work task efficiency greatly.
6, in addition, the AC source of this platform (can to electrical network feed) be connected with electrical network, and the function of inverter own is by converting direct-current power into alternating-current power.So the test electric energy that testing power supply provides by inverter, be transmitted back to electrical network again.Therefore, the electric energy loss of this platform is only cable consume.
Accompanying drawing explanation
Accompanying drawing 1, structural representation of the present utility model;
Accompanying drawing 2, the annexation block diagram of PC and associated test devices;
Accompanying drawing 3, FB(flow block);
Number in the figure illustrates:
1---inverter; 2---power analyzer;
3---PC; 4---testing jig;
5---load resistance box; 6---AC source;
7---DC source; 8---heat sink.
Embodiment
Shown in the annexation block diagram of reference accompanying drawing 1 structural representation of the present utility model and accompanying drawing 2PC machine and associated test devices:
A kind of middle low power inverter performance automatic test platform, there are testing power supply, power analyzer 2, controlled by PC 3, inverter 1 and associated test devices are contained on a testing jig 4, described associated test devices comprises testing power supply, power analyzer 2, load resistance box 5, be placed in different sashes respectively, this testing jig 4 assembles a PC 3, control testing power supply and power analyzer 2 respectively, instruction is sent to the test event of inverter, wherein, described testing power supply is AC source 6 and DC source 7.
Miscellaneous equipment besides electrical resistance on test board 4 is switched on power, makes it normally work and provide inverter to test electric energy used.In addition also need each equipment (AC source 6, DC source 7, power analyzer 2, inverter) and PC to use 485 or other order wire couple together.At PC 3(host computer) on be written with and control each equipment and make the software of corresponding test, FB(flow block) as shown in Figure 3, operating personnel only need on PC opening operation software, the user name hit testing logging in oneself starts, PC will control relevant device and do corresponding test, and test result and relevant criterion are compared, automatically generate a test report, the properties test result of inverter can be provided in this report.At the end of test, software can point out inverter performance test whether qualified, if defective, can provide corresponding nonconformance, and slip-stick artist can rectify and improve inverter accordingly according to the information of software prompt.
The utility model is assembled to inverter workshop, can save the performance test time of inverter, and Timeliness coverage problem, improve the quality management and control of product.
PC 3 described in the present embodiment uses 485 or other order wire connection AC source 6, DC source 7, power analyzer 2 and inverter 1.
The described AC source of the present embodiment is connected with electrical network.The test electric energy provided by testing power supply, is transmitted back to electrical network again.Electric energy loss because of this test board is only cable consume.

Claims (3)

1. a middle low power inverter performance automatic test platform, there are testing power supply, power analyzer, controlled by PC, it is characterized in that, inverter and associated test devices are contained on a testing jig, described associated test devices comprises testing power supply, power analyzer, load resistance box, be placed in different sashes respectively, this testing jig assembles a PC, control testing power supply and power analyzer respectively, send instruction to the test event of inverter, wherein, described testing power supply is AC source and DC source.
2. middle low power inverter performance automatic test platform according to claim 1, is characterized in that: described PC uses 485 or other order wire connection AC source, DC source, power analyzer and inverter.
3. middle low power inverter performance automatic test platform according to claim 1, is characterized in that: described AC source is connected with electrical network.
CN201520264281.1U 2015-04-28 2015-04-28 Automatic test platform of medium and small power inverter performance Active CN204807636U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520264281.1U CN204807636U (en) 2015-04-28 2015-04-28 Automatic test platform of medium and small power inverter performance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520264281.1U CN204807636U (en) 2015-04-28 2015-04-28 Automatic test platform of medium and small power inverter performance

Publications (1)

Publication Number Publication Date
CN204807636U true CN204807636U (en) 2015-11-25

Family

ID=54592440

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520264281.1U Active CN204807636U (en) 2015-04-28 2015-04-28 Automatic test platform of medium and small power inverter performance

Country Status (1)

Country Link
CN (1) CN204807636U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105974238A (en) * 2016-06-20 2016-09-28 重庆瑜欣平瑞电子股份有限公司 Automatic testing method and automatic testing system for gasoline engine inverter

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105974238A (en) * 2016-06-20 2016-09-28 重庆瑜欣平瑞电子股份有限公司 Automatic testing method and automatic testing system for gasoline engine inverter
CN105974238B (en) * 2016-06-20 2019-07-23 重庆瑜欣平瑞电子股份有限公司 Gasoline engine inverter automatic test approach and system

Similar Documents

Publication Publication Date Title
CN106054672B (en) Real microgrid operation dynamic simulation test platform based on RT-LAB
CN109066754B (en) Direct-current power distribution network real-time simulation system and method
CN202548240U (en) Automated test platform for photovoltaic grid-connected micro-inverter
CN103544652A (en) Power grid industry classification load automatic statistical method and system
CN106803671B (en) A kind of photovoltaic plant low voltage ride-through capability appraisal procedure
Albu et al. Online monitoring of the power transfer in a DC test grid
CN103592939B (en) Wind power converter system control panel frock testing apparatus
CN203858310U (en) Large-power energy-storage current transformer testing system
CN202837421U (en) DSP and CPLD-based wind-power electrical-network electric-energy parameter detection apparatus
CN202794383U (en) Wind power grid electric energy quality parameter detecting device based on DSP, CPLD, and ARM
CN110865252A (en) Output electrical characteristic simulation device of proton exchange membrane fuel cell and control method thereof
CN204807636U (en) Automatic test platform of medium and small power inverter performance
CN106383285A (en) Multichannel mini household inverter efficiency testing system and testing method
CN105182100A (en) Voltage fluctuation test system and voltage fluctuation test method for photovoltaic inverters
CN204649850U (en) Photovoltaic DC-to-AC converter emc testing system
CN204855762U (en) LED drive power supply automatic test system that adjusts luminance
KR101296812B1 (en) System for examination of grid connected system and method for it
Lai et al. Educational simulation platform for micro-grid
CN104730357A (en) Photovoltaic power generation inverter grid-connection test device
CN202748404U (en) Wind power grid voltage, current, and harmonic wave detection apparatus based on DSP and ARM
CN105182068A (en) System and method for testing adaptability of photovoltaic inverter to grid harmonic
CN204882817U (en) General if converting circuit test system
CN201600440U (en) Comprehensive energy efficiency quality test device
CN105301404A (en) Solar cell simulator used for photovoltaic grid-connected inverter detection
CN104880612A (en) Photovoltaic inverter electromagnetic compatibility test system and test method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 315700, No. 57, golden access road, Binhai Industrial Park, Xiangshan County, Ningbo, Zhejiang

Patentee after: NINGBO GINLONG NEW ENERGY TECHNOLOGY CO., LTD.

Address before: 315700, No. 57, golden access road, Binhai Industrial Park, Xiangshan County, Ningbo, Zhejiang

Patentee before: Ningbo Ginlong Technologies Co., Ltd.

CP01 Change in the name or title of a patent holder

Address after: 315700, No. 57, golden access road, Binhai Industrial Park, Xiangshan County, Ningbo, Zhejiang

Patentee after: Jinlang Technology Co., Ltd

Address before: 315700, No. 57, golden access road, Binhai Industrial Park, Xiangshan County, Ningbo, Zhejiang

Patentee before: NINGBO GINLONG NEW ENERGY TECHNOLOGY Co.,Ltd.

CP01 Change in the name or title of a patent holder