CN204785105U - Prop up gallows structure - Google Patents
Prop up gallows structure Download PDFInfo
- Publication number
- CN204785105U CN204785105U CN201520506571.2U CN201520506571U CN204785105U CN 204785105 U CN204785105 U CN 204785105U CN 201520506571 U CN201520506571 U CN 201520506571U CN 204785105 U CN204785105 U CN 204785105U
- Authority
- CN
- China
- Prior art keywords
- tube bank
- support
- hanger structure
- locking nut
- support hanger
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model provides a prop up gallows structure, a supporting beam 2 is welded in advance by two C type channel -section steels and forms, and there is positioning tooth 21 C type channel -section steel bottom inboard, fixes a position restraining 1 with 3 meshings on the square nut. A supporting beam 2 endwise slip, convenient distance of adjusting 1 tube bank according to on -the -spot construction requirements can be followed to slip gasket 6 under the circumstances that flange face lock nut 4 did not tighten. The connection of gallows need not field weld and drilling, and the very big constructor that has made things convenient for has improved the construction progress, can effectively improve the construction environment simultaneously. And the accessory pulled down and channel -section steel can all used repeatedly, can not cause the waste to the material. The iron and steel finished piece has all carried out surperficial preserved handle, can prolong product life, effectively practices thrift the capital input cost.
Description
Technical field
The utility model relates to a kind of support hanger structure, is mainly used in the field of track traffic such as high ferro, subway.
Background technique
The connection of traditional suspension and support adopts the mode of Site Welding and pre-drilled more, be difficult to after support installing completes regulate again, in work progress, be mostly to estimate by rule of thumb, random large, in addition operative's intensity is large, and not manageability, easily causes waste and the shortcoming of material, oil surface paint is as anticorrosion, antirust treatment, meanwhile, later maintenance difficulty, costly.
Model utility content
The deficiency that the utility model exists for prior art, provides a kind of without the need to Site Welding and boring, the convenient support hanger structure installing adjustment.
The technical solution adopted in the utility model is: a kind of support hanger structure, comprises tube bank, support beam, square nut, flanged surface locking nut, screw rod, sliding shim.Described support beam is welded in advance by two C type channel-section steels, and without the need to Site Welding, upper and lower notch can compatiblely support and hanging two kinds of forms.Described C type channel-section steel bottom inside has locating tooth, engages position tube bank with square nut 3.
Described tube bank is made up of two semicircle fixtures, hex head bolt, hexagonal double-ended bolts, and described hexagonal double-ended bolt is internal thread through hole, and one of them semicircle fixture and hexagonal double-ended bolt weld together in advance.
Hexagonal double-ended bolt in described tube bank is connected with screw rod, and screw rod is connected with flanged surface locking nut, sliding shim and square nut, tube bank is fixed on support beam.
Described two semicircle fixtures connect by hex head bolt the clamping carrying out pipeline to be fixed.
Described sliding shim can slide axially along support beam when flanged surface locking nut is not tightened, the convenient distance requiring adjutage interfascicular according to site operation, and after tube bank position is determined, tightening flanged surface locking nut can locate.
Surface anticorrosion process has all been carried out in all steel piece surfaces on the support hanger structures such as described support beam, square nut, screw rod.
Technique effect of the present utility model: the connection of suspension and support is without the need to Site Welding and boring, can carry out easily tearing down and reconstructing adjustment, the convenient distance requiring adjutage interfascicular according to site operation, greatly facilitates workmen, improve construction speed, effectively can improve construction environment simultaneously.And the accessory pulled down and channel-section steel can be reused, and can not cause waste to material.Steel piece has all carried out surface anticorrosion process, can extend product working life, effectively saves infusion of financial resources cost.
Accompanying drawing explanation
For ease of illustrating, the utility model is described in detail by following the drawings and the specific embodiments.
Fig. 1 is the structural representation of mode of execution of the present utility model.
Accompanying drawing figure number illustrates: 1-restrains, the semicircle fixture of 11-, 12-hexagonal double-ended bolt, 13-hex head bolt, 2-support beam, 21-locating tooth, 3-square nut, 4-flanged surface locking nut, 5-screw rod, 6-sliding shim.
Embodiment
Below in conjunction with accompanying drawing, embodiment of the present utility model is described in detail.
As shown in drawings, a kind of support hanger structure, comprises tube bank 1, support beam 2, square nut 3, flanged surface locking nut 4, screw rod 5, sliding shim 6.Described support beam 2 is welded, without the need to Site Welding in advance by two C type channel-section steels.C type channel-section steel bottom inside has locating tooth 21, engages locate tube bank 1 with square nut 3.
Tube bank 1 is made up of two semicircle fixtures 11, hex head bolt 13, hexagonal double-ended bolts 12, and hexagonal double-ended bolt 12 is internal thread through hole, and one of them semicircle fixture 11 welds together in advance with hexagonal double-ended bolt 12.Hexagonal double-ended bolt 12 is connected with screw rod 5, and screw rod 5 is connected with flanged surface locking nut 4, sliding shim 6 and square nut 3, tube bank 1 is fixed on support beam 2.Two semicircular clamp 11 connects by hex head bolt 13 clamping carrying out pipeline to be fixed.
Sliding shim 6 can slide axially along support beam 2 when flanged surface locking nut 4 is not tightened, and convenient according to the distance between site operation requirement adjustment tube bank 1, after position is determined, tightening flanged surface locking nut 4 can locate.
Surface anticorrosion process has all been carried out in all steel piece surfaces on support hanger structure.
Be only several concrete implementation example of the present utility model above, but the application is not limited thereto, the changes that any person skilled in the art can think of, all should drops in the protection domain of the application.
Claims (5)
1. a support hanger structure, comprise tube bank, support beam, square nut, flanged surface locking nut, screw rod, sliding shim, it is characterized in that: described support beam is welded in advance by two C type channel-section steels, without the need to Site Welding, upper and lower notch can compatiblely support and hanging two kinds of forms, described C type channel-section steel bottom inside has locating tooth, engages position tube bank with square nut 3.
2. a kind of support hanger structure according to claim 1, it is characterized in that: described tube bank is made up of two semicircle fixtures, hex head bolt, hexagonal double-ended bolts, described two semicircle fixtures connect by hex head bolt the clamping carrying out pipeline to be fixed, described hexagonal double-ended bolt is internal thread through hole, and one of them semicircle fixture and hexagonal double-ended bolt weld together in advance.
3. a kind of support hanger structure according to claim 1, is characterized in that: the hexagonal double-ended bolt in described tube bank is connected with screw rod, screw rod is connected with flanged surface locking nut, sliding shim and square nut, tube bank is fixed on support beam.
4. a kind of support hanger structure according to claim 1, it is characterized in that: described sliding shim can slide axially along support beam when flanged surface locking nut is not tightened, the convenient distance requiring adjutage interfascicular according to site operation, after tube bank position is determined, tightening flanged surface locking nut can locate.
5. a kind of support hanger structure according to claim 1, is characterized in that: surface anticorrosion process has all been carried out in all steel piece surfaces on described support hanger structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520506571.2U CN204785105U (en) | 2015-07-14 | 2015-07-14 | Prop up gallows structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520506571.2U CN204785105U (en) | 2015-07-14 | 2015-07-14 | Prop up gallows structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204785105U true CN204785105U (en) | 2015-11-18 |
Family
ID=54525154
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520506571.2U Active CN204785105U (en) | 2015-07-14 | 2015-07-14 | Prop up gallows structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204785105U (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105299319A (en) * | 2015-11-24 | 2016-02-03 | 王琳 | Spouting pipe sleeving rack |
CN106981845A (en) * | 2017-04-18 | 2017-07-25 | 广州地铁设计研究院有限公司 | A kind of improved leakage cable clamp |
CN107044566A (en) * | 2016-02-05 | 2017-08-15 | 第防蚀管业有限公司 | Tubing suspends bracket in midair |
CN107069638A (en) * | 2017-04-18 | 2017-08-18 | 广州地铁设计研究院有限公司 | A kind of new leakage cable clamp |
CN107701199A (en) * | 2017-09-19 | 2018-02-16 | 山东安泰克工程材料有限公司 | A kind of clamping type is used for the plastic clip that pre-buried channel flow is fixed |
CN109282085A (en) * | 2017-07-21 | 2019-01-29 | 德梅斯特(上海)环保科技有限公司 | Pipeline fixing device and pipe fixing system and conduit component set |
CN110553776A (en) * | 2019-09-12 | 2019-12-10 | 苏州热工研究院有限公司 | Clamp of pipeline support hanger force measuring device and pipeline support hanger force measuring device |
CN110778431A (en) * | 2019-11-01 | 2020-02-11 | 中车大连机车车辆有限公司 | Pipeline bracket and pipeline fixing method |
CN111255951A (en) * | 2020-01-16 | 2020-06-09 | 中铁二局集团有限公司 | Concrete pump pipe fixing structure for super high-rise building construction |
-
2015
- 2015-07-14 CN CN201520506571.2U patent/CN204785105U/en active Active
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105299319A (en) * | 2015-11-24 | 2016-02-03 | 王琳 | Spouting pipe sleeving rack |
CN107044566A (en) * | 2016-02-05 | 2017-08-15 | 第防蚀管业有限公司 | Tubing suspends bracket in midair |
CN106981845A (en) * | 2017-04-18 | 2017-07-25 | 广州地铁设计研究院有限公司 | A kind of improved leakage cable clamp |
CN107069638A (en) * | 2017-04-18 | 2017-08-18 | 广州地铁设计研究院有限公司 | A kind of new leakage cable clamp |
CN109282085A (en) * | 2017-07-21 | 2019-01-29 | 德梅斯特(上海)环保科技有限公司 | Pipeline fixing device and pipe fixing system and conduit component set |
CN107701199A (en) * | 2017-09-19 | 2018-02-16 | 山东安泰克工程材料有限公司 | A kind of clamping type is used for the plastic clip that pre-buried channel flow is fixed |
CN110553776A (en) * | 2019-09-12 | 2019-12-10 | 苏州热工研究院有限公司 | Clamp of pipeline support hanger force measuring device and pipeline support hanger force measuring device |
CN110778431A (en) * | 2019-11-01 | 2020-02-11 | 中车大连机车车辆有限公司 | Pipeline bracket and pipeline fixing method |
CN111255951A (en) * | 2020-01-16 | 2020-06-09 | 中铁二局集团有限公司 | Concrete pump pipe fixing structure for super high-rise building construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204785105U (en) | Prop up gallows structure | |
CN204487029U (en) | A kind of safety belt suspension clamp | |
CN205057564U (en) | Unsteady anchor clamps of processing steel pipe | |
CN204662939U (en) | A kind of bidirectional locking quickly dismantled scaffold clasp | |
CN202245724U (en) | Clamping type bridge lifting device | |
CN205394326U (en) | Channel bend external [line up] clamp | |
CN203509286U (en) | Cutting device for transition slope of steel structural tube | |
CN202579579U (en) | Eccentric clamping nut | |
CN202823718U (en) | Clamping device for spray paint protection | |
CN206634471U (en) | A kind of civil engineering pipe fitting apparatus for placing | |
CN207138919U (en) | Wave drilling tool | |
CN106641464B (en) | The technique for fixing of line holder | |
CN203514838U (en) | Multi-angle adjustable edge protective handrail | |
CN206842863U (en) | Vertical pipeline hanging apparatus applied to large-scale resource | |
CN213268821U (en) | Hoop hanging basket device convenient for welding of high-altitude steel beams | |
CN204081536U (en) | For the detachable safety device of Steel Structure Installation in a kind of building operations | |
CN204546538U (en) | The switching mechanism of processing flange | |
CN210034108U (en) | Bolt lengthening device | |
CN207005015U (en) | A kind of construction(al)steel pipe connection | |
CN207656178U (en) | A kind of cultivation equipment column body welding fixture | |
CN203487805U (en) | Rapid purline/steel beam clamping support with safety rope | |
CN202640287U (en) | Device for withdrawing bearing | |
CN206519684U (en) | A kind of multi-functional welding test fixture | |
CN207161443U (en) | A kind of novel steel beam folder | |
CN211414152U (en) | Adjustable marine pipeline welding jig |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |