CN204780557U - Bridge - Google Patents

Bridge Download PDF

Info

Publication number
CN204780557U
CN204780557U CN201520495187.7U CN201520495187U CN204780557U CN 204780557 U CN204780557 U CN 204780557U CN 201520495187 U CN201520495187 U CN 201520495187U CN 204780557 U CN204780557 U CN 204780557U
Authority
CN
China
Prior art keywords
layer
bridge
steelframe
hollow hole
top layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520495187.7U
Other languages
Chinese (zh)
Inventor
许盛龙
唐志波
王晋宝
田美灵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Ocean University ZJOU
Original Assignee
Zhejiang Ocean University ZJOU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Ocean University ZJOU filed Critical Zhejiang Ocean University ZJOU
Priority to CN201520495187.7U priority Critical patent/CN204780557U/en
Application granted granted Critical
Publication of CN204780557U publication Critical patent/CN204780557U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a bridge, including the top layer that from the top down set gradually, prefabricated layer and steel construction layer, still include hollow hole layer between top layer and the prefabricated layer, hollow hole layer includes the hollow hole of a plurality of, and hollow hole is the rounded rectangle structure, the junction on prefabricated layer and steel construction layer is fixed with a plurality of shear forces nail, top layer and prefabricated in situ portion are equipped with the reinforcing bar of buckling with the shear force nailed joint. The utility model relates to a bridge, from the top down set gradually top layer, prefabricated layer and steel construction layer, and this structure can become a new whole and realize common atress, active powder concrete is adopted on the top layer, has better mechanical properties, intensity, toughness and durability, is excellent bridge surface course structure, can improve bridge's anti fatigue strength, C80 reinforced concrete is adopted on prefabricated layer, has high durability, high work nature and high stability.

Description

A kind of bridge
Technical field
The utility model belongs to bridge engineering field, is specifically related to a kind of bridge.
Background technology
Bridge refers to the building for road crosses over natural or cultural obstacle and build, and such as, crosses over the bridge in rivers and gully.Usually, bridge comprises girder and supports the bridge pier of this girder.At present, the vehicles increasing, highway, railway start by ground to aerial development, form now day by day various road surface bridge engineering.
But there is a large amount of problem in road surface bridge construction now: 1. bridge design load is " CR live loading ", if mobile load coefficient is bigger than normal, bridge security deposit can reduce greatly, long-term operation will produce larger negative effect to bridge security, the fatigue damage development of bridge construction can be aggravated under train and large-scale passenger traffic goods stock load long term, greatly reduce the safety stock of bridge, affect the fatigue behaviour of bridge, shortening structure fatigue life; 2. current bridge many employings concrete or steel work, but there is the problems such as pitted skin problem, the problem revealing muscle, honeycomb problem, hollow hole problem, gap and Problem of Interlayer, truncation and arrisdefect problem, crack problem, strength deficiency in ordinary concrete bridge; There is etching problem in steel structure bridge, and maintenance difficulty, and upkeep cost is expensive, and in addition, steel structure bridge is inflammable, and fire safety problem has become the problem be on the rise now.
Summary of the invention
The utility model, according to prior art Problems existing, proposes a kind of bridge, and this bridge possesses good bending resistance, shearing resistance, resistance to compression, fire-resistance and anti-fatigue performance.
Technical solutions of the utility model are as follows: a kind of bridge, comprise set gradually from top to bottom top layer, preformed layer and steel structural layer; It is characterized in that, also comprise the hollow hole layer between described top layer and preformed layer; Described hollow hole layer comprises several hollow holes, and hollow hole is round rectangle structure; The junction of described preformed layer and steel structural layer is fixed with some WELDING STUDS; Described top layer is provided with preformed layer inside the bending reinforcing steel bar be connected with WELDING STUDS; Described steel structural layer comprises interconnective first steelframe and the second steelframe; Described first steelframe and the second steelframe are i beam.
Described first steelframe and the second steelframe include the reinforcing rib of the upper and lower junction plate of upper junction plate, lower connecting plate and connection; The upper junction plate of described first steelframe is provided with connection projection, and lower connecting plate is provided with connecting groove; The upper junction plate of described second steelframe is provided with the connecting groove suitable with the connection projection of described first steelframe, and the lower connecting plate of described second steelframe is provided with the connection projection suitable with the connecting groove of described first steelframe.
Described top layer, employing splicing connection between preformed layer and steel structural layer.
Described preformed layer adopts C80 steel concrete.
Described top layer adopts RPC.
A kind of bridge of the utility model, sets gradually top layer, preformed layer and steel structural layer from top to bottom, and this structure can become a new entirety and realize jointly stressed; A kind of bridge of the utility model, be provided with WELDING STUDS, WELDING STUDS is evenly distributed on below hollow hole.Like this, WELDING STUDS can bear shearing and uplift force, to playing support below hollow hole, strengthening and the effect of power transmission, load around hollow hole can be distributed on steel structural layer as early as possible, make bridge more firm, thus ensure the quality of bridge, extend the application life of bridge; A kind of bridge of the utility model, described bending reinforcing steel bar is arranged in top layer and preformed layer, and one end of described bending reinforcing steel bar is connected with described WELDING STUDS, and the two ends of bending reinforcing steel bar all form kink, and the kink of one end is connected with WELDING STUDS; These bending reinforcing steel bars have certain bearing capacity, ensure that the firm of bridge, extend the application life of bridge.A kind of bridge of the utility model, top layer adopts RPC, has good mechanical property, intensity, toughness and durability, is excellent bridge surface layer structure, can improves the fatigue resistance of bridge; Preformed layer adopts C80 steel concrete, has high-durability, high workability and high stability; Steel structural layer can increase stability, and can improve overall vertical rigidity and the ductility of bridge, effectively can retrain the sex change of upper two layers, effectively can improve rigidity and the cracking resistance of integral bridge; Hollow hole layer comprises several hollow holes, effectively can alleviate the weight of overall bridge, reduce concrete consumption, and can reach the effect subtracting sound noise reduction.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
In figure: 1-top layer; 2-preformed layer; The hollow hole of 3-; 4-first steelframe; 5-second steelframe; 6-upper junction plate; 7-lower connecting plate; 8-reinforcing rib; 9-connects projection; 10-connecting groove; 11-WELDING STUDS; 12-bending reinforcing steel bar.
Detailed description of the invention
As shown in Figure 1, a kind of bridge of the utility model, comprise set gradually from top to bottom top layer 1, preformed layer 2 and steel structural layer; Also comprise the hollow hole layer between described top layer 1 and preformed layer 2; Described hollow hole layer comprises several hollow holes 3, and hollow hole 3 is round rectangle structure; The junction of described preformed layer 2 and steel structural layer is fixed with some WELDING STUDS 11; Described top layer 1 is provided with preformed layer 2 inside the bending reinforcing steel bar 12 be connected with WELDING STUDS 11; Described steel structural layer comprises interconnective first steelframe 4 and the second steelframe 5; Described first steelframe 4 and the second steelframe 5 are i beam.
The two ends of bending reinforcing steel bar 12 described in the utility model are provided with kink, and wherein the kink of one end is connected with WELDING STUDS 11.Described first steelframe 4 and the second steelframe 5 include upper junction plate 6, lower connecting plate 7 and are connected the reinforcing rib 8 of upper and lower junction plate 6,7; The upper junction plate 6 of described first steelframe 4 is provided with and connects projection 9, and lower connecting plate 7 is provided with connecting groove 10; The upper junction plate 6 of described second steelframe 5 is provided with the connecting groove 10 suitable with the connection projection 9 of described first steelframe 4, and the lower connecting plate 7 of described second steelframe 5 is provided with the connection projection 9 suitable with the connecting groove 10 of described first steelframe 4.
Top layer 1 described in the utility model, employing splicing connection between preformed layer 2 and steel structural layer.Described preformed layer 2 adopts C80 steel concrete.Described top layer 1 adopts RPC.
A kind of bridge of the utility model, sets gradually top layer, preformed layer and steel structural layer from top to bottom, and this structure can become a new entirety and realize jointly stressed; A kind of bridge of the utility model, be provided with WELDING STUDS, WELDING STUDS is evenly distributed on below hollow hole.Like this, WELDING STUDS can bear shearing and uplift force, to playing support below hollow hole, strengthening and the effect of power transmission, load around hollow hole can be distributed on steel structural layer as early as possible, make bridge more firm, thus ensure the quality of bridge, extend the application life of bridge; A kind of bridge of the utility model, described bending reinforcing steel bar is arranged in top layer and preformed layer, and one end of described bending reinforcing steel bar is connected with described WELDING STUDS, and the two ends of bending reinforcing steel bar all form kink, and the kink of one end is connected with WELDING STUDS; These bending reinforcing steel bars have certain bearing capacity, ensure that the firm of bridge, extend the application life of bridge.A kind of bridge of the utility model, top layer adopts RPC, has good mechanical property, intensity, toughness and durability, is excellent bridge surface layer structure, can improves the fatigue resistance of bridge; Preformed layer adopts C80 steel concrete, has high-durability, high workability and high stability; Steel structural layer can increase stability, and can improve overall vertical rigidity and the ductility of bridge, effectively can retrain the sex change of upper two layers, effectively can improve rigidity and the cracking resistance of integral bridge; Hollow hole layer comprises several hollow holes, effectively can alleviate the weight of overall bridge, reduce concrete consumption, and can reach the effect subtracting sound noise reduction.

Claims (6)

1. a bridge, comprise set gradually from top to bottom top layer (1), preformed layer (2) and steel structural layer; It is characterized in that: also comprise the hollow hole layer between described top layer (1) and preformed layer (2); Described hollow hole layer comprises several hollow holes (3), and hollow hole (3) are round rectangle structure; The junction of described preformed layer (2) and steel structural layer is fixed with some WELDING STUDS (11); Described top layer (1) and preformed layer (2) inside are provided with the bending reinforcing steel bar (12) be connected with WELDING STUDS (11); Described steel structural layer comprises interconnective first steelframe (4) and the second steelframe (5); Described first steelframe (4) and the second steelframe (5) are i beam.
2. a kind of bridge according to claim 1, is characterized in that: the two ends of described bending reinforcing steel bar (12) are provided with kink, and wherein the kink of one end is connected with WELDING STUDS (11).
3. a kind of bridge according to claim 1, is characterized in that: described first steelframe (4) and the second steelframe (5) include upper junction plate (6), lower connecting plate (7) and be connected the reinforcing rib (8) of upper and lower junction plate (6,7); The upper junction plate (6) of described first steelframe (4) is provided with and connects projection (9), and lower connecting plate (7) is provided with connecting groove (10); The upper junction plate (6) of described second steelframe (5) is provided with the connecting groove (10) suitable with the connection projection (9) of described first steelframe (4), and the lower connecting plate (7) of described second steelframe (5) is provided with the connection projection (9) suitable with the connecting groove (10) of described first steelframe (4).
4. a kind of bridge according to claim 1, is characterized in that: described top layer (1), employing splicing connection between preformed layer (2) and steel structural layer.
5. a kind of bridge according to claim 1, is characterized in that: described preformed layer (2) adopts C80 steel concrete.
6. a kind of bridge according to claim 1, is characterized in that: described top layer (1) adopts RPC.
CN201520495187.7U 2015-07-07 2015-07-07 Bridge Expired - Fee Related CN204780557U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520495187.7U CN204780557U (en) 2015-07-07 2015-07-07 Bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520495187.7U CN204780557U (en) 2015-07-07 2015-07-07 Bridge

Publications (1)

Publication Number Publication Date
CN204780557U true CN204780557U (en) 2015-11-18

Family

ID=54520643

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520495187.7U Expired - Fee Related CN204780557U (en) 2015-07-07 2015-07-07 Bridge

Country Status (1)

Country Link
CN (1) CN204780557U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107288029A (en) * 2017-08-07 2017-10-24 重庆交通大学 The method for making square column type performance of concrete column confined
CN107288030A (en) * 2017-08-07 2017-10-24 重庆交通大学 The method for making cylindrical concrete pier stud

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107288029A (en) * 2017-08-07 2017-10-24 重庆交通大学 The method for making square column type performance of concrete column confined
CN107288030A (en) * 2017-08-07 2017-10-24 重庆交通大学 The method for making cylindrical concrete pier stud

Similar Documents

Publication Publication Date Title
CN103696355B (en) The light-duty combined bridge structure of a kind of superhigh tenacity concrete slab-girder steel
CN104612050B (en) A kind of simply supported beam continuous new construction of bridge bridge floor and constructional method
CN103556565B (en) A kind of connecting structure of different performance beams of concrete
CN203613459U (en) Light combined bridge floor structure with longitudinal open stiffening ribs
CN108660921B (en) Orthotropic steel-ultra-high performance concrete bridge deck structure and construction method thereof
CN103061418A (en) Continuous variable-stiffness shear key type steel-concrete joint section
CN104831627A (en) Bridge deck slab longitudinal unequal strength steel-concrete composite structure bridge and construction method thereof
CN108118610A (en) A kind of ultra-high performance concrete and regular reinforcement concrete combination beam
CN203593939U (en) Connecting structure of concrete beams differing in performance
CN204780557U (en) Bridge
CN103614974A (en) Prestress sectional steel reinforcing system of reinforced concrete arch shell bridge body
CN204738217U (en) Bridge
CN203188112U (en) Steel-concrete rigid-connection combined beam
CN109930469B (en) Steel box girder thin-wall pier rigid frame cable-stayed bridge suitable for straddle type monorail
CN204715192U (en) A kind of bridge
CN203383137U (en) Transversely assembled corrugated steel web combined box girder
CN105155400A (en) Concrete beam-corrugated steel web beam combined continuous beam bridge
CN203700976U (en) Prestressed section steel reinforcement system of ferroconcrete arch shell bridge
CN204715191U (en) A kind of bridge
CN110306425B (en) Pier bottom structure of short pier rigid frame bridge capable of greatly reducing bearing bending moment
CN204919326U (en) Adopt ultra high performance concrete's simply supported girder bridge bridge floor to construct in succession
CN102337723B (en) Bridge
CN202401381U (en) A bridge
CN211548384U (en) High-strength steel pipe constraint high-strength steel reinforced concrete combined column
CN210482020U (en) Pier bottom structure of low pier rigid frame bridge capable of greatly reducing bearing bending moment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151118

Termination date: 20160707

CF01 Termination of patent right due to non-payment of annual fee