CN204800581U - Electric hammer operation support - Google Patents

Electric hammer operation support Download PDF

Info

Publication number
CN204800581U
CN204800581U CN201520529667.0U CN201520529667U CN204800581U CN 204800581 U CN204800581 U CN 204800581U CN 201520529667 U CN201520529667 U CN 201520529667U CN 204800581 U CN204800581 U CN 204800581U
Authority
CN
China
Prior art keywords
mobile jib
bar
electric hammer
support
adjustment hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520529667.0U
Other languages
Chinese (zh)
Inventor
刘宏生
丁永洁
牟亮
马东旭
师冠英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Bureau Installation Engineering Co Ltd
Original Assignee
China Construction Seventh Engineering Bureau Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Bureau Installation Engineering Co Ltd filed Critical China Construction Seventh Engineering Bureau Installation Engineering Co Ltd
Priority to CN201520529667.0U priority Critical patent/CN204800581U/en
Application granted granted Critical
Publication of CN204800581U publication Critical patent/CN204800581U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses an electric hammer operation support, including electric hammer and support, the upper end at the support is installed to the electric hammer, the support comprises mobile jib and time pole, is equipped with the bracing piece between mobile jib and time pole, is located mobile jib and inferior pole and still is equipped with the die -pin between. The utility model discloses time only need be operated by an user of service, and need not high altitude construction, safe and reliable in the use, and a large amount of labours are saved simultaneously to easy operation, convenience. The device increases adjustable interval, can carry out operating space adjustment, convenient construction according to different floor height.

Description

Electric hammer operation support
Technical field
The utility model belongs to construction instrument, particularly relates to a kind of electric hammer operation support.
Background technology
In order to pipe laying, equipment, furred ceiling at the bottom of floor in construction, perforating is needed to hole, generally this work worker stands need carry out constructing operation on double ladder or movable scaffold, the method needs minimum 2 of workmen, and construction speed is slower, eminence construction safety coefficient is low, and especially for the building that main body is frame structure, this work more needs to consume a large amount of labour.
Summary of the invention
The purpose of this utility model is the shortcoming overcoming above-mentioned prior art, provides a kind of structure simple, easy construction, saving resource, safety labor-saving, the electric hammer operation support of conveniently moving.
The utility model is achieved through the following technical solutions:
A kind of electric hammer operation support, comprise electric hammer and support, described electric hammer is arranged on the upper end of support, and described support is made up of mobile jib and time bar, is provided with support bar, between mobile jib and secondary bar, is also provided with pressure pin between mobile jib and secondary bar; Described mobile jib top and middle part are provided with adjustment apertures and middle adjustment hole, and the bottom of described bar is provided with lower adjustment hole; Described support bar comprises upper support bar and lower support bar, and one end of described upper support bar is fixed on time bar, and the other end of upper support bar is arranged on the adjustment hole place, top on mobile jib top; One end of lower support bar is fixed on mobile jib, and the other end of described lower support bar is arranged on the lower adjustment hole place on time bar; Described pressure pin is positioned at the pars intermedia of mobile jib and time bar, and one end of pressure pin is fixed on the pars intermedia of time bar, and the other end of pressure pin is arranged on the middle adjustment hole place of mobile jib pars intermedia.
The length of described pressure pin is greater than the length of upper support bar and lower support bar.
The quantity of described adjustment apertures, middle adjustment hole and lower adjustment hole is at least 3.
The length of described mobile jib is greater than the length of time bar.
Described pressure pin is provided with switch, and switch is connected with electric hammer by wire.The utility model has the advantages that:
When using the utility model, a user of service is only needed to operate, and without the need to work high above the ground, safe and reliable in use procedure, simple, convenient, save a large amount of labour simultaneously.Device increases adjustable interval, can carry out operating space adjustment, convenient construction according to different story height.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
Embodiment: electric hammer operation support as shown in the figure, comprise electric hammer 1 and support, described electric hammer 1 is arranged on the upper end of support, and described support is made up of mobile jib 2 and time bar 3, and the length of described mobile jib 2 is greater than the length of time bar 3.Be provided with between mobile jib 2 and secondary bar 3 and support 4 bars and lower support bar 9, between mobile jib 2 and secondary bar 3, be also provided with pressure pin 8, the length of this pressure pin 8 is greater than the length of support 4 bar and lower support bar 9.Described pressure pin 8 is provided with switch 7, and switch 7 is connected with electric hammer 1 by wire.
Described mobile jib 2 top and middle part are provided with adjustment apertures 5 and middle adjustment hole 6, and the bottom of described bar 3 is provided with lower adjustment hole 10.One end of described upper support bar 4 is fixed on time bar 3, and the other end of upper support bar 4 is arranged on top adjustment hole 5 place on mobile jib 2 top; One end of described lower support bar 9 is fixed on mobile jib 2, and the other end of lower support bar 9 is arranged on lower adjustment hole 10 place on time bar 3.
Described pressure pin 8 is positioned at the pars intermedia of mobile jib 2 and time bar 3, and one end of pressure pin 8 is fixed on the pars intermedia of time bar 3, and the other end of pressure pin 8 is arranged on the middle adjustment hole place 10 of mobile jib 2 pars intermedia.
The quantity of above-mentioned adjustment apertures 5, middle adjustment hole 6 and lower adjustment hole 10 is at least 3.
The utility model can carry out the adjustment of position relationship between mobile jib 2 and secondary bar 3 by adjustment hole, can expand the scope of application like this, and not by the restriction of height with space, only needs a people just can complete construction operation.
Because electric hammer operation support is manual operation, consider easy to use, support own wt is unsuitable overweight, and support can adopt light material, as light-gauge steel section, and the lumps of wood etc.

Claims (5)

1. an electric hammer operation support, comprise electric hammer and support, described electric hammer is arranged on the upper end of support, it is characterized in that: described support is made up of mobile jib and time bar, is provided with support bar, between mobile jib and secondary bar, is also provided with pressure pin between mobile jib and secondary bar; Described mobile jib top and middle part are provided with adjustment apertures and middle adjustment hole, and the bottom of described bar is provided with lower adjustment hole; Described support bar comprises upper support bar and lower support bar, and one end of described upper support bar is fixed on time bar, and the other end of upper support bar is arranged on the adjustment hole place, top on mobile jib top; One end of lower support bar is fixed on mobile jib, and the other end of described lower support bar is arranged on the lower adjustment hole place on time bar; Described pressure pin is positioned at the pars intermedia of mobile jib and time bar, and one end of pressure pin is fixed on the pars intermedia of time bar, and the other end of pressure pin is arranged on the middle adjustment hole place of mobile jib pars intermedia.
2. electric hammer operation support according to claim 1, is characterized in that: the length of described pressure pin is greater than the length of upper support bar and lower support bar.
3. electric hammer operation support according to claim 1, is characterized in that: the quantity of described adjustment apertures, middle adjustment hole and lower adjustment hole is at least 3.
4. electric hammer operation support according to claim 1, is characterized in that: the length of described mobile jib is greater than the length of time bar.
5. electric hammer operation support according to claim 1, is characterized in that: described pressure pin is provided with switch, and switch is connected with electric hammer by wire.
CN201520529667.0U 2015-07-21 2015-07-21 Electric hammer operation support Expired - Fee Related CN204800581U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520529667.0U CN204800581U (en) 2015-07-21 2015-07-21 Electric hammer operation support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520529667.0U CN204800581U (en) 2015-07-21 2015-07-21 Electric hammer operation support

Publications (1)

Publication Number Publication Date
CN204800581U true CN204800581U (en) 2015-11-25

Family

ID=54585471

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520529667.0U Expired - Fee Related CN204800581U (en) 2015-07-21 2015-07-21 Electric hammer operation support

Country Status (1)

Country Link
CN (1) CN204800581U (en)

Similar Documents

Publication Publication Date Title
CN204782062U (en) Curtain crossbeam installation appurtenance
MY163896A (en) Lifting method for formwork working platform
CN204370781U (en) One easily regulates scaffold
CN204053007U (en) Electric drill bracing frame
CN204800581U (en) Electric hammer operation support
CN203565916U (en) Drilling tool with rear-mounted member
CN203531345U (en) Movable cantilever frame
CN201915304U (en) High-altitude electric drill drilling support
CN203156100U (en) Drilling instrument for suspended ceiling construction
CN203412518U (en) Indoor ceiling drilling device capable of freely adjusting drilling height
CN204343647U (en) A kind of the shaped steel suspension scaffolding bracing frame
CN205224565U (en) Steel construction is truss for factory building convenient to dismouting
CN204525381U (en) A kind of lifting electric hammer combination pressure rod member for boring ceiling furred ceiling muscle hole
CN203583897U (en) Rebar-planting portable support
CN202448113U (en) Support frame of hole forming device
CN203201123U (en) Device capable of enabling worker to carry out ceiling suspending engineering nail hole coating work on ground
CN202954551U (en) Simple steel reinforcement cage for high-altitude welding
CN203330451U (en) Roof drilling device
CN204053009U (en) A kind of vertical bar planting boring ease of Use frame
CN204295649U (en) Electric hammer auxiliary operation support
CN205259554U (en) A mount for installation of light steel joist gypsum -lath furred ceiling
CN104594616A (en) Simple scaffold
CN205134920U (en) Simple and easy aerial working platform device of building engineering
CN204899227U (en) Manual cloth mechanic possesses formula unable adjustment base
CN204997030U (en) Control system is cut to conticaster hydraulic pressure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151125

Termination date: 20180721