CN204781785U - Stone material mounting structure - Google Patents
Stone material mounting structure Download PDFInfo
- Publication number
- CN204781785U CN204781785U CN201520108938.5U CN201520108938U CN204781785U CN 204781785 U CN204781785 U CN 204781785U CN 201520108938 U CN201520108938 U CN 201520108938U CN 204781785 U CN204781785 U CN 204781785U
- Authority
- CN
- China
- Prior art keywords
- suspension member
- installation structure
- draw
- groove
- fastener
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a stone material mounting structure, locate the steelframe on, stone material mounting structure includes that stone material and at least one are hung and detains the subassembly, seted up at least one draw -in groove on the stone material, at least one it includes first pendant, second pendant and third pendant to hang the knot subassembly, the one end block of first pendant in at least one in the draw -in groove, be provided with first buckle spare on the other end of first pendant, the second pendant is provided with second buckle spare, second buckle spare with first buckle spare block, the third pendant includes first connecting portion and second connecting portion, first connecting portion with the second pendant is kept away from the one end fixed connection of first pendant, the second connecting portion are fixed in on the steelframe. The utility model provides a stone material mounting structure construction is simple and convenient, so reduction construction cycle that can be great to save construction cost. In addition, this stone material mounting structure has simple structure, the convenient advantage of dismantling.
Description
Technical field
The utility model relates to architectural decoration field, particularly relates to a kind of stone installation structure.
Background technology
Stone material dry suspending is a kind of construction technology of external wall, is hung on the external surface of building structure (such as body of wall) by ornamental stone by connector.
Existing mounting structure generally includes fastener for installing and mounting suspension member, good by installing hole internal fixtion fastener for installing glue being bonded in stone material, and then fastener for installing is fixed on mounting suspension member by screw and glue, finally mounting suspension member is fixed on square steel.Because said structure adopts screw and glue to be fixed, therefore when needs are changed mounting suspension member, be then not easy to change, thus be unfavorable for the maintenance in later stage.In addition, the part of this stone material installation system is more, complex structure, and is not easy to construction, thus has a strong impact on efficiency of construction.
Therefore, be badly in need of that design is a kind of can be convenient to dismantle and improve the stone installation structure of efficiency of construction.
Utility model content
The purpose of this utility model is to provide a kind of and can be convenient to dismantle and improves the stone installation structure of efficiency of construction.
In order to solve the problems of the technologies described above, the utility model provides a kind of stone installation structure, be located on steelframe, described stone installation structure comprises stone material and at least one hanging fastener component, described stone material offers at least one draw-in groove, hanging fastener component described at least one comprises the first suspension member, second suspension member and the 3rd suspension member, one end of described first suspension member is sticked in draw-in groove described at least one, the other end of described first suspension member is provided with the first fastener, described second suspension member is provided with the second fastener, described second fastener engages with described first fastener, described 3rd suspension member comprises the first connecting portion and the second connecting portion, described first connecting portion is fixedly connected with described second suspension member one end away from described first suspension member, described second connecting portion is fixed on described steelframe.
Wherein, described draw-in groove is set to two, and described hanging fastener component is set to two, and the first suspension member of each described hanging fastener component is sticked in described draw-in groove respectively.
Wherein, described draw-in groove is cross draw-in groove.
Wherein, described first suspension member is I-shaped batten, and described first suspension member is spliced to form by Part I and Part II, and described Part I and Part II are all partially housed in described draw-in groove, and described first fastener is located on described Part I.
Wherein, described first fastener is be located at the snap fit on described Part I, and described second fastener is be located at the side plate on described second suspension member.
Wherein, described second suspension member is also provided with snap fit, described snap fit hooks and is located on described Part II.
Wherein, described stone installation structure also comprises fluid sealant, and described fluid sealant is coated on the junction of described Part I and described stone material.
Wherein, described 3rd suspension member is angle steel.
Wherein, described stone installation structure also comprises steel angle hitch, and described second connecting portion is fixed on described steelframe by described steel angle hitch.
Wherein, described stone installation structure also comprises foam rods, and described foam rods is filled in described draw-in groove.
The stone installation structure that the utility model provides by offering draw-in groove on stone material, one end of first suspension member is sticked in draw-in groove, thus stone material can be connected with the first suspension member, second suspension member is engaged with the first suspension member and arranges, and be fixedly connected with the second suspension member and steelframe by the 3rd suspension member, thus stone material and steelframe are coupled together, when making when needs replacing second suspension member or safeguard, only the second suspension member need be separated with the first suspension member, instead of and existing first suspension member and the second suspension member connections all adopt the hydropexic mode of glue, make the dismounting of this first suspension member and the second suspension member and change more convenient.In addition, due to its easy construction, so construction period can be reduced greatly, thus construction cost is saved.It is simple that this stone installation structure has structure, advantage for convenience detach.
Accompanying drawing explanation
In order to be illustrated more clearly in the technical solution of the utility model, be briefly described to the accompanying drawing used required in embodiment below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the schematic diagram of the stone installation structure that the utility model embodiment provides;
Fig. 2 is that the II of Fig. 1 is to partial enlarged drawing.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is clearly and completely described.
See also Fig. 1 to Fig. 2, a kind of stone installation structure 100 that the utility model embodiment provides, be located on steelframe 200, described stone installation structure 100 comprises stone material 10 and at least one hanging fastener component 20.Described stone material 10 is connected with hanging fastener component described at least one 20, and at least one hanging fastener component 20 described is fixedly arranged on described steelframe 200.
Described stone material 10 offers at least one draw-in groove 11.In the present embodiment, the quantity of described draw-in groove 11 is set to two, and two described draw-in grooves 11 are cross draw-in groove, so that engage described hanging fastener component 20.Be understandable that, in other embodiments, described draw-in groove 11 also can be T-shaped draw-in groove or concave shape draw-in groove etc.
In order to ensure the installation strength of described stone material 10 further, in the present embodiment, described hanging fastener component 20 is set to two, and each described hanging fastener component 20 is sticked in each described draw-in groove 11 respectively.Be understandable that, in other embodiments, described hanging fastener component 20 also can adjust according to practice of construction situation, as three, four or more.
Described hanging fastener component 20 comprises the first suspension member 21, second suspension member 22 and the 3rd suspension member 23, and one end of described first suspension member 21 is sticked in described draw-in groove 11, to be connected with described stone material 10 by described hanging fastener component 20.In the present embodiment, described first suspension member 21 is I-shaped batten.Described first suspension member 21 is spliced to form by Part I 21a and Part II 21b.Described Part I 21a and Part II 21b is all partially housed in described draw-in groove 11.Be understandable that, in other embodiments, described first suspension member 21 also can be T-shaped batten or concave shape batten.
In the present embodiment, described Part I 21a and Part II 21b for process respectively so that be sticked in described draw-in groove 11.Be understandable that, in other embodiments, described Part I 21a and Part II 21b also can be one-body molded.
In order to further improvement, in the present embodiment, described stone installation structure 100 also comprises foam rods 30, and described foam rods 30 is filled in described draw-in groove 11.Concrete, described foam rods 30 is filled in the junction of described draw-in groove 11 and described Part I 21a and Part II 21b, to make described foam rods 30 can fill up described draw-in groove 11, prevent described Part I 21a and Part II 21b from dropping out in described draw-in groove 11.Be understandable that, in other embodiments, also can be filled with a sealing pad or sponge etc. in described draw-in groove 11.
In order to further improvement, in the present embodiment, described stone installation structure 100 also comprises fluid sealant 40, described fluid sealant 40 is coated on the connection of described Part I 21a and described stone material 10, thus described first suspension member 21 firmly can be fixed on described stone material 10, prevent described first suspension member 21 from departing from described stone material 10.Be understandable that, in other embodiments, described first suspension member 21 is also fixedly connected with described stone material 10 by screw.
The other end of described first suspension member 21 is provided with the first fastener 21c.In the present embodiment, described first fastener 21c is located on described Part I 21a, and described first fastener 21c is used for engaging with described second suspension member 22, to be engaged with described second suspension member 22 by described first suspension member 21.Concrete, described first fastener 21c is located at the snap fit on described Part I 21a, thus is convenient to hook and is located at described second suspension member 22, to ensure the engaging tight ness rating of described first suspension member 21 and described second suspension member 22.Be understandable that, in other embodiments, described first fastener 21c also can be the draw-in groove be sticked on described Part I 21a or the projection be convexly equipped on described Part I 21a.
In the present embodiment, described second suspension member 22 is square batten, so that processing and connection.Be understandable that, in other embodiments, described second suspension member 22 also can be U-shaped batten.
Described second suspension member 22 is provided with the second fastener 22a, and described second fastener 22a engages with described first fastener 21c, to be engaged with described first suspension member 21 by described second suspension member 22.In the present embodiment, described second fastener 22a is located at the side plate on described second suspension member 22.Be understandable that, in other embodiments, described second fastener 22a also can be the projection be located on described second suspension member 22 or the draw-in groove be opened on described second suspension member 22.
In order to further improvement, in the present embodiment, described second suspension member 22 is also provided with snap fit 22b, described snap fit 22b hooks and is located on the side of described Part II 21b, and described snap fit 22b and described second fastener 22a is oppositely arranged.When described second suspension member 22 is connected with described first suspension member 21, described second fastener 22a is engaged with described first fastener 21c, and described snap fit 22b hook is located on described Part II 21b, described second suspension member 22 can be realized to engage with described first suspension member 21, and due to described second suspension member 22 and the second suspension member 21 being respectively arranged with snap fit 22b and the first fastener 21c, thus the engaging tight ness rating of described second suspension member 22 and described first suspension member 21 can be ensured, thus can prevent the first suspension member 21 described in use procedure from departing from described second suspension member 22 and causing construction accident.
Described 3rd suspension member 23 is fixedly connected with described second suspension member 22.In the present embodiment, described 3rd suspension member 23 is angle steel.Described 3rd suspension member 23 comprises the first connecting portion 23a and the second connecting portion 23b, and described first connecting portion 23a is fixedly connected with described second suspension member 22.Concrete, described first connecting portion 23a is fixedly connected with described second suspension member 22 by screw, so that dismounting and replacing.Be understandable that, in other embodiments, described first connecting portion 23a also can be welded in described second suspension member 22 or be adhered on described second suspension member 22.
In order to further improvement, in the present embodiment, described stone installation structure 100 also comprises rubber cushion 50, the junction of described second suspension member 22 and described first connecting portion 23a is located at by described rubber cushion 50 pad, extruding force is produced with described first connecting portion 23a in order to make described second suspension member 22, to make the connection between described second suspension member 22 and described first connecting portion 23a compacter, thus improve imporosity and the steadiness of described stone installation structure 100.In addition, described rubber cushion 50 also can prevent described second suspension member 22 from mutually wearing and tearing with described first connecting portion 23a further.Be understandable that, in other embodiments, also at described second suspension member 22, dividing plate or foam-rubber cushion can be set with the junction of described first connecting portion 23a.
Described second connecting portion 23b is fixedly connected with described steelframe 200.In the present embodiment, described second connecting portion 23b is fixedly connected with described steelframe 200 by screw, while ensureing connecting compactness, also can be convenient to dismounting.Be understandable that, in other embodiments, described second connecting portion 23b also can be welded on described steelframe 200.
In order to further improvement, in the present embodiment, described stone installation structure 100 also comprises steel angle hitch 60, and described second connecting portion 23b is fixedly connected with described steelframe 200 by described steel angle hitch 60 and described screw, to ensure its compactness connected.
During installation, first the first suspension member 21 is sticked in the draw-in groove 11 of described stone material 10, and described second suspension member 22 is engaged with described first suspension member 21, then described 3rd suspension member 23 is fixedly connected with described second suspension member 22, finally described 3rd suspension member 23 is fixedly connected with described steelframe 200, the installation of described stone installation structure 100 can be completed.
The stone installation structure that the utility model provides by offering draw-in groove on stone material, one end of first suspension member is sticked in draw-in groove, thus stone material can be connected with the first suspension member, second suspension member is engaged with the first suspension member and arranges, and be fixedly connected with the second suspension member and steelframe by the 3rd suspension member, thus stone material and steelframe are coupled together, when making when needs replacing second suspension member or safeguard, only the second suspension member need be separated with the first suspension member, instead of and existing first suspension member and the second suspension member connections all adopt the hydropexic mode of glue, make the dismounting of this first suspension member and the second suspension member and change more convenient.In addition, due to its easy construction, so construction period can be reduced greatly, thus construction cost is saved.It is simple that this stone installation structure has structure, advantage for convenience detach.
The above is preferred embodiment of the present utility model; it should be pointed out that for those skilled in the art, under the prerequisite not departing from the utility model principle; can also make some improvements and modifications, these improvements and modifications are also considered as protection domain of the present utility model.
Claims (10)
1. a stone installation structure, be located on steelframe, it is characterized in that, described stone installation structure comprises stone material and at least one hanging fastener component, described stone material offers at least one draw-in groove, hanging fastener component described at least one comprises the first suspension member, second suspension member and the 3rd suspension member, one end of described first suspension member is sticked in draw-in groove described at least one, the other end of described first suspension member is provided with the first fastener, described second suspension member is provided with the second fastener, described second fastener engages with described first fastener, described 3rd suspension member comprises the first connecting portion and the second connecting portion, described first connecting portion is fixedly connected with described second suspension member one end away from described first suspension member, described second connecting portion is fixed on described steelframe.
2. stone installation structure according to claim 1, is characterized in that, described draw-in groove is set to two, and described hanging fastener component is set to two, and the first suspension member of each described hanging fastener component is sticked in described draw-in groove respectively.
3. stone installation structure according to claim 1, is characterized in that, described draw-in groove is cross draw-in groove.
4. stone installation structure according to claim 1, it is characterized in that, described first suspension member is I-shaped batten, described first suspension member is spliced to form by Part I and Part II, described Part I and Part II are all partially housed in described draw-in groove, and described first fastener is located on described Part I.
5. stone installation structure according to claim 4, is characterized in that, described first fastener is be located at the snap fit on described Part I, and described second fastener is be located at the side plate on described second suspension member.
6. stone installation structure according to claim 4, is characterized in that, described second suspension member is also provided with snap fit, and described snap fit hooks and is located on described Part II.
7. stone installation structure according to claim 4, is characterized in that, described stone installation structure also comprises fluid sealant, and described fluid sealant is coated on the junction of described Part I and described stone material.
8. stone installation structure according to claim 1, is characterized in that, described 3rd suspension member is angle steel.
9. stone installation structure according to claim 1, is characterized in that, described stone installation structure also comprises steel angle hitch, and described second connecting portion is fixed on described steelframe by described steel angle hitch.
10. stone installation structure according to claim 1, is characterized in that, described stone installation structure also comprises foam rods, and described foam rods is filled in described draw-in groove.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520108938.5U CN204781785U (en) | 2015-02-13 | 2015-02-13 | Stone material mounting structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520108938.5U CN204781785U (en) | 2015-02-13 | 2015-02-13 | Stone material mounting structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204781785U true CN204781785U (en) | 2015-11-18 |
Family
ID=54521857
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520108938.5U Expired - Fee Related CN204781785U (en) | 2015-02-13 | 2015-02-13 | Stone material mounting structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204781785U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109184118A (en) * | 2018-10-23 | 2019-01-11 | 沈阳远大铝业工程有限公司 | A kind of mounting structure and installation method of bright frame heat-insulating integral aluminium sheet |
-
2015
- 2015-02-13 CN CN201520108938.5U patent/CN204781785U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109184118A (en) * | 2018-10-23 | 2019-01-11 | 沈阳远大铝业工程有限公司 | A kind of mounting structure and installation method of bright frame heat-insulating integral aluminium sheet |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202866099U (en) | Universal keel hanging pieces for indoor ceiling | |
CN205046799U (en) | Dry pendant of decorative board | |
CN204781785U (en) | Stone material mounting structure | |
CN205369835U (en) | Receive limit ornamental strip mounting structure | |
CN203022126U (en) | Embedded groove and wave-shaped-thread anchor rods | |
CN206752909U (en) | Insulation and decoration hanging plate and heat-preserving decorating wall | |
CN202913539U (en) | Exposed framing glass curtain wall vertical large clamping cover connecting structure | |
CN203412154U (en) | Stone back suspension type single transverse beam structure | |
CN204919903U (en) | Novel heat preservation mounting structure of stone material curtain | |
CN207620295U (en) | The dried hanging hang structure of inner wall finishing plate | |
CN202658775U (en) | Supporting device of full-glass curtain wall | |
CN202706269U (en) | Connection structure of acrylic-plate curtain wall | |
CN204126176U (en) | A kind of improvement cladding system | |
CN201593280U (en) | Decorative plate and fixed structure thereof | |
CN204040376U (en) | Anchoring bolt reinforced by a kind of stone material | |
CN203856117U (en) | Reverse supporting installation structure | |
CN203284922U (en) | Hanging-buckle type pendant for curtain walls | |
CN203453624U (en) | Pipeline-fixing member | |
CN203808318U (en) | Sealant joint-free type stone suspended ceiling curtain wall | |
CN204983158U (en) | Wall body of various steel sheet building and connecting piece of roofing | |
CN104060796B (en) | Anchoring bolt reinforced by a kind of stone material | |
CN201962894U (en) | Suspension structure for building wall | |
CN204983510U (en) | Seat is hung to convenient to use's stone material | |
CN206091208U (en) | Embedded caulking strips is detained outward to joint | |
CN210366643U (en) | One-step pre-buried formed hanger safety connection component |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151118 Termination date: 20210213 |
|
CF01 | Termination of patent right due to non-payment of annual fee |