CN204689786U - Construction site vehicle wash water treatment device - Google Patents

Construction site vehicle wash water treatment device Download PDF

Info

Publication number
CN204689786U
CN204689786U CN201520370845.XU CN201520370845U CN204689786U CN 204689786 U CN204689786 U CN 204689786U CN 201520370845 U CN201520370845 U CN 201520370845U CN 204689786 U CN204689786 U CN 204689786U
Authority
CN
China
Prior art keywords
water
chamber
settling pit
lift pump
vehicle wash
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520370845.XU
Other languages
Chinese (zh)
Inventor
陈泉
白向阳
刘贵利
朱成军
李刚
陈威
罗成江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN201520370845.XU priority Critical patent/CN204689786U/en
Application granted granted Critical
Publication of CN204689786U publication Critical patent/CN204689786U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of construction site vehicle wash water treatment device, comprise two drainage trays that horizontal parallel is on the ground arranged, the top of drainage tray is equipped with cover plate along drainage tray length direction, cover plate is provided with some leaking holes, also comprise Water warfare retrieving arrangement, Water warfare retrieving arrangement comprises and is arranged on underground settling pit, at least three chambers are provided with along its length in settling pit, be communicated with by overflow port before adjacent two chambers, the chamber inner wall being positioned at described settling pit end, one end is along its length provided with water-in and is communicated with described drainage tray, the height of described overflow port reduces along described water-in place chamber gradually to the chamber direction away from described water-in.The utility model structure is simple, easy to use, investment and running cost low, make the recycle again after the sewage disposal after vehicle wash, saved water resources.

Description

Construction site vehicle wash water treatment device
Technical field
The utility model relates to a kind of water treatment device, is specifically related to a kind of construction site vehicle wash water treatment device.
Background technology
Along with expanding economy, the construction in city, in urban district, increasing construction site puts into operation, and a large amount of engineering dregs needs to transport.Dregs transportation is lack of standardization, not only affects the appearance in city, brings traffic safety hidden danger also to vehicular traffic and pedestrian.Some are built, unit in charge of construction and transport practitioner in order to work to tight deadlines, grab progress, road surface sclerosis is not done or is done less in some building sites, does not arrange or not according to standard configuration vehicle wash facility.Even if there are some easy vehicle wash facility, are also only an ornament, do not come into operation, cause the vehicle band mud in building site of coming in and going out to be set out on a journey, had a strong impact on the daily of urban road and kept a public place clean.
For ensureing social environment environmental protection, at present with construction site airborne dust and carrier vehicle band clay contaminated urban road for administering emphasis.And the way in current most construction site is all set up easy vehicle wash pond, adopts 1 to 2 personnel to keep watch specially and at gate place, vehicle to be rinsed.But so also can only rinse vehicle and outer surface of tire, and cannot rinse inside tire and put in place, after vehicle is set out on a journey, the vibrations that rotation and traveling along with vehicle tyre are brought, earth will drop on road surface, to environment.
In order to address this problem, applicant devises gate place, a kind of construction site vehicle wash system, comprise motor flusher and construction site vehicle wash water treatment device, motor flusher comprises three bar shaped rinsing areas that horizontal parallel is on the ground arranged, the flushing direction of bar shaped rinsing area is perpendicular to the length direction of described bar shaped rinsing area, and the flushing direction of adjacent two described bar shaped rinsing areas is oppositely arranged.But wherein vehicle wash water treatment device in construction site needs how to design, can have structure simple, easy to use, investment and the effect such as running cost is low, just become the problem that needs are further considered.
Utility model content
For above-mentioned the deficiencies in the prior art, technical problem to be solved in the utility model is: how to provide a kind of structure simple, easy to use, investment and the low construction site vehicle wash water treatment device of running cost.
In order to solve the problems of the technologies described above, the utility model have employed following technical scheme:
A kind of construction site vehicle wash water treatment device, comprise two drainage trays that horizontal parallel is on the ground arranged, the top of drainage tray is equipped with cover plate along drainage tray length direction, cover plate is provided with some leaking holes, it is characterized in that: also comprise Water warfare retrieving arrangement, Water warfare retrieving arrangement comprises and is arranged on underground settling pit, at least three chambers are provided with along its length in settling pit, be communicated with by overflow port before adjacent two chambers, the chamber inner wall being positioned at described settling pit end, one end is along its length provided with water-in and is communicated with described drainage tray, the height of described overflow port reduces along described water-in place chamber gradually to the chamber direction away from described water-in.
In the utility model, after carrier vehicle has loaded engineering dregs on-site, travel to gate, building site place, by storing cycle on wash-down water treatment unit, the wheel of vehicle both sides is on the cover plate of two drainage trays separately, then vehicle is rinsed.Water after vehicle wash carries silt and flow in the chamber of end, settling pit length direction one end through drainage tray from water-in, the foreign material such as silt just will be deposited at the bottom of the pond of chamber under gravity, upper surface compared with clean water through overflow port overflow in adjacent next chamber.Overflow water again precipitates in chamber, the impurity such as earth are still deposited at the bottom of pond, the precipitation water on upper strata is equally through overflow port overflow extremely next chamber, the quantity of chamber may set according to practical situation, until overflow is to last chamber, compare clean water exactly, finally extract circulation flushing out with lift pump and use.
As optimization, described Water warfare retrieving arrangement also comprises and is arranged on underground blowdown watch-keeping cubicle, the pool wall of each chamber at the bottom of pond in described settling pit is provided with sewage draining exit, described blowdown watch-keeping cubicle is provided with many blow-off pipes and is communicated with each sewage draining exit respectively, and the described blow-off pipe being positioned at described blowdown watch-keeping cubicle is provided with control valve.After using for some time, a large amount of silt can be precipitated at the bottom of the pond of each chamber, according to the precipitation status of silt, respectively different chambers is rinsed, operator open the control valve needed on the blow-off pipe of irrigation chamber in blowdown watch-keeping cubicle, then rinse at chamber roof water, silt is just flushed to sewer line by blow-off pipe, rinses and completes closed control valve again.
As optimization, described Water warfare retrieving arrangement also comprises and is arranged on underground flocculation basin and water collecting basin and is arranged on ground strainer, lift pump I is provided with in the chamber of described settling pit away from end, described water-in one end, the exit end of lift pump I is connected with hydraulic pipe I and the end of hydraulic pipe I extend in described flocculation basin, the top of described flocculation basin is provided with and is fixedly connected on ground erecting stage, erecting stage is fixedly connected with agitator, the bottom of agitator comprises the stir shaft extend into through described erecting stage in flocculation basin, stir the tip of the axis and be provided with agitating vane, lift pump II is provided with at the bottom of described water collecting basin pond, the input terminus of lift pump II is communicated with the output terminal of described strainer, the input terminus of described strainer is connected with hydraulic pipe II and the end of hydraulic pipe II stretches at the bottom of described flocculation basin pond.Settling pit has carried out precipitation process to wash-down water, in time rinsing vehicle and be comparatively intensive, in settling pit, each chamber also has little time to precipitate wash-down water just to overflow to next chamber, some larger sandstones can only be precipitated like this, if and slime water is delivered to flushing machine when lacking precipitation by lift pump, the blocking of flushing machine can be caused unavoidably.Slime water is evacuated in flocculation basin by lift pump I, then in flocculation basin, add certain flocculation of sludge agent, and start agitator stirring reaction is carried out to slime water, slime water is made to form larger throw out, flocculation water is evacuated in strainer and filters by lift pump II again, throw out is filtered out, finally obtains clean water and be stored in water collecting basin and wait for and reusing.
As optimization, the chamber at described lift pump I place is provided with hollow out platform away from the bottom of described overflow port side, the bottom of hollow out platform is provided with the supporting leg for supporting described hollow out platform, the height of described hollow out platform is lower than the height of overflow port in the chamber of described hollow out platform place, and described lift pump I is positioned on described hollow out platform.Although lift pump I place chamber flow to chamber for last overflow water, also the contamination precipitations such as some earth sandstone can be there is at the bottom of the pond of chamber unavoidably, improve the installation site of lift pump I, hollow out platform can prevent from above earth is deposited in, avoiding earth to be drawn in equipment to result in blockage.
In sum, the beneficial effects of the utility model are: the utility model structure is simple, easy to use, investment and running cost low, make the recycle again after the sewage disposal after vehicle wash, saved water resources.
Accompanying drawing explanation
In order to make the object of utility model, technical scheme and advantage clearly, below in conjunction with accompanying drawing, the utility model is described in further detail, wherein:
Fig. 1 is vertical view of the present utility model;
Fig. 2 is the side-view of the settling pit in the utility model;
Fig. 3 is the flushing machine structural representation in the utility model.
Embodiment
Below in conjunction with accompanying drawing, the utility model is described in further detail.
As shown in Figure 1 to Figure 3, gate, construction site place vehicle wash system in this embodiment, comprise motor flusher and wash-down water treatment unit, wash-down water treatment unit comprises two drainage trays 1 that horizontal parallel is on the ground arranged, the top of drainage tray 1 is equipped with cover plate 2 along drainage tray 1 length direction, cover plate 2 is provided with some leaking holes, described motor flusher comprises on the ground that is positioned at outside two described drainage trays 1 respectively along the spaced multiple outer flushing machine 3 of described drainage tray 1 length direction, article two, the flushing direction of the described outer flushing machine 3 outside described drainage tray 1 is perpendicular to described drainage tray 1 length direction and be oppositely arranged, article two, the ground between described drainage tray 1 is arranged at intervals with multiple interior flushing machine 4 along described drainage tray 1 length direction, the flushing direction of interior flushing machine is perpendicular to described drainage tray 1 length direction, the flushing direction of adjacent two described interior flushing machines is contrary.
In this embodiment, described outer flushing machine 3 and described interior flushing machine 4 comprise the bracing frame 5 that is oppositely arranged and the hydraulic giant 6 between bracing frame 5 separately, the body of a gun both sides level of hydraulic giant 6 is provided with and stretches out and coaxial back shaft 7, and the back shaft 7 of the body of a gun both sides of hydraulic giant 6 is rotatably assorted with the bracing frame 5 of described hydraulic giant 6 both sides separately.
In this embodiment, the front end of described hydraulic giant 6 is provided with detachable water nozzle 8, and the outside surface of the rear end of described hydraulic giant 6 is arranged at intervals with multiple annular protrusion 9 circumferentially along hydraulic giant 6 length direction.
In this embodiment, described outer flushing machine 3 and described interior flushing machine 4 also comprise separately and are fixedly connected on the drive-motor I 10 of support frame as described above 5 away from described hydraulic giant 6 side, and the drive shaft of drive-motor I 10 coordinates with the transmission of described back shaft 7.
In this embodiment, described outer flushing machine and described interior flushing machine also comprise the wheelwork be positioned at below support frame as described above 5 separately, wheelwork comprises base 23 and to be positioned at above base 23 and horizontally disposed rotating disk 24, described base 23 upper surface has been recessed to form motor installation cavity, motor installation cavity internal fixtion is connected with drive-motor II 25, the top of drive-motor II 25 comprises straight up and the rotating shaft be fixedly connected with described rotating disk 24 center, and the bottom of support frame as described above 5 is fixedly connected on the upper surface of described rotating disk 24.
In this embodiment, described wash-down water treatment unit also comprises Water warfare retrieving arrangement, Water warfare retrieving arrangement comprises and is arranged on underground settling pit, at least three chambers 12 are provided with along its length in settling pit, be communicated with by overflow port 13 before adjacent two chambers 12, chamber 12 inwall being positioned at described settling pit end, one end is along its length provided with water-in 14 and is communicated with described drainage tray 1, the chamber 12 being positioned at described settling pit the other end end is along its length provided with lift pump I 15, the exit end of lift pump I 15 is connected with hydraulic pipe I 16 and hydraulic pipe I 16 is communicated with interior flushing machine 4 with outer flushing machine 3, the height of described overflow port 13 reduces along described water-in 14 place chamber 12 gradually to chamber 12 direction, described lift pump I 15 place.
In this embodiment, described Water warfare retrieving arrangement also comprises and is arranged on underground blowdown watch-keeping cubicle 17, the pool wall of each chamber 12 at the bottom of pond in described settling pit is provided with sewage draining exit 18, described blowdown watch-keeping cubicle 17 is provided with many blow-off pipes 11 and is communicated with each sewage draining exit 17 respectively, and the described blow-off pipe 11 being positioned at described blowdown watch-keeping cubicle 17 is provided with control valve 19.
In this embodiment, described Water warfare retrieving arrangement also comprises and is arranged on underground flocculation basin 26 with water collecting basin 27 be arranged on ground strainer 28, the end of described hydraulic pipe I 16 extend in described flocculation basin 26, the top of described flocculation basin 26 is provided with and is fixedly connected on ground erecting stage 29, erecting stage 29 is fixedly connected with agitator 30, the bottom of agitator 30 comprises the stir shaft 22 extend into through described erecting stage 29 in flocculation basin 26, the end of stir shaft 22 is provided with agitating vane 31, lift pump II 32 and lift pump III 33 is provided with at the bottom of described water collecting basin 27 pond, the input terminus of lift pump II 32 is communicated with the output terminal of described strainer 28, the input terminus of described strainer 28 is connected with hydraulic pipe II 34 and the end of hydraulic pipe II 34 stretches at the bottom of described flocculation basin 26 pond, the output terminal of described lift pump III 33 is connected with hydraulic pipe III 35 and hydraulic pipe III 35 is communicated with interior flushing machine with outer flushing machine.
In this embodiment, the chamber 12 at described lift pump I 15 place is provided with hollow out platform 20 away from the bottom of described overflow port 13 side, the bottom of hollow out platform 20 is provided with the supporting leg 21 for supporting described hollow out platform 20, the height of described hollow out platform 20 is lower than the height of overflow port 13 in described hollow out platform 20 place chamber 12, and described lift pump I 15 is positioned on described hollow out platform 20.
Can also do like this in the process implemented, ground outside two described drainage trays 1 is respectively arranged with dash platform along described drainage tray 1 length direction, described outer flushing machine is fixedly connected on the top of dash platform, dash platform is utilized to be blocked by vehicle wash water, prevent sewage outflow contaminate environment, the rate of recovery of wash-down water can also be improved simultaneously, economize on resources.Above each chamber and blowdown watch-keeping cubicle 17 of settling pit, lay cover plate, the generation of the mishap such as prevent that personnel from dropping, also prevents extraneous foreign matter impurity from entering in settling pit simultaneously.The sidewall in blowdown watch-keeping cubicle 17 installs stair, convenient operation personnel down operation control valve 19.The two ends of strainer 28 have employed the mode of connection of ring flange in addition, conveniently carry out dismounting and change.
What finally illustrate is, above embodiment is only in order to illustrate the technical solution of the utility model and unrestricted, although be described the utility model by referring to preferred embodiment of the present utility model, but those of ordinary skill in the art is to be understood that, various change can be made to it in the form and details, and not depart from the spirit and scope of the present utility model that appended claims limits.

Claims (4)

1. a construction site vehicle wash water treatment device, comprise two drainage trays that horizontal parallel is on the ground arranged, the top of drainage tray is equipped with cover plate along drainage tray length direction, cover plate is provided with some leaking holes, it is characterized in that: also comprise Water warfare retrieving arrangement, Water warfare retrieving arrangement comprises and is arranged on underground settling pit, at least three chambers are provided with along its length in settling pit, be communicated with by overflow port before adjacent two chambers, the chamber inner wall being positioned at described settling pit end, one end is along its length provided with water-in and is communicated with described drainage tray, the height of described overflow port reduces along described water-in place chamber gradually to the chamber direction away from described water-in.
2. construction site according to claim 1 vehicle wash water treatment device, it is characterized in that: described Water warfare retrieving arrangement also comprises and is arranged on underground blowdown watch-keeping cubicle, the pool wall of each chamber at the bottom of pond in described settling pit is provided with sewage draining exit, described blowdown watch-keeping cubicle is provided with many blow-off pipes and is communicated with each sewage draining exit respectively, and the described blow-off pipe being positioned at described blowdown watch-keeping cubicle is provided with control valve.
3. construction site according to claim 1 vehicle wash water treatment device, it is characterized in that: described Water warfare retrieving arrangement also comprises and is arranged on underground flocculation basin and water collecting basin and is arranged on ground strainer, lift pump I is provided with in the chamber of described settling pit away from end, described water-in one end, the exit end of lift pump I is connected with hydraulic pipe I and the end of hydraulic pipe I extend in described flocculation basin, the top of described flocculation basin is provided with and is fixedly connected on ground erecting stage, erecting stage is fixedly connected with agitator, the bottom of agitator comprises the stir shaft extend into through described erecting stage in flocculation basin, stir the tip of the axis and be provided with agitating vane, lift pump II is provided with at the bottom of described water collecting basin pond, the input terminus of lift pump II is communicated with the output terminal of described strainer, the input terminus of described strainer is connected with hydraulic pipe II and the end of hydraulic pipe II stretches at the bottom of described flocculation basin pond.
4. construction site according to claim 3 vehicle wash water treatment device, it is characterized in that: the chamber at described lift pump I place is provided with hollow out platform away from the bottom of described overflow port side, the bottom of hollow out platform is provided with the supporting leg for supporting described hollow out platform, the height of described hollow out platform is lower than the height of overflow port in the chamber of described hollow out platform place, and described lift pump I is positioned on described hollow out platform.
CN201520370845.XU 2015-06-02 2015-06-02 Construction site vehicle wash water treatment device Expired - Fee Related CN204689786U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520370845.XU CN204689786U (en) 2015-06-02 2015-06-02 Construction site vehicle wash water treatment device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520370845.XU CN204689786U (en) 2015-06-02 2015-06-02 Construction site vehicle wash water treatment device

Publications (1)

Publication Number Publication Date
CN204689786U true CN204689786U (en) 2015-10-07

Family

ID=54230101

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520370845.XU Expired - Fee Related CN204689786U (en) 2015-06-02 2015-06-02 Construction site vehicle wash water treatment device

Country Status (1)

Country Link
CN (1) CN204689786U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105966366A (en) * 2016-06-23 2016-09-28 中建市政工程有限公司 Method and system for self-cleaning water-saving type comprehensive vehicle washing for civil construction site

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105966366A (en) * 2016-06-23 2016-09-28 中建市政工程有限公司 Method and system for self-cleaning water-saving type comprehensive vehicle washing for civil construction site
CN105966366B (en) * 2016-06-23 2018-08-17 中建市政工程有限公司 A kind of method and its system from clear water-saving pattern synthesis carwash for civil engineering building site

Similar Documents

Publication Publication Date Title
CN207842900U (en) A kind of construction site environment-friendly water-saving automatic car washing device
CN202516413U (en) Circulating water system for engineering vehicle cleaning tank
CN201268037Y (en) Automatic recovery system for concrete sandstone sewerage
CN109878466A (en) A kind of construction site slag-soil truck cleaning device
CN104196118A (en) Automatic pool vacuum-flushing and desilting device and method
CN104674891A (en) Power-free rainwater recycling system
CN108996740A (en) A kind of just rain processing system and method
CN205473049U (en) Doublestage deposits formula grit separation sewage cycle equipment of recycling
CN104032696B (en) A kind of road purging method and rinse-system
CN207276352U (en) Sewage collecting processing unit and system
CN204689786U (en) Construction site vehicle wash water treatment device
CN204659690U (en) Gate, construction site place vehicle wash system
CN204659688U (en) A kind of washing system for construction site vehicle
CN101332446A (en) Device and method for flushing gravel using recirculated water at construction site
CN103833164B (en) Sewage precipitative filter tank
CN106567505A (en) Household separate rainwater collecting and processing device and method for drought regions
CN110270159A (en) A kind of drop energy emission reduction water circulation system
CN110217908A (en) A kind of industrial tail water environment protection treating system
CN202130431U (en) Automatic washer for engineering vehicle
CN204659689U (en) Motor flusher
CN210874250U (en) Muddy water recovery unit that system concrete was used
CN210176577U (en) Artificial wetland dredging system of gravel packed bed
CN209098457U (en) A kind of domestic sewage processing system
CN203469560U (en) Site sewage collection and treatment tank of coal preparation plants
CN207328396U (en) Wheel cleaning system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151007

Termination date: 20160602