CN204711482U - Extra-high voltage steel tube tower flange pairing machine - Google Patents
Extra-high voltage steel tube tower flange pairing machine Download PDFInfo
- Publication number
- CN204711482U CN204711482U CN201520463634.0U CN201520463634U CN204711482U CN 204711482 U CN204711482 U CN 204711482U CN 201520463634 U CN201520463634 U CN 201520463634U CN 204711482 U CN204711482 U CN 204711482U
- Authority
- CN
- China
- Prior art keywords
- mobile roof
- roof supports
- extra
- high voltage
- steel tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 38
- 239000010959 steel Substances 0.000 title claims abstract description 38
- 230000005540 biological transmission Effects 0.000 claims description 9
- 238000009434 installation Methods 0.000 claims description 3
- 238000012423 maintenance Methods 0.000 abstract description 3
- 238000004134 energy conservation Methods 0.000 abstract description 2
- 238000003466 welding Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000000969 carrier Substances 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Landscapes
- Wind Motors (AREA)
Abstract
The utility model relates to a kind of extra-high voltage steel tube tower processing auxiliary equipment, specifically, relates to a kind of extra-high voltage steel tube tower flange pairing machine.Comprise travelling platform, walking track, two mobile roof supports and adjustable steel pipe carrier; Described walking track is provided with two that are parallel to each other, and is provided with the tooth bar paralleled with track of walking between two walking tracks; Two mobile roof supports comprise the mobile roof support laying respectively at travelling platform two ends, No. two mobile roof supports, and they are arranged on walking track respectively, and can move left and right along walking track; The madial wall of a described mobile roof support, No. two mobile roof supports is fixed with flange fixed disc respectively, and the center of circle of two flange fixed discs is on same straight line.The utility model structure is simple, easy to maintenance, maintaining cost is low; Power consumption is little, energy-conservation, noiselessness; Easy to operate.
Description
Technical field
The utility model relates to a kind of extra-high voltage steel tube tower processing auxiliary equipment, specifically, relates to a kind of extra-high voltage steel tube tower flange pairing machine.
Background technology
In the process of extra-high voltage steel tube tower, need to use extra-high voltage steel tube tower flange pairing machine to carry out flange group pair to steel pipe.But the extra-high voltage steel tube tower flange pairing machine that current most of extra-high voltage steel tube tower manufacturing enterprise uses, ubiquity is expensive, complex structure, maintenance cost are high, highly energy-consuming, use product are single and the problems such as complex operation.
Utility model content
The purpose of this utility model is, provides a kind of extra-high voltage steel tube tower flange pairing machine, to solve above-mentioned technical problem.
For achieving the above object, the technical scheme that the utility model adopts is:
A kind of extra-high voltage steel tube tower plate grouping machine, is characterized in that: the adjustable steel pipe carrier comprising travelling platform, walking track, two mobile roof supports and be arranged between two mobile roof supports; Described walking track is provided with two that are parallel to each other, and they are fixed on the end face of travelling platform; The tooth bar paralleled with track of walking is provided with between two walking tracks; Two mobile roof supports comprise the mobile roof support laying respectively at travelling platform two ends, No. two mobile roof supports, and they are arranged on walking track respectively, and can move left and right along walking track; The madial wall of a described mobile roof support, No. two mobile roof supports is fixed with flange fixed disc respectively, and described flange fixed disc is longitudinally arranged, perpendicular with travelling platform, and the center of circle of two flange fixed discs is on same straight line.
Say further:
Described adjustable steel pipe carrier comprises base plate, base, support column, locker, adjuster and V-arrangement bracket, and described base plate is installed on walking track, and is locked by locker; Described base bottom is fixed on base plate, and support column bottom is arranged on base by adjuster, and described V-arrangement bracket is fixed on the top of support column.
The below of a described mobile roof support is fixed with slide plate at the bottom of No., and the below of described No. two mobile roof supports is connected with slide plate at the bottom of No. two, and slide plate at the bottom of described No., slide plate at the bottom of No. two are installed on walking track; The base plate of a described mobile roof support is installed with reductor, and reductor top is provided with drive motors, and the clutch end of described reductor is in transmission connection power transmission shaft, and the bottom of power transmission shaft is provided with a gear; The base plate of described No. two mobile roof supports is provided with bearing block, and bearing block is built with hand axle, and the top of hand axle is provided with wind, and bottom is installed with No. two gears; A described gear, No. two gears are meshed with tooth bar respectively.
The base plate of described No. two mobile roof supports is provided with several arc adjustment holes, is respectively equipped with bolt in described arc adjustment hole, and the base plate of described No. two mobile roof supports is connected with slide plate at the bottom of No. two by bolt; The pan front of described No. two mobile roof supports is provided with the arc mounting groove for installation shaft bearing.
The center of described flange fixed disc is provided with centre bore, around centre bore, be evenly provided with several bar holes, is provided with fastening bolt at least two symmetrical bar holes.
Two lateral walls of described travelling platform are fixed with respectively the holder that several can be fixedly connected with ground.
Beneficial effect: compared with prior art, the utility model has the following advantages: 1, structure is simple, easy to maintenance, maintaining cost is low; 2, power consumption is little, energy-conservation, noiselessness; 3, easy to operate, new employee only through simple task instruction, need can enter duty the very first time; 4, flange set bolt is adopted to be fixed on by flange on two flange fixed discs, make the line of centres and the pipe centerline axis parallel of two end flanges homonymy co-altitude flange holes, thus solve similar steel pipe flange grouping machine use laser lamp location, cause the problem that two ends flange hole deviation is large; 5, two flange fixed discs and travelling platform are at right angle setting, and two end flanges fixed disc central points are on same level axis, so the depth of parallelism of the axiality of product two end flanges and steel pipe, two end flange face and be with the angle of angle flange to reach promising result; 6, end flange fixed disc adopts rotatable design, the group that not only can be used for the parallel common steel tube flange of two end flange face is right, also the group that can be used for extra-high voltage steel tube tower lowermost end and change slope place one length of tape angle steel pipe flange is right, thus compensate for similar steel tube tower flange pairing machine and longitudinally can only regulate size, can not transverse rotation, cannot group to the defect of band angle flange.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of the fixed disc of flange described in the utility model;
Fig. 3 is the plan structure schematic diagram of No. two mobile roof supports described in the utility model.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is further described.
With reference to Fig. 1, extra-high voltage steel tube tower flange pairing machine described in the utility model, the adjustable steel pipe carrier comprising travelling platform 1, walking track 2, two mobile roof supports and be arranged between two mobile roof supports; Two lateral walls of described travelling platform 1 are fixed with respectively the holder 4 that several can be fixedly connected with ground.
Described walking track 2 is provided with two that are parallel to each other, and they are fixed on the end face of travelling platform 1; The tooth bar 3 paralleled with track of walking is provided with between two walking tracks 2; Two mobile roof supports comprise a mobile roof support 54, No. two mobile roof supports 64 laying respectively at travelling platform 1 two ends, and they are highly identical, are arranged on respectively on walking track 2, and can move left and right along walking track 2; The madial wall of a described mobile roof support 54, No. two mobile roof supports 64 is fixed with flange fixed disc 7 respectively, and described flange fixed disc 7 is longitudinally arranged, perpendicular with travelling platform 1, and the center of circle of two flange fixed discs 7 is on same straight line.As shown in Figure 2, the center of described flange fixed disc 7 is provided with centre bore 71, is evenly provided with several bar holes 72 around centre bore 71, is provided with fastening bolt 8 at least two symmetrical bar holes 72.
Described adjustable steel pipe carrier comprises base plate 91, base 92, support column 93, locker, adjuster 96 and V-arrangement bracket 95, and described base plate 91 is installed on walking track 2, and is locked by locker; Described base 92 bottom is fixed on base plate 91, and support column 96 bottom is arranged on base 92 by adjuster 96, and described V-arrangement bracket 95 is fixed on the top of support column 93.
The below of a described mobile roof support 54 is fixed with slide plate 56 at the bottom of No., and the below of described No. two mobile roof supports 64 is connected with slide plate 66 at the bottom of No. two, and slide plate 66 at the bottom of No. 56, two, slide plate at the bottom of described No. is installed on walking track 2; The base plate of a described mobile roof support 54 is installed with reductor 53, and reductor 53 top is provided with drive motors 55, and the clutch end of described reductor 53 is in transmission connection power transmission shaft 52, and the bottom of power transmission shaft 52 is provided with a gear 51; The base plate of described No. two mobile roof supports 64 is provided with bearing block 63, and bearing block 63 is built with hand axle 62, and the top of hand axle 62 is provided with wind 65, and bottom is installed with No. two gears 61; A described gear 51, No. two gears 61 are meshed with tooth bar 3 respectively.Such mobile roof support 54 can be walked along walking track 2 under the driving of drive motors 55, and No. two mobile roof supports 64 realize fine position by rotary handle crank 65.
As shown in Figure 3, the base plate of described No. two mobile roof supports 64 is provided with several arc adjustment holes 67, is respectively equipped with bolt 68 in described arc adjustment hole 67, and the base plate of described No. two mobile roof supports 64 is connected with slide plate 66 at the bottom of No. two by bolt 68; The pan front of described No. two mobile roof supports 64 is provided with the arc mounting groove 69 for installation shaft bearing 63.By adjusting the position on No. two mobile roof supports 64 slide plate 66 at the bottom of No. two, realize the adjustment of No. two mobile roof support 64 upper flange fixed disc angles.
The utility model operationally, is first separately fixed at required two pieces flange on two flange fixed discs 7 with fastening bolt 8, and required steel pipe is placed on middle two adjustable steel pipe carriers; Again according to production drawing technological requirement, adjust the angle of the flange fixed disc on No. two mobile roof supports 64; Then, utilize drive motors 55 to drive a mobile roof support 54 to move along walking track 2, reach drawing requirement size with the distance realized between two pieces flange; Next, regulate the height of two adjustable steel pipe brackets, make the center line of the center line of steel pipe and two end flanges on the same axis; Finally, CO is adopted
2gas shielded welding machine two end flanges and steel pipe rivet welding firm; After welding, unclamp the fastening bolt 8 on two flange fixed discs 7, retreat drive motors 55, product is hung station, and the group namely completing a tube flange is right.
Claims (6)
1. an extra-high voltage steel tube tower flange pairing machine, is characterized in that: the adjustable steel pipe carrier comprising travelling platform (1), walking track (2), two mobile roof supports and be arranged between two mobile roof supports; Described walking track (2) is provided with two that are parallel to each other, and they are fixed on the end face of travelling platform (1); The tooth bar (3) paralleled with track of walking is provided with between two walking tracks (2); Two mobile roof supports comprise the mobile roof support (54) laying respectively at travelling platform (1) two ends, No. two mobile roof supports (64), they are arranged in walking track (2) respectively, and can move left and right along walking track (2); The madial wall of a described mobile roof support (54), No. two mobile roof supports (64) is fixed with flange fixed disc (7) respectively, described flange fixed disc (7) is longitudinally arranged, perpendicular with travelling platform (1), and the center of circle of two flange fixed discs (7) is on same straight line.
2. extra-high voltage steel tube tower flange pairing machine according to claim 1, it is characterized in that: described adjustable steel pipe carrier comprises base plate (91), base (92), support column (93), locker, adjuster (96) and V-arrangement bracket (95), described base plate (91) is installed in walking track (2), and is locked by locker; Described base (92) bottom is fixed on base plate (91), support column (96) bottom is arranged on base (92) by adjuster (96), and described V-arrangement bracket (95) is fixed on the top of support column (93).
3. extra-high voltage steel tube tower flange pairing machine according to claim 1 and 2, it is characterized in that: the below of a described mobile roof support (54) is fixed with slide plate (56) at the bottom of No., the below of described No. two mobile roof supports (64) is connected with slide plate (66) at the bottom of No. two, and slide plate (56) at the bottom of described No., slide plate (66) at the bottom of No. two are installed in walking track (2); The base plate of a described mobile roof support (54) is installed with reductor (53), reductor (53) top is provided with drive motors (55), the clutch end of described reductor (53) is in transmission connection power transmission shaft (52), and the bottom of power transmission shaft (52) is provided with a gear (51); The base plate of described No. two mobile roof supports (64) is provided with bearing block (63), bearing block (63) is built with hand axle (62), the top of hand axle (62) is provided with wind (65), and bottom is installed with No. two gears (61); A described gear (51), No. two gears (61) are meshed with tooth bar (3) respectively.
4. extra-high voltage steel tube tower flange pairing machine according to claim 3, it is characterized in that: the base plate of described No. two mobile roof supports (64) is provided with several arc adjustment holes (67), be respectively equipped with bolt (68) in described arc adjustment hole (67), the base plate of described No. two mobile roof supports (64) is connected with slide plate (66) at the bottom of No. two by bolt (68); The pan front of described No. two mobile roof supports (64) is provided with the arc mounting groove (69) for installation shaft bearing (63).
5. extra-high voltage steel tube tower flange pairing machine according to claim 4, it is characterized in that: the center of described flange fixed disc (7) is provided with centre bore (71), around centre bore (71), be evenly provided with several bar holes (72), at least two symmetrical bar holes (72), be provided with fastening bolt (8).
6. extra-high voltage steel tube tower flange pairing machine according to claim 5, is characterized in that: two lateral walls of described travelling platform (1) are fixed with respectively the holder (4) that several can be fixedly connected with ground.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520463634.0U CN204711482U (en) | 2015-06-24 | 2015-06-24 | Extra-high voltage steel tube tower flange pairing machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520463634.0U CN204711482U (en) | 2015-06-24 | 2015-06-24 | Extra-high voltage steel tube tower flange pairing machine |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204711482U true CN204711482U (en) | 2015-10-21 |
Family
ID=54310510
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520463634.0U Expired - Fee Related CN204711482U (en) | 2015-06-24 | 2015-06-24 | Extra-high voltage steel tube tower flange pairing machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204711482U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106271238A (en) * | 2016-08-15 | 2017-01-04 | 中建三局基础设施工程有限公司 | A kind of adjustable steel tubing string processing platform and construction method thereof |
CN106392455A (en) * | 2016-11-03 | 2017-02-15 | 南京奥特电气股份有限公司 | Heavy process pipe assembling center |
CN107138908A (en) * | 2017-06-19 | 2017-09-08 | 绵竹市加林动力备件厂(普通合伙) | The method for supporting welded suitable for conical pipe fitting or special piece |
CN107931942A (en) * | 2017-11-28 | 2018-04-20 | 佛山市程显科技有限公司 | A kind of weld fixture apparatus |
CN108326767A (en) * | 2017-07-04 | 2018-07-27 | 广州增立钢管结构股份有限公司 | The column foot component groups of power transmission and transformation steel tube tower are to equipment |
CN109317915A (en) * | 2018-10-31 | 2019-02-12 | 江苏华电铁塔制造有限公司 | A kind of tower unit spliced tooling |
-
2015
- 2015-06-24 CN CN201520463634.0U patent/CN204711482U/en not_active Expired - Fee Related
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106271238A (en) * | 2016-08-15 | 2017-01-04 | 中建三局基础设施工程有限公司 | A kind of adjustable steel tubing string processing platform and construction method thereof |
CN106271238B (en) * | 2016-08-15 | 2018-10-23 | 中建三局基础设施工程有限公司 | A kind of adjustable steel tubing string processing platform and its construction method |
CN106392455A (en) * | 2016-11-03 | 2017-02-15 | 南京奥特电气股份有限公司 | Heavy process pipe assembling center |
CN107138908A (en) * | 2017-06-19 | 2017-09-08 | 绵竹市加林动力备件厂(普通合伙) | The method for supporting welded suitable for conical pipe fitting or special piece |
CN108326767A (en) * | 2017-07-04 | 2018-07-27 | 广州增立钢管结构股份有限公司 | The column foot component groups of power transmission and transformation steel tube tower are to equipment |
CN108326767B (en) * | 2017-07-04 | 2019-09-13 | 广州增立钢管结构股份有限公司 | The column foot component groups of power transmission and transformation steel tube tower are to equipment |
CN107931942A (en) * | 2017-11-28 | 2018-04-20 | 佛山市程显科技有限公司 | A kind of weld fixture apparatus |
CN109317915A (en) * | 2018-10-31 | 2019-02-12 | 江苏华电铁塔制造有限公司 | A kind of tower unit spliced tooling |
CN109317915B (en) * | 2018-10-31 | 2023-06-02 | 江苏华电铁塔制造有限公司 | Pipe tower unit concatenation frock |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204711482U (en) | Extra-high voltage steel tube tower flange pairing machine | |
CN204280504U (en) | A kind of chain mat machine | |
CN105500089B (en) | Axis hole central positioner | |
CN202097687U (en) | Assembling machine for cylindrical container sealing head | |
CN204603603U (en) | Extra-high voltage steel tube tower plate grouping machine | |
CN200949110Y (en) | Drum quenching device | |
CN204712367U (en) | For the auxiliary mould of horizontal injection press die change | |
CN106808447A (en) | A kind of steel member bi-directional adjustable detent mechanism | |
CN104261042A (en) | Transmission rail with guide wheels | |
CN109773715B (en) | Installation and replacement device for carbon slide plate of pantograph | |
CN109183529B (en) | Sleeper laying vehicle for emergency rescue and disaster relief | |
CN102699501A (en) | Driving slide carriage mechanism of plasma groove cutting machine | |
CN201688808U (en) | Backlash measuring device for rotor of double-screw air compressor | |
CN202815591U (en) | Profiling traveling device | |
CN202371994U (en) | Adjusting device for supporting seat of large rotary roller | |
CN201198000Y (en) | Cooling bed transmission gear | |
CN108381006A (en) | A kind of travel guidance mechanism for flame cutting machine | |
CN203753800U (en) | PBT 300 extra-heavy type double channel ground plate chain conveyer | |
CN201002617Y (en) | Eccentric axis wing wheel rail vehicle | |
CN204060724U (en) | A kind of template walking mechanism of trestle trolley | |
CN104355047B (en) | Chain conveying-type automobile bumper coating line | |
CN203944973U (en) | Magnetic cutting machine lifting navigation device | |
CN111229844B (en) | Bar cooling bed steel moving device and steel moving method thereof | |
CN203819065U (en) | Integral insulation bracket of magnetic suspension traffic contact rail | |
CN109733200B (en) | Installation and replacement method for pantograph carbon slide plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151021 |
|
CF01 | Termination of patent right due to non-payment of annual fee |