CN204725867U - The device of deposit belt deflection radius prepreg - Google Patents

The device of deposit belt deflection radius prepreg Download PDF

Info

Publication number
CN204725867U
CN204725867U CN201520403071.6U CN201520403071U CN204725867U CN 204725867 U CN204725867 U CN 204725867U CN 201520403071 U CN201520403071 U CN 201520403071U CN 204725867 U CN204725867 U CN 204725867U
Authority
CN
China
Prior art keywords
prepreg
lay
pressure roller
connecting rod
radius
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520403071.6U
Other languages
Chinese (zh)
Inventor
方宜武
赵宏飞
商莉
卢凤英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Hengshen Co Ltd
Original Assignee
Jiangsu Hengshen Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Hengshen Co Ltd filed Critical Jiangsu Hengshen Co Ltd
Priority to CN201520403071.6U priority Critical patent/CN204725867U/en
Application granted granted Critical
Publication of CN204725867U publication Critical patent/CN204725867U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Moulding By Coating Moulds (AREA)

Abstract

The utility model provides a kind of device of deposit belt deflection radius prepreg, and comprise pressure roller, briquetting, holding rod, connecting rod and backstay, method forming step is: install flexible gaskets; Lay prepreg; Choose pressure roller initial position and lay direction; Determine connecting rod direction; Stationary positioned bar; Apply briquetting and carry out lay.This device and method, not by the automatic placement equipment of costliness, can complete common manual lay cannot the quality that goes out of lay homogeneous, deflect uniform prepreg circular arc, and provide by changing ballast weight the lay pressure adapting to different needs, radius prepreg circular arc can be become by lay, can be used for shaping or its performance study test of prepeg process.

Description

The device of deposit belt deflection radius prepreg
Technical field
The utility model relates to a kind of device of deposit belt deflection radius prepreg, belongs to Composites Molding Techniques.
Background technology
At some composite material parts in shaping or prepreg performance test, need to obtain preimpregnation material strip or the prepreg bundle with certain deflection radius.But lay cannot complete this operation by hand; This operation can be completed with automatic placement equipment, but its apparatus expensive.
Utility model content
The utility model is intended to propose a kind of device and method for manual deposit belt deflection radius prepreg, not by the automatic placement equipment of costliness, only uses easy device, completes the prepreg circular arc of deposit belt deflection radius.
In order to the prepreg circular arc of deposit belt deflection radius, technical solution of the present utility model is:
A kind of device of deposit belt deflection radius prepreg, comprise pressure roller, briquetting, holding rod, connecting rod and backstay, the top of holding rod is connected with briquetting, the bottom of holding rod is connected with pressure roller, the middle part of holding rod is connected with the end of connecting rod, another end of connecting rod connects on the securing lever, pressure roller adopts flexible compression roller, pressure roller comprises flexible gaskets, be located at inner rigidity supporting structure, mandrel, mandrel is through the middle part of rigidity supporting structure, flexible gaskets is wrapped in outside rigidity supporting structure, flexible gaskets adopts annular packing ring, flexible gaskets comprises some inner packing rings, for the external gasket of fixing prepreg, inner packing ring spread configuration, the diameter of external gasket is greater than the diameter of inner packing ring, external gasket comprises external gasket one, external gasket two, external gasket one is located between inner packing ring or end, external gasket two is located between inner packing ring or end.
Further, the connected mode of briquetting and holding rod, holding rod and backstay, connecting rod and backstay is spigot-and-socket, buckled, bolt pin type or bolt type, connecting rod respectively with holding rod, backstay is vertical is connected.
Further, flexible gaskets adopts elastomeric material to make, and elastomeric material adopts silicon rubber, polyurethane or polyethylene.
Further, the large 0.3-1.0mm of radius of the inner packing ring of the radius ratio of external gasket.
Further, described briquetting is counterweight or metal derby.
Further, holding rod comprises push rod and U-shaped bar, and an end of push rod connects briquetting, and another end of push rod connects U-shaped bar, and the middle part of push rod is connected with connecting rod, the two ends of U-shaped bar difference connecting mandrel.
Adopt a method for device deposit belt deflection radius prepreg described in above-mentioned any one, comprise the following steps:
Step one: install flexible gaskets: lay flexible gaskets on the rigidity supporting structure of pressure roller, by adjusting the position of external gasket, make external gasket one, the adjacent side spacing of external gasket two is equal to or greater than the width treating lay prepreg, after inner packing ring is installed, with rigid structure, all packing rings are fixed on rigidity supporting structure, form flexible compression roller;
Step 2: lay prepreg: be placed in by banded prepreg between pressure roller peripheral packing ring, provides the tractive force of 1-5N to make it keep straight to the prepreg of non-lay part;
Step 3: choose pressure roller initial position and lay direction: the pressure roller laying prepreg is placed on lay starting point, and make the mandrel direction of pressure roller perpendicular to lay direction, then the mandrel direction of pressure roller is deflection radius direction, namely the direction of connecting rod;
Step 4: determine connecting rod direction, connects mandrel and the connecting rod of pressure roller;
Step 5: according to required deflection radius, stationary positioned bar position: according to deflection radius, from lay starting point, connecting rod measures deflection radius, namely obtains the center of circle deflecting circular arc, at the circle centre position stationary positioned bar of connecting rod upper deflecting circular arc;
Step 6: according to required lay pressure, holding rod applies briquetting and carries out lay, keep holding rod perpendicular to lay face, and make the prepreg of non-lay keep tension force, in lay starting point along lay direction, do around axle motion around backstay, lay face obtains the prepreg circular arc of belt deflector radius.
Further, lay becomes the method for radius prepreg:
Step 7: completing steps six, when pressure roller moves to second lay starting point, keeps holding rod to fix second lay starting point and keeps tension force perpendicular to lay face, prepreg, unloading lower connecting rod and backstay from pressure roller;
According to step one to step 6, mandrel and the connecting rod of pressure roller is connected at pressure roller opposite side, connecting rod measures the center of circle that second lay radius obtains second deflection circular arc, at the circle centre position stationary positioned bar of second deflection circular arc, pressure roller is done around axle motion around backstay, lay face obtains the prepreg circular arc of band second deflection radius.
Further, repeat step 7 and carry out the prepreg circular arc that lay becomes radius continuously.
Further, lay material used is the wide unidirectional pre-immersion material of cutting.
The method of this kind of deposit belt deflection radius prepreg, determines connecting rod direction by initial lay direction and position, then according to lay radius determination backstay position.Be specially:
After installation flexible gaskets, between the flexible gaskets that two radiuses are bigger, put into prepreg, make prepreg embed both in the height that exceeds, its length direction is vertical with pressure roller mandrel direction, and around pressure roller mandrel covering certain angle; Adjustment pressure roller and the integrally-built direction of prepreg, the two is placed on lay starting point, and the mandrel direction of pressure roller is perpendicular to initial lay direction, pressure roller is pressed on prepreg uniformly; According to the mandrel direction of pressure roller, connected by the mandrel of connecting rod and pressure roller, the two overlaps with the mandrel direction of pressure roller in conjunction with rear connecting rod.
According to the lay radius of institute's lay prepreg, from pressure roller center calculation length, and on connecting rod, measure this length, determine the position of backstay, and connecting rod and backstay are coupled together.
According to required lay pressure, holding rod is connected and fixed briquetting, makes holding rod perpendicular to lay face, traction prepreg, then slow at the uniform velocity ambulatory handheld bar, makes connecting rod do pivoting movement around backstay, completes the lay of prepreg circular arc.
The beneficial effects of the utility model are: not by the automatic placement equipment of costliness, can complete common manual lay cannot the quality that goes out of lay homogeneous, deflect uniform prepreg circular arc, and provide by changing ballast weight the lay pressure adapting to different needs, radius prepreg circular arc can be become by lay, can be used for shaping or its performance study test of prepeg process.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model embodiment for the device of manual deposit belt deflection radius prepreg;
Fig. 2 is the structural representation of flexible compression roller in embodiment;
Fig. 3 is to adapt to the schematic diagram of different in width prepreg by adjustment flexible gaskets position;
Fig. 4 is the side view of flexible compression roller lay prepreg in embodiment;
Fig. 5 is according to the initial lay position of pressure roller and direction, determines connecting rod direction and backstay position, the top view of lay prepreg circular arc;
Fig. 6 is the schematic diagram that in embodiment, lay becomes radius prepreg.
Wherein: 01-pressure roller, 02-briquetting, 03-holding rod, 04-connecting rod, 05-backstay, 06-die surface, 07-prepreg.
The flexible gaskets that 0111-radius is bigger, the flexible gaskets that 0112-radius is smaller, 012-rigidity supporting structure, 013-mandrel.
Detailed description of the invention
Preferred embodiment of the present utility model is described in detail below in conjunction with accompanying drawing.
Embodiment
Fig. 1 illustrates the device of deposit belt deflection radius prepreg by hand, and the key component in described device is flexible compression roller 01.
As Fig. 2, pressure roller is made up of flexible gaskets 011, rigidity supporting structure 012 and the mandrel 013 of fixing the two, and mandrel 013, by being connected with holding rod 03, makes pressure roller 01 can transmission of pressure.The packing ring 0111 that two radiuses are bigger is had in flexible gaskets 011, and the packing ring 0112 that other radius is smaller.The about 0.3-1.0mm of radius of the radius ratio packing ring 0112 of packing ring 0111, like this, when they being arranged on rigidity supporting structure 012, the packing ring 0111 of both sides exceeds about 0.3-1.0mm than middle packing ring 0112, as shown in Figure 2, when prepreg 07 is placed on pressure roller, the effect that the part that packing ring 0111 exceeds serves fixing prepreg 07 edge, prevents prepreg 07 from deflecting away from.
As Fig. 3, when when prepreg 07 width of lay is less, by changing the installation site of packing ring 0111, make them in the middle part of pressure roller 01, thus reach the effect of fixing narrower prepreg 07.
Embodiment method forming step is: install flexible gaskets; Lay prepreg; Choose pressure roller initial position and lay direction; Determine connecting rod direction; Stationary positioned bar; Apply briquetting and carry out lay.Can not by automatic placement equipment, prepreg by means of only easy device deposit belt deflection radius, be applicable to shaping or its performance test of prepeg process.
The method of this kind deposit belt deflection radius prepreg by hand:
As Fig. 4, prepreg 07 is placed between pressure roller 01 middle washer 0111, provides the tractive force of 1-5N to make it keep straight, avoid occurring gauffer in laid course to the prepreg 07 of non-lay part.Because packing ring 011 is flexible material, under the effect of the pressure, the part that packing ring 0111 exceeds is crushed on lay face 06, thus reaches the effect of fixing prepreg 07.Lay direction in Fig. 4 as shown in figure sharp head direction,
As Fig. 5, the pressure roller 01 laying prepreg 07 is placed on lay starting point o, and making its mandrel 013 direction perpendicular to lay direction, lay direction is as shown in Fig. 5 sharp head direction, then mandrel 013 direction of pressure roller 01 is deflection radius direction, the namely direction of connecting rod 04; Connect pressure roller mandrel 013 and connecting rod 04.According to deflection radius r, from opoint starts, and connecting rod 04 measures r, namely obtain the center of circle deflecting circular arc p, on connecting rod 04 pplace's stationary positioned bar 05.
According to required lay pressure, holding rod 03 connects briquetting 02, keep holding rod 03 perpendicular to lay face 06, and make the prepreg 07 of non-lay keep tension force, opoint, along lay direction, does around axle motion around backstay 05, lay face 06 obtains belt deflector radius rprepreg circular arc 07.
Fig. 6 illustrates that lay becomes the method for radius prepreg: when moving to o 2 time, lay radius becomes r 2 , o 2 place keeps holding rod 03 fixing and keeps tension force perpendicular to lay face 06, prepreg 07, unloads lower connecting rod 04 and backstay 05 from pressure roller 01; With reference to above-mentioned way, lay direction, as shown in Fig. 6 sharp head direction, connects pressure roller mandrel 013 and connecting rod 04 at pressure roller 01 opposite side, connecting rod 04 measures r 2 obtain the center of circle of new deflection circular arc p 2 , p 2 place's stationary positioned bar 05, makes pressure roller 01 do around axle motion around backstay 05, lay face 06 obtains belt deflector radius r 2 prepreg circular arc 07.

Claims (6)

1. the device of a deposit belt deflection radius prepreg, it is characterized in that: comprise pressure roller, briquetting, holding rod, connecting rod and backstay, the top of holding rod is connected with briquetting, the bottom of holding rod is connected with pressure roller, the middle part of holding rod is connected with the end of connecting rod, another end of connecting rod connects on the securing lever, pressure roller adopts flexible compression roller, pressure roller comprises flexible gaskets, be located at inner rigidity supporting structure, mandrel, mandrel is through the middle part of rigidity supporting structure, flexible gaskets is wrapped in outside rigidity supporting structure, flexible gaskets adopts annular packing ring, flexible gaskets comprises some inner packing rings, for the external gasket of fixing prepreg, inner packing ring spread configuration, the diameter of external gasket is greater than the diameter of inner packing ring, external gasket comprises external gasket one, external gasket two, external gasket one is located between inner packing ring or end, external gasket two is located between inner packing ring or end.
2. the device of deposit belt deflection radius prepreg as claimed in claim 1, it is characterized in that: the connected mode of briquetting and holding rod, holding rod and backstay, connecting rod and backstay is spigot-and-socket, buckled, bolt pin type or bolt type, connecting rod respectively with holding rod, backstay is vertical is connected.
3. the device of deposit belt deflection radius prepreg as claimed in claim 1 or 2, is characterized in that: flexible gaskets adopts elastomeric material to make, and elastomeric material adopts silicon rubber, polyurethane or polyethylene.
4. the device of deposit belt deflection radius prepreg as claimed in claim 3, is characterized in that: the large 0.3-1.0mm of radius of the inner packing ring of radius ratio of external gasket.
5. the device of deposit belt deflection radius prepreg as claimed in claim 1 or 2, is characterized in that: described briquetting is counterweight or metal derby.
6. the device of deposit belt deflection radius prepreg as claimed in claim 1 or 2, it is characterized in that: holding rod comprises push rod and U-shaped bar, an end of push rod connects briquetting, another end of push rod connects U-shaped bar, the middle part of push rod is connected with connecting rod, the two ends of U-shaped bar difference connecting mandrel.
CN201520403071.6U 2015-06-12 2015-06-12 The device of deposit belt deflection radius prepreg Expired - Fee Related CN204725867U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520403071.6U CN204725867U (en) 2015-06-12 2015-06-12 The device of deposit belt deflection radius prepreg

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520403071.6U CN204725867U (en) 2015-06-12 2015-06-12 The device of deposit belt deflection radius prepreg

Publications (1)

Publication Number Publication Date
CN204725867U true CN204725867U (en) 2015-10-28

Family

ID=54384249

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520403071.6U Expired - Fee Related CN204725867U (en) 2015-06-12 2015-06-12 The device of deposit belt deflection radius prepreg

Country Status (1)

Country Link
CN (1) CN204725867U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104859159A (en) * 2015-06-12 2015-08-26 江苏恒神股份有限公司 Device and method for laying prepreg with deflection radius

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104859159A (en) * 2015-06-12 2015-08-26 江苏恒神股份有限公司 Device and method for laying prepreg with deflection radius

Similar Documents

Publication Publication Date Title
CN104859159A (en) Device and method for laying prepreg with deflection radius
CN201898197U (en) Extra flexible caterpillar traction device
CN113339585B (en) Construction method of internally-penetrated steel pipe for water diversion project top pipe
CN204725867U (en) The device of deposit belt deflection radius prepreg
CN205839199U (en) A kind of novel electrostatic device for spinning
CN207876941U (en) A kind of cloth textile process tensioner apparatus
US20130133393A1 (en) Apparatus for correcting upward deformation of large member of stainless steel car roof
CN113339625B (en) On-spot lining hose folding equipment
CN103482418A (en) Optical fiber pay-off rack
CN206691412U (en) Pipe production line and its winder
CN206691948U (en) Pipe production line and its receiving rack
CN203077611U (en) Variable track transverse drawing mechanism for preparing PTFE (Polytetrafluoroethylene) film
CN207296187U (en) A kind of adjustable for height high strength cast iron stent
CN203529596U (en) Optical fiber pay-off rack
CN207404614U (en) A kind of roll material storage device
CN206066941U (en) Chain clamp mechanism
CN209666257U (en) A kind of carat of pipe molding equipment and its forming roller
CN204487718U (en) A kind of plate joggling apparatus
CN203665813U (en) Pressure roller assembly
WO2013141714A4 (en) Supporting device for cables and method for using the same
CN112499335A (en) Building carbon fiber reinforcing belt and reinforcing belt winding device
CN207046388U (en) Top plate slide device after a kind of hydraulic cutting presser
CN210099429U (en) Tractor for fire hose sleeve
CN205291980U (en) Pressing wheel mechanism that books were carried
USRE22762E (en) Method of and apparatus fob

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151028

Termination date: 20210612