CN204691787U - A kind of concrete ejection smears integrated constructing tunnel device - Google Patents

A kind of concrete ejection smears integrated constructing tunnel device Download PDF

Info

Publication number
CN204691787U
CN204691787U CN201520231820.1U CN201520231820U CN204691787U CN 204691787 U CN204691787 U CN 204691787U CN 201520231820 U CN201520231820 U CN 201520231820U CN 204691787 U CN204691787 U CN 204691787U
Authority
CN
China
Prior art keywords
tunnel
platform
track
floating
arc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520231820.1U
Other languages
Chinese (zh)
Inventor
李庆华
朱谊
徐世烺
柯锦涛
梁铭耀
吴宇星
王聪诚
黄博滔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University ZJU
Original Assignee
Zhejiang University ZJU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University ZJU filed Critical Zhejiang University ZJU
Priority to CN201520231820.1U priority Critical patent/CN204691787U/en
Application granted granted Critical
Publication of CN204691787U publication Critical patent/CN204691787U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of concrete ejection and smear integrated constructing tunnel device, comprise ejecting gun head, floating cylinder, floating brush, rotatable platform, platform gear, mobile platform, arc track, transfer tube, track gear, ground rail, skewed horizontal load frame, mixer, spiral propeller and air pump.Load raw material in mixer after, the sprayed mortar of fresh mixing is first transported in spiral propeller, ejecting gun head is transported to through transfer tube under air pump promotes, be ejected to inside tunnel by ejecting gun head, mobile platform can move on arc track, then in moving process, floating cylinder and floating brush just can be floating by the concrete spraying metope.After completing a section job, whole arc track, along ground rail to tunnel direction of advance advance certain distance, continues the work of next section.This device effectively can improve the construction of shotcrete efficiency of tunnel internal metope, and construction effect is good, is applicable to multiple tunnel.

Description

A kind of concrete ejection smears integrated constructing tunnel device
Technical field
The utility model relates to a kind of constructing tunnel device, the integrated constructing tunnel device particularly relating to concrete ejection He smear.
Background technology
Concrete-spraying technology is the construction method with Spray Gun Of The Pressure spraying placing pea gravel concreten.Be usually used in the thin wall constructions such as placing tunnel liner, wall, ceiling or the lining of other structures and the topping of steel work.
Concrete-spraying technology is applied to construction have been had for many years, and job specfication and correlation technique regulation are comparatively ripe.The application of spraying technique in concrete construction makes bridge, the construction of tunnel top becomes efficiently feasible.
Although various concrete development and injection, up to the present, in building operations, the concrete leveling for building (comprising tunnel, bridge etc.) top still mainly adopts the mode of manually smearing and striking off.Even if some engineering have employed concrete ejection technology at present, floating work still by manually completing, is wasted time and energy, automation still not.
Along with the development of modern architecture construction technology, Construction unit and the requirement of society to rate of progress of the construction more and more higher, and the anxiety of human resources also makes cost of labor also improve constantly, while how high-effect high-quality completes construction task, reduce construction cost as much as possible, become contemporary unit in charge of construction problem demanding prompt solution.The unsolved technical problem of prior art is mainly divided into the following aspects: 1) how to make injection shower nozzle and automatic plastering scoop against tunnel internal uniform motion; 2) how while injector head uniform motion, ensure that all sites of tunnel bottom differing heights all sprays the concrete material of same thickness; 3) how to use mode as far as possible easily that the concrete material being ejected into tunnel bottom is smeared evenly.
Summary of the invention
The purpose of this utility model is for the deficiencies in the prior art, provides a kind of concrete ejection to smear integrated constructing tunnel device, effectively helps the construction of tunnel internal metope sprayed mortar, effectively improves efficiency of construction, lifting construction quality.
The purpose of this utility model is achieved through the following technical solutions: a kind of concrete ejection smears integrated constructing tunnel device, it is characterized in that, comprise ejecting gun head, floating cylinder, floating brush, rotatable platform, two platform gears, mobile platform, two arc tracks, transfer tube, four track gears, two ground rails, skewed horizontal load frame, mixer, spiral propeller and air pumps; Wherein, described two ground rails are parallel to each other, and built by straightway assembly and all arrange along direction, tunnel, the upper surface of described ground rail is dentalation;
Described two arc tracks are parallel to each other, firmly connected by some diagonal members between two arc tracks, each arc track is spliced to build by some ARCS and forms, shape is consistent with the cross section of inner surface of tunnel, arc track and inner surface of tunnel radial spacing 0.5-1m, ensure floating cylinder and be floatingly brushed with suitable working space; Two end points of described arc track are equipped with track gear, and track gear is driven by motor, and described track gear is meshed with ground rail; The both sides of each end points of described arc track are equipped with skewed horizontal load frame, to ensure arc track stablizing in construction; The bottom of skewed horizontal load frame is provided with pulley so that skewed horizontal load frame moves along with arc track;
The both sides of described mobile platform are respectively equipped with platform gear, and two platform gears are connected by connecting axle, and platform gear is driven by motor; Arc track upper surface is dentalation, and two platform gears are meshed with two arc tracks respectively; Below four angle points of mobile platform, be respectively equipped with the stabilizing bracket of L shape, the base of the stabilizing bracket of L shape contacts with the soffit of arc track, ensures that mobile platform can not from arc track landing;
Mobile platform top is by turning cylinder connection of rotating platform, and described turning cylinder is driven by motor, thus can realize rotatable platform and to rotate moving axis 360 degree rotation, to adjust ejecting gun head, floating cylinder and the front and back position of floating brush in course;
Described rotatable platform upper surface is provided with two guide rails along direction, tunnel, guide rail is provided with slide block, and two slide blocks are connected with ejecting gun head and floating brush respectively, can along direction, tunnel slide anteroposterior both during construction, two slide blocks are driven by two motors respectively, control slide block along direction, tunnel slide anteroposterior; Floating cylinder is fixed in position between rotatable platform upper surface two guide rails;
Described mixer is connected with spiral propeller, shaft horizontal positioned, topples over outputting in spiral propeller after being stirred by sprayed mortar; Described spiral propeller is connected with air pump, and described air pump is connected with ejecting gun head by transfer tube, and the concrete pump in spiral propeller, by increasing air pressure, is delivered in transfer tube and sprayed through ejecting gun head by air pump.
Further, described floating brush 4 keeps 10-20 degree angle with inner surface of tunnel 1.
Further, described arc track 8 is assembled by the arc section of different curvature radius, every section of long 0.5m of circular arc, by different permutation and combination, assembled curve track can adapt to various curved surface top, recycles to reach, the object of environmental protection construction.
The beneficial effects of the utility model are: 1) this device has the ground rail consistent with tunnel direction of advance and the arc track consistent with tunnel cross sectional shape, shower nozzle, floating cylinder and the freely-movable thereon of floating brush can be made, cover all corners of track inner surface, realize the automatic plastering of sprayed mortar; 2) automatic plastering eliminates and to be constructed the different and construction effect deviation brought of handicraft by workman, and ensure that the concrete material of same thickness is all sprayed at the position of inner surface of tunnel differing heights, construction effect is guaranteed; 3) the alternative manpower of this integrative construction device carries out constructing tunnel, reduces the engineering time, reduce construction cost to a certain extent while reduction human cost; 4) the utility model also can be used for tunnel internal reinforcement and repair.
Accompanying drawing explanation
Fig. 1 is that integrated constructing tunnel device overall structure figure is smeared in injection;
Fig. 2 is ground rail and support junction detail drawing;
Fig. 3 is rotatable platform top view;
Fig. 4 is mobile platform and rotatable platform elevation;
Fig. 5 is support connection layout;
Fig. 6 is floating brush motion track;
In figure, inner surface of tunnel 1, ejecting gun head 2, floating cylinder 3, floating brush 4, rotatable platform 5, platform gear 6, mobile platform 7, support 8, transfer tube 9, track gear 10, track 11, pulley 12, mixer 13, spiral propeller 14, air pump 15.
Specific embodiments
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
As shown in figures 1 to 6, a kind of concrete ejection of the utility model smears integrated constructing tunnel device, comprises ejecting gun head 2, floating cylinder 3, floating brush 4, rotatable platform 5, two platform gears 6, mobile platform 7, two arc tracks 8, transfer tube 9, four track gears 10, two ground rails 11, skewed horizontal load frame 12, mixer 13, spiral propeller 14 and air pumps 15; Wherein, described two ground rails 11 are parallel to each other, and built by straightway assembly and all arrange along direction, tunnel, the upper surface of described ground rail 11 is dentalation.
Described two arc tracks 8 are parallel to each other, firmly connected by some diagonal members between two arc tracks 8, each arc track 8 is spliced to build by some ARCS and forms, shape is consistent with the cross section of inner surface of tunnel 1, arc track 8 and inner surface of tunnel 1 radial spacing 0.5-1m, ensure that floating cylinder 3 and floating brush 4 have suitable working space; Two end points of described arc track 8 are equipped with track gear 10, and track gear 10 is driven by motor, and described track gear 10 is meshed with ground rail 11; The both sides of each end points of described arc track 8 are equipped with skewed horizontal load frame 12, to ensure arc track 8 stablizing in construction; The bottom of skewed horizontal load frame 12 is provided with pulley so that skewed horizontal load frame 12 moves along with arc track 8.
The both sides of described mobile platform 7 are respectively equipped with platform gear 6, two platform gears 6 and are connected by connecting axle, and platform gear 6 is driven by motor; Arc track 8 upper surface is dentalation, and two platform gears 6 are meshed with two arc tracks 8 respectively; Below four angle points of mobile platform 7, be respectively equipped with the stabilizing bracket of L shape, the base of the stabilizing bracket of L shape contacts with the soffit of arc track 8, ensures that mobile platform 7 can not from arc track 8 landing.
Mobile platform 7 top is by turning cylinder connection of rotating platform 5, and described turning cylinder is driven by motor, thus can realize rotatable platform 5 and to rotate moving axis 360 degree rotation, to adjust ejecting gun head 2, floating cylinder 3 and the front and back position of floating brush 4 in course;
Described rotatable platform 5 upper surface is provided with two guide rails along direction, tunnel, guide rail is provided with slide block, two slide blocks are connected with ejecting gun head 2 and floating brush 4 respectively, can along direction, tunnel slide anteroposterior both during construction, two slide blocks are driven by two motors respectively, control slide block along direction, tunnel slide anteroposterior; Floating cylinder 3 is fixed in position between rotatable platform 5 upper surface two guide rails; Described ejecting gun head 2 bore is applicable to multiple sprayed mortar, fibrous concrete, but has certain restriction and requirement to material coarse aggregate size and fibre length.
Described mixer 13 is connected with spiral propeller 14, shaft horizontal positioned, topples over and output in spiral propeller 14 after being stirred by sprayed mortar; Described spiral propeller 14 is connected with air pump 15, and described air pump 15 is connected with ejecting gun head 2 by transfer tube 9, and the concrete pump in spiral propeller 14, by increasing air pressure, is delivered in transfer tube 9 and sprayed through ejecting gun head 2 by air pump 15.
Described floating cylinder 3 surface coverage abherent, effectively stops the sprayed mortar bonding of stickiness, is bulldozed the sprayed mortar of inner surface of tunnel 1.Described floating brush 4 keeps 10-20 degree angle with inner surface of tunnel 1, under power source drives, by the floating motion that circulates, makes inner surface of tunnel 1 even uniform, and thickness is unified.Described floating brush 4 is under power source drives, its motion path is rectangle, realize the floating motion of concrete circulation, namely floating brush 4 is along adding moving of vertical and rotatable platform 7 upper surface direction between tunnel direction of advance moves back and forth on rotatable platform 7, makes floating brush 4 can not destroy the concrete surface of floating mistake when returning original position and being again floating.Described arc track 8 is assembled by the arc section of different curvature radius, every section of long 0.5m of circular arc, and by different permutation and combination, assembled curve track can adapt to various curved surface top, recycles to reach, the object of environmental protection construction.Described ejecting gun head 2 seesaws along tunnel direction of advance in construction, and the concrete coating realizing ejecting has certain width.
The course of work of the present utility model is as follows:
Concrete mixer 13, spiral propeller 14 and air pump 15 are placed on ground.Through stirring the sprayed mortar producing fresh mixing add raw material in concrete mixer 13 after, transfer in spiral propeller 14 by the mode of toppling over, through the propelling movement of spiral propeller 14 and the pumping of air pump 15, fresh sprayed mortar is transported to ejecting gun head 2 from transfer tube 9, air pump 15 sprays proterties to regulate concrete, the at the uniform velocity uniform flow amount ejection at ejecting gun head 2 place by being mixed into air.Mobile platform 7 moves along arc track 8 with floating brush 4 with the ejecting gun head 2 on rotatable platform 5, floating cylinder 3, in moving process, along uniform motion before and after tunnel direction of advance under the motor of ejecting gun head 2 on mobile platform 7 drives, realize the uniform all thick injection of sprayed mortar.The floating cylinder 3 mobile alignment being in rear position just can be floating by the concrete sprayed with floating brush 4.The special abherent of floating cylinder 3 surface coverage, while preventing sprayed mortar from bonding on cylinder, realizes tentatively floating.At the rear side of mobile alignment, moveable floating brush 4 being installed, by controlling suitable angle and the floating path of rectangle, realizing the again floating of sprayed mortar surface.Mobile platform 7 is under power source drives, slowly move along arc track 8 evenly, after the floating work of the injection completing this cross section, rotatable platform 5 rotates 180 ° under the effect of power set on mobile platform 7, to adjust the front and back position of ejecting gun head 2, floating cylinder 3 and floating brush 4, under whole arc track 8 drives together with the track gear 10 of the mobile platform 7 above track at arc track 8 two ends simultaneously, along a segment distance that the ground rail 11 in direction, tunnel advances forward, continue above-mentioned workflow.

Claims (3)

1. a concrete ejection smears integrated constructing tunnel device, it is characterized in that, comprise ejecting gun head (2), floating cylinder (3), floating brush (4), rotatable platform (5), two platform gears (6), mobile platform (7), two arc tracks (8), transfer tube (9), four track gears (10), two ground rails (11), skewed horizontal load frame (12), mixer (13), spiral propeller (14) and air pumps (15); Wherein, described two ground rails (11) are parallel to each other, and built by straightway assembly and all arrange along direction, tunnel, the upper surface of described ground rail (11) is dentalation;
Described two arc tracks (8) are parallel to each other, firmly connected by some diagonal members between two arc tracks (8), each arc track (8) is spliced to build by some ARCS and forms, shape is consistent with the cross section of inner surface of tunnel (1), arc track (8) and inner surface of tunnel (1) radial spacing 0.5-1m, ensure that floating cylinder (3) and floating brush (4) have suitable working space; Two end points of described arc track (8) are equipped with track gear (10), and track gear (10) is driven by motor, and described track gear (10) is meshed with ground rail (11); The both sides of each end points of described arc track (8) are equipped with skewed horizontal load frame (12), to ensure arc track (8) stablizing in construction; The bottom of skewed horizontal load frame (12) is provided with pulley so that skewed horizontal load frame (12) is along with arc track (8) movement;
The both sides of described mobile platform (7) are respectively equipped with platform gear (6), and two platform gears (6) are connected by connecting axle, and platform gear (6) is driven by motor; Arc track (8) upper surface is dentalation, and two platform gears (6) are meshed with two arc tracks (8) respectively; Below four angle points of mobile platform (7), be respectively equipped with the stabilizing bracket of L shape, the base of the stabilizing bracket of L shape contacts with the soffit of arc track (8), ensures that mobile platform (7) can not from arc track (8) landing;
Mobile platform (7) top is by turning cylinder connection of rotating platform (5), described turning cylinder is driven by motor, thus rotatable platform (5) can be realized to rotate moving axis 360 degree rotation, to adjust ejecting gun head (2), floating cylinder (3) and floating brush (4) front and back position in course;
Described rotatable platform (5) upper surface is provided with two guide rails along direction, tunnel, guide rail is provided with slide block, two slide blocks are connected with ejecting gun head (2) and floating brush (4) respectively, can along direction, tunnel slide anteroposterior both during construction, two slide blocks are driven by two motors respectively, control slide block along direction, tunnel slide anteroposterior; Floating cylinder (3) is fixed in position between rotatable platform (5) upper surface two guide rails;
Described mixer (13) is connected with spiral propeller (14), shaft horizontal positioned, topples over and output in spiral propeller (14) after being stirred by sprayed mortar; Described spiral propeller (14) is connected with air pump (15), described air pump (15) is connected with ejecting gun head (2) by transfer tube (9), concrete pump in spiral propeller (14), by increasing air pressure, is delivered in transfer tube (9) and is sprayed through ejecting gun head (2) by air pump (15).
2. a kind of concrete ejection smears integrated constructing tunnel device according to claim 1, it is characterized in that, described floating brush (4) and inner surface of tunnel (1) keep 10-20 degree angle.
3. a kind of concrete ejection smears integrated constructing tunnel device according to claim 1, it is characterized in that, described arc track (8) is assembled by the arc section of different curvature radius, every section of long 0.5m of circular arc, by different permutation and combination, assembled curve track can adapt to various curved surface top, recycles to reach, the object of environmental protection construction.
CN201520231820.1U 2015-04-16 2015-04-16 A kind of concrete ejection smears integrated constructing tunnel device Withdrawn - After Issue CN204691787U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520231820.1U CN204691787U (en) 2015-04-16 2015-04-16 A kind of concrete ejection smears integrated constructing tunnel device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520231820.1U CN204691787U (en) 2015-04-16 2015-04-16 A kind of concrete ejection smears integrated constructing tunnel device

Publications (1)

Publication Number Publication Date
CN204691787U true CN204691787U (en) 2015-10-07

Family

ID=54232090

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520231820.1U Withdrawn - After Issue CN204691787U (en) 2015-04-16 2015-04-16 A kind of concrete ejection smears integrated constructing tunnel device

Country Status (1)

Country Link
CN (1) CN204691787U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104818999A (en) * 2015-04-16 2015-08-05 浙江大学 Concrete spraying and painting integration tunnel construction device
CN107288664A (en) * 2017-08-01 2017-10-24 夏峰 A kind of spray-on tunnel film waterproof construction device and construction method
CN110863842A (en) * 2019-12-10 2020-03-06 徐州秩润矿山设备科技有限公司 Self-spraying concrete wet spraying machine based on gear and rack transmission and working method thereof
CN111677532A (en) * 2020-06-17 2020-09-18 汪美霞 Construction method for building and reinforcing urban underground traffic tunnel engineering

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104818999A (en) * 2015-04-16 2015-08-05 浙江大学 Concrete spraying and painting integration tunnel construction device
CN107288664A (en) * 2017-08-01 2017-10-24 夏峰 A kind of spray-on tunnel film waterproof construction device and construction method
CN110863842A (en) * 2019-12-10 2020-03-06 徐州秩润矿山设备科技有限公司 Self-spraying concrete wet spraying machine based on gear and rack transmission and working method thereof
CN110863842B (en) * 2019-12-10 2024-04-12 徐州秩润矿山设备科技有限公司 Gear and rack transmission-based self-spraying concrete wet spraying machine and working method thereof
CN111677532A (en) * 2020-06-17 2020-09-18 汪美霞 Construction method for building and reinforcing urban underground traffic tunnel engineering

Similar Documents

Publication Publication Date Title
CN104818999A (en) Concrete spraying and painting integration tunnel construction device
CN204691787U (en) A kind of concrete ejection smears integrated constructing tunnel device
CN205766713U (en) Building 3D printing equipment
CN213143770U (en) Plastering device for building construction
CN109538250B (en) Device and method for quick construction of tunnel primary support with mould sprayed concrete
CN108019033A (en) A kind of automatic construction equipment of construction wall and its construction method
CN113121264B (en) Self-walking concrete curing vehicle for tunnel
CN108252492A (en) A kind of wall surface spraying devices and methods therefor of construction and decoration
CN205638484U (en) Tunnel build concrete flush coater construction equipment
CN102296970B (en) Concrete sprayer
CN109505626B (en) Method for spraying support mold at initial stage of tunnel by using belt template assembly
CN108787279A (en) One kind being based on the chaindriven building decoration plank paint spraying apparatus of tooth
CN208252129U (en) A kind of construction of shotcrete device
CN105041343A (en) Concrete slant grouting machine
CN212452211U (en) Base surface slotting device for building construction
CN109372553B (en) Belt template assembly for primary support mould spraying of tunnel
CN111962834A (en) Feeding wall plastering structure and full-automatic wall plastering machine
CN210289177U (en) Building concrete shakeouts device
CN105781584A (en) Concrete wet-spraying self-walking shotcrete support robot
CN209195439U (en) Tunnel mould spray belt template component
CN111249834A (en) Novel tower crane water spraying device
CN219190644U (en) Building brick body sprayer
CN220814992U (en) Even ash device that spreads of construction masonry mortar
CN220597337U (en) Spraying device for concrete curing
CN212820580U (en) Make building material's mixed spraying equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20151007

Effective date of abandoning: 20170329

AV01 Patent right actively abandoned