CN204806936U - Under lead cooler device - Google Patents

Under lead cooler device Download PDF

Info

Publication number
CN204806936U
CN204806936U CN201520400790.2U CN201520400790U CN204806936U CN 204806936 U CN204806936 U CN 204806936U CN 201520400790 U CN201520400790 U CN 201520400790U CN 204806936 U CN204806936 U CN 204806936U
Authority
CN
China
Prior art keywords
flange
copper pipe
adpting flange
under
clamp plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520400790.2U
Other languages
Chinese (zh)
Inventor
李斌
姚春风
吾斯曼江
姚茹玲
刘建刚
刘建民
麦麦提明
雍百炼
杨志斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiang Nan Electric Co Of Guo Wang Xinjiang Power Co
State Grid Corp of China SGCC
Original Assignee
Jiang Nan Electric Co Of Guo Wang Xinjiang Power Co
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiang Nan Electric Co Of Guo Wang Xinjiang Power Co, State Grid Corp of China SGCC filed Critical Jiang Nan Electric Co Of Guo Wang Xinjiang Power Co
Priority to CN201520400790.2U priority Critical patent/CN204806936U/en
Application granted granted Critical
Publication of CN204806936U publication Critical patent/CN204806936U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

(B, ) the utility model relates to an it is an under lead cooler device to lead the cooling technique field under the unit, and it includes a flange, the 2nd flange, copper pipe, connector, flange, the parallelly connected copper pipe of installing two piece at least interval arrangements between two the 1st flange, copper pipe are the major arc form, and two the 1st flange outer ends are connected with the 2nd flange, connector and flange respectively in order, copper pipe, a flange, the 2nd flange, connector and flange are inside to communicate with each other. (B, ) (b) the utility model has the advantages of reasonable and compact structure, its cooling tube is connected in parallel by many copper pipes and constitutes to each copper guan douke independently supplies water, has formed multiple guarantee, has avoided owing to lead down that the cooler stops up, unit tile temperature rises and results in the emergence of tile kilning accident, has avoided the unit accident to shut down, has improved unit safety nature, stability. (B, )

Description

Under lead cooling arrangement
Technical field
the utility model relates to conduction cooling but technical field under unit, is lead cooling arrangement under one.
Background technology
leading cooler under generation current brand-name computer group is spiraled by single copper pipe to form, interim in summer, because channel contains a large amount of weeds and silt, is easy to just enter in unit cooler; And ice breast comes interim in the winter time, there is a large amount of ice breast in channel, when unit cooling water runs, has mixed a large amount of ice breasts and entered unit cooler.And to lead cooler under unit be spiraled by single copper pipe to form; when weeds and silt, ice breast are led cooler and made cooler block under entering unit, a unit watt temperature rises, as dredged cooler not in time; the generation of burning accident will be caused, cause unit failure to shut down.
Summary of the invention
the utility model leads cooling arrangement under providing one, overcomes the deficiency of above-mentioned prior art, and it effectively can solve cooler and easily block the problem bringing compressor emergency shutdown.
the technical solution of the utility model is realized by following measures: lead cooling arrangement under one, comprises the first adpting flange, the second adpting flange, copper pipe, connector, flange; At least two spaced copper pipes have been installed in parallel between two the first adpting flanges, copper pipe is major arc shape, two the first adpting flange outer ends are connected with the second adpting flange, connector and flange respectively in turn, and described copper pipe, the first adpting flange, the second adpting flange, connector and flange inside communicate.
here is the further optimization and/or improvements to above-mentioned utility model technical scheme:
can sealing gasket be provided with between above-mentioned first adpting flange and the second adpting flange and be installed together by threaded fastener.
above-mentioned copper pipe can include first half copper pipe, Lower Half copper pipe, and first half copper pipe and Lower Half plumbers shed are fixed with the 3rd adpting flange, the 4th adpting flange successively, are connected short tube, the 4th adpting flange and the 3rd adpting flange, and inside communicates.
can sealing gasket be provided with between above-mentioned 3rd adpting flange and the 4th adpting flange and be installed together by threaded fastener.
above-mentioned copper pipe can be fixed with at least one retention clip assembling device, retention clip assembling device comprise clamp plate, under clamp plate, perpendicular gusset, bolt, nut; On clamp plate and under clamp between plate and be fixed with at least two spaced perpendicular gussets, be laterally fixed with at least one bolt in the middle part of perpendicular gusset, bolt end is provided with nut.
clamping plate one end on above-mentioned can upwards bending, under clamp plate corresponding end downward bending, dogleg section is equipped with through hole.
the port of above-mentioned connector and Flange joint can be forward.
the utility model reasonable and compact in structure; its cooling tube is composed in parallel by many copper pipes; and each root copper pipe all can independently supply water; define multi-ensuring; avoid due under lead cooler blocking, unit watt temperature rises and causes the generation of burning accident; avoid unit failure to shut down, improve unit safety, stability.
Accompanying drawing explanation
accompanying drawing 1 is the main TV structure schematic diagram of the utility model most preferred embodiment.
accompanying drawing 2 is that the A-A of accompanying drawing 1 is to sectional structure schematic diagram.
coding in accompanying drawing is respectively: 1 is the first adpting flange, and 2 is the second adpting flange, and 3 is copper pipe, and 4 is connector, and 5 is flange, 6 is the 3rd adpting flange, and 7 is the 4th adpting flange, 8 for connect short tube, 9 on clamp plate, 10 be under clamp plate, 11 is perpendicular gusset, and 12 is bolt, and 13 is nut.
Detailed description of the invention
the utility model by the restriction of following embodiment, can not determine concrete embodiment according to the technical solution of the utility model and actual conditions.
in the utility model, for convenience of description, the description of the relative position relation of each parts is all be described according to the Butut mode of Figure of description 1, as: the position relationship of upper and lower, left and right etc. determines according to the Butut direction of Figure of description.
below in conjunction with embodiment and accompanying drawing, the utility model is further described:
as shown in Figure 1, lead cooling arrangement under this and comprise the first adpting flange 1, second adpting flange 2, copper pipe 3, connector 4, flange 5; At least two spaced copper pipes 3 have been installed in parallel between two the first adpting flanges 1, copper pipe 3 is in major arc shape, two the first adpting flange 1 outer ends are connected with the second adpting flange 2, connector 4 and flange 5 respectively in turn, and described copper pipe 3, first adpting flange 1, second adpting flange 2, connector 4 and flange 5 inside communicate.In using; two panels flange 5 is connected with feed liquor port, fluid port respectively; because cooling tube is composed in parallel by many copper pipes 3; and each root copper pipe 3 all can independently supply water; define multi-ensuring; avoid due under lead cooler blocking, unit watt temperature rises and causes the generation of burning accident, avoid unit failure and shut down, improve unit safety, stability.
can according to actual needs, make further optimization and/or improvements leading cooling arrangement under above-mentioned:
as shown in Figure 1, copper pipe 3 includes first half copper pipe, Lower Half copper pipe, first half copper pipe and Lower Half plumbers shed are fixed with the 3rd adpting flange 6, the 4th adpting flange 7 successively, are connected short tube 8, the 4th adpting flange 7 and the 3rd adpting flange 6, and inside communicates.So not only be convenient to installation of the present utility model, dismounting, maintenance, the bulk strength of copper pipe 3 can also be increased, be convenient to permanent use.Connect short tube 8 and can select pipe, square tube or rectangular tube according to scene.
as shown in Figure 1, be provided with sealing gasket between the first adpting flange 1 and the second adpting flange 2 and be installed together by threaded fastener.Its sealing property can be ensured like this.
as shown in Figure 1, be provided with sealing gasket between the 3rd adpting flange 6 and the 4th adpting flange 7 and be installed together by threaded fastener.Its sealing property can be ensured like this.
as shown in accompanying drawing 1,2, copper pipe 3 is fixed with at least one retention clip assembling device, retention clip assembling device comprise clamp plate 9, under clamp plate 10, perpendicular gusset 11, bolt 12, nut 13; On clamp plate 9 and under clamp between plate 10 and be fixed with at least two spaced perpendicular gussets 11, be laterally fixed with at least one bolt 12 through perpendicular gusset 11 in the middle part of perpendicular gusset 11, bolt 12 end is provided with nut 13.During use, copper pipe 3 through by perpendicular gusset 11, bolt 12 and above clamp plate 9 or by perpendicular gusset 11, bolt 12 with under the square hole that clamps plate 10 or surrounded with bolt 12 by perpendicular gusset 11, fastening nut 13, clamps maintenance by perpendicular gusset 11 by copper pipe 3, to extend the service life of copper pipe 3.
as shown in accompanying drawing 1,2, above clamp the upwards bending of plate 9 one end, under clamp plate 10 corresponding end downward bending, dogleg section is equipped with through hole.Be convenient to installation of the present utility model location like this.
as shown in Figure 1, the port that is connected with flange 5 of connector 4 forward.Floor space of the present utility model can be reduced like this, make full use of space.
above technical characteristic constitutes most preferred embodiment of the present utility model, and it has stronger adaptability and best implementation result, can increase and decrease non-essential technical characteristic according to actual needs, meet the demand of different situations.

Claims (10)

1. lead a cooling arrangement under, it is characterized in that comprising the first adpting flange, the second adpting flange, copper pipe, connector, flange; At least two spaced copper pipes have been installed in parallel between two the first adpting flanges, copper pipe is major arc shape, two the first adpting flange outer ends are connected with the second adpting flange, connector and flange respectively in turn, and described copper pipe, the first adpting flange, the second adpting flange, connector and flange inside communicate.
2. lead cooling arrangement under according to claim 1, it is characterized in that being provided with sealing gasket between the first adpting flange and the second adpting flange and being installed together by threaded fastener.
3. under according to claim 1 and 2, lead cooling arrangement, it is characterized in that copper pipe includes first half copper pipe, Lower Half copper pipe, first half copper pipe and Lower Half plumbers shed are fixed with the 3rd adpting flange, the 4th adpting flange successively, are connected short tube, the 4th adpting flange and the 3rd adpting flange, and inside communicates.
4. lead cooling arrangement under according to claim 3, it is characterized in that being provided with sealing gasket between the 3rd adpting flange and the 4th adpting flange and being installed together by threaded fastener.
5. lead cooling arrangement under according to claim 1 and 2, it is characterized in that copper pipe being fixed with at least one retention clip assembling device, retention clip assembling device comprise clamp plate, under clamp plate, perpendicular gusset, bolt, nut; On clamp plate and under clamp between plate and be fixed with at least two spaced perpendicular gussets, be laterally fixed with at least one bolt in the middle part of perpendicular gusset, bolt end is provided with nut.
6. lead cooling arrangement under according to claim 3, it is characterized in that copper pipe being fixed with at least one retention clip assembling device, retention clip assembling device comprise clamp plate, under clamp plate, perpendicular gusset, bolt, nut; On clamp plate and under clamp between plate and be fixed with at least two spaced perpendicular gussets, be laterally fixed with at least one bolt in the middle part of perpendicular gusset, bolt end is provided with nut.
7. lead cooling arrangement under according to claim 4, it is characterized in that copper pipe being fixed with at least one retention clip assembling device, retention clip assembling device comprise clamp plate, under clamp plate, perpendicular gusset, bolt, nut; On clamp plate and under clamp between plate and be fixed with at least two spaced perpendicular gussets, be laterally fixed with at least one bolt in the middle part of perpendicular gusset, bolt end is provided with nut.
8. lead cooling arrangement under according to claim 5, it is characterized in that clamping the upwards bending of plate one end, under clamp plate corresponding end downward bending, dogleg section is equipped with through hole; Or/and the port of connector and Flange joint forward.
9. lead cooling arrangement under according to claim 6, it is characterized in that clamping the upwards bending of plate one end, under clamp plate corresponding end downward bending, dogleg section is equipped with through hole; Or/and the port of connector and Flange joint forward.
10. lead cooling arrangement under according to claim 7, it is characterized in that clamping the upwards bending of plate one end, under clamp plate corresponding end downward bending, dogleg section is equipped with through hole; Or/and the port of connector and Flange joint forward.
CN201520400790.2U 2015-06-11 2015-06-11 Under lead cooler device Expired - Fee Related CN204806936U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520400790.2U CN204806936U (en) 2015-06-11 2015-06-11 Under lead cooler device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520400790.2U CN204806936U (en) 2015-06-11 2015-06-11 Under lead cooler device

Publications (1)

Publication Number Publication Date
CN204806936U true CN204806936U (en) 2015-11-25

Family

ID=54591748

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520400790.2U Expired - Fee Related CN204806936U (en) 2015-06-11 2015-06-11 Under lead cooler device

Country Status (1)

Country Link
CN (1) CN204806936U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104896972A (en) * 2015-06-11 2015-09-09 国家电网公司 Lower guide cooler device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104896972A (en) * 2015-06-11 2015-09-09 国家电网公司 Lower guide cooler device

Similar Documents

Publication Publication Date Title
CN201434753Y (en) Pressure testing tool for self sealed pipe joints
CN204806936U (en) Under lead cooler device
CN201575234U (en) Hose fixing device
CN217422510U (en) Pipeline assembly of hydraulic hoist hydraulic system and pipe joint thereof
CN204554185U (en) A kind of insulation threeway adopting Flange joint
CN104896972A (en) Lower guide cooler device
CN208474612U (en) A kind of easy-to-dismount starting solenoid valve
CN208191128U (en) A kind of Inlet and outlet water connection structure for multilayer water cooling panel assembly
CN202041009U (en) Joint at water inlet and water outlet of heat collector
CN209876051U (en) Ammonia water absorption process pipeline check valve device
CN218300864U (en) Tubular bus connecting fitting
CN209688287U (en) A kind of duplex connector
CN206175832U (en) Detachable two -way pipe connection head
CN204438881U (en) Collector arrangement in a kind of air-conditioning box finned heat exchanger
CN203478650U (en) Device for connecting a solar-project collector header
CN213272046U (en) 1 advances 7 control panel
CN214170798U (en) Stable and durable hydraulic end assembly of drilling pump
CN218581794U (en) Water collecting block for water pump and water collecting structure of water pump
CN220733267U (en) Liquid cooling pipeline
CN209725471U (en) A kind of boiler tube channel fixing device
CN205332898U (en) Radiator of pressure testing takeover is pressed to height
CN220647138U (en) Connection structure of cooling water pipe of driving motor controller and driving motor controller
CN211231131U (en) Hydraulic oil cooling device for coal mine hydraulic grouting pump
CN215927964U (en) Hydraulic valve block convenient for drilling for wind power system
CN203605318U (en) Water inlet valve for combination wall-mounted gas furnace

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151125