CN204783985U - Connection structure who is connected with combined material - Google Patents

Connection structure who is connected with combined material Download PDF

Info

Publication number
CN204783985U
CN204783985U CN201520499660.9U CN201520499660U CN204783985U CN 204783985 U CN204783985 U CN 204783985U CN 201520499660 U CN201520499660 U CN 201520499660U CN 204783985 U CN204783985 U CN 204783985U
Authority
CN
China
Prior art keywords
link
connecting piece
composite material
groove
linkage structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520499660.9U
Other languages
Chinese (zh)
Inventor
张万虎
李芳丽
李宪强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huzhou Langqing Composite Material Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520499660.9U priority Critical patent/CN204783985U/en
Application granted granted Critical
Publication of CN204783985U publication Critical patent/CN204783985U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Injection Moulding Of Plastics Or The Like (AREA)
  • Lining Or Joining Of Plastics Or The Like (AREA)
  • Body Structure For Vehicles (AREA)

Abstract

The utility model discloses a connection structure who is connected with combined material, it includes: first connecting piece is equipped with at least one connection face on it, establish at least one recess on the connection face, recess notch size is lighter than recess bottom size, with the transversal T of personally submitting of the recess shape of being connected the facial features friendship, the second connecting piece, it comprises combined material, forms at least one bellied connecting portion on it, the connecting portion buckle is in the recess of first connecting piece. The second connecting piece comprises combined material, fills the connecting portion that first connecting piece concave part configuration becomes the second connecting piece under the molten condition, realizes first connecting piece behind the cooling and solidification and is connected with the plane of second connecting piece, obtains the utility model discloses a connection structure.

Description

A kind of linkage structure be connected with composite material
Technical field
The utility model belongs to composite material linkage structure field, is specifically related to a kind of linkage structure be connected with composite material.
Background technique
Along with fiber-reinforced resin matrix compound material extensive use, the connection between composite material and other materials is increasing.Common connecting means utilizes the mechanical fastener such as bolt and rivet to carry out.But owing to there being the existence of the link such as bolt and rivet, these mechanical joining methods can have influence on the planarization of flat connecting section position, and then be restricted in application.
Summary of the invention
The purpose of this utility model is to provide a kind of linkage structure be connected with composite material, and in this linkage structure, join strength is large, and the plane between the material being applicable to unlike material connects.
For achieving the above object, the technical solution of the utility model is:
A kind of linkage structure be connected with composite material, it comprises: the first link, which is provided with at least one junction surface, described junction surface is established at least one groove, described groove notch size is less than bottom portion of groove size, and the groove cross section crossing with junction surface is T-shaped; Second link, it is made up of composite material, and it forms the joint of at least one projection, described joint buckle is in the groove of the first link.
Further, described first link is different from the material of the second link.
Described second link is formed by thermoplastic resin or thermoplastic fiber reinforced composite.
Again, described thermoplastic resin is the one in polyamide resin, polyester resin or vistanex.
Reinforcing fiber in described thermoplastic fiber reinforced composite is carbon fiber or glass fibre.
The material of the first link described in the utility model is the one in metallic material, stupalith, fiber reinforcement thermosetting composite material or fiber reinforced thermolplastic composite material.
First link of linkage structure described in the utility model is connected by concaveconvex structure with the second link, wherein, the joint of the second link utilizes injection molding forming method that thermoplastic composite material is injected in the groove of the first link in the molten state to be formed, realize the first link after solidification to be cooled to be connected with the second link plane, obtain linkage structure described in the utility model.
The beneficial effects of the utility model:
The utility model connects the connection achieved between the first link and composite material by concaveconvex structure, form a kind of concavo-convex jointing type structure, join strength is large, the advantage having weight reduction and reduce costs, has broad application prospects at macrostructure thing, building fields such as machinery, electric equipment and aviation, vehicle, boats and ships.
Accompanying drawing explanation
Fig. 1 is the cross sectional representation of the first link in the utility model embodiment.
Fig. 2 is the cross sectional representation of the second link in the utility model embodiment.
Fig. 3 is the cross sectional representation of the utility model embodiment.
Embodiment
Below in conjunction with embodiment and accompanying drawing, the utility model is described further.
See Fig. 1 ~ Fig. 3, the linkage structure be connected with composite material of the present utility model, it comprises: the first link 1, which is provided with at least one junction surface 11, described junction surface 11 is established at least one groove 12, described groove 12 notch size is less than groove 12 bottom size, and the groove cross section crossing with junction surface 11 is T-shaped; Second link 2, it is made up of composite material, and it forms the joint 21 of at least one projection, described joint 21 buckle is in the groove of the first link 1.
Further, described first link 1 is different from the material of the second link 2.
Described second link 2 is formed by thermoplastic resin or thermoplastic fiber reinforced composite.
Again, described thermoplastic resin is the one in polyamide resin, polyester resin or vistanex.
Reinforcing fiber in described thermoplastic fiber reinforced composite is carbon fiber or glass fibre.
In the present embodiment, the first link 1 aluminium sheet alloy, thickness is 5mm.Lathe processes required opening part, H1=3mm, H2=6mm, L=6mm.Second link 2 adopts glass fiber reinforced polypropylene material, content of glass fiber 40%.Injecting machine material tube temperature 230 DEG C.Ready first link 1 is put into injection moulding mould, utilizes the method for molding and forming that the material of formation second link 2 is filled in mould, the plane realizing two kinds of sheet materials after solidification to be cooled connects, and obtains the linkage structure of described concavo-convex connection.
Finally should be noted that, above embodiment is only in order to illustrate the technical solution of the utility model and unrestricted, those of ordinary skill in the art is to be understood that, can modify to this technological scheme or equivalent replacement, and not departing from the spirit and scope of technical solutions of the utility model, it all should be encompassed in right of the present utility model.

Claims (5)

1. the linkage structure be connected with composite material, it comprises:
First link, which is provided with at least one junction surface, described junction surface is established at least one groove, and described groove notch size is less than bottom portion of groove size, and the groove cross section crossing with junction surface is T-shaped;
Second link, it is made up of composite material, and it forms the joint of at least one projection, described joint buckle is in the groove of the first link.
2. the linkage structure be connected with composite material according to claim 1, is characterized in that, described first link is different from the material of the second link.
3. the linkage structure be connected with composite material according to claim 1, is characterized in that, described second link is made up of thermoplastic resin or thermoplastic fiber reinforced composite.
4. the linkage structure be connected with composite material according to claim 3, is characterized in that, described thermoplastic resin is the one in polyamide resin, polyester resin or vistanex.
5. the linkage structure be connected with composite material according to claim 3, is characterized in that, the reinforcing fiber in described thermoplastic fiber reinforced composite is carbon fiber or glass fibre.
CN201520499660.9U 2015-07-09 2015-07-09 Connection structure who is connected with combined material Expired - Fee Related CN204783985U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520499660.9U CN204783985U (en) 2015-07-09 2015-07-09 Connection structure who is connected with combined material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520499660.9U CN204783985U (en) 2015-07-09 2015-07-09 Connection structure who is connected with combined material

Publications (1)

Publication Number Publication Date
CN204783985U true CN204783985U (en) 2015-11-18

Family

ID=54524041

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520499660.9U Expired - Fee Related CN204783985U (en) 2015-07-09 2015-07-09 Connection structure who is connected with combined material

Country Status (1)

Country Link
CN (1) CN204783985U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105747697A (en) * 2016-05-12 2016-07-13 深圳壹号柜科技股份有限公司 Ultra-thin wall-hanging type sample cabinet
CN108019399A (en) * 2016-11-04 2018-05-11 德韧运营公司 Hybrid metal polymer interlock

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105747697A (en) * 2016-05-12 2016-07-13 深圳壹号柜科技股份有限公司 Ultra-thin wall-hanging type sample cabinet
CN108019399A (en) * 2016-11-04 2018-05-11 德韧运营公司 Hybrid metal polymer interlock

Similar Documents

Publication Publication Date Title
CN204783998U (en) Connection structure who is connected with combined material
CN103496400B (en) Carbon fibre composite upper crossbeam of automobile water tank assembly and preparation method thereof
CN103477069B (en) For keeping the module of at least one lining
CN204037255U (en) The transverse for vehicle wheel suspension obtained by fiber-reinforced plastic
CN103261007B (en) Body modules component and manufacture method thereof
US10399657B2 (en) Fibre-reinforced metal component for an aircraft or spacecraft and production methods for fibre-reinforced metal components
CN101522520B (en) Fitting
CA2726594C (en) Aircraft fuselage frame in composite material with stabilized web
CN102729482B (en) Composite heatproof bearing cylinder and preparation method thereof
CN103523094B (en) Carbon fibre composite upper crossbeam of automobile water tank and preparation method thereof
CN102922621A (en) Production method for automobile roof made of fiber reinforced composite material
US9914248B2 (en) Method for producing a hybrid composite component from organo sheets and a metallic reinforcing element
CN103538715A (en) Composite material pi-type lug interface and integral co-curing forming method
CN104743096A (en) Aircraft structure made of composite material
CN106542123A (en) Carrier rocket composite tank with cellular sandwich wall and its processing method
CN204783985U (en) Connection structure who is connected with combined material
CN213936421U (en) Box connection structure under car combined material battery box
EP0587927B1 (en) Composite material bicycle frame and method for making same
CN105538747A (en) Fiber-reinforced polymer matrix composite T-joint and making method thereof
CN102922622A (en) Production method of fiber reinforced composite material rear automobile case cover
CN204783973U (en) Connection structure who is connected with combined material
JP6567255B2 (en) Fiber reinforced thermoplastic resin molding
CN104129435A (en) Upper beam assembly made from hybrid fiber composite material for auto radiator and manufacturing method thereof
CN204783974U (en) Connection structure who is connected with combined material
US8870117B2 (en) Composite aircraft frame

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190320

Address after: 314500 1/11 Building, Gaoqiao Town Industrial Zone, Tongxiang City, Jiaxing City, Zhejiang Province

Patentee after: TONGXIANG ZHAOLI COMPOSITE MATERIAL TECHNOLOGY Co.,Ltd.

Address before: 314500 Room 208, Kechuang Garden, Gaoqiao Town, Tongxiang City, Jiaxing City, Zhejiang Province

Patentee before: Zhang Wanhu

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220720

Address after: 313100 first floor, unit 3, North Park, National University Science Park, Jingsi Road, Taihu street, Changxing County, Huzhou City, Zhejiang Province

Patentee after: Huzhou Langqing composite material technology Co.,Ltd.

Address before: 314500 1/11 Building, Gaoqiao Town Industrial Zone, Tongxiang City, Jiaxing City, Zhejiang Province

Patentee before: TONGXIANG ZHAOLI COMPOSITE MATERIAL TECHNOLOGY Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151118