CN204803742U - Transportation by driving bridge that safety and stability nature is high - Google Patents
Transportation by driving bridge that safety and stability nature is high Download PDFInfo
- Publication number
- CN204803742U CN204803742U CN201520443309.8U CN201520443309U CN204803742U CN 204803742 U CN204803742 U CN 204803742U CN 201520443309 U CN201520443309 U CN 201520443309U CN 204803742 U CN204803742 U CN 204803742U
- Authority
- CN
- China
- Prior art keywords
- transportation
- shaped steel
- buttress
- bracket
- bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 48
- 239000010959 steel Substances 0.000 claims abstract description 48
- 238000007667 floating Methods 0.000 claims abstract description 15
- 241001669679 Eleotris Species 0.000 claims abstract description 8
- 230000008878 coupling Effects 0.000 claims description 6
- 238000010168 coupling process Methods 0.000 claims description 6
- 238000005859 coupling reaction Methods 0.000 claims description 6
- 239000000463 material Substances 0.000 abstract description 4
- 210000000481 breast Anatomy 0.000 abstract 2
- 238000010276 construction Methods 0.000 description 8
- 238000000034 method Methods 0.000 description 5
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 4
- 230000000916 dilatatory effect Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 229910052742 iron Inorganic materials 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 244000062793 Sorghum vulgare Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 235000019713 millet Nutrition 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000012882 sequential analysis Methods 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a transportation by driving bridge that safety and stability nature is high, including floating the mound, and set up at the bracket buttress that floats the mound upper end, and set up the I40b shaped steel bearing beam in bracket buttress upper end, and set up the I55 shaped steel main longitudinal grider in I40b shaped steel bearing beam upper end, and set up and set a roof beam in place at the breast of I55 shaped steel main longitudinal grider upper end, and set up at the breast sleeper buttress of upper end of setting a roof beam in place, and set up the liu siliang on the mound is floated to both sides, the utility model relates to a transportation by driving bridge that safety and stability nature is high, its simple structure, material saving practice thrift cost, time limit for a project weak point, can eliminate potential safety hazard, dependable performance, convenient operation, steady quality.
Description
Technical field
The utility model relates to the high transportation by driving bridge of a kind of security and stability, belongs to bridge technical field.
Background technology
Steel truss girder assembling, similar construction method has two.One is that original position is assembled, sets up support exactly under the position of design steel truss girder, and it is assembled to carry out steel truss girder, and the beam that then falls is in place, for the magnitude of traffic flow is comparatively large or navigable river potential safety hazard is larger; But dilatory method, outside the position of design steel truss girder, carry out rack platform exactly and set up, assembled steel truss girder on platform, then longitudinal pull puts in place, and the beam that falls is in place, needs to set up platform for lining, dilatory track support, and carry out steel truss girder construction after pier stud construction must be treated.
The assembled method erecting steel truss girder of original position, after pier stud construction, carry out steel truss girder assembling putting up platform, set up rack platform exactly under the position of design steel truss girder, on rack platform, then carry out steel truss girder assembled, and the beam that finally falls is in place.
For the rack platform of highway interchange, must ensure to have a good transport and communication network and traffic, construction safety; For river course, must ensure that normal navigation and steel girder member bar transport put in place, so potential safety hazard is larger.And must to carry out steel truss girder assembled after pier stud construction, can not parallel construction, can only sequential analysis, and in operation process, relating to the problem such as traffic and navigation, the engineering time is longer, and needs to set up assembled and dilatory orbital platform, platform support materials are more, costly; Pier stud and steel truss girder are assembled cannot synchronously construct, and the duration is longer.
Utility model content
The technical problems to be solved in the utility model be to provide a kind of structure simple, save material, cost-saving, the duration is short, can eliminate safe hidden trouble, dependable performance, easy to operate, stay-in-grade transportation by driving bridge.
For solving the problem, the utility model adopts following technical scheme: the transportation by driving bridge that a kind of security and stability is high, comprise floating pier, and be arranged on the bracket buttress of Fu Dun upper end, and be arranged on the I40b shaped steel bearing beam of bracket buttress upper end, and be erected at the I55 shaped steel main longitudinal grider of I40b shaped steel bearing beam upper end, and be erected at the falsework for erecting bridge of I55 shaped steel main longitudinal grider upper end, and the sleeper being erected at falsework for erecting bridge upper end props up buttress, and be arranged on both sides and float Liu Siliang on pier.
Further, described bracket buttress is mutually superposed by 5 layers of bracket and is formed.
Further, be also provided with coupling assembling between described six or four beams and floating pier, described coupling assembling comprises the thick steel plate of 16mm, and is arranged on the side of a ship outboard angle below steel plate, and the high-strength bolt of fixing side of a ship outboard angle and steel plate.
The beneficial effects of the utility model are:
1. adopt this transportation by driving bridge to carry out steel truss girder assembled, in main span, set up support draw track as steel truss girder, save material, cost-saving;
2. can with main pier synchronous construction, can the reduction of erection time, save overhead cost;
3. do not close navigation channel and traffic data process, can eliminate safe hidden trouble;
4. the method advanced technology, dependable performance, easy to operate, steady quality, has wide popularizing application prospect.
Accompanying drawing explanation
Fig. 1 is the front view of the transportation by driving bridge that a kind of security and stability of the utility model is high;
Fig. 2 is the left view of the transportation by driving bridge that a kind of security and stability of the utility model is high;
Fig. 3 is the top view of the transportation by driving bridge that a kind of security and stability of the utility model is high;
Fig. 4 is the schematic diagram that in the transportation by driving bridge that a kind of security and stability of the utility model is high, six or four beams are connected with floating pier.
Detailed description of the invention
The technological means realized for making the utility model, creation characteristic, reaching object and effect is easy to understand, below in conjunction with detailed description of the invention, setting forth the utility model further.
Consult shown in Fig. 1 to Fig. 4, the transportation by driving bridge that a kind of security and stability is high, comprise floating pier 7, and be arranged on the bracket buttress 5 of floating pier 7 upper end, and be arranged on the I40b shaped steel bearing beam 8 of bracket buttress 5 upper end, and be erected at the I55 shaped steel main longitudinal grider 4 of I40b shaped steel bearing beam 8 upper end, and be erected at the falsework for erecting bridge 3 of I55 shaped steel main longitudinal grider 4 upper end, and the sleeper being erected at falsework for erecting bridge 3 upper end props up buttress 2, and be arranged on both sides and float six or four beams 6 on pier 7.
Described bracket buttress 5 is mutually superposed by 5 layers of bracket and is formed.
Also be provided with coupling assembling between described six or four beams 6 and floating pier 7, described coupling assembling comprises the thick steel plate of 16mm 9, and is arranged on the side of a ship outboard angle 11 below steel plate 9, and the high-strength bolt 10 of fixing side of a ship outboard angle 11 and steel plate 9.
In the present embodiment, transportation by driving ship is made up of 4 floating piers 7, and each floating pier 7 is saved by 9 standard boats respectively and forms 27.0m × 8.1m, uses the accurate boat joint of 36 feast-brand mark altogether.Respectively with three group of six or four beam 6, four floating piers 7 are linked to be entirety in floating pier 7 both sides; Two groups of bracket buttresses 5 installed by each floating pier 7, often organize bracket buttress 5 to be made up of five layers of bracket, bracket buttress 5 is installed two groups of Two bors d's oeuveres I40b shaped steel bearing beam 8 i iron and longitudinally pads fine strain of millet as first floor, lay one deck I55 shaped steel main longitudinal grider 4 i iron above as the horizontal bearing beam of the second layer.Bearing beam is set up falsework for erecting bridge 3, and falsework for erecting bridge 3 is made up of the Bailey beam that 228 57m are long, and every two line up one group, totally 6 groups, each 3 groups of every side; Assembled for ease of girder steel, falsework for erecting bridge 3 is set up the high sleeper of 40 cm and props up buttress 2, respectively set up one in the both sides of the large node of lower chord, sleeper props up buttress 2 and carries out adjustment height according to the camber of steel truss girder 1.
Bracket buttress 5 is made up of five layers of bracket, and between bracket, bracket saves with standard boat and use high-strength bolt 10 to be connected, and bracket top installs additional distributes I40b shaped steel bearing beam 8.Bracket group carries out spelling group on the coast, then under the cooperation of loop wheel machine, is directly lifted into floating pier 7 saves with standard boat and carries out bolt.
On four groups of bracket buttresses 5, set up the long Bailey beam falsework of 57m, assembled for ease of girder steel, the sleeper that falsework for erecting bridge 3 sets up 11 groups 40 centimetres high according to steel truss girder node location props up buttress 2, one is respectively set up at the both sides place of the large node of chord member, two ends respectively establish one at minor node place, and the concrete height that each sleeper props up buttress 2 should be considered the camber of steel truss girder 1 and arrange.
More than show and describe general principle of the present utility model and principal character and advantage of the present utility model.The technician of the industry should understand; the utility model is not restricted to the described embodiments; what describe in above-described embodiment and manual just illustrates principle of the present utility model; under the prerequisite not departing from the utility model spirit and scope; the utility model also has various changes and modifications, and these changes and improvements all fall within the scope of claimed the utility model.The claimed scope of the utility model is defined by appending claims and equivalent thereof.
Claims (4)
1. the transportation by driving bridge that a security and stability is high, it is characterized in that: comprise floating pier, and be arranged on the bracket buttress of Fu Dun upper end, and be arranged on the I40b shaped steel bearing beam of bracket buttress upper end, and be erected at the I55 shaped steel main longitudinal grider of I40b shaped steel bearing beam upper end, and be erected at the falsework for erecting bridge of I55 shaped steel main longitudinal grider upper end, and the sleeper being erected at falsework for erecting bridge upper end props up buttress, and is arranged on both sides and floats Liu Siliang on pier.
2. the transportation by driving bridge that a kind of security and stability according to claim 1 is high, is characterized in that: described bracket buttress is mutually superposed by five layers of bracket and formed.
3. the transportation by driving bridge that a kind of security and stability according to claim 1 is high, is characterized in that: be also provided with coupling assembling between described six or four beams and floating pier.
4. the transportation by driving bridge that a kind of security and stability according to claim 1 is high, is characterized in that: described coupling assembling comprises steel plate, and is arranged on the side of a ship outboard angle below steel plate, and the high-strength bolt of fixing side of a ship outboard angle and steel plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520443309.8U CN204803742U (en) | 2015-06-25 | 2015-06-25 | Transportation by driving bridge that safety and stability nature is high |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520443309.8U CN204803742U (en) | 2015-06-25 | 2015-06-25 | Transportation by driving bridge that safety and stability nature is high |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204803742U true CN204803742U (en) | 2015-11-25 |
Family
ID=54588591
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520443309.8U Active CN204803742U (en) | 2015-06-25 | 2015-06-25 | Transportation by driving bridge that safety and stability nature is high |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204803742U (en) |
-
2015
- 2015-06-25 CN CN201520443309.8U patent/CN204803742U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101078198B (en) | Steel box beam erection method for self-anchored suspension bridge | |
CN205399220U (en) | Whole system of erectting of large -scale arched bridge over strait | |
CN105970836A (en) | Method for erecting large-span lower chord variable truss high continuous steel trussed beam cantilever | |
CN105603881A (en) | Integral erecting system for large sea-crossing arch bridge and construction method thereof | |
CN205934739U (en) | Support system is used to eccentric construction by formula steel case tied arch bridge float towing to one side of large -span | |
CN103614970A (en) | Longitudinal-pulling and transverse-pushing sliding system used for assembly and erection construction of steel truss girder | |
CN103614969A (en) | Steel truss girder assembling, erecting and construction process | |
CN104018426B (en) | A kind of steel truss girder installation method | |
CN109898550A (en) | A kind of prefabricated assembled cantilever retaining wall being connected by screw bolts mode | |
CN104727227A (en) | Whole-section erecting method for open lattice type steel beam of half-through steel box tied-arch bridge | |
CN104532749A (en) | Support used for construction of upper beam of main tower of suspension bridge | |
CN101629409B (en) | Synchronous continuous support pulling construction method of long and large steel box girder | |
CN205775786U (en) | A kind of novel railway curve Cable-stayed Bridge with Slanted Pylon | |
CN101260645B (en) | Wide span canting pull type trestle | |
CN204385629U (en) | A kind of support for the construction of suspension bridge king-tower top rail | |
CN103806374B (en) | The overall track erection supplying system of assembly type steel bridge on highway and erection push technique | |
CN102587280B (en) | Main tower area steel truss girder erection method of base support auxiliary frame beam crane and base support | |
CN202509398U (en) | Base support frame of simulation steel truss girder for assisting erection of main tower zone steel truss girder of cable stayed bridge | |
CN109898421B (en) | Wind-resistant structure and wind-resistant method for integrally lifting arch rib of steel box arch bridge | |
CN204803742U (en) | Transportation by driving bridge that safety and stability nature is high | |
CN204802032U (en) | Transportation by driving ship that transportation by driving was turned and is erect steel longeron | |
CN208105058U (en) | A kind of steel box-girder mounting bracket | |
CN203546601U (en) | Steel truss assembling support | |
CN204919348U (en) | Supplementary head tower of using of self anchored suspension bridge installation | |
CN110373990A (en) | The double-deck whole hole of Combined steel truss beam manufactures and erection construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
DD01 | Delivery of document by public notice |
Addressee: CHINA RAILWAY AIRPORT CONSTRUCTION Group Corp. Person in charge of patents Document name: payment instructions |
|
DD01 | Delivery of document by public notice | ||
DD01 | Delivery of document by public notice |
Addressee: CHINA RAILWAY AIRPORT CONSTRUCTION Group Corp. Person in charge of patents Document name: Notice of Termination of Patent Rights |
|
DD01 | Delivery of document by public notice |