CN204751931U - Big circular rail doube bridge derrick crane crane span structure - Google Patents

Big circular rail doube bridge derrick crane crane span structure Download PDF

Info

Publication number
CN204751931U
CN204751931U CN201520326552.1U CN201520326552U CN204751931U CN 204751931 U CN204751931 U CN 204751931U CN 201520326552 U CN201520326552 U CN 201520326552U CN 204751931 U CN204751931 U CN 204751931U
Authority
CN
China
Prior art keywords
span structure
crane span
crane
bridge
circular rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520326552.1U
Other languages
Chinese (zh)
Inventor
乾红伦
陶和平
任伟杰
李娇
朱国庆
董向楠
戚良才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN HENGYUAN HOISTING MACHINERY GROUP CO Ltd
Original Assignee
HENAN HENGYUAN HOISTING MACHINERY GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN HENGYUAN HOISTING MACHINERY GROUP CO Ltd filed Critical HENAN HENGYUAN HOISTING MACHINERY GROUP CO Ltd
Priority to CN201520326552.1U priority Critical patent/CN204751931U/en
Application granted granted Critical
Publication of CN204751931U publication Critical patent/CN204751931U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a big circular rail doube bridge derrick crane crane span structure, it includes the crane span structure roof beam, the crane span structure roof beam have two, the both ends of crane span structure roof beam be connected with the end beam respectively, crane span structure roof beam and end beam connect into the crane span structure into a rectangle, the downside of crane span structure left part end beam be provided with vice crane span structure, vice crane span structure downside be provided with fixed leg, two crane span structure roof beam right parts be connected with the removal landing leg, removal landing leg downside be provided with circular rail, two crane span structure roof beam upper surfaces be connected with the trapezoidal plate respectively, the trapezoidal plate upper surface all be provided with the track, two crane span structure roof beam upper surface both sides be provided with the guardrail respectively, guardrail upper portion inboard all be connected with the dead lever, the dead lever other end all be connected with the leading wheel, the end beam upper surface be provided with the stopper respectively, two crane span structure roof beam lower surfaces all be provided with the light, the utility model discloses it derails to prevent effectively that the dolly from turning on one's side, and the design is simple, safe and reliable.

Description

A kind of large circular rail double-bridge crane crane span structure
Technical field
The utility model relates to crane field, particularly relates to crane bridge, particularly one large circular rail double-bridge crane crane span structure.
Background technology
In some logistics accumulatings transhipment place, loading/unloading volume is large, separation space is concentrated and handling are frequent, the crane job scope needed is large, speed is fast, work efficiency is high, large circular rail double-bridge crane is as the large special equipment in carrier, it is the visual plant in applicable a lot of logistics place, but large circular rail double-bridge crane is as a kind of special hoisting crane, its special service conditions, make it in the process run, produce the interference of unnecessary force of inertia, centnifugal force and foreign material, then cause the potential safety hazard in a lot of real-world operation; Therefore, provide a kind of simplicity of design, safe and reliable, prevent dolly from turning on one's side and derail, and the large circular rail double-bridge crane crane span structure providing illumination is very necessary.
Summary of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art, and provides a kind of simplicity of design, safe and reliable, effectively can prevent dolly from turning on one's side and derail, and provide the large circular rail double-bridge crane crane span structure of illumination.
The purpose of this utility model is achieved in that a kind of large circular rail double-bridge crane crane span structure, it comprises bridge stand beam, described bridge stand beam has two, the two ends of described bridge stand beam are connected to end carriage, described bridge stand beam and end carriage are connected to become the crane span structure of a rectangle, the downside of described crane span structure left part end carriage is provided with secondary crane span structure, fixed supporting leg is provided with on the downside of described secondary crane span structure, two described bridge stand beam right parts are connected with mobile supporting leg, circular rail is provided with on the downside of described mobile supporting leg, two described bridge stand beam upper surfaces are connected to trapezoidal plate, described trapezoidal plate upper surface is provided with track, two described bridge stand beam upper surface both sides are respectively arranged with guardrail, described guardrail upper inner is all connected with fixed link, the described fixed link other end is all connected with track adjusting wheel, described end carriage upper surface is respectively arranged with limiting stopper, two described bridge stand beam lower surfaces are provided with illuminating lamp.
The cross sectional shape that described trapezoidal plate and bridge stand beam upper surface link together is trapezoidal.
The connection mode of described trapezoidal plate and bridge stand beam upper surface is for welding.
Described fixed link and the connection mode of guardrail are that bolt is connected or welds.
Described fixed link and the quantity of track adjusting wheel are all at least 8.
The quantity of described illuminating lamp is at least 6.
The beneficial effects of the utility model: the utility model adopts track adjusting wheel, operating hoisting crane motor-driven carrier both sides can be acted on, ensure the running orbit of motor-driven carrier, prevent the tangential force owing to producing in crane span structure twirl process, force of inertia causes the rollover of motor-driven carrier to derail, track is arranged on the upside of trapezoidal plate, trapezoidal plate can effectively prevent from accumulating a large amount of foreign material in the both sides of the track of outside work, thus prevent the generation of the derailment accident of motor-driven carrier, under the condition of the on-the-spot insufficient light of lifting, the illuminating lamp arranged can provide enough light, reduce the generation of contingency, the utility model effectively prevents dolly rollover derailing, additional illumination, and simplicity of design is safe and reliable, reduces accident rate.
Accompanying drawing explanation
Fig. 1 is the birds-eye view of a kind of large circular rail double-bridge crane crane span structure of the utility model.
Fig. 2 is the front elevation of a kind of large circular rail double-bridge crane crane span structure of the utility model.
Fig. 3 is the right elevation of a kind of large circular rail double-bridge crane crane span structure of the utility model.
Fig. 4 is the structural representation of the track adjusting wheel of a kind of large circular rail double-bridge crane crane span structure of the utility model.
In figure: 1, bridge stand beam 2, end carriage 3, secondary crane span structure 4, fixed supporting leg 5, mobile supporting leg 6, circular rail 7, trapezoidal plate 8, track 9, guardrail 10, fixed link 11, track adjusting wheel 12, limiting stopper 13, illuminating lamp.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described further.
Embodiment 1
As Figure 1-4, a kind of large circular rail double-bridge crane crane span structure, it comprises bridge stand beam 1, described bridge stand beam 1 has two, the two ends of described bridge stand beam 1 are connected to end carriage 2, described bridge stand beam 1 and end carriage 2 are connected to become the crane span structure of a rectangle, the downside of described crane span structure left part end carriage 2 is provided with secondary crane span structure 3, fixed supporting leg 4 is provided with on the downside of described secondary crane span structure 3, two described bridge stand beam 1 right parts are connected with mobile supporting leg 5, circular rail 6 is provided with on the downside of described mobile supporting leg 5, two described bridge stand beam 1 upper surfaces are connected to trapezoidal plate 7, described trapezoidal plate 7 upper surface is provided with track 8, two described bridge stand beam 1 upper surface both sides are respectively arranged with guardrail 9, described guardrail 9 upper inner is all connected with fixed link 10, described fixed link 10 other end is all connected with track adjusting wheel 11, described end carriage 2 upper surface is respectively arranged with limiting stopper 12, two described bridge stand beam 1 lower surfaces are provided with illuminating lamp 13.
The utility model adopts track adjusting wheel, operating hoisting crane motor-driven carrier both sides can be acted on, ensure the running orbit of motor-driven carrier, prevent the tangential force owing to producing in crane span structure twirl process, rollover that force of inertia causes motor-driven carrier derails, track is arranged on the upside of trapezoidal plate, trapezoidal plate can effectively prevent from accumulating a large amount of foreign material in the both sides of the track of outside work, thus prevent the generation of the derailment accident of motor-driven carrier, under the condition of the on-the-spot insufficient light of lifting, the illuminating lamp arranged can provide enough light, reduces the generation of contingency; The utility model effectively prevents dolly rollover derailing, additional illumination, and simplicity of design is safe and reliable, reduces accident rate.
Embodiment 2
As Figure 1-4, a kind of large circular rail double-bridge crane crane span structure, it comprises bridge stand beam 1, described bridge stand beam 1 has two, the two ends of described bridge stand beam 1 are connected to end carriage 2, described bridge stand beam 1 and end carriage 2 are connected to become the crane span structure of a rectangle, the downside of described crane span structure left part end carriage 2 is provided with secondary crane span structure 3, fixed supporting leg 4 is provided with on the downside of described secondary crane span structure 3, two described bridge stand beam 1 right parts are connected with mobile supporting leg 5, circular rail 6 is provided with on the downside of described mobile supporting leg 5, two described bridge stand beam 1 upper surfaces are connected to trapezoidal plate 7, described trapezoidal plate 7 upper surface is provided with track 8, two described bridge stand beam 1 upper surface both sides are respectively arranged with guardrail 9, described guardrail 9 upper inner is all connected with fixed link 10, described fixed link 10 other end is all connected with track adjusting wheel 11, described end carriage 2 upper surface is respectively arranged with limiting stopper 12, two described bridge stand beam 1 lower surfaces are provided with illuminating lamp 13.
The cross sectional shape that described trapezoidal plate 7 and bridge stand beam 1 upper surface link together is trapezoidal.
The connection mode of described trapezoidal plate 7 and bridge stand beam 1 upper surface is for welding.
Described fixed link 10 and the connection mode of guardrail 9 are that bolt is connected or welds.
Described fixed link 10 and the quantity of track adjusting wheel 11 are all at least 8.
The quantity of described illuminating lamp 13 is at least 6.
The utility model adopts track adjusting wheel, operating hoisting crane motor-driven carrier both sides can be acted on, ensure the running orbit of motor-driven carrier, prevent the tangential force owing to producing in crane span structure twirl process, rollover that force of inertia causes motor-driven carrier derails, track is arranged on the upside of trapezoidal plate, trapezoidal plate can effectively prevent from accumulating a large amount of foreign material in the both sides of the track of outside work, thus prevent the generation of the derailment accident of motor-driven carrier, under the condition of the on-the-spot insufficient light of lifting, the illuminating lamp arranged can provide enough light, reduces the generation of contingency; The utility model effectively prevents dolly rollover derailing, additional illumination, and simplicity of design is safe and reliable, reduces accident rate.

Claims (6)

1. a large circular rail double-bridge crane crane span structure, it comprises bridge stand beam, it is characterized in that: described bridge stand beam has two, the two ends of described bridge stand beam are connected to end carriage, described bridge stand beam and end carriage are connected to become the crane span structure of a rectangle, the downside of described crane span structure left part end carriage is provided with secondary crane span structure, fixed supporting leg is provided with on the downside of described secondary crane span structure, two described bridge stand beam right parts are connected with mobile supporting leg, circular rail is provided with on the downside of described mobile supporting leg, two described bridge stand beam upper surfaces are connected to trapezoidal plate, described trapezoidal plate upper surface is provided with track, two described bridge stand beam upper surface both sides are respectively arranged with guardrail, described guardrail upper inner is all connected with fixed link, the described fixed link other end is all connected with track adjusting wheel, described end carriage upper surface is respectively arranged with limiting stopper, two described bridge stand beam lower surfaces are provided with illuminating lamp.
2. one according to claim 1 large circular rail double-bridge crane crane span structure, is characterized in that: the cross sectional shape that described trapezoidal plate and bridge stand beam upper surface link together is trapezoidal.
3. one according to claim 1 large circular rail double-bridge crane crane span structure, is characterized in that: the connection mode of described trapezoidal plate and bridge stand beam upper surface is for welding.
4. one according to claim 1 large circular rail double-bridge crane crane span structure, is characterized in that: described fixed link and the connection mode of guardrail are that bolt is connected or welds.
5. one according to claim 1 large circular rail double-bridge crane crane span structure, is characterized in that: described fixed link and the quantity of track adjusting wheel are all at least 8.
6. one according to claim 1 large circular rail double-bridge crane crane span structure, is characterized in that: the quantity of described illuminating lamp is at least 6.
CN201520326552.1U 2015-05-20 2015-05-20 Big circular rail doube bridge derrick crane crane span structure Expired - Fee Related CN204751931U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520326552.1U CN204751931U (en) 2015-05-20 2015-05-20 Big circular rail doube bridge derrick crane crane span structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520326552.1U CN204751931U (en) 2015-05-20 2015-05-20 Big circular rail doube bridge derrick crane crane span structure

Publications (1)

Publication Number Publication Date
CN204751931U true CN204751931U (en) 2015-11-11

Family

ID=54466660

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520326552.1U Expired - Fee Related CN204751931U (en) 2015-05-20 2015-05-20 Big circular rail doube bridge derrick crane crane span structure

Country Status (1)

Country Link
CN (1) CN204751931U (en)

Similar Documents

Publication Publication Date Title
CN204751931U (en) Big circular rail doube bridge derrick crane crane span structure
CN203359820U (en) Double-layered quay crane for loading and unloading containers
CN202575878U (en) Pull wire type manual hydraulic platform car
CN204873574U (en) Hoist girder construction of stretching out and drawing back
CN204823870U (en) Bridge crane and dolly
CN205113097U (en) Crawler -type mountain transport vehicle carriage vertical lifting device
CN203651793U (en) Wagon bogie retaining key structure
CN205772879U (en) A kind of underhung crane platform twin beams transport vehicle
CN205575394U (en) A protection device for preventing deorbit during bridge crane operation
CN203472865U (en) Movable pedal for railway freight wagon and railway freight wagon
CN202829393U (en) Multifunctional semi-automatic crane
CN206384724U (en) The split crane span structure of bridge crane six
CN103395426B (en) A kind of maintenance double girder crane Trolley
CN203957423U (en) A kind of double-deck welded tube with alternating expression weld seam
CN209127966U (en) Mine car overhauls lifting machine
CN103303805B (en) A kind of double-deck bank bridge for container handling
CN203651792U (en) Light-weight deputy frame radial bogie
CN202575876U (en) Knob type manual hydraulic platform car
CN203832413U (en) Rear anti-collision steel beam for container truck
CN205186178U (en) Fixed mine wagon falls guide rerail device
CN204714341U (en) A kind of bridging crane main beam and end carriage connection structure
CN203651794U (en) Radial mechanism connecting structure of bogie of railway freight car
CN204737605U (en) Crane end beam structure
CN205292664U (en) Railway goods vehicle bears saddle device with anticreep function
CN204823759U (en) Gantry crane running gear

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151111

Termination date: 20160520