CN204715175U - Adjustable integral type screed - Google Patents

Adjustable integral type screed Download PDF

Info

Publication number
CN204715175U
CN204715175U CN201520231989.7U CN201520231989U CN204715175U CN 204715175 U CN204715175 U CN 204715175U CN 201520231989 U CN201520231989 U CN 201520231989U CN 204715175 U CN204715175 U CN 204715175U
Authority
CN
China
Prior art keywords
support bar
screed
side support
guiding mechanism
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520231989.7U
Other languages
Chinese (zh)
Inventor
刘谦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN KANGYUAN ENGINEERING MACHINERY Co Ltd
Original Assignee
TIANJIN KANGYUAN ENGINEERING MACHINERY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN KANGYUAN ENGINEERING MACHINERY Co Ltd filed Critical TIANJIN KANGYUAN ENGINEERING MACHINERY Co Ltd
Priority to CN201520231989.7U priority Critical patent/CN204715175U/en
Application granted granted Critical
Publication of CN204715175U publication Critical patent/CN204715175U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Machines (AREA)

Abstract

The utility model provides adjustable integral type screed, upper and lower conveyor track is had on inside screed main body, left side screed is connected by the left side of upper and lower conveyor track with described screed main body, left side screed is also provided with left side screed guiding mechanism, left side screed guiding mechanism is located in upper and lower conveyor track, on the left of screed main body, lower end is connected with the first screed oil cylinder by Left-side support bar, on the right side of screed main body, lower end is connected with the second screed oil cylinder by Right side support bar, 3rd screed oil cylinder is connected with the lower end, middle part of screed main body by midfoot support bar.Structure is simple, efficiency of assembling is high, fixed form is simple and easy but reliability strong, it is little, with low cost to take up room, and changes the work area of screed, has saved manpower and materials, also saved the working time.

Description

Adjustable integral type screed
Technical field
The utility model relates to road surface job engineering technical field, more particularly, relates to a kind of adjustable integral type screed.
Background technology
Screed, as the core work device of asphalt paver, directly decides spreading quality and the functional performance of machine.At present, domestic and international ironing plate of asphalt spreader all adopts the rectangular box structure of Plate Welding, and bottom has been bolted Wear-resisting bottom plate.When pave hot-mix asphalt mixture time, the high-temperature that paver screed base plate will be heated to more than 130 DEG C, and screed casing upper part is in ambient temperature conditions.Because screed body structure upper and lower temperature difference is larger, the swell increment being in the lower part screed of high temperature is much larger than the swell increment of upper part screed being in low temperature, thus cause whole screed two ends to occur upwarping phenomenon, cause the decline of paving concrete pavement planeness thus, have a strong impact on the quality of construction of the highway.
In recent years, large width paver and modified asphalt mixture obtain application in Expressway Construction, and the flatness requirement of user to road construction is also more and more higher.For the construction of the high temperature material spreader such as increase and modified asphalt mixture of paver paving width, the heat distortion amount at screed two ends all can be caused to enlarge markedly.Existing screed thermal deformation suppressing way, mainly reserves heat distortion amount by screed casing and compensates thermal deformation, and this needs to change the physical dimension of screed, and small-sized due to reserved heat distortion amount, its processing and installation difficulty very large.And current most of ironing plate of asphalt spreader does not take effective thermal deformation suppressing way, work progress screed is heated generation deflection, has had a strong impact on the operation quality of paving concrete pavement.
Utility model content
The utility model overcomes deficiency of the prior art, provides a kind of adjustable integral type screed.
The purpose of this utility model is achieved by following technical proposals.
Adjustable integral type screed, comprise screed main body, left side screed, right side screed, left side screed guiding mechanism, right side screed guiding mechanism, first screed oil cylinder, second screed oil cylinder and the 3rd screed oil cylinder, inside described screed main body, upper and lower two ends are respectively arranged with upper driving track and underdrive track, described left side screed is connected with the left side of described screed main body by described upper driving track and described underdrive track, described left side screed is also provided with described left side screed guiding mechanism, the screed guiding mechanism activity of described left side be arranged on described upper driving track and described underdrive track, and screed guiding mechanism inside, described left side is provided with drive motors under the upper drive motors in left side and left side, described right side screed is connected with the right side of described screed main body by described upper driving track and described underdrive track, described right side screed is also provided with described right side screed guiding mechanism, the screed guiding mechanism activity of described right side be arranged on described upper driving track and described underdrive track, and screed guiding mechanism inside, described right side is provided with drive motors under the upper drive motors in right side and right side, drive motors on described left side, drive motors under described left side, on described right side, under drive motors and described right side, the output of drive motors is connected with described left side screed guiding mechanism and described right side screed guiding mechanism respectively, on the left of described screed main body, lower end is connected with described first screed oil cylinder by Left-side support bar, on the right side of described screed main body, lower end is connected with described second screed oil cylinder by Right side support bar, described 3rd screed oil cylinder is connected with the lower end, middle part of described screed main body by midfoot support bar, described Left-side support bar comprises in Left-side support bar the Left-side support bar outer tube managed and be set in described Left-side support bar outside pipe, pipe and described Left-side support bar outer tube can relative slidings vertically in described Left-side support bar, Left-side support bar elastic device is provided with in pipe in described Left-side support bar, Left-side support bar button is connected with on described Left-side support bar elastic device top, described Left-side support bar outer tube is radially distributed with the Left-side support bar locating hole coordinated with described Left-side support bar button, described Right side support bar comprises in Right side support bar the Right side support bar outer tube managed and be set in described Right side support bar outside pipe, pipe and described Right side support bar outer tube can relative slidings vertically in described Right side support bar, Right side support bar elastic device is provided with in pipe in described Right side support bar, Right side support bar button is connected with on described Right side support bar elastic device top, described Right side support bar outer tube is radially distributed with the Right side support bar locating hole coordinated with described Right side support bar button.
Described Left-side support bar elastic device and described Right side support bar elastic device all adopt V-type shell fragment.
Described midfoot support bar comprises in midfoot support bar the midfoot support bar outer tube managed and be set in described midfoot support bar outside pipe, pipe and described midfoot support bar outer tube can relative slidings vertically in described midfoot support bar, midfoot support bar elastic device is provided with in pipe in described midfoot support bar, be connected with midfoot support bar button on described midfoot support bar elastic device top, described midfoot support bar outer tube be radially distributed with the midfoot support bar locating hole coordinated with described midfoot support bar button.
Described midfoot support bar elastic device adopts V-type shell fragment.
The beneficial effects of the utility model are: Left-side support bar, midfoot support bar and Right side support bar structure simple, efficiency of assembling is high, fixed form is simple and easy but reliability is strong, take up room little, with low cost, simultaneously because paver to be heated generation deflection at work progress screed, have a strong impact on the operation quality of paving concrete pavement, Left-side support bar, the setting of midfoot support bar and Right side support bar, the left and right sides of adjustment screed main body is at Left-side support bar, symmetrical gradually along the downward-sloping distortion of normal direction of screed bottom surface under the effect of midfoot support bar and Right side support bar, what compensate that screed work is heated with this is bent upwards distortion, thus normal screed flat configuration when ensure that paving operation, effectively improve the spreading evenness on road surface, the work area of screed is changed by the mode arranging left side freely-moving mangle oil cylinder and right side freely-moving mangle oil cylinder in screed body interior, simultaneously, because left side screed and right side screed are connected with screed main body by upper driving track and underdrive track, left side screed and right side screed and screed main body have good integraty, in paving process, space can not be there is because of left side screed and between right side screed and screed main body, the paving operation caused is defective, operation need be repeated or need workman to carry out the process of part finishing to this defective part, manpower and materials are saved, also save the working time.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of Left-side support bar in the utility model.
In figure: 1 is screed main body, 2 is left side screed, 3 is right side screed, 4 is left side screed guiding mechanism, 5 is right side screed guiding mechanism, 6 is the first screed oil cylinder, 7 is the second screed oil cylinder, 8 is the 3rd screed oil cylinder, 9 is upper driving track, 10 is underdrive track, 11 is drive motors on left side, 12 is drive motors under left side, 13 is drive motors on right side, 14 is drive motors under right side, 15 is Left-side support bar, 16 is Right side support bar, 17 is midfoot support bar, 18 is pipe in Left-side support bar, 19 is Left-side support bar outer tube, 20 is Left-side support bar elastic device, 21 is Left-side support bar button, 22 is Left-side support bar locating hole.
Detailed description of the invention
Below by specific embodiment, the technical solution of the utility model is further described.
As depicted in figs. 1 and 2, wherein, 1 is screed main body, 2 is left side screed, 3 is right side screed, 4 is left side screed guiding mechanism, 5 is right side screed guiding mechanism, 6 is the first screed oil cylinder, 7 is the second screed oil cylinder, 8 is the 3rd screed oil cylinder, 9 is upper driving track, 10 is underdrive track, 11 is drive motors on left side, 12 is drive motors under left side, 13 is drive motors on right side, 14 is drive motors under right side, 15 is Left-side support bar, 16 is Right side support bar, 17 is midfoot support bar, 18 is pipe in Left-side support bar, 19 is Left-side support bar outer tube, 20 is Left-side support bar elastic device, 21 is Left-side support bar button, 22 is Left-side support bar locating hole.
Adjustable integral type screed, comprise screed main body 1, left side screed 2, right side screed 3, left side screed guiding mechanism 4, right side screed guiding mechanism 5, first screed oil cylinder 6, second screed oil cylinder 7 and the 3rd screed oil cylinder 8, inside screed main body 1, upper and lower two ends are respectively arranged with upper driving track 9 and underdrive track 10, left side screed 2 is connected with the left side of screed main body 1 by upper driving track 9 and underdrive track 10, left side screed 2 is also provided with left side screed guiding mechanism 4, left side screed guiding mechanism 4 activity be arranged on upper driving track 9 and underdrive track 10, and screed guiding mechanism 4 inside, left side is provided with drive motors 12 under the upper drive motors 11 in left side and left side, right side screed 3 is connected with the right side of screed main body 1 by upper driving track 9 and underdrive track 10, right side screed 3 is also provided with right side screed guiding mechanism 5, right side screed guiding mechanism 5 activity be arranged on upper driving track 9 and underdrive track 10, and screed guiding mechanism 5 inside, right side is provided with drive motors 14 under the upper drive motors 13 in right side and right side, drive motors 11 on left side, the lower drive motors 12 in left side, on right side, under drive motors 13 and right side, the output of drive motors 14 is connected with left side screed guiding mechanism 4 and right side screed guiding mechanism 5 respectively, on the left of screed main body 1, lower end is connected with the first screed oil cylinder 6 by Left-side support bar 15, on the right side of screed main body 1, lower end is connected with the second screed oil cylinder 7 by Right side support bar 16, 3rd screed oil cylinder 8 is connected with the lower end, middle part of screed main body 1 by midfoot support bar 17, Left-side support bar 15 comprises pipe 18 and the Left-side support bar outer tube 19 be set in Left-side support bar outside pipe 18 in Left-side support bar, in Left-side support bar, pipe 18 and Left-side support bar outer tube 19 can relative slidings vertically, Left-side support bar elastic device 20 is provided with in pipe 18 in Left-side support bar, Left-side support bar button 21 is connected with on Left-side support bar elastic device 20 top, Left-side support bar outer tube 19 is radially distributed with the Left-side support bar locating hole 22 coordinated with Left-side support bar button 21, Right side support bar comprises in Right side support bar the Right side support bar outer tube managed and be set in Right side support bar outside pipe, pipe and Right side support bar outer tube can relative slidings vertically in Right side support bar, Right side support bar elastic device is provided with in pipe in Right side support bar, Right side support bar button is connected with on Right side support bar elastic device top, Right side support bar outer tube is radially distributed with the Right side support bar locating hole coordinated with Right side support bar button.
Left-side support bar elastic device 20 and Right side support bar elastic device all adopt V-type shell fragment.
Midfoot support bar comprises in midfoot support bar the midfoot support bar outer tube managed and be set in midfoot support bar outside pipe, pipe and midfoot support bar outer tube can relative slidings vertically in midfoot support bar, midfoot support bar elastic device is provided with in pipe in midfoot support bar, be connected with midfoot support bar button on midfoot support bar elastic device top, midfoot support bar outer tube be radially distributed with the midfoot support bar locating hole coordinated with midfoot support bar button.
Midfoot support bar elastic device adopts V-type shell fragment.
Left-side support bar, midfoot support bar and Right side support bar structure simple, efficiency of assembling is high, fixed form is simple and easy but reliability is strong, take up room little, with low cost, simultaneously because paver to be heated generation deflection at work progress screed, have a strong impact on the operation quality of paving concrete pavement, Left-side support bar, the setting of midfoot support bar and Right side support bar, the left and right sides of adjustment screed main body is at Left-side support bar, symmetrical gradually along the downward-sloping distortion of normal direction of screed bottom surface under the effect of midfoot support bar and Right side support bar, what compensate that screed work is heated with this is bent upwards distortion, thus normal screed flat configuration when ensure that paving operation, effectively improve the spreading evenness on road surface, the work area of screed is changed by the mode arranging left side freely-moving mangle oil cylinder and right side freely-moving mangle oil cylinder in screed body interior, simultaneously, because left side screed and right side screed are connected with screed main body by upper driving track and underdrive track, left side screed and right side screed and screed main body have good integraty, in paving process, space can not be there is because of left side screed and between right side screed and screed main body, the paving operation caused is defective, operation need be repeated or need workman to carry out the process of part finishing to this defective part, manpower and materials are saved, also save the working time.
Above an embodiment of the present utility model has been described in detail, but described content being only preferred embodiment of the present utility model, can not being considered to for limiting practical range of the present utility model.All equalizations done according to the utility model application range change and improve, and all should still belong within patent covering scope of the present utility model.

Claims (4)

1. adjustable integral type screed, it is characterized in that: comprise screed main body, left side screed, right side screed, left side screed guiding mechanism, right side screed guiding mechanism, first screed oil cylinder, second screed oil cylinder and the 3rd screed oil cylinder, inside described screed main body, upper and lower two ends are respectively arranged with upper driving track and underdrive track, described left side screed is connected with the left side of described screed main body by described upper driving track and described underdrive track, described left side screed is also provided with described left side screed guiding mechanism, the screed guiding mechanism activity of described left side be arranged on described upper driving track and described underdrive track, and screed guiding mechanism inside, described left side is provided with drive motors under the upper drive motors in left side and left side, described right side screed is connected with the right side of described screed main body by described upper driving track and described underdrive track, described right side screed is also provided with described right side screed guiding mechanism, the screed guiding mechanism activity of described right side be arranged on described upper driving track and described underdrive track, and screed guiding mechanism inside, described right side is provided with drive motors under the upper drive motors in right side and right side, drive motors on described left side, drive motors under described left side, on described right side, under drive motors and described right side, the output of drive motors is connected with described left side screed guiding mechanism and described right side screed guiding mechanism respectively, on the left of described screed main body, lower end is connected with described first screed oil cylinder by Left-side support bar, on the right side of described screed main body, lower end is connected with described second screed oil cylinder by Right side support bar, described 3rd screed oil cylinder is connected with the lower end, middle part of described screed main body by midfoot support bar, described Left-side support bar comprises in Left-side support bar the Left-side support bar outer tube managed and be set in described Left-side support bar outside pipe, pipe and described Left-side support bar outer tube can relative slidings vertically in described Left-side support bar, Left-side support bar elastic device is provided with in pipe in described Left-side support bar, Left-side support bar button is connected with on described Left-side support bar elastic device top, described Left-side support bar outer tube is radially distributed with the Left-side support bar locating hole coordinated with described Left-side support bar button, described Right side support bar comprises in Right side support bar the Right side support bar outer tube managed and be set in described Right side support bar outside pipe, pipe and described Right side support bar outer tube can relative slidings vertically in described Right side support bar, Right side support bar elastic device is provided with in pipe in described Right side support bar, Right side support bar button is connected with on described Right side support bar elastic device top, described Right side support bar outer tube is radially distributed with the Right side support bar locating hole coordinated with described Right side support bar button.
2. adjustable integral type screed according to claim 1, is characterized in that: described Left-side support bar elastic device and described Right side support bar elastic device all adopt V-type shell fragment.
3. adjustable integral type screed according to claim 1, it is characterized in that: described midfoot support bar comprises in midfoot support bar the midfoot support bar outer tube managed and be set in described midfoot support bar outside pipe, pipe and described midfoot support bar outer tube can relative slidings vertically in described midfoot support bar, midfoot support bar elastic device is provided with in pipe in described midfoot support bar, midfoot support bar button is connected with on described midfoot support bar elastic device top, described midfoot support bar outer tube is radially distributed with the midfoot support bar locating hole coordinated with described midfoot support bar button.
4. adjustable integral type screed according to claim 3, is characterized in that: described midfoot support bar elastic device adopts V-type shell fragment.
CN201520231989.7U 2015-04-16 2015-04-16 Adjustable integral type screed Expired - Fee Related CN204715175U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520231989.7U CN204715175U (en) 2015-04-16 2015-04-16 Adjustable integral type screed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520231989.7U CN204715175U (en) 2015-04-16 2015-04-16 Adjustable integral type screed

Publications (1)

Publication Number Publication Date
CN204715175U true CN204715175U (en) 2015-10-21

Family

ID=54314180

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520231989.7U Expired - Fee Related CN204715175U (en) 2015-04-16 2015-04-16 Adjustable integral type screed

Country Status (1)

Country Link
CN (1) CN204715175U (en)

Similar Documents

Publication Publication Date Title
CN204715172U (en) Double-layer prestressed screed
CN207846150U (en) A kind of heat-regenerating paver of asphalt pavement
CN207079447U (en) A kind of bituminous paving corner compaction apparatus
CN204715176U (en) Double-deck adjustable integrated screed
CN204715175U (en) Adjustable integral type screed
CN101649598B (en) Ironing board for paver having performance of thermal deformation compensation
CN204715177U (en) Prestressing force screed
CN204715174U (en) The prestressing force screed of width adjustable
CN203613440U (en) Telescopic front retaining plate device of screed
CN206457997U (en) A kind of prefabricated panel reinforcing bar stationary positioned device
CN202519571U (en) Bracing rod pre-pressed downward deformed ironing plate of asphalt paver
CN204715173U (en) The screed that bi-laminate width is adjustable
CN206127834U (en) Scraper blade for laying -out is spread out and put on to highway
CN206070317U (en) The adjustable screed of bi-laminate width
CN206070316U (en) Adjustable integral type screed
CN102635055B (en) Ironing board of asphalt paver with downward deformation by being pre-pressed by strut and pull rods
CN102720116A (en) Equal-stroke double-vibrating device of asphalt spreading machine
CN207685639U (en) A kind of spring piston shoes screeder
CN201502026U (en) Paver screed board with thermal deformation compensation
CN106149529A (en) Adjustable integral type screed
CN106149527A (en) Double-deck adjustable integrated screed
CN204875455U (en) Paver
CN214737194U (en) Ironing plate capable of preventing normal temperature cold asphalt from sticking
CN101100838A (en) Regenerative material lying device for hot in-place regeneration remixer
CN204282173U (en) A kind of paver and screed thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151021

Termination date: 20170416

CF01 Termination of patent right due to non-payment of annual fee