CN204736197U - A dust arrester installation for vertical drilling of electric drill - Google Patents

A dust arrester installation for vertical drilling of electric drill Download PDF

Info

Publication number
CN204736197U
CN204736197U CN201520438991.1U CN201520438991U CN204736197U CN 204736197 U CN204736197 U CN 204736197U CN 201520438991 U CN201520438991 U CN 201520438991U CN 204736197 U CN204736197 U CN 204736197U
Authority
CN
China
Prior art keywords
dust
electric drill
precipitator
arrester installation
vertical drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520438991.1U
Other languages
Chinese (zh)
Inventor
夏玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
CMTCC Shanghai Shisanye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CMTCC Shanghai Shisanye Construction Co Ltd filed Critical CMTCC Shanghai Shisanye Construction Co Ltd
Priority to CN201520438991.1U priority Critical patent/CN204736197U/en
Application granted granted Critical
Publication of CN204736197U publication Critical patent/CN204736197U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Processing Of Stones Or Stones Resemblance Materials (AREA)

Abstract

The utility model relates to a dust arrester installation for vertical drilling of electric drill, dust collector (1) be cylinder protection casing form, its one end has arranged and has collected mouthful (11), collection mouth (11) be loudspeaker forms, dust collector (1) other end in arranged installation locating hole (12). The utility model has the characteristics of simple structure, convenient to use, can take in dust that when drilling produced, improve the operational safety who uses when the electric drill is vertical upwards to punch, reduce drilling work in -process because of dust pollution to operational environment and construction operating personnel's influence etc.

Description

A kind of dust arrester installation for electric drill vertical drilling hole
Technical field
The utility model relates to electric drill attachment technique field, particularly relates to a kind of dust arrester installation for electric drill vertical drilling hole.
Background technology
In building construction process, often need concrete, fragment of brick, building stones, the materials such as plank punch straight up.And all kinds of dust produced in drill process, chip disperse everywhere, cannot effectively collect, have impact on operating environment, also have impact on the operation sight line of operating personnel simultaneously, there is certain potential safety hazard, the more important thing is if operating personnel lack effective safeguard procedures, the dust sucking punching generation will affect the healthy of operating personnel.
Summary of the invention
Technical problem to be solved in the utility model is to provide a kind of dust arrester installation for electric drill vertical drilling hole, have that structure is simple, easy to use, the dust that produces when can receive boring, improve processing safety when using electric drill to punch straight up, reduce in the boring course of work because dust pollution is on features such as the impacts of working environment and constructing operation personnel.
The utility model solves the technical scheme that its technical problem adopts: provide a kind of dust arrester installation for electric drill vertical drilling hole, comprise dust-precipitator, the cylindrical protection of described dust-precipitator is hood-like, its one end is furnished with collection mouth, described collection mouth is horn-like, mounting-positioning holes is furnished with in the described dust-precipitator other end, the dust collected mouth and be used for dropping when collecting boring is arranged, by arranging that mounting-positioning holes is used for dust-precipitator being fixed on electrical drilling machine bit head place at the dust-precipitator other end in dust-precipitator one end.
Supplementing as to the one of technical scheme described in the utility model, in described mounting-positioning holes, locating piece is installed, making dust-precipitator be connected more firm with drill bit of drilling machine portion by installing locating piece.
Supplement as to the one of technical scheme described in the utility model, described locating piece is that center has the cylindric of through hole.
Supplementing as to the one of technical scheme described in the utility model, between described locating piece and mounting-positioning holes, be furnished with Upper gasket, in the middle part of described Upper gasket, be furnished with through hole, improve the sealing effectiveness of dust-precipitator by installing pad.
beneficial effect
The utility model relates to a kind of dust arrester installation for electric drill vertical drilling hole, the dust collected mouth and be used for dropping when collecting boring is arranged in dust-precipitator one end, by arranging that mounting-positioning holes is used for dust-precipitator being fixed on electrical drilling machine bit head place at the dust-precipitator other end, by installing locating piece, dust-precipitator being connected more firmly with drill bit of drilling machine portion, improve the sealing effectiveness of dust-precipitator by installing pad.The utility model also has that structure is simple, easy to use, the dust that produces when can receive boring, improve processing safety when using electric drill to punch straight up, reduces in the boring course of work because dust pollution is on features such as the impacts of working environment and constructing operation personnel.
Accompanying drawing explanation
Fig. 1 is topology view of the present utility model;
Fig. 2 is explosive view of the present utility model.
Diagram: 1, dust-precipitator, 2, Upper gasket, 3, locating piece, 11, collect mouth, 12, locating hole.
Detailed description of the invention
Below in conjunction with specific embodiment, set forth the utility model further.Should be understood that these embodiments are only not used in restriction scope of the present utility model for illustration of the utility model.In addition should be understood that those skilled in the art can make various changes or modifications the utility model, and these equivalent form of values fall within the application's appended claims limited range equally after the content of having read the utility model instruction.
Embodiment of the present utility model relates to a kind of dust arrester installation for electric drill vertical drilling hole, as shown in Fig. 1-2, comprise dust-precipitator 1, the described cylindrical protection of dust-precipitator 1 is hood-like, its one end is furnished with collects mouth 11, described collection mouth 11, in horn-like, is furnished with mounting-positioning holes 12 in described dust-precipitator 1 other end.
In described mounting-positioning holes 12, locating piece 3 is installed.
Described locating piece 3 has the cylindric of through hole in center.
Be furnished with Upper gasket 2 between described locating piece 3 and mounting-positioning holes 12, in the middle part of described Upper gasket 2, be furnished with through hole.
Embodiment
When workman needs to hole from lower to upper time, first in the mounting-positioning holes 12 of dust-precipitator 1, Upper gasket 2 is installed, afterwards locating piece 3 is arranged in mounting-positioning holes 12, and press Upper gasket 2, afterwards by the through hole of electric drill rod portion through locating piece 3, and by fixedly sleeved for dust-precipitator 1 in drill bit portion.
Work as drill bit rotational, time drilling rod carries out holing, the dust that boring produces can drop at dust-precipitator 1, make dust can not block staff's sight line, and it is healthy to endanger staff.

Claims (4)

1. the dust arrester installation for electric drill vertical drilling hole, comprise dust-precipitator (1), it is characterized in that: described dust-precipitator (1) cylindrical protection is hood-like, its one end is furnished with collects mouth (11), described collection mouth (11), in horn-like, is furnished with mounting-positioning holes (12) in described dust-precipitator (1) other end.
2. a kind of dust arrester installation for electric drill vertical drilling hole according to claim 1, is characterized in that: be provided with locating piece (3) in described mounting-positioning holes (12).
3. a kind of dust arrester installation for electric drill vertical drilling hole according to claim 2, is characterized in that: described locating piece (3) has the cylindric of through hole in center.
4. a kind of dust arrester installation for electric drill vertical drilling hole according to Claims 2 or 3, it is characterized in that: be furnished with Upper gasket (2) between described locating piece (3) and mounting-positioning holes (12), described Upper gasket (2) middle part is furnished with through hole.
CN201520438991.1U 2015-06-24 2015-06-24 A dust arrester installation for vertical drilling of electric drill Active CN204736197U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520438991.1U CN204736197U (en) 2015-06-24 2015-06-24 A dust arrester installation for vertical drilling of electric drill

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520438991.1U CN204736197U (en) 2015-06-24 2015-06-24 A dust arrester installation for vertical drilling of electric drill

Publications (1)

Publication Number Publication Date
CN204736197U true CN204736197U (en) 2015-11-04

Family

ID=54417953

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520438991.1U Active CN204736197U (en) 2015-06-24 2015-06-24 A dust arrester installation for vertical drilling of electric drill

Country Status (1)

Country Link
CN (1) CN204736197U (en)

Similar Documents

Publication Publication Date Title
CN203936422U (en) A kind of electric drill for building
CN204736197U (en) A dust arrester installation for vertical drilling of electric drill
CN202555902U (en) Bench saw with chip collecting device
CN211415784U (en) House building construction wall drilling machine
CN204224901U (en) dust-proof borer
CN213500098U (en) Concrete wall drilling equipment who prevents ftractureing
CN203062741U (en) Novel percussion drill
CN201848837U (en) Percussion drill capable of collecting dust
CN206811183U (en) A kind of pipeline tapping positions instrument
CN206536049U (en) A kind of boring support of building roof
CN203171340U (en) Protection device on drilling machine
CN205277341U (en) Large -scale pneumatic drill dust collection device
CN209580097U (en) A kind of replaceable drill point
CN208396660U (en) A kind of Multifunctional drill
CN205651433U (en) Perforating machine
CN203669737U (en) Drill boom with dust collector
CN206241973U (en) A kind of hand-held suppresses the latent rig of impeller set
CN209792679U (en) Pollution-free puncher applied to environment-friendly building
CN207326025U (en) A kind of punching type hole making drill
CN204899923U (en) A it is mechanical that hydraulic pressure bores coal for coal mining
CN205219051U (en) Profile modeling cutting platform
CN203321334U (en) Protection device for drilling machine
CN204357389U (en) The special fishing socket of oil gas field air hammer drill bit
CN204237972U (en) A kind of web divides stacking device
CN215804420U (en) Road surface engineering drilling equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Patentee before: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd.

Address after: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Patentee after: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd.

Address before: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Patentee before: CMTCC Shanghai 13th Construction Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190708

Address after: Room A, Room 403, 1325 Mudanjiang Road, Baoshan District, Shanghai, 20199

Co-patentee after: CHINA MCC20 GROUP Corp.,Ltd.

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: Room A, Room 403, 1325 Mudanjiang Road, Baoshan District, Shanghai, 20199

Patentee before: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.