CN204690023U CN201520352672.9U CN201520352672U CN204690023U CN 204690023 U CN204690023 U CN 204690023U CN 201520352672 U CN201520352672 U CN 201520352672U CN 204690023 U CN204690023 U CN 204690023U
Authority
CN
China
Prior art keywords
plate
groove
wall
gap
web member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520352672.9U
Other languages
Chinese (zh)
Inventor
杨晓婷
曹勇
郑敬先
芦文凯
常醒民
蔡景春
李洪亮
张锦炳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shougang Co Ltd
Original Assignee
Beijing Shougang Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shougang Co Ltd filed Critical Beijing Shougang Co Ltd
Priority to CN201520352672.9U priority Critical patent/CN204690023U/en
Application granted granted Critical
Publication of CN204690023U publication Critical patent/CN204690023U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of pendulum wall for blast-furnace equipment, and described pendulum wall comprises: the first plate; Second plate, each end face of described second plate is provided with the first groove, forms the first gap between described first plate and described second plate, and described first groove is vertical with described first gap to be arranged; Articulamentum, described articulamentum covers in described first groove and described first gap, and is located between described first plate and described second plate; Wherein, described first plate and described second plate are fitted also relative fixing by described articulamentum.The utility model reaches and makes that pendulum wall is easy for installation, precision is high and the technique effect of good stability.

Description

A kind of pendulum wall for blast-furnace equipment
Technical field
The utility model relates to blast-furnace equipment technical field, particularly a kind of pendulum wall for blast-furnace equipment.
Background technology
Pendulum wall is a kind of body of wall of special tectonic, and it connects at wall bottom hinge, has certain turning power.Be provided with a stifled pendulum wall in blast-furnace equipment in gas pipe, in order to the gas pipe protection wall preventing the coal gas air-flow inputted from directly impacting opposite, play the effect of protection gas pipe protection wall.Pendulum wall is combined by the prefabricated component of polylith casting.
Contriver finds to there is following deficiency in prior art in practice process:
When the pendulum wall in blast-furnace equipment is damaged by the unexpected big area of certain reason, pendulum wall of the prior art owing to being subject to the restriction of working space and condition, the problem such as have that lifting is difficult, setting accuracy is not high and stability is not enough.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of pendulum wall for blast-furnace equipment, this pendulum wall solves in prior art to be put when wall damages because the technical problem of difficulty is changed in the restriction being subject to operating environment in operation process, reach and make that pendulum wall is easy for installation, precision is high and the technique effect of good stability.
For solving the problems of the technologies described above, the utility model provides a kind of pendulum wall for blast-furnace equipment, and described pendulum wall comprises: the first plate; Second plate, each end face of described second plate is provided with the first groove, forms the first gap between described first plate and described second plate, and described first groove is vertical with described first gap to be arranged; Articulamentum, described articulamentum covers in described first groove and described first gap, and is located between described first plate and described second plate; Wherein, described first plate and described second plate are fitted also relative fixing by described articulamentum.
Preferably, each end face of described first plate is provided with the second groove.
Preferably, the end face of described first plate and described second plate also comprises multiple blind holes of establishing the first web member for card respectively, and described first plate is relative fixing by described first web member with described second plate; And/or described first plate is removably fixedly connected with by the second web member with described second plate, described second web member is positioned at the homonymy of described first plate and described second plate.
Preferably, described first plate and described second plate, by described first web member and/or described second web member, make described first gap being provided with predetermined width between described first plate and described second plate.
Preferably, be interconnected between described first groove, the second groove and described first gap.
Preferably, described articulamentum is high-temperature agglomerant.
Preferably, described articulamentum pours into described first groove, described second groove and described first gap from described pendulum coping, and described first plate is fixedly connected with described second plate.
Preferably, described first web member is bearing pin; And/or described second web member is duroplasts; And/or described first plate and described second plate offer the first through hole respectively.
The utility model also provides a kind of blast furnace utility appliance, and described blast furnace utility appliance comprises puts wall as above.
The application's beneficial effect is as follows:
A kind of pendulum wall for blast-furnace equipment that the application provides, during operation, the second groove that described first plate and described second plate are arranged respectively, first groove, and described first plate and described second plate form described first gap under the effect of described first web member and described second web member, make described first gap, described first groove and described second groove are interconnected, handled easily personnel pour into described articulamentum from described Bai Qiang top, fast, facilitate and firmly fix described pendulum wall, reach and make pendulum wall easy for installation, the technique effect of the high and good stability of precision.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the structural representation of the application one better embodiment for the pendulum wall of blast-furnace equipment;
Fig. 2 is the vertical view putting wall in Fig. 1;
Fig. 3 is the side-view putting wall in Fig. 1;
Fig. 4 is the partial view putting wall in Fig. 1;
Accompanying drawing illustrates:
100-puts wall, 1-first plate, 11-second groove, 2-first web member, 3-second plate, 31-first through hole, 32-blind hole, 33-first groove, 4-articulamentum, 5-first gap, 6-second web member.
Embodiment
In order to better understand technique scheme, below in conjunction with Figure of description and concrete embodiment, technique scheme is described in detail.
Fig. 1 is the structural representation of the application one better embodiment for the pendulum wall 100 of blast-furnace equipment; Fig. 2 is the vertical view putting wall 100 in Fig. 1; Fig. 3 is the side-view putting wall 100 in Fig. 1; Fig. 4 is the partial view putting wall 100 in Fig. 1; Refer to Fig. 1-4, described pendulum wall 100 comprises: the first plate 1, second plate 3 and articulamentum 4.
Wherein, each end face of described second plate 3 is provided with the first groove 33 and multiple blind hole 32, described articulamentum 4 is arranged between described first plate 1 and described second plate 3, for fixing described first plate 1 and described second plate 3, the first gap 5 is formed between described first plate 1 and described second plate 3, described first groove 33 is vertical with described first gap 5 to be arranged, described first plate 1 and described second plate 3 is made to cover in described first groove 33 and described first gap 5, and be located between described first plate 1 and described second plate 3, described first plate 1 and described second plate 3 are fitted also relative fixing by described articulamentum 4.In the present embodiment, described first plate 1 is identical with the structure of described second plate 3, and described articulamentum 4 is high-temperature agglomerant.
Concrete, in order to fast and convenient, fix described first plate 1 and described second plate 3 more accurately, described articulamentum 4 is high-temperature agglomerant, each end face of described first plate 1 is provided with the second groove 11, the end face of described first plate 1 and described second plate 3 also comprises multiple blind holes 32 of establishing the first web member 2 for card respectively, described first plate 1 is relative fixing by described first web member 2 with described second plate 3, forms described first gap 5 of presetting to make described first plate 1 with described second plate 3; Described first plate 1 is removably fixedly connected with by the second web member 6 with described second plate 3, described second web plate 6 is relative with the end face of described second plate 3 with described first plate 1 to be respectively fixedly connected with, described second web member 6 is positioned at the homonymy of described first plate 1 and described second plate 3, keeps stable further to make described first gap 5 between described first plate 1 and described second plate 3.Described second web member 6 is duroplasts, for convenience detach and can reuse and economize on resources.Be interconnected between the groove of described first plate 1, the groove 33 of described second plate 3 and described first gap 5, facilitate described articulamentum 4 fast and evenly pour into described first groove 33, described second groove 11 and described first gap 5 from the top of described pendulum wall 100, described first plate 1 is fixedly connected with described second plate 3.In the present embodiment, described first web member 2 is bearing pin, and described first gap 5 is wide is 2mm ~ 5mm, and in other embodiments, the width in described first gap 5 can regulate according to actual needs.
During operation, the second groove 11 that described first plate 1 is arranged respectively with described second plate 3, first groove 33, and described first plate 1 and described second plate 3 form described first gap 5 under the effect of described first web member 2 and described second web member 6, make described first gap 5, described first groove 33 and described second groove 11 are interconnected, handled easily personnel pour into described articulamentum 4 from described pendulum wall 100 top, fast, facilitate and firmly fix described pendulum wall 100, reach and make pendulum wall 100 easy for installation, the technique effect of the high and good stability of precision.
In addition, conveniently transport, described first plate 1 and described second plate 3 offer described first through hole 31 respectively.
The utility model additionally provides a kind of blast furnace utility appliance, and described blast furnace utility appliance comprises above-mentioned pendulum wall 100 structure.
The beneficial effect of the application is as follows:
During operation, the second groove, the first groove that described first plate and described second plate are arranged respectively, and described first plate and described second plate form described first gap under the effect of described first web member and described second web member, described first gap, described first groove and described second groove are interconnected, handled easily personnel pour into described articulamentum from described Bai Qiang top, fast, convenient and firmly fix described pendulum wall, reach and make that pendulum wall is easy for installation, precision is high and the technique effect of good stability.
It should be noted last that, above embodiment is only in order to illustrate the technical solution of the utility model and unrestricted, although be described in detail the utility model with reference to example, those of ordinary skill in the art is to be understood that, can modify to the technical solution of the utility model or equivalent replacement, and not departing from the spirit and scope of technical solutions of the utility model, it all should be encompassed in the middle of right of the present utility model.

Claims (9)

1. for a pendulum wall for blast-furnace equipment, it is characterized in that, described pendulum wall comprises:
First plate;
Second plate, each end face of described second plate is provided with the first groove, forms the first gap between described first plate and described second plate, and described first groove is vertical with described first gap to be arranged;
Articulamentum, described articulamentum covers in described first groove and described first gap, and is located between described first plate and described second plate;
Wherein, described first plate and described second plate are fitted also relative fixing by described articulamentum.
2. put wall as claimed in claim 1, it is characterized in that, each end face of described first plate is provided with the second groove.
3. put wall as claimed in claim 2, it is characterized in that, the end face of described first plate and described second plate also comprises multiple blind holes of establishing the first web member for card respectively, and described first plate is relative fixing by described first web member with described second plate; And/or described first plate is removably fixedly connected with by the second web member with described second plate, described second web member is positioned at the homonymy of described first plate and described second plate.
4. put wall as claimed in claim 3, it is characterized in that, described first plate and described second plate, by described first web member and/or described second web member, make described first gap being provided with predetermined width between described first plate and described second plate.
5. put wall as claimed in claim 4, it is characterized in that, be interconnected between described first groove, the second groove and described first gap.
6. put wall as claimed in claim 5, it is characterized in that, described articulamentum is high-temperature agglomerant.
7. put wall as claimed in claim 5, it is characterized in that, described articulamentum pours into described first groove, described second groove and described first gap from described pendulum coping, and described first plate is fixedly connected with described second plate.
8. the pendulum wall as described in as arbitrary in claim 3-7, it is characterized in that, described first web member is bearing pin; And/or described second web member is duroplasts; And/or described first plate and described second plate offer the first through hole respectively.
9. a blast furnace utility appliance, is characterized in that, described blast furnace utility appliance comprise as arbitrary in claim 1-8 as described in pendulum wall.
CN201520352672.9U 2015-05-27 2015-05-27 A kind of pendulum wall for blast-furnace equipment Active CN204690023U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520352672.9U CN204690023U (en) 2015-05-27 2015-05-27 A kind of pendulum wall for blast-furnace equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520352672.9U CN204690023U (en) 2015-05-27 2015-05-27 A kind of pendulum wall for blast-furnace equipment

Publications (1)

Publication Number Publication Date
CN204690023U true CN204690023U (en) 2015-10-07

Family

ID=54230336

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520352672.9U Active CN204690023U (en) 2015-05-27 2015-05-27 A kind of pendulum wall for blast-furnace equipment

Country Status (1)

Country Link
CN (1) CN204690023U (en)

Similar Documents

Publication Publication Date Title
CN203868052U (en) Electric meter box hung on electrical pole temporarily
CN204690023U (en) A kind of pendulum wall for blast-furnace equipment
CN203460077U (en) Location tool for breaking hammer nitrogen chamber
CN204000565U (en) A kind of steel work arch bridge
CN203112332U (en) Eccentric lifting device for dome
CN104074222A (en) Mining excavator and weight box of mining excavator
CN205091338U (en) Concrete is anti performance testing device that splits in early days
CN204127480U (en) A kind of detachable built-in pipe channel fixing device
CN204266603U (en) The interim apparatus for placing of high-strength bolt
CN207645633U (en) A kind of reversal hanger for Rectangular Tunnel combined type section of jurisdiction
CN204508570U (en) Medium-speed pulverizer mill hoisting mechanism
CN205172036U (en) Formwork support equipment for building engineering
CN203938371U (en) The safe unloading unit of a kind of girder steel and girder steel thereof unload safely vehicle clamper
CN108421182A (en) A kind of substation equipment maintenance and repair safety belt suspension device
CN203343423U (en) Molten steel furnace fixing equipment
CN205310506U (en) Cement (mixing) shaft
CN204258088U (en) A kind of power distribution cabinet assembly based on square and fan-shaped splice plate
CN204243553U (en) A kind of power distribution cabinet assembly based on fan-shaped splice plate
CN203590646U (en) Support frame combined structure and cabinet body
CN202321940U (en) Reversible professional hanging tool
CN204357100U (en) A kind of scaffold floor
CN203560594U (en) Vertical equal-diameter upper left bend for pallet type bridge rack
CN204552049U (en) A kind of building iron structure bracing frame
CN203782712U (en) Device for cast molding of basic protective cap
CN208311234U (en) Connection component and hook mechanism

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant