CN204684887U - Boiler smoke energy-efficient treatment system - Google Patents
Boiler smoke energy-efficient treatment system Download PDFInfo
- Publication number
- CN204684887U CN204684887U CN201520249975.8U CN201520249975U CN204684887U CN 204684887 U CN204684887 U CN 204684887U CN 201520249975 U CN201520249975 U CN 201520249975U CN 204684887 U CN204684887 U CN 204684887U
- Authority
- CN
- China
- Prior art keywords
- tower
- drying tower
- gas wash
- treatment system
- efficient treatment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of boiler smoke energy-efficient treatment system, comprise interconnective boiler and economizer, the hot-air outlet of economizer connects gas wash tower, drying tower and chimney successively, described gas wash tower inside is provided with helical form dedusting coil pipe, dedusting coil pipe is evenly distributed with the shower nozzle for water spray, the top of gas wash tower is communicated with by horizontal pipe with drying tower top, and the bottom of gas wash tower is also connected to three-stage filtration pond by drainpipe; The inwall of described drying tower is uneven wall, and drying tower inside is also provided with the multiple semicircle crash panel be crisscross arranged vertically, and be communicated with by exhaust passage between the bottom of drying tower and the bottom of chimney, exhaust passage is provided with air exhauster.The boiler smoke energy-efficient treatment system architecture that the utility model provides is simple, corrosion-resistant, the life-span is long, economize energy, and use cost is low.
Description
Technical field
the utility model relates to field of fume treatment equipment, is specifically related to a kind of boiler smoke energy-efficient treatment system.
Background technology
china is that world today's coal-burned industrial boiler is produced and uses maximum countries.Along with China is to the further deflation of air quality regulation dusty gas discharge standard, the energy that coal-burning boiler is transformed into the contaminant capacities such as burning liquid gas, natural gas less is gradually the system of fuel.But no matter be coal or natural gas, the flue gas discharged during burning has certain pollution to environment.The flue gas discharged when coal combustion, liquefied gas, natural gas equal energy source comprises CO, CO
2, SO
2, NO, NO
2deng pernicious gas, these gases not only endanger the healthy of people, and pollute human habitat.Current Industrial Boiler and small household boiler energy efficiency and pollution problem very outstanding, the total amount of pollutant of annual discharge is larger.Therefore solve and administer Pollution of Boiler and become the difficult point that various places solve atmosphere pollution.
Utility model content
For solving the problems of the technologies described above, the utility model provides a kind of boiler smoke energy-efficient treatment system, and this system architecture is simple, corrosion-resistant, the life-span is long, economize energy, and use cost is low.
The technical scheme that the utility model adopts is: boiler smoke energy-efficient treatment system, comprise interconnective boiler and economizer, the hot-air outlet of economizer connects gas wash tower, drying tower and chimney successively, described gas wash tower inside is provided with helical form dedusting coil pipe, dedusting coil pipe is evenly distributed with the shower nozzle for water spray, the top of gas wash tower is communicated with by horizontal pipe with drying tower top, and the bottom of gas wash tower is also connected to three-stage filtration pond by drainpipe; The inwall of described drying tower is uneven wall, and drying tower inside is also provided with the multiple semicircle crash panel be crisscross arranged vertically, and be communicated with by exhaust passage between the bottom of drying tower and the bottom of chimney, exhaust passage is provided with air exhauster.
Further optimization, described crash panel is provided with more than three.
Further optimization, the distance between adjacent two described crash panels is 30-60cm.
Compared with prior art, the utility model at least has following advantage and beneficial effect:
Compared with prior art, structure is simple for smoke processing system of the present utility model, corrosion-resistant, the life-span is long, drying tower is attached to after including the air impingement tower wall of hydrone on tower wall naturally to fall, and also having high-temperature flue gas by carrying out drying, not needing extra power, economize energy, use cost is low.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Reference numeral: 1, boiler, 2, economizer, 3, gas wash tower, 4, drying tower, 5, chimney, 6, dedusting coil pipe, 7, drainpipe, 8, three-stage filtration pond, 9, crash panel.
Detailed description of the invention
For making content of the present utility model become apparent, below in conjunction with specific embodiment, the utility model is described in detail.
As shown in the figure, boiler smoke energy-efficient treatment system, comprise interconnective boiler 1 and economizer 2, the hot-air outlet of economizer 2 connects gas wash tower 3, drying tower 4 and chimney 5 successively, described gas wash tower 3 inside is provided with helical form dedusting coil pipe 6, dedusting coil pipe 6 is evenly distributed with the shower nozzle for water spray, the top of gas wash tower 3 is communicated with by horizontal pipe with drying tower 4 top, and the bottom of gas wash tower 3 is also connected to three-stage filtration pond 8 by drainpipe 7; The inwall of described drying tower 4 is uneven wall, and drying tower 4 inside is also provided with the multiple semicircle crash panel 9 be crisscross arranged vertically, and the bottom of drying tower 4 is communicated with by exhaust passage with between the bottom of chimney 5, and exhaust passage is provided with air exhauster.
In order to make the utility model have better result of use, described crash panel 9 is provided with more than three, and the distance between adjacent two crash panels 9 is 30-60cm.
In the technical program, smoke processing system of the present utility model compared with prior art, structure is simple, corrosion-resistant, the life-span is long, drying tower 4 is attached to after including the air impingement tower wall of hydrone on tower wall naturally to fall, and also having high-temperature flue gas by carrying out drying, not needing extra power, economize energy, use cost is low.
Technical scheme cited by the utility model and embodiment be not restriction, be equal to the technical scheme cited by the utility model and embodiment or effect same approach all in the scope that the utility model is protected.
Claims (3)
1. boiler smoke energy-efficient treatment system, comprise interconnective boiler (1) and economizer (2), it is characterized in that: the hot-air outlet of economizer (2) connects gas wash tower (3), drying tower (4) and chimney (5) successively, described gas wash tower (3) inside is provided with helical form dedusting coil pipe (6), dedusting coil pipe (6) is evenly distributed with the shower nozzle for water spray, the top of gas wash tower (3) is communicated with by horizontal pipe with drying tower (4) top, and the bottom of gas wash tower (3) is also connected to three-stage filtration pond (8) by drainpipe (7); The inwall of described drying tower (4) is uneven wall, and drying tower (4) inside is also provided with the multiple semicircle crash panel (9) be crisscross arranged vertically, the bottom of drying tower (4) is communicated with by exhaust passage with between the bottom of chimney (5), and exhaust passage is provided with air exhauster.
2. boiler smoke energy-efficient treatment system as claimed in claim 1, is characterized in that: described crash panel (9) is provided with more than three.
3. boiler smoke energy-efficient treatment system as claimed in claim 1 or 2, is characterized in that: the distance between adjacent two described crash panels (9) is 30-60cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520249975.8U CN204684887U (en) | 2015-04-23 | 2015-04-23 | Boiler smoke energy-efficient treatment system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520249975.8U CN204684887U (en) | 2015-04-23 | 2015-04-23 | Boiler smoke energy-efficient treatment system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204684887U true CN204684887U (en) | 2015-10-07 |
Family
ID=54225229
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520249975.8U Active CN204684887U (en) | 2015-04-23 | 2015-04-23 | Boiler smoke energy-efficient treatment system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204684887U (en) |
-
2015
- 2015-04-23 CN CN201520249975.8U patent/CN204684887U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204996283U (en) | Boiler exhaust -gas treatment apparatus | |
CN205517263U (en) | Flue gas heat exchange energy conservation SOx/NOx control device | |
CN205550020U (en) | Wet flue gas desulfurization dust collector | |
CN204684887U (en) | Boiler smoke energy-efficient treatment system | |
CN203323152U (en) | Building integration biomass burning flue gas purifying heat recovery unit based on natural material utilization | |
CN202962194U (en) | Desulfurization dust removal spraying device | |
CN205102148U (en) | Coal fired power plant's boiler purifier that discharges fume | |
CN205842714U (en) | House refuse pyrolysis furnace flue gas processing device | |
CN204648286U (en) | A kind of steam generator system of high-efficiency environment friendly energy-conservation | |
CN205352103U (en) | Fall pollution waste heat recovery and utilize boiler | |
CN203549873U (en) | Rice husk ash spraying collection device | |
CN205664389U (en) | Novel incineration boiler is recycled to rubbish | |
CN203370451U (en) | Two-stage wet-type efficient desulfurization and dust collection device | |
CN103615799B (en) | Energy-saving environment-friendly multi-stage water boiler | |
CN203017921U (en) | Novel boiler waste gas treatment environmental protection equipment | |
CN205627558U (en) | Plasma photocatalyst exhaust gas purification device | |
CN204718112U (en) | A kind of environmental protection coal-fired boiler | |
CN206008406U (en) | A kind of coal-burning power plant's minimum discharge device | |
CN105879635A (en) | Boiler flue gas desulfurization and denitrification device | |
CN204478114U (en) | A kind of coal-burning boiler desulphurization system | |
CN204768009U (en) | Biomass fuel furnace exhaust gas purification device of spraying plastics oven | |
CN205037573U (en) | Boiler waste heat utilizing device | |
CN204320008U (en) | A kind of biomass boiler smoke eliminator | |
CN203990249U (en) | High-efficiency desulfurization denitration compound dust-collection device | |
CN204699551U (en) | Boiler combustion air emission abatement device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |