CN204689886U - A kind of 6 meters of overlength optical fiber prefabricated rods - Google Patents

A kind of 6 meters of overlength optical fiber prefabricated rods Download PDF

Info

Publication number
CN204689886U
CN204689886U CN201520351546.1U CN201520351546U CN204689886U CN 204689886 U CN204689886 U CN 204689886U CN 201520351546 U CN201520351546 U CN 201520351546U CN 204689886 U CN204689886 U CN 204689886U
Authority
CN
China
Prior art keywords
tail pipe
plug
pipe
sleeve
sleeve pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520351546.1U
Other languages
Chinese (zh)
Inventor
郭浩林
俞亮
顾单元
焦猛
孙雄章
沈震强
肖华
陈伟
袁健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hengtong Optic Electric Co Ltd
Original Assignee
Jiangsu Hengtong Optic Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Hengtong Optic Electric Co Ltd filed Critical Jiangsu Hengtong Optic Electric Co Ltd
Priority to CN201520351546.1U priority Critical patent/CN204689886U/en
Application granted granted Critical
Publication of CN204689886U publication Critical patent/CN204689886U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P40/00Technologies relating to the processing of minerals
    • Y02P40/50Glass production, e.g. reusing waste heat during processing or shaping
    • Y02P40/57Improving the yield, e-g- reduction of reject rates

Landscapes

  • Light Guides In General And Applications Therefor (AREA)

Abstract

The utility model provides a kind of 6 meters of overlength optical fiber prefabricated rods, comprise sleeve pipe, plug, prolongation tail pipe and tail pipe filling glass post, its middle sleeve and plug all at least two, plug is all enclosed within two sleeve pipes, another by being welded to connect between adjacent casing, extend tail pipe with telescopic joint after end be connected, and coaxially distribute with sleeve pipe, tail pipe filling glass post is embedded in and extends in tail pipe and offset with plug, its manufacturing process comprises sleeved, cored, connects and extends four steps such as tail pipe and filling tail pipe filling glass post.The utility model contributes to the production efficiency improving single optical wand length of string, optical wand utilising efficiency and wire-drawing equipment on the one hand, and the utility model can make single optical wand length of string reach 15000km, the manufacturing cost of about 3% ~ 5% is saved compared with traditional technology, there is the phenomenon that is subjected to displacement in sleeve pipe and glides that the ultra-long mandrel overcoming 6 meters of traditional length easily occurs in drawing process on the other hand, thus contribute to the constant product quality improving single optical wand wire drawing production.

Description

A kind of 6 meters of overlength optical fiber prefabricated rods
Technical field
The utility model relates to a kind of 6 meters of overlength optical fiber prefabricated rods, belongs to optical fiber production processing technique field.
Background technology
Along with popularizing of optical-fibre communications and bundle, current fibre circuit obtains and uses widely, but find in only using, owing to needing when fibre circuit connects to carry out melting welding connection, connect difficulty large, and link node quality is not easily controlled, therefore in order to improve fibre circuit operation stability, more and more higher to the length requirement of simple optical fiber on market, and it is current main in the processing of optical fiber, the principal element of restriction simple optical fiber length is the useful length of the plug preparing optical fiber for wire drawing, but find the increase of plug length in producing, in drawing process, and generation plug is subjected to displacement downslide phenomenon in sleeve pipe, thus cause wire drawing production efficiency low and constant product quality is poor, therefore in order to ensure quality product, the current plug length for drawing optical fibers processing is all at about 3 meters, but far can not meet the needs of market to simple optical fiber length, therefore plug stability in optical fiber prefabricating plug length and drawing process how is improved, become the important factor that restriction improves simple optical fiber quality, for this present situation, in the urgent need to developing a kind of production technique realizing preparing the prefabricated plug length of overlength optical fiber completely newly, with the needs that satisfied reality uses.
Utility model content
The purpose of this utility model is to provide the utility model and provides a kind of 6 meters of overlength optical fiber prefabricated rods.
In order to achieve the above object, the utility model provides following technical scheme:
A kind of 6 meters of overlength optical fiber prefabricated rods, comprise sleeve pipe, plug, extend tail pipe and tail pipe filling glass post, its middle sleeve and plug all at least two, and length is identical, previous stage sleeve pipe is little compared with rear stage casing inner diameter at least 3 millimeters, plug is all enclosed within two sleeve pipes, and coaxially distribute with sleeve pipe, another by being welded to connect between adjacent casing, and casing axis is distributed in same rectilinear direction, extend tail pipe with telescopic joint after end be connected, and coaxially distribute with sleeve pipe, tail pipe filling glass post is embedded in and extends in tail pipe and offset with plug, tail pipe filling glass post is another coaxially to distribute with prolongation tail pipe.
Further, described sleeve pipe and plug length error are not more than 0.3 meter.
Further, described sleeve outer size deviation is not more than 1 millimeter, and inner diameter deviation is not more than 1.5 millimeters, and plug outside diameter tolerance is not more than 1 millimeter.
The utility model structural stability, production technique is simple, and controllability and good stability, thus contribute to the production efficiency improving single optical wand length of string, optical wand utilising efficiency and wire-drawing equipment on the one hand, and the utility model can make single optical wand length of string reach 15000km, the manufacturing cost of about 3% ~ 5% is saved compared with traditional technology, there is the phenomenon that is subjected to displacement in sleeve pipe and glides that the ultra-long mandrel overcoming 6 meters of traditional length easily occurs in drawing process on the other hand, thus contribute to the constant product quality improving single optical wand wire drawing production.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the utility model structural representation;
Fig. 2 is the utility model manufacturing process flow diagram.
Embodiment
Be clearly and completely described the technical solution of the utility model below in conjunction with accompanying drawing of the present utility model, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
The 6 meters of overlength optical fiber prefabricated rods of one as shown in Figure 1, comprise sleeve pipe 1, plug 2, extend tail pipe 3 and tail pipe filling glass post 4, its middle sleeve 1 and plug 2 all at least two, and length is identical, previous stage sleeve pipe 1 is little at least 3 millimeters compared with rear stage sleeve pipe 1 internal diameter, plug 2 is all enclosed within two sleeve pipes 1, and coaxially distribute with sleeve pipe 1, another by being welded to connect between adjacent casing 1, and sleeve pipe 1 axis is distributed in same rectilinear direction, end after prolongation tail pipe 3 is connected with sleeve pipe 1 connects, and coaxially distribute with sleeve pipe 1, tail pipe filling glass post 4 is embedded in and extends in tail pipe 3 and offset with plug 2, tail pipe filling glass post 4 is another coaxially to distribute with prolongation tail pipe 3.
Further, described sleeve pipe and plug length error are not more than 0.3 meter.
Further, described sleeve outer size deviation is not more than 1 millimeter, and inner diameter deviation is not more than 1.5 millimeters, and plug outside diameter tolerance is not more than 1 millimeter.
The step during manufacture of a kind of 6 meters of overlength optical fiber prefabricated rods is as shown in Figure 2 as follows:
The first step, sleeved, select two length 3 meters, external diameter is 200mm external diameter, and in two sleeve pipes, front end sleeve bore is 49 millimeters, and rear end sleeve pipe is 52 millimeters, then sleeve pipe to be placed on horizontal table and to be located by fixture, make two casing axis in same rectilinear direction, then with blowtorch, melting welding is carried out to two sleeve interface, and by graphite, face of weld is smoothed at two sleeve pipe welds in melting welding simultaneously;
Second step, cored, to complete and after cooling telescopic joint, then in hydrofluoric acid, sleeve pipe and plug are cleaned 30 minutes, and dry 3 hours, then successively two plugs are placed into inside pipe casing, and by positioning fixture, plug and sleeve pipe are coaxially distributed, wherein previous stage mandrel tip and sleeve pipe seam crossing keep 0.5 millimeter of spacing, described rear stage plug front end be positioned at sleeve pipe seam crossing and with cover tube seam clamping;
3rd step, connects and extends tail pipe, after completing plug installation, be installed in cannula end by prolongation tail pipe, and prolongation tail pipe and sleeve pipe coaxially distributes;
4th step, filling tail pipe filling glass post, after completing the installation extending tail pipe and sleeve pipe, loads tail pipe filling glass post and extends in tail pipe, and tail pipe filling glass post front end and mandrel tip are offseted and compacting, then seal with vacuum seal.
In the present embodiment, by after the melting welding of two sleeve pipes 1 in the described the first step, the bow degree after two sleeve pipe docking is less than 0.5.
In the present embodiment, 1 melting welding of described prolongation tail pipe 3 and sleeve pipe is connected.
In the present embodiment, described plug 2, when carrying out bracing wire, is vacuum state in sleeve pipe 1.
Embodiment 2:
The manufacturing process of a kind of 6 meters of overlength optical fiber prefabricated rods as shown in Figure 2 comprises the steps:
The first step, sleeved, select 3 length 2 meters, external diameter is 200mm external diameter, and in two sleeve pipes, front end sleeve bore is 55 millimeters, and rear end sleeve pipe is 60 millimeters, then sleeve pipe to be placed on horizontal table and to be located by fixture, make two casing axis in same rectilinear direction, then with blowtorch, melting welding is carried out to two sleeve interface, and by graphite, face of weld is smoothed at two sleeve pipe welds in melting welding simultaneously;
Second step, cored, to complete and after cooling telescopic joint, then in hydrofluoric acid, sleeve pipe and plug are cleaned 40 minutes, and dry 4 hours, then successively two plugs are placed into inside pipe casing, and by positioning fixture, plug and sleeve pipe are coaxially distributed, wherein previous stage mandrel tip and sleeve pipe seam crossing keep 0.1 millimeter of spacing, described rear stage plug front end be positioned at sleeve pipe seam crossing and with cover tube seam clamping;
3rd step, connects and extends tail pipe, after completing plug installation, be installed in cannula end by prolongation tail pipe, and prolongation tail pipe and sleeve pipe coaxially distributes;
4th step, filling tail pipe filling glass post, after completing the installation extending tail pipe and sleeve pipe, loads tail pipe filling glass post and extends in tail pipe, and tail pipe filling glass post front end and mandrel tip are offseted and compacting, then seal with vacuum seal.
In the present embodiment, by after the melting welding of two sleeve pipes 1 in the described the first step, the bow degree after two sleeve pipe docking is less than 0.5.
In the present embodiment, 1 melting welding of described prolongation tail pipe 3 and sleeve pipe is connected.
In the present embodiment, described plug 2, when carrying out bracing wire, is vacuum state in sleeve pipe 1.
The utility model structural stability, production technique is simple, and controllability and good stability, thus contribute to the production efficiency improving single optical wand length of string, optical wand utilising efficiency and wire-drawing equipment on the one hand, and the utility model can make single optical wand length of string reach 15000km, the manufacturing cost of about 3% ~ 5% is saved compared with traditional technology, there is the phenomenon that is subjected to displacement in sleeve pipe and glides that the ultra-long mandrel overcoming 6 meters of traditional length easily occurs in drawing process on the other hand, thus contribute to the constant product quality improving single optical wand wire drawing production.
The above; be only embodiment of the present utility model; but protection domain of the present utility model is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that the utility model discloses; change can be expected easily or replace, all should be encompassed within protection domain of the present utility model.Therefore, protection domain of the present utility model should described be as the criterion with the protection domain of claim.

Claims (3)

1. 6 meters of overlength optical fiber prefabricated rods, it is characterized in that: 6 meters of described overlength optical fiber prefabricated rods comprise sleeve pipe, plug, extend tail pipe and tail pipe filling glass post, wherein said sleeve pipe and plug all at least two, and length is identical, previous stage sleeve pipe is little compared with rear stage casing inner diameter at least 3 millimeters, described plug is all enclosed within two sleeve pipes, and coaxially distribute with sleeve pipe, another by being welded to connect between described adjacent casing, and casing axis is distributed in same rectilinear direction, described prolongation tail pipe with telescopic joint after end be connected, and coaxially distribute with sleeve pipe, described tail pipe filling glass post is embedded in and extends in tail pipe and offset with plug, described tail pipe filling glass post is another coaxially to distribute with prolongation tail pipe.
2. a kind of 6 meters of overlength optical fiber prefabricated rods according to claim 1, it is characterized in that, described sleeve pipe and plug length error are not more than 0.3 meter.
3. a kind of 6 meters of overlength optical fiber prefabricated rods according to claim 1, it is characterized in that, described sleeve outer size deviation is not more than 1 millimeter, and inner diameter deviation is not more than 1.5 millimeters, and plug outside diameter tolerance is not more than 1 millimeter.
CN201520351546.1U 2015-05-27 2015-05-27 A kind of 6 meters of overlength optical fiber prefabricated rods Expired - Fee Related CN204689886U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520351546.1U CN204689886U (en) 2015-05-27 2015-05-27 A kind of 6 meters of overlength optical fiber prefabricated rods

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520351546.1U CN204689886U (en) 2015-05-27 2015-05-27 A kind of 6 meters of overlength optical fiber prefabricated rods

Publications (1)

Publication Number Publication Date
CN204689886U true CN204689886U (en) 2015-10-07

Family

ID=54230200

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520351546.1U Expired - Fee Related CN204689886U (en) 2015-05-27 2015-05-27 A kind of 6 meters of overlength optical fiber prefabricated rods

Country Status (1)

Country Link
CN (1) CN204689886U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104860530A (en) * 2015-05-27 2015-08-26 江苏亨通光纤科技有限公司 Six-meter super-long optical fiber preform bar and manufacturing process

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104860530A (en) * 2015-05-27 2015-08-26 江苏亨通光纤科技有限公司 Six-meter super-long optical fiber preform bar and manufacturing process
CN104860530B (en) * 2015-05-27 2017-03-22 江苏亨通光纤科技有限公司 Six-meter super-long optical fiber preform bar and manufacturing process

Similar Documents

Publication Publication Date Title
CN104860530A (en) Six-meter super-long optical fiber preform bar and manufacturing process
CN204689886U (en) A kind of 6 meters of overlength optical fiber prefabricated rods
CN207776881U (en) A kind of novel segment connecting elements
CN103777299B (en) A kind of fiber cable laying servicing unit of power pipe and making and construction method
CN103423543A (en) Universal-movement PE (polyethylene) combination electric hot molten pipe fitting and molding technology thereof
CN206270546U (en) A kind of fixed structure and its producing device of fiber array arrangement
CN202972296U (en) Flexible connection welded pipe fitting for water drainage
CN210510556U (en) Pipe connection structure
CN209943789U (en) Hot melt electric smelting adapter and PSP steel-plastic composite pressure pipe connecting device
CN104179380A (en) Rectangular butt-welded seam steel pipe for communication tower
CN204006825U (en) A kind of brass liquid-dividing head assembly
CN205958794U (en) Rubber -sheathed lamp cord optic fibre hot melt pipe
CN204793244U (en) Binding post with pyrocondensation function
CN203377552U (en) Drawing head of high voltage crosslinked cable
CN202282433U (en) Connecting assembly, low pass filter and cavity filter
CN202647034U (en) Polythene electric melt pipe fitting
CN202992500U (en) Composite tube connecting part
CN102361109B (en) Connecting assembly, low pass filter and cavity filter
CN202469299U (en) Extra high voltage electrode flange
CN201571211U (en) Repaired joint of electric trace pipe
CN204154941U (en) Optical fiber ceramic lock pin
CN104175015A (en) Welding rod
CN103618272A (en) Middle connection structure of tubular busbar
CN202647038U (en) Double-wall corrugated pipe joint
CN204885510U (en) Stabilize intermodulation cable subassembly

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151007

Termination date: 20180527