CN204690522U - A kind of industrial railway circuit attending device - Google Patents

A kind of industrial railway circuit attending device Download PDF

Info

Publication number
CN204690522U
CN204690522U CN201520398894.4U CN201520398894U CN204690522U CN 204690522 U CN204690522 U CN 204690522U CN 201520398894 U CN201520398894 U CN 201520398894U CN 204690522 U CN204690522 U CN 204690522U
Authority
CN
China
Prior art keywords
pry
pulling device
railway spike
bar
railway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520398894.4U
Other languages
Chinese (zh)
Inventor
魏健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520398894.4U priority Critical patent/CN204690522U/en
Application granted granted Critical
Publication of CN204690522U publication Critical patent/CN204690522U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The utility model relates to rail track maintenance tool, is specially a kind of industrial railway circuit attending device; It box spanner (2) comprising railway spike pulling device (1) and be arranged on railway spike pulling device (1) free end; Described railway spike pulling device (1) is by pry head (101), and pry handle (102) forms, and pry head (101) is U-shaped structure; Its ring wrench (2) is by tommy bar (201), ratchet (202), dowel bar (203), sleeve (204), axis (205), railway spike pulling device (1) and box spanner (2) are linked together by sleeve (204) by its pry handle (102) free end, its ratchet (202) is arranged on the middle part of tommy bar (201), and in be provided with cutting ferrule; Described sleeve (204) top is provided with dowel bar (203), and dowel bar (203) one end is formed with axis (205).Its beneficial effect is: structure is simple, easy to operate, operating efficiency is high, and railway spike pulling device and box spanner are integrated, easy to carry.

Description

A kind of industrial railway circuit attending device
Technical field
The utility model relates to the technical field of rail track maintenance tool, is specially a kind of industrial railway circuit attending device.
Background technology
Crowbar use in rail track upkeep operation is a lot, and existing crowbar in use can carry out just rule and stir, and sleeper bottom track lining changes its course, raises track or transforms bar and coordinates correction gauge etc., but in the specific operation process of maintenance line, encounter some problems; The head camber of existing crowbar can only be suitable for common sleeper track remodelling and rise outside railway spike and sleeper bridge and play railway spike operation, is not suitable for the railway spike operation between guard rail of bridge and circuit rail small space; Also need nail nipping pad simultaneously and coordinate the normal nail nipping of ability, be suitable for inconvenient.Meanwhile, when crowbar plays railway spike, crowbar head and the head of a nail are along easily producing skidding, and the railway spike running into corrosion is then more difficult to nail nipping, and operation is dangerous, time-consuming, effort, efficiency are low.Application number is the utility model of 201120491452.6, name is called a kind of railroad spike pulling device, which solve the problems referred to above, but it is when carrying out repair and maintenance to the railway spike bolt between rail and concrete sleeper, need to take other box spanner, it uses inconvenience, in the wild during operation, maintenance tool is too many not portable, and fix during the connection between box spanner its tommy bar and dowel bar used at present, therefore after often turning tommy bar certain angle, just inconvenience continues operation, at this moment sleeve is just needed to take off from nut, then be again stuck in again on nut after tommy bar being turned an angle, proceeding aforesaid operations afterwards, its troublesome poeration, inefficiency.Therefore for the problems referred to above, we have developed that a kind of structure is simple, easy to operate, operating efficiency is high, and railway spike pulling device and box spanner are integrated, industrial railway circuit attending device easy to carry.
Utility model content
The purpose of this utility model is for above-described problems of the prior art, provides that a kind of structure is simple, easy to operate, operating efficiency is high, and railway spike pulling device and box spanner are integrated, industrial railway circuit attending device easy to carry.
In order to realize described object, the utility model specifically adopts following technical scheme:
A kind of industrial railway circuit attending device, it comprises railway spike pulling device 1 and is arranged on the box spanner 2 of railway spike pulling device 1 free end.It is characterized in that: described railway spike pulling device 1 is by pry head 101, and pry handle 102 forms, and pry head 101 is U-shaped structure; Its ring wrench 2 is by tommy bar 201, ratchet 202, dowel bar 203, sleeve 204, axis 205, railway spike pulling device 1 and box spanner 2 are linked together by sleeve 204 by its pry handle 102 free end, its ratchet 202 is arranged on the middle part of tommy bar 201, and in be provided with cutting ferrule; Be provided with dowel bar 203 above described sleeve 204, and dowel bar 203 one end is formed with axis 205, its axis 205 inserts and is arranged in the cutting ferrule of ratchet 202.
Described tommy bar 201 is flexibly connected with dowel bar 203 by ratchet 202.
Described pry head 101 is flexibly connected with pry handle 102.
Described pry handle 102 is made up of multistage, and is flexibly connected by screw thread between adjacent two sections.
Described tommy bar 201, dowel bar 203 are made up of multistage sleeve pipe, and are flexibly connected by guide rail between adjacent sleeve pipe.
A kind of industrial railway circuit of the utility model attending device, railway spike pulling device 1 and box spanner 2 are linked together by sleeve 204 by described pry handle 102 free end, and railway spike pulling device 1 and box spanner 2 are integrated, easy to carry.
Compared with prior art, the beneficial effects of the utility model are: one, railway spike pulling device 1 and box spanner 2 are integral type structure, easy to carry; Two, pry head 101 is not easily skidded for during U-shaped structural clamp railway spike, and pry head 101 is connected with pry handle 102 is vertical, and force is convenient; Three, the box spanner 2 being arranged on pry handle 102 free end can serve as the effect of iron hammer, i.e. all right hammering operation when needed; Four, the pry handle 102 of multisection type, the used time is not detachable, easy to carry; Five, dowel bar 203 is flexibly connected with tommy bar 201, solves after often turning tommy bar 201 certain angle and continues operation with regard to inconvenience, i.e. troublesome poeration, ineffective problem.
Accompanying drawing explanation
Fig. 1 is the structural representation of specific embodiment 1.
Fig. 2 is the structural representation of instantiation example 2.
In figure: railway spike pulling device 1, box spanner 2, pry head 101, pry handle 102, tommy bar 201, ratchet 202, dowel bar 203, sleeve 204, axis 205.
Detailed description of the invention
Below in conjunction with accompanying drawing 1, accompanying drawing 2, structure of the present utility model and beneficial effect thereof are further illustrated.
Embodiment 1
A kind of industrial railway circuit attending device, as shown in Figure 1, it comprises railway spike pulling device 1 and is arranged on the box spanner 2 of railway spike pulling device 1 free end.Described railway spike pulling device 1 is by pry head 101, and pry handle 102 forms, and pry head 101 is U-shaped structure; Its ring wrench 2 is by tommy bar 201, ratchet 202, dowel bar 203, sleeve 204, axis 205, railway spike pulling device 1 and box spanner 2 are linked together by sleeve 204 by its pry handle 102 free end, its ratchet 202 is arranged on the middle part of tommy bar 201, and in be provided with cutting ferrule; Be provided with dowel bar 203 above described sleeve 204, and dowel bar 203 one end is formed with axis 205, its axis 205 inserts and is arranged in the cutting ferrule of ratchet 202.
Described pry head 101 is not easily skidded for during U-shaped structural clamp railway spike, and pry head 101 is connected with pry handle 102 is vertical, and force is convenient.
Described pry handle 102 is made up of multistage, and is flexibly connected by screw thread between adjacent two sections, and the used time is not detachable, easy to carry.
Embodiment 2
A kind of industrial railway circuit attending device, its concrete structure as described in Example 1.
Described tommy bar 201 is flexibly connected with dowel bar 203 by ratchet 202, solves after often turning tommy bar 201 certain angle and continues operation with regard to inconvenience, i.e. troublesome poeration, ineffective problem.
Described tommy bar 201, dowel bar 203 are made up of multistage sleeve pipe, and be flexibly connected by guide rail between adjacent sleeve pipe, through overregulating the length of tommy bar 201 and dowel bar 203, make box spanner 2 can serve as the effect of iron hammer, namely all right hammering operation when needed, multiple functional, easy to use.
When needs utilize box spanner 2 to tighten railway spike bolt, first box spanner 2 is unloaded from pry handle 102, then sleeve 204 is stuck on the nut of railway spike bolt, then be used for rotating tommy bar 201 with arm, this power will reach sleeve 204 by dowel bar 203, thus by railway spike bolt tightening, when needing the direction adjusting tommy bar 201 when operating inconvenience, only tommy bar 1 direction need be rotated.
When the loosening railway spike bolt of needs, only ratchet 202 need be taken off from dowel bar 203 together with tommy bar 201, then ratchet 202 is arranged on dowel bar 203 together with tommy bar 201 again after the axis of tommy bar 201 overturns 180 °, the nut afterwards sleeve 204 being stuck in railway spike bolt repeats aforesaid operations.

Claims (5)

1. an industrial railway circuit attending device, it box spanner (2) comprising railway spike pulling device (1) and be arranged on railway spike pulling device (1) free end; It is characterized in that: described railway spike pulling device (1) is by pry head (101), and pry handle (102) forms, and pry head (101) is U-shaped structure; Its ring wrench (2) is by tommy bar (201), ratchet (202), dowel bar (203), sleeve (204), axis (205), railway spike pulling device (1) and box spanner (2) are linked together by sleeve (204) by its pry handle (102) free end, its ratchet (202) is arranged on the middle part of tommy bar (201), and in be provided with cutting ferrule; Described sleeve (204) top is provided with dowel bar (203), and dowel bar (203) one end is formed with axis (205), its axis (205) inserts and is arranged in the cutting ferrule of ratchet (202).
2. a kind of industrial railway circuit attending device according to claim 1, is characterized in that: described tommy bar (201) is flexibly connected with dowel bar (203) by ratchet (202).
3. a kind of industrial railway circuit attending device according to claim 1, is characterized in that: described pry head (101) is flexibly connected with pry handle (102).
4. a kind of industrial railway circuit attending device according to claim 1, is characterized in that: described pry handle (102) is made up of multistage, and is flexibly connected by screw thread between adjacent two sections.
5. a kind of industrial railway circuit attending device according to claim 1, is characterized in that: described tommy bar (201), dowel bar (203) are made up of multistage sleeve pipe, and are flexibly connected by guide rail between adjacent sleeve pipe.
CN201520398894.4U 2015-06-10 2015-06-10 A kind of industrial railway circuit attending device Expired - Fee Related CN204690522U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520398894.4U CN204690522U (en) 2015-06-10 2015-06-10 A kind of industrial railway circuit attending device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520398894.4U CN204690522U (en) 2015-06-10 2015-06-10 A kind of industrial railway circuit attending device

Publications (1)

Publication Number Publication Date
CN204690522U true CN204690522U (en) 2015-10-07

Family

ID=54230832

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520398894.4U Expired - Fee Related CN204690522U (en) 2015-06-10 2015-06-10 A kind of industrial railway circuit attending device

Country Status (1)

Country Link
CN (1) CN204690522U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106120491A (en) * 2016-08-22 2016-11-16 洛阳双瑞橡塑科技有限公司 A kind of frock for assembling fastener and assemble method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106120491A (en) * 2016-08-22 2016-11-16 洛阳双瑞橡塑科技有限公司 A kind of frock for assembling fastener and assemble method

Similar Documents

Publication Publication Date Title
CN103659683A (en) Stud mounting and dismounting tool
CN204690522U (en) A kind of industrial railway circuit attending device
CN204308828U (en) The T-shaped antioverloading box spanner of a kind of connecting rod folding type
CN204308820U (en) The adjustable antioverloading box spanner of a kind of T-shaped load of connecting rod folding type
CN204076121U (en) A kind of Telescopic screwdriver
CN203236400U (en) Special-shaped wrench
CN204263046U (en) A kind of bending dual-purpose type box spanner
CN204149081U (en) A kind of connecting rod can bending dual-purpose type antioverloading box spanner
CN204108898U (en) A kind of bending dual-purpose type antioverloading box spanner
CN204076122U (en) The T-shaped antioverloading screwdriver of a kind of bendable
CN204308856U (en) The adjustable T-shaped antioverloading screwdriver of a kind of folding type load
CN204308839U (en) A kind of knife bar can bending antioverloading sleeve screw driver
CN204308857U (en) The T-shaped antioverloading screwdriver of a kind of folding type
CN203956876U (en) A kind of Multifunctional hand-hammer
CN207333917U (en) Multifunctional force applying rod
CN204308818U (en) The adjustable T-shaped antioverloading box spanner of a kind of bending dual-purpose type load
CN204195634U (en) A kind of connecting rod can the T-shaped antioverloading screwdriver of bending dual-purpose type
CN204149091U (en) The T-shaped antioverloading screwdriver of a kind of bending dual-purpose type
CN202622624U (en) Internal hexagonal wrench
CN204308861U (en) The adjustable T-shaped antioverloading screwdriver of a kind of bending dual-purpose type load
CN204308855U (en) The T-shaped antioverloading screwdriver of a kind of connecting rod folding type
CN202971499U (en) High-strength anti-corrosion fastening screw
CN204308862U (en) The adjustable T-shaped antioverloading screwdriver of a kind of bendable load
CN204308874U (en) A kind of knife bar can the adjustable antioverloading screwdriver of bending load
CN204308867U (en) One can the adjustable T-shaped antioverloading screwdriver of bending load

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151007

Termination date: 20160610

CF01 Termination of patent right due to non-payment of annual fee