CN204803698U - Half range diesis shape interchange bridge - Google Patents

Half range diesis shape interchange bridge Download PDF

Info

Publication number
CN204803698U
CN204803698U CN201520184105.7U CN201520184105U CN204803698U CN 204803698 U CN204803698 U CN 204803698U CN 201520184105 U CN201520184105 U CN 201520184105U CN 204803698 U CN204803698 U CN 204803698U
Authority
CN
China
Prior art keywords
bridge
overpass
lane
shaped cross
line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520184105.7U
Other languages
Chinese (zh)
Inventor
及佳
及兰平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520184105.7U priority Critical patent/CN204803698U/en
Application granted granted Critical
Publication of CN204803698U publication Critical patent/CN204803698U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model relates to a " half range diesis shape interchange bridge " belongs to urban road traffic areas. The utility model discloses a core is two U -shaped cross -line overpasss (3) that (1) two orientation craspedodrome lane of yan zhuqiao was built, they have undertaken the task of traveling of turning left of (1) two craspedodrome direction vehicle on the main bridge, simultaneously owing to they follow the craspedodrome lane outside to erect, go up a slope, the access bridge of downhill path has only occupy two the lane area soils in craspedodrome lane both sides, the tune of turning occupies is the upper portion space in lane of going straight, additionally do not occupy the soil, thereby the effectual soil that has utilized, inferior bridge (2) are that the plane is current completely, additionally do not occupy the soil, capacity has improved more than the twice.

Description

Half range diesis shape interchange overpass
Technical field
The utility model relates to a kind of interchange overpass, belongs to urban highway traffic field.
Background technology
What in current domestic solution city, crossroad multilevel traffic problem was the most frequently used is build interchange overpass, and diesis shape intercommunicated overpass is immediate prior art with the utility model, its essential characteristic is: the cross four direction direct lane along the main overpass bridge of cross builds 4 U-shaped cross-line overpass bridges, they assume responsibility for tune and the left-hand bend traveling task of through vehicles, simultaneously because their access bridge sets up outside direct lane, go up a slope, descending only occupies area soil, Liang Tiao track, direct lane both sides, what tune of turning took is the upper space of direct lane, not extra land occupation, therefore, it is less than the cloverleaf intercommunicated overpass generally adopted at present that this overpass bridge has floor space, achieve again the object of the full intercommunication of crossroad vehicle simultaneously.But in reality, crossroad in city, by various conditionality, and the cross four direction direct lane not all possessed along the main overpass bridge of cross builds the condition of 4 U-shaped cross-line overpass bridges, many crossroads only possess in both sides, crossing, along the condition of a constructing road U-shaped cross-line overpass bridge, the application of diesis shape intercommunicated overpass is restricted in this case.
Summary of the invention
The purpose of this utility model: when the crossroad in city only possesses in both sides, crossing, during along condition (or the unnecessary four direction in crossroad all builds U-shaped cross-line overpass bridge) of a constructing road U-shaped cross-line overpass bridge, adopt the utility model, vehicle and time bridge intercommunication of main bridge twocouese traveling can be realized, secondary bridge vehicle is passed through by traffic signal control, and its traffic capacity improves more than twice.
The utility model has following characteristics:
1, two U-shaped cross-line overpass bridges (3) are built in the both sides of the main overpass bridge of cross and along two craspedodrome directions of main bridge (1), and the vehicle on two the craspedodrome directions solving main bridge (1) turns left to travel.
2, secondary bridge (2) vehicle is passed through by traffic signal control, and its traffic capacity improves more than twice.
3, can take according to actual conditions: single seat or two U-shaped cross-line overpass bridges extend access bridge length, strengthen the form of cross-line overpass bridge turning radius.
Accompanying drawing explanation
Fig. 1 half range diesis shape interchange overpass plan view
Fig. 2 half range diesis shape interchange overpass A-A elevation
Fig. 3 half range diesis shape interchange overpass B-B elevation
Fig. 4 half range diesis shape interchange overpass (single bridge access bridge extends) plan view
Number in figure: (1)-main bridge, (2)-secondary bridge, (3)-U-shaped cross-line overpass bridge, (4)-right-hand rotation ring road, (5)-left rotaring ring road, (6)-grade separation culvert.
Detailed description of the invention
Contrast accompanying drawing below and elaborate the utility model, the main overpass bridge of cross that the utility model forms primarily of: main bridge (1) and secondary bridge (2), two U-shaped cross-line overpass bridges (3), 4 right-hand rotation ring roads (4), two left rotaring ring roads (5) are formed jointly.
The utility model is implemented by following technical measures: as shown in Figure 1, two U-shaped cross-line overpass bridges (3) are built in the both sides of the main overpass bridge of cross and along two craspedodrome directions of main bridge (1), two U-shaped cross-line overpass bridges (3) are all to do starting point outside main bridge (1) craspedodrome direction lane, access bridge extends outside craspedodrome direction lane, when extend to height at the bottom of bridge meet code requirement apart from main bridge (1) bridge floor height after (as Fig. 2, shown in Fig. 3), the direct lane of main bridge (1) is crossed in tune of turning left, arrive the outside of main bridge (1) opposite craspedodrome direction lane, direct motion situation is formed with opposite craspedodrome direction lane, and along descending outside opposite craspedodrome direction lane, converge with the right-turn lane of opposite craspedodrome direction lane, form the vehicle left-hand rotation U-shaped cross-line overpass bridge of main bridge (1) twocouese.
Main bridge (1) and time bridge (2) four direction respectively build a vehicle right turn ramp (4), right-hand rotation for vehicle travels, the through vehicles of secondary bridge (2) and left turning vehicle are passed through by traffic signal control, build two left rotaring ring roads (5), the vehicle for secondary bridge (2) turns left to travel.
So far, half range diesis shape interchange overpass completes: the vehicle above main bridge (1) is kept straight on, turn left, turning right travels continuously; Vehicle above secondary bridge (2) is turned right and is travelled continuously, craspedodrome and left-hand bend vehicle are passed through by traffic signal control, because only have the signal control of secondary bridge (2) twocouese, so than the signal control time shorten twice of plane cross crossing four direction, bus capacity improves more than twice.
Core of the present utility model is two U-shaped cross-line overpass bridges (3) that Yan Zhuqiao (1) both direction direct lane is built, the left-hand bend that they assume responsibility for main bridge (1) two craspedodrome direction vehicle travels task, simultaneously because they set up outside direct lane, go up a slope, the access bridge of descending only occupies area soil, Liang Tiao track, direct lane both sides, what tune of turning took is that the upper space of direct lane is (as Fig. 2, shown in Fig. 3), not extra land occupation, thus effectively make use of soil, secondary bridge (2) is that plane is passed through completely, not extra land occupation, the traffic capacity improves more than twice,
The utility model has following major advantage:
1, owing to only needing to build two U-shaped cross-line overpass bridges (3) along main bridge (1) both direction direct lane, and the access bridge of U-shaped cross-line overpass bridge (3) only occupies area soil, Liang Tiao track, direct lane both sides, secondary bridge (2) is that plane is passed through completely, not extra land occupation, therefore the utility model greatly reduces floor space.
2, the utility model achieves the current continuously of main bridge (1) all directions, and secondary bridge (2) traffic capacity improves more than twice, improves the traffic of crossroad.
3, two U-shaped cross-line overpass bridges (or U-shaped cross-line tunnel) are symmetrical each other, and appearance is succinctly attractive in appearance, and all directions traffic route is simply clear and definite, and form is basically identical, and human pilot is not easily got lost;
4, the utility model according to on-site actual situations, can be taked: U-shaped cross-line overpass bridge, or the form such as U-shaped cross-line tunnel.
5, the utility model according to on-site actual situations, can be taked: single seat or two U-shaped cross-line overpass bridges extend access bridge length, strengthen the form of cross-line overpass bridge turning radius, as shown in Figure 4.
The utility model is applicable to the crossroad that vehicular traffic in city is large, width of roadway is limited and realizes multilevel traffic.

Claims (4)

1. a half range diesis shape interchange overpass, primarily of the main overpass bridge of cross that main bridge (1) and time bridge (2) form, two U-shaped cross-line overpass bridges (3), article 4, right-hand rotation ring road (4), article two, left rotaring ring road (5) is formed jointly, it is characterized in that: two U-shaped cross-line overpass bridges (3) are built in the both sides of the main overpass bridge of cross and along two craspedodrome directions of main bridge (1), two U-shaped cross-line overpass bridges (3) are all to do starting point outside main bridge (1) craspedodrome direction lane, access bridge extends outside craspedodrome direction lane, when extending to after height at the bottom of bridge meets code requirement apart from main bridge (1) bridge floor height, the direct lane of main bridge (1) is crossed in tune of turning left, arrive the outside of main bridge (1) opposite craspedodrome direction lane, direct motion situation is formed with opposite craspedodrome direction lane, and extend outside opposite craspedodrome direction lane, converge with the right-turn lane of opposite craspedodrome direction lane, form the vehicle left-hand rotation U-shaped cross-line overpass bridge of main bridge (1) twocouese.
2. half range diesis shape interchange overpass according to claim 1, is characterized in that: U-shaped cross-line overpass bridge (3) according to on-site actual situations, can be taked: U-shaped cross-line overpass bridge, or U-shaped cross-line tunnel form.
3. half range diesis shape interchange overpass according to claim 1, is characterized in that: the vehicle above secondary bridge (2) is passed through by traffic signal control, and its traffic capacity comparatively plane cross crossing improves more than twice.
4. half range diesis shape interchange overpass according to claim 1, is characterized in that: can take to extend single seat or two U-shaped cross-line overpass bridge access bridge length, strengthen the form of cross-line overpass bridge turning radius.
CN201520184105.7U 2015-03-30 2015-03-30 Half range diesis shape interchange bridge Expired - Fee Related CN204803698U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520184105.7U CN204803698U (en) 2015-03-30 2015-03-30 Half range diesis shape interchange bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520184105.7U CN204803698U (en) 2015-03-30 2015-03-30 Half range diesis shape interchange bridge

Publications (1)

Publication Number Publication Date
CN204803698U true CN204803698U (en) 2015-11-25

Family

ID=54588547

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520184105.7U Expired - Fee Related CN204803698U (en) 2015-03-30 2015-03-30 Half range diesis shape interchange bridge

Country Status (1)

Country Link
CN (1) CN204803698U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106149490A (en) * 2015-03-30 2016-11-23 及佳 Half range diesis shape interchange overpass

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106149490A (en) * 2015-03-30 2016-11-23 及佳 Half range diesis shape interchange overpass

Similar Documents

Publication Publication Date Title
CN202577082U (en) Double cross full intercommunication overpass
CN204803698U (en) Half range diesis shape interchange bridge
CN101387095B (en) Full interchange crossroad
CN105625127A (en) Intersection road of Chinese knot type interchange
CN106149490A (en) Half range diesis shape interchange overpass
CN202090253U (en) Two crossroad full unblocked cross composite bridges of right turn bridges
CN104947558B (en) The aspect intercommunicated overpass of swinging two under the bridge of T-shaped road junction
CN204608533U (en) A kind of city road and bridge net
CN104153265B (en) A kind of city road and bridge net
CN204185741U (en) The full interchange viaduct of crossroad two aspect
CN207498761U (en) Viaduct
CN102605694A (en) T-junction flyover with pedestrian and vehicle lanes
CN207498760U (en) Viaduct
CN101949121A (en) Annular overpass with four connected ring inner edge slope bridges
CN101333796A (en) Crossing viaduct
CN202023130U (en) Elevated overpass shaped like a Chinese character `Ri`
CN204266074U (en) The road structure that a kind of transport solution blocks up
CN201924248U (en) Novel flyover
CN204825534U (en) City road bridge net
CN204825536U (en) Interchange bridge of people's car layering
CN104088206B (en) City road and bridge net
CN204803699U (en) Economical cross overpass
CN102277808B (en) Righted-sided travel complete single layer combined tunnel containing four independent h-shaped tunnels
CN202247572U (en) Multifunctional urban overhead road
CN102330395A (en) High speed road network of city center

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151125

Termination date: 20180330