CN204753402U - Thoughtlessly congeal soil box roof beam manhole and seal module system all - Google Patents

Thoughtlessly congeal soil box roof beam manhole and seal module system all Download PDF

Info

Publication number
CN204753402U
CN204753402U CN201520483575.3U CN201520483575U CN204753402U CN 204753402 U CN204753402 U CN 204753402U CN 201520483575 U CN201520483575 U CN 201520483575U CN 204753402 U CN204753402 U CN 204753402U
Authority
CN
China
Prior art keywords
template
manhole
ribbing
screw
roof beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520483575.3U
Other languages
Chinese (zh)
Inventor
肖攀
刘波
杨利民
彭建锋
黎平
于远建
曾寅
高晨
赵阳
杨瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Original Assignee
Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Engineering Co Ltd of China Construction Third Engineering Division filed Critical Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Priority to CN201520483575.3U priority Critical patent/CN204753402U/en
Application granted granted Critical
Publication of CN204753402U publication Critical patent/CN204753402U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Curing Cements, Concrete, And Artificial Stone (AREA)

Abstract

The utility model relates to a thoughtlessly congeal soil box roof beam manhole and seal module system all, mainly by template with ribbing, the iron wire, the screw -thread steel is constituteed, through adopting fixed four angles of template with ribbing of iron wire, then hoist template with ribbing, and be on the screw -thread steel of striding the setting of case roof beam people angle of spot hole to one side with the other end of iron wire, screw up in a down -to -earth manner, it is fixed firm with template with ribbing to utilize zhi fanli, make template with ribbing and case back board ground seamless, final recovery case roof beam manhole reinforcing bar, the concrete is poured, it seals to accomplish case roof beam manhole. The utility model provides the high stability of manhole template, and it is seamless, the indoor unnecessary no debris of rear cabinet are sealed to the maximum case room of having guaranteed. This construction method strong operability, simple and convenient, the easy realization make the manhole seal the mould quality and improve greatly.

Description

A kind of concrete box girder manhole envelope modular system
Technical field
The utility model relates to bridge engineering field, relates generally to a kind of concrete box girder manhole envelope modular system.
Background technology
At present, prestressed in-situ depositing case beam for internal mold remove and case beam case indoor prestressing force needs, manhole (stock size is 0.8m × 0.8m) must be set at case beam case room top board, and traditional manhole envelope mould to need after support body is set up in case indoor installation form again, and gap between template and case back plate bottom surface is comparatively large and be difficult to eliminate, easily Concrete Leakage is there is when concreting vibrates, uncompacted phenomenon, this weakness may become bridge deck structure potential safety hazard, and after having built, formwork support body is forever retained in case indoor as building waste and cannot takes out, run counter to green construction principle.
Summary of the invention
The purpose of this utility model is to solve because manhole template is insecure, not tight, easily Concrete Leakage is there is when concreting, uncompacted phenomenon, and manhole close after by the problem of permanent for formwork support body indwelling case indoor, provide a kind of concrete box girder manhole envelope modular system, by the method for closed manhole of template being sling with iron wire, manhole is made to seal mould more firm, seamless, for concreting, vibrate and provide good condition, improve manhole place concrete quality, avoid manhole to enclose simultaneously, by permanent for constructional materials indwelling and case indoor, the utility model strong operability, easy, easy realization, make manhole seal mould quality greatly to improve.
The technical scheme that the utility model technical solution problem adopts is:
Concrete box girder manhole envelope modular system, comprise template with ribbing, four iron wires, four screw-thread steels, it is characterized in that: pass template with ribbing with iron wire respectively at template with ribbing four angles, and the rib walking around behind passes template with ribbing again, two suspension centres are become at each dihedral of template with ribbing, every root iron wire two ends are fixed on same screw-thread steel, and four screw-thread steels are inclined cross respectively on case beam manhole four angles.
The utility model also comprises four sponge strips, and a sponge strip is posted on every limit of template with ribbing, and allows sponge strip align with case beam manhole four limit.
The utility model also comprises fragment of brick, and the two ends of every root screw-thread steel are padded respectively and established fragment of brick.
The construction method of the concrete box girder manhole envelope modular system described in utilization, it is characterized in that carrying out according to the following steps: step one, first immediately below beam case manhole, template with ribbing is put, all long than the beam case manhole each limit size 30cm of template with ribbing each limit size, and paste the wide sponge strip of 4cm along beam case manhole in template with ribbing four projection sidelines, then template with ribbing is passed with an iron wire respectively at template with ribbing four angles, template with ribbing is passed again after walking around rib behind, two suspension centres are become at template dihedral with ribbing, again by the case room of iron wire outlet box beam, by four iron wires, template with ribbing is sling, guarantee that four sponge strips in template with ribbing align with case beam manhole four limit, step 2, respectively four screw-thread steels are set across angle at case beam top manway four angles, fragment of brick is established at the two ends pad of every root screw-thread steel, the iron wire at template four angles with ribbing to be lain in respectively on four screw-thread steels and to tighten sturdy, ensure that template face with ribbing and case back plate bottom surface are close to seamless, complete manhole envelope mould and close, step 3, finally recovers beam case manhole reinforcing bar, concreting, completes case beam manhole and close.
The utility model is by the method for closed manhole of template being sling with iron wire, manhole is made to seal mould more firm, seamless, for concreting, vibrating provides good condition, improve manhole place concrete quality, avoid manhole to enclose simultaneously, permanent for constructional materials indwelling and case is indoor, the utility model strong operability, easy, easily realize, make manhole seal mould quality and greatly improve.
Accompanying drawing explanation
Fig. 1 is the utility model sectional schematic diagram.
Fig. 2 is the utility model floor map.
Detailed description of the invention
Structure Figure is described in detail to the utility model:
As shown in Figure 1 and Figure 2, the utility model comprises template with ribbing 1, four iron wires 3, four screw-thread steels 2, four sponge strips 5, fragments of brick 4, it is characterized in that: pass template with ribbing with iron wire 3 respectively at template with ribbing 1 four angles, and the rib 7 walking around behind passes template with ribbing again, two suspension centres are become at each dihedral of template 1 with ribbing, every root iron wire 3 two ends are fixed on same screw-thread steel 2, and four screw-thread steels 2 are inclined cross respectively on case beam manhole four angles; A sponge strip 5 is posted on every limit of template 1 with ribbing, and allows sponge strip 5 align with case beam manhole four limit; The two ends of every root screw-thread steel 2 are padded respectively and are established fragment of brick 4.
The construction method of the concrete box girder manhole envelope modular system described in utilization, is characterized in that carrying out according to the following steps:
1, manhole template construct
First immediately below beam case manhole, put template 1 with ribbing, then adopt 10cm × 5cm wood a tree, used in making timber for boats 7 as the back of the body rib of template 1 with ribbing.All long than the beam case manhole each limit size 30cm of each limit of template 1 with ribbing size, and paste the wide sponge strip 5 of 4cm along beam case manhole in template 1 with ribbing four projection sidelines, then template with ribbing is passed with an iron wire 3 respectively at template with ribbing 1 four angles, template with ribbing is passed again after walking around wooden a tree, used in making timber for boats 7 behind, two suspension centres are become at template dihedral with ribbing, again by the case room of iron wire 3 outlet box beam, by four iron wires 3, template 1 with ribbing is sling, guarantee that four sponge strips 5 in template 1 with ribbing align with case beam manhole four limit;
2, manhole template is fixed
Respectively four screw-thread steels 2 are set across angle at case back plate 6 manhole four angles, fragment of brick 4 is established at the two ends pad of every root screw-thread steel 2, the iron wire at template 1 four angles with ribbing to be lain in respectively on four screw-thread steels 2 and to tighten sturdy, ensure that template with ribbing 1 and case back plate bottom surface are close to seamless, complete manhole envelope mould and close;
3, manhole reinforcing bar recovers
According to design drawing requirement, the welding of the reserved steel bar at manhole place recovered, weld length and the joint distance that staggers meets code requirement, and cleaning welding welding slag;
4, manhole concreting
Adopt C50 slightly expanded concrete to build manhole, concrete adopts artificial low latitude to topple over, and with 30 type vibrating spears, concrete vibrating is closely knit, avoids in the process of vibrating side touching template of vibrating as far as possible.After concreting, complete surface and receive light, with covered rearing with plastic film, and warning mark is set in manhole surrounding, avoids personnel to trample.
5, on-the-spot cleaning
After concreting completes 72 hours, remove the iron wire of colligation on screw-thread steel, cleaning manhole surrounding fragment of brick and other foreign material.

Claims (3)

1. concrete box girder manhole envelope modular system, comprise template with ribbing, four iron wires, four screw-thread steels, it is characterized in that: pass template with ribbing with iron wire respectively at template with ribbing four angles, and the rib walking around behind passes template with ribbing again, two suspension centres are become at each dihedral of template with ribbing, every root iron wire two ends are fixed on same screw-thread steel, and four screw-thread steels are inclined cross respectively on case beam manhole four angles.
2. concrete box girder manhole envelope modular system according to claim 1, it is characterized in that: also comprise four sponge strips, a sponge strip is posted on every limit of template with ribbing, and allows sponge strip align with case beam manhole four limit.
3. concrete box girder manhole envelope modular system according to claim 1, it is characterized in that: also comprise fragment of brick, the two ends of every root screw-thread steel are padded respectively and are established fragment of brick.
CN201520483575.3U 2015-07-07 2015-07-07 Thoughtlessly congeal soil box roof beam manhole and seal module system all Active CN204753402U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520483575.3U CN204753402U (en) 2015-07-07 2015-07-07 Thoughtlessly congeal soil box roof beam manhole and seal module system all

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520483575.3U CN204753402U (en) 2015-07-07 2015-07-07 Thoughtlessly congeal soil box roof beam manhole and seal module system all

Publications (1)

Publication Number Publication Date
CN204753402U true CN204753402U (en) 2015-11-11

Family

ID=54468128

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520483575.3U Active CN204753402U (en) 2015-07-07 2015-07-07 Thoughtlessly congeal soil box roof beam manhole and seal module system all

Country Status (1)

Country Link
CN (1) CN204753402U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104947597A (en) * 2015-07-07 2015-09-30 中建三局第二建设工程有限责任公司 Concrete box girder manhole model sealing system and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104947597A (en) * 2015-07-07 2015-09-30 中建三局第二建设工程有限责任公司 Concrete box girder manhole model sealing system and construction method

Similar Documents

Publication Publication Date Title
CN207419711U (en) Steel plate shear force wall and the connection structure of steel bar girder floor plates
CN104947597A (en) Concrete box girder manhole model sealing system and construction method
CN207406004U (en) A kind of steel form locks leg structure
CN108019054A (en) A kind of wall hole to be provided antiseep plugging device
CN206844707U (en) A kind of Reinforced Concrete Reinforcement component
CN103696437B (en) A kind of construction method of cutting lattice column
CN105463986A (en) Construction method of bridge expansion joint
CN204753402U (en) Thoughtlessly congeal soil box roof beam manhole and seal module system all
CN204825945U (en) A fixture for fixing buried bolt in advance
CN103669422A (en) Waterproof construction method of pile head of anchor rod static pressure pile
CN204282391U (en) A kind of heel foundation formwork erecting structure
CN103397661B (en) The construction technology of combined exterior wall structure under shaped steel-concrete ground
CN203905331U (en) Cast-in-place plate-type staircase with seamless steps
CN206844638U (en) A kind of house and its construction mould
CN203285056U (en) Stair formwork supporting base
CN206418394U (en) A kind of main pier of railway High-pier and long-span continuous frigid frame bridge
CN208009182U (en) A kind of prefabricated assembled Cement Concrete Pavement Slab
CN207376642U (en) A kind of additional elevator is to a point prefabricated assembled basis
CN206493404U (en) A kind of batch shaped device for building elevation concrete block
CN204139644U (en) A kind of newly-increased beam of SRC member
CN204040457U (en) Wood frame plastic formwork system
CN203905045U (en) Moving foundation of hoisting machine
CN207392235U (en) Construction template of circular pipe culvert in urban underground comprehensive pipe gallery
CN212249196U (en) Frame post exempts from interior screw rod template system of consolidating
CN204626964U (en) Concreting leak-proof device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant