CN204695017U - A kind of electric control system fortune inspection operation training comprehensive stimulation system - Google Patents
A kind of electric control system fortune inspection operation training comprehensive stimulation system Download PDFInfo
- Publication number
- CN204695017U CN204695017U CN201520386465.5U CN201520386465U CN204695017U CN 204695017 U CN204695017 U CN 204695017U CN 201520386465 U CN201520386465 U CN 201520386465U CN 204695017 U CN204695017 U CN 204695017U
- Authority
- CN
- China
- Prior art keywords
- subsystem
- control subsystem
- electrical control
- electric
- inspection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The utility model relates to a kind of electric control system fortune inspection operation training comprehensive stimulation system, comprises operation and what comes into a driver's subsystem, electrical control subsystem, electric fault inspection and repair subsystem and overhead control subsystem; Described operation and what comes into a driver's subsystem, electrical control subsystem and electric fault inspection and repair subsystem are all electrically connected with described overhead control subsystem; Described operation and what comes into a driver's subsystem and electric fault inspection and repair subsystem are also all electrically connected with described electrical control subsystem.The utility model achieves operator can carry out operation separately, and when carrying out inspection operation, operation and inspection operation is combined, and carry out inspection operation in real time according to operation troubles and running status, simulates real solid is strong.
Description
Technical field
The utility model relates to operation training simulation field, particularly a kind of electric control system fortune inspection operation training comprehensive stimulation system.
Background technology
Along with process of industrialization advances, electric equipment operation and maintenance are modern job focal points subjects, operation and inspection operation relative separation in existing electric equipment operation and maintenance teaching simulation training system, operator can not in inspection operation process, overhaul in real time in conjunction with operation troubles, simulates real solid is not strong.
Utility model content
The purpose of this utility model is to provide a kind of electric control system fortune inspection operation training comprehensive stimulation system, solves the above-mentioned problems in the prior art.
The technical scheme that the utility model solves the problems of the technologies described above is as follows:
A kind of electric control system fortune inspection operation training comprehensive stimulation system, comprises operation and what comes into a driver's subsystem, electrical control subsystem, electric fault inspection and repair subsystem and overhead control subsystem; Described operation and what comes into a driver's subsystem, electrical control subsystem and electric fault inspection and repair subsystem are all electrically connected with described overhead control subsystem; Described operation and what comes into a driver's subsystem and electric fault inspection and repair subsystem are also all electrically connected with described electrical control subsystem.
The beneficial effects of the utility model are: operator can carry out operation separately, and when carrying out inspection operation, operation and inspection operation are combined, and carry out inspection operation in real time according to operation troubles and running status, simulates real solid is strong.
On the basis of technique scheme, the utility model can also do following improvement.
Further, described operation and what comes into a driver's subsystem comprise operation room, visualgen server and visual display device; Described operation room is electrically connected with described overhead control subsystem and electrical control subsystem respectively; Described visualgen server is electrically connected respectively at described overhead control subsystem, electrical control subsystem and visual display device.
Further, described operation room is true electrical equipment operation room, comprises real operator seat and real combined operation platform.
Further, described electrical control subsystem comprises PLC assembly and the frequency converter assembly that is connected with described PLC electrical component or relay assembly.
The beneficial effect of above-mentioned further scheme is adopted to be that, for reaching the high fidelity of simulation, in electrical control subsystem, assembly adopts the frequency converter assembly of true electric control system; On the other hand, for simplifying the data processing complex degree of simulation system, relay assembly also can be adopted to substitute frequency converter assembly.
Further, described electric fault inspection and repair subsystem comprises fault simulation machine, instrument display screen, fault detect district and breakdown maintenance machine; Described fault simulation machine is electrically connected with described overhead control subsystem, electrical control subsystem and fault detect district respectively; Described instrument display screen is electrically connected with described electrical control subsystem; Described breakdown maintenance machine is respectively at described overhead control subsystem and the electrical connection of electrical control subsystem.
Further, described fault detect district has multiple metering contacts of corresponding electrical control subsystem operation logic figure, and the voltage of described metering contact or current status are controlled by described fault simulation machine.
Further, described overhead control subsystem is also connected with PLC electrical component in described electrical control subsystem.
Accompanying drawing explanation
Fig. 1 is the circuit frame schematic diagram of a kind of electric control system fortune of the utility model inspection operation training comprehensive stimulation system;
Fig. 2 is fault detect district schematic diagram in a kind of electric control system fortune of the utility model inspection operation training comprehensive stimulation system.
Embodiment
Be described principle of the present utility model and feature below in conjunction with accompanying drawing, example, only for explaining the utility model, is not intended to limit scope of the present utility model.
As shown in Figure 1, a kind of electric control system fortune inspection operation training comprehensive stimulation system, is characterized in that, comprise operation and what comes into a driver's subsystem, electrical control subsystem, electric fault inspection and repair subsystem and overhead control subsystem; Described operation and what comes into a driver's subsystem, electrical control subsystem and electric fault inspection and repair subsystem are all electrically connected with described overhead control subsystem; Described operation and what comes into a driver's subsystem and electric fault inspection and repair subsystem are also all electrically connected with described electrical control subsystem.
Described operation and what comes into a driver's subsystem, it is for providing the operating environment of emulation, electric equipment operation task instruction operator according to overhead control subsystem configures operates, gather operation data, and pass to electrical control subsystem and overhead control subsystem, also show for the operation driving data generating run what comes into a driver's that feeds back according to electrical control subsystem.
Described operation and what comes into a driver's subsystem comprise operation room, visualgen server and visual display device.
Described operation room is electrically connected with described overhead control subsystem and electrical control subsystem respectively; It is for carrying out operation, the operation data of acquisition operations person, and passes to electrical control subsystem and overhead control subsystem; For true electrical equipment operation room, comprise real operator seat and real combined operation platform.
Described visualgen server is electrically connected respectively at described overhead control subsystem, electrical control subsystem and visual display device; It generates auditory effect 3D for the operation driving data fed back according to electrical control subsystem and runs what comes into a driver's.
Described visual display device its for show described auditory effect 3D run what comes into a driver's.Operator checks the auditory effect 3D operation what comes into a driver's in direction by upper, front, the left and right or other people of combined operation platform manual switchover visual display device display operator.
Described electrical control subsystem, it is for simulating the electric control system of electrical equipment, performs corresponding actions according to operation data, produces operation driving data, feeds back to operation and what comes into a driver's subsystem.
Described electrical control subsystem comprises PLC assembly and the frequency converter assembly that is connected with described PLC electrical component or relay assembly.
Described electric fault inspection and repair subsystem, it drives electrical control subsystem to break down for the type broken down arranged according to overhead control subsystem, causes operation and what comes into a driver's subsystem back-to-back running fault; The running status of display electrical control subsystem; And carry out failure detection operations and breakdown maintenance operation.
Described electric fault inspection and repair subsystem comprises fault simulation machine, instrument display screen, fault detect district and breakdown maintenance machine.
Described fault simulation machine is electrically connected with described overhead control subsystem, electrical control subsystem and fault detect district respectively; It drives electrical control subsystem corresponding assembly abnormal work for the type broken down arranged according to overhead control subsystem, and electrical control subsystem breaks down, and causes operation and what comes into a driver's subsystem back-to-back running fault; It stores polytype fault, and adds new type failure by software upgrading pattern.
Described instrument display screen is electrically connected with described electrical control subsystem; It is for showing running status meter diagram or the operation logic figure of described electrical control subsystem.
As shown in Figure 2, described fault detect district, it is for operator's survey instrument, as hand-held ammeter, carries out failure detection operations; Described fault detect district has multiple metering contacts of corresponding electrical control subsystem operation logic figure, and the voltage of described metering contact or current status are controlled by described fault simulation machine.
Described breakdown maintenance machine is respectively at described overhead control subsystem and the electrical connection of electrical control subsystem; It carries out breakdown maintenance operation for driving abnormal work assembly normally to work, and breakdown maintenance service data is passed to overhead control subsystem.
Described overhead control subsystem, also for using the self-defined control content of writing PLC assembly in electrical control subsystem of PLC programming tool, uses CMS to monitor the operation of described electrical control subsystem.
The foregoing is only preferred embodiment of the present utility model, not in order to limit the utility model, all within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.
Claims (7)
1. an electric control system fortune inspection operation training comprehensive stimulation system, is characterized in that, comprise operation and what comes into a driver's subsystem, electrical control subsystem, electric fault inspection and repair subsystem and overhead control subsystem; Described operation and what comes into a driver's subsystem, electrical control subsystem and electric fault inspection and repair subsystem are all electrically connected with described overhead control subsystem; Described operation and what comes into a driver's subsystem and electric fault inspection and repair subsystem are also all electrically connected with described electrical control subsystem.
2. a kind of electric control system fortune examines operation training comprehensive stimulation system according to claim 1, and it is characterized in that, described operation and what comes into a driver's subsystem comprise operation room, visualgen server and visual display device; Described operation room is electrically connected with described overhead control subsystem and electrical control subsystem respectively; Described visualgen server is electrically connected respectively at described overhead control subsystem, electrical control subsystem and visual display device.
3. a kind of electric control system fortune examines operation training comprehensive stimulation system according to claim 2, and it is characterized in that, described operation room is true electrical equipment operation room, comprises real operator seat and real combined operation platform.
4. a kind of electric control system fortune inspection operation training comprehensive stimulation system according to claim 1, is characterized in that, described electrical control subsystem comprises PLC assembly and the frequency converter assembly that is connected with described PLC electrical component or relay assembly.
5. a kind of electric control system fortune examines operation training comprehensive stimulation system according to claim 4, and it is characterized in that, described electric fault inspection and repair subsystem comprises fault simulation machine, instrument display screen, fault detect district and breakdown maintenance machine; Described fault simulation machine is electrically connected with described overhead control subsystem, electrical control subsystem and fault detect district respectively; Described instrument display screen is electrically connected with described electrical control subsystem; Described breakdown maintenance machine is respectively at described overhead control subsystem and the electrical connection of electrical control subsystem.
6. a kind of electric control system fortune examines operation training comprehensive stimulation system according to claim 5, it is characterized in that, described fault detect district has multiple metering contacts of corresponding electrical control subsystem operation logic figure, and the voltage of described metering contact or current status are controlled by described fault simulation machine.
7. a kind of electric control system fortune examines operation training comprehensive stimulation system according to claim 4, and it is characterized in that, described overhead control subsystem is also connected with PLC electrical component in described electrical control subsystem.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520386465.5U CN204695017U (en) | 2015-06-05 | 2015-06-05 | A kind of electric control system fortune inspection operation training comprehensive stimulation system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520386465.5U CN204695017U (en) | 2015-06-05 | 2015-06-05 | A kind of electric control system fortune inspection operation training comprehensive stimulation system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204695017U true CN204695017U (en) | 2015-10-07 |
Family
ID=54235292
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520386465.5U Active CN204695017U (en) | 2015-06-05 | 2015-06-05 | A kind of electric control system fortune inspection operation training comprehensive stimulation system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204695017U (en) |
-
2015
- 2015-06-05 CN CN201520386465.5U patent/CN204695017U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204423141U (en) | For the Special testing device of the traction inverter controller of railcar system | |
CN202134154U (en) | Training and examine system for authentic false wiring detection of electric energy metering device | |
CN103440803B (en) | The authentic training system of 10kV power distribution equipment real voltage analog current closed loop | |
CN102831792B (en) | Distribution Network Failure analogue system and emulation mode thereof | |
CN103544857A (en) | Integrated power transformation operation and maintenance training system | |
CN109272798A (en) | A kind of electrical teaching training system and its Training Methodology suitable for EMU | |
CN108777089A (en) | A kind of correct errors with wiring connects electric training system with the dress table of fabrication evaluation | |
CN204965174U (en) | Power hardware is at ring test system | |
CN105045135A (en) | Electric control system operation and maintenance operation training integrated simulation system and method | |
CN204695017U (en) | A kind of electric control system fortune inspection operation training comprehensive stimulation system | |
CN203520719U (en) | 10kV power distribution unit actual voltage simulation current closed-loop all-real training system | |
CN205140330U (en) | Trouble analogue means is observed and controled in power supply | |
CN105093966A (en) | Track traffic signal equipment fault and work state monitoring apparatus | |
CN112104085A (en) | Multifunctional electric power and electric automation control system | |
CN107093366A (en) | A kind of diagnosing faults of numerical control machine checking system and method | |
CN104464429A (en) | KYN switch cabinet maintenance somatosensory equipment and using method thereof | |
CN203981790U (en) | A kind of combined type backup auto-activating device tester | |
CN204348126U (en) | A kind of KYN switch cubicle maintenance body sense equipment | |
CN207529538U (en) | Chemical industry overhauls electrical practice training evaluation device | |
CN109213001A (en) | Aircraft level-one electric power distribution network analog machine and analog equivalent Trial Verification Installation | |
CN209070084U (en) | A kind of electrical part test macro | |
CN205427133U (en) | A stretcher for subway signal modules simulation tests | |
CN114495616A (en) | Combined electric power operation and installation practical training system | |
CN105425149B (en) | A kind of AC machine drive system detection device | |
CN112419474A (en) | Three-dimensional inspection training system based on simulation of extra-high voltage direct current converter station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |