CN204676501U - A kind of air entraining facilities of flood discharging tunnel - Google Patents

A kind of air entraining facilities of flood discharging tunnel Download PDF

Info

Publication number
CN204676501U
CN204676501U CN201520251098.8U CN201520251098U CN204676501U CN 204676501 U CN204676501 U CN 204676501U CN 201520251098 U CN201520251098 U CN 201520251098U CN 204676501 U CN204676501 U CN 204676501U
Authority
CN
China
Prior art keywords
discharging tunnel
flood discharging
air
utility
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520251098.8U
Other languages
Chinese (zh)
Inventor
殷亮
彭育
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201520251098.8U priority Critical patent/CN204676501U/en
Application granted granted Critical
Publication of CN204676501U publication Critical patent/CN204676501U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model relates to a kind of air entraining facilities of flood discharging tunnel.The purpose of this utility model is to provide a kind of air entraining facilities of safe and reliable, simple flood discharging tunnel of constructing, and avoids directly contacting with high-velocity flow section gas-vapor mix, can provide enough air to greatest extent, ensures ventilatory effect and good bubble distribution state.The technical solution of the utility model is: a kind of air entraining facilities of flood discharging tunnel, comprise the flood discharging tunnel being provided with air mixing corrosion reducing facility, it is concrete base plate bottom flood discharging tunnel, both sides are concrete-lined hole wall, vertical independent ventilation hole is arranged in the wall of described hole, stable aerated cavity is formed bottom air vent and between base plate, it is characterized in that: described flood discharging tunnel section is gateway opening shape, with flood discharging tunnel section center line for axis is provided with the air shaft be communicated with ambient atmosphere, described air vent upper end is connected with arc transition with between air shaft lower end.The utility model is applicable to the civil engineering such as water conservancy, water power.

Description

A kind of air entraining facilities of flood discharging tunnel
Technical field
The utility model relates to a kind of air entraining facilities of flood discharging tunnel, is applicable to the civil engineering such as water conservancy, water power.
Background technology
Large-scale flood discharging tunnel is for preventing cavitation destruction, and the place being usually greater than 30m/s ~ 35m/s at flow velocity adds air mixing corrosion reducing facility along current limit wall, and this layout is the engineer applied such as water conservancy, water power form of structure widely.As higher in certain engineering flood discharging tunnel dragon rear flow rate of water flow that falls, Peak Flow Rate is at about 45m/s, flow cavitation number is between 0.16 ~ 0.24, the position that these flow cavitation numbers are smaller, likely there is cavitation destruction, comparatively large on the safe operation impact of flood discharging tunnel, need to take effective, economic, reliable anti-cavitation cavitation corrosion measure, this is engineering problem commonplace in the civil engineering such as water conservancy, water power flood discharging tunnel.
At present; all generally bottom water layer after facility to the layout pattern of air mixing corrosion reducing facility in flood discharging tunnel or sidewall forms the stable cavity of certain length; utilize the negative pressure formed in cavity; by the air vent connected; outside air is sucked automatically, and with current blending after move down to reach the effect protecting hole wall thereupon.As shown in Figure 1, the traditional air vent of flood discharging tunnel aerator is generally arranged in Dong Bi both sides, utilize local to dig supplies gas from hole top connection, but because high-velocity flow section hole static headspace gas may be full of gas-vapor mix, from hole top tonifying Qi by often not reaching necessary aeration concentrater (generally minimum not should lower than 4% ~ 5%), affect the ventilatory effect of air entraining facilities.
Summary of the invention
The technical problems to be solved in the utility model is: for above-mentioned Problems existing, a kind of air entraining facilities of safe and reliable, simple flood discharging tunnel of constructing is provided, avoid directly contacting with high-velocity flow section gas-vapor mix, enough air can be provided to greatest extent, ensure ventilatory effect and good bubble distribution state.
The technical scheme that the utility model adopts is: a kind of air entraining facilities of flood discharging tunnel, comprise the flood discharging tunnel being provided with air mixing corrosion reducing facility, it is concrete base plate bottom flood discharging tunnel, both sides are concrete-lined hole wall, vertical independent ventilation hole is arranged in the wall of described hole, stable aerated cavity is formed bottom air vent and between base plate, it is characterized in that: described flood discharging tunnel section is gateway opening shape, with flood discharging tunnel section center line for axis is provided with the air shaft be communicated with ambient atmosphere, described air vent upper end is connected with arc transition with between air shaft lower end.
The sectional dimension of described air vent is 1.5m × 2.0m.
The beneficial effects of the utility model are: the utility model adopts local to dig, utilizes concrete lining to form the ventilation layout pattern of both sides independence air inlet, avoid directly contacting with high-velocity flow section gas-vapor mix, enough air can be provided to greatest extent, ensure ventilatory effect, simultaneously to streamflow regime also without obvious adverse effect, do not increase difficulty of construction, construction quality also can be guaranteed, safe and reliable.
Accompanying drawing explanation
Fig. 1 is flood discharging tunnel aerator tradition ventilation arrangement diagram.
Fig. 2 is structural layout plan of the present utility model.
Detailed description of the invention
As shown in Figure 2, the present embodiment is a kind of air entraining facilities of flood discharging tunnel, be provided with air mixing corrosion reducing facility and section is the flood discharging tunnel 1 of gateway opening shape, it is concrete base plate 2 bottom this flood discharging tunnel, both sides are concrete-lined hole wall 3, the independent ventilation hole 5 that sectional dimension is 1.5m × 2.0m is vertically furnished with in the wall of hole, aerated cavity 4 is formed bottom air vent and between base plate 2, with the independent ventilation vertical shaft 6 that the section center line of flood discharging tunnel 1 is communicated with ambient atmosphere for axis is provided with, be connected with arc transition between this air shaft lower end with air vent 5 upper end.When being provided with air mixing corrosion reducing facility in flood discharging tunnel 1, adopt local to dig, utilize concrete lining to form the ventilation layout pattern of both sides independence air inlet, thus adapt to the requirement of ventilation tonifying Qi, air entraining facilities independent ventilation hole 5 is connected with ambient atmosphere by independent ventilation vertical shaft 6, instead of from the direct tonifying Qi of hole top gas-vapor mix.Compared to traditional ventilation layout pattern, its ventilatory effect is good, does not increase difficulty of construction, and construction quality is also easily guaranteed.
The present embodiment Specific construction step:
1) flood discharging tunnel 1 local digs: according to the deployment scenarios of air mixing corrosion reducing facility, determines the position that flood discharging tunnel 1 local digs; The size of air vent 5 is determined according to air-conditioning requirement, is generally 1.5m × 2.0m (wide × long); The geological conditions that the thickness of concrete-lined hole wall 3 digs position according to local is determined, generally gets 1m.
2) concrete lining: construction of concrete lining can be carried out after having dug in hole, concrete grade requires to be not less than C25.

Claims (2)

1. the air entraining facilities of a flood discharging tunnel, comprise the flood discharging tunnel (1) being provided with air mixing corrosion reducing facility, it is concrete base plate (2) bottom flood discharging tunnel, both sides are concrete-lined hole wall (3), vertical independent ventilation hole (5) is arranged in the wall of described hole, stable aerated cavity (4) is formed bottom air vent and between base plate (2), it is characterized in that: described flood discharging tunnel (1) section is gateway opening shape, the independent ventilation vertical shaft (6) be communicated with ambient atmosphere for axis is provided with flood discharging tunnel section center line, be connected with arc transition between described air vent (5) upper end with air shaft (6) lower end.
2. the air entraining facilities of flood discharging tunnel according to claim 1, is characterized in that: the sectional dimension of described independent ventilation hole (5) is 1.5m × 2.0m.
CN201520251098.8U 2015-04-23 2015-04-23 A kind of air entraining facilities of flood discharging tunnel Active CN204676501U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520251098.8U CN204676501U (en) 2015-04-23 2015-04-23 A kind of air entraining facilities of flood discharging tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520251098.8U CN204676501U (en) 2015-04-23 2015-04-23 A kind of air entraining facilities of flood discharging tunnel

Publications (1)

Publication Number Publication Date
CN204676501U true CN204676501U (en) 2015-09-30

Family

ID=54176206

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520251098.8U Active CN204676501U (en) 2015-04-23 2015-04-23 A kind of air entraining facilities of flood discharging tunnel

Country Status (1)

Country Link
CN (1) CN204676501U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106919772A (en) * 2017-04-24 2017-07-04 中国电建集团成都勘测设计研究院有限公司 High-velocity flow free flow drain cavern gas supplementary structure method of construction and gas supplementary structure
CN108842733A (en) * 2018-08-06 2018-11-20 中国电建集团华东勘测设计研究院有限公司 A kind of asynchronous three-dimensional air mixing corrosion reducing structure
CN109083107A (en) * 2018-07-17 2018-12-25 四川大学 It is a kind of to choose the air entraining facilities that stream forms aerated cavity using water flow centripetal force inertia
CN109295939A (en) * 2018-10-29 2019-02-01 中国电建集团华东勘测设计研究院有限公司 A kind of air compensating system and its ventilation amount control method of high-velocity flow tunnel

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106919772A (en) * 2017-04-24 2017-07-04 中国电建集团成都勘测设计研究院有限公司 High-velocity flow free flow drain cavern gas supplementary structure method of construction and gas supplementary structure
CN106919772B (en) * 2017-04-24 2023-06-20 中国电建集团成都勘测设计研究院有限公司 Construction method of air supplementing structure of high-speed water flow open flow water drain hole and air supplementing structure
CN109083107A (en) * 2018-07-17 2018-12-25 四川大学 It is a kind of to choose the air entraining facilities that stream forms aerated cavity using water flow centripetal force inertia
CN108842733A (en) * 2018-08-06 2018-11-20 中国电建集团华东勘测设计研究院有限公司 A kind of asynchronous three-dimensional air mixing corrosion reducing structure
CN109295939A (en) * 2018-10-29 2019-02-01 中国电建集团华东勘测设计研究院有限公司 A kind of air compensating system and its ventilation amount control method of high-velocity flow tunnel
CN109295939B (en) * 2018-10-29 2024-05-31 中国电建集团华东勘测设计研究院有限公司 Air supplementing system of high-speed water flow tunnel and air ventilation control method of air ventilation system

Similar Documents

Publication Publication Date Title
CN204676501U (en) A kind of air entraining facilities of flood discharging tunnel
CN201785733U (en) Spillway chute structure
CN102966082A (en) Aeration facility with downward-bent base slab
CN106919772A (en) High-velocity flow free flow drain cavern gas supplementary structure method of construction and gas supplementary structure
CN2915940Y (en) Curved aerated chute
CN102900053A (en) Improved deep-cylinder stilling well
CN204023521U (en) For the drain cavern structure of rotational flow silo
CN101892654B (en) Conical swirling flow vertical shaft
CN206053881U (en) A kind of gas lift reverse circulation slag cleaning device
CN203411957U (en) Aerification device used for flood discharge deep hole
CN205088648U (en) High -velocity flow for flood discharge air defense lose flood discharge hole
CN113405760A (en) External mounting structure of wind tunnel turning water conservancy diversion piece
CN207419408U (en) A kind of high water head delays base slope sluicing tunnel build
CN208995999U (en) A kind of asynchronous three-dimensional air mixing corrosion reducing structure
CN103711119B (en) A kind of pneumatic anti-settling circulating system of drilled pile mud and using method
CN103214108A (en) Efficient injection type aerator
CN103306681B (en) A kind of tunnel piercing sector rotation construction method
CN102556669B (en) Gas-solid mixing accelerating chamber
CN110230295B (en) A air entrainment formula volute chamber water conservancy diversion bank for whirl shaft
CN209412794U (en) A kind of parallel air compensating system of high-velocity flow tunnel
CN101767886A (en) Aeration design method of rubber dam project and device thereof
CN210459271U (en) Fan jacket structure for offshore wind power
CN207175606U (en) A kind of rake release
CN204475347U (en) Vertical shaft concrete conveyance slow descending device
CN203684195U (en) Lip air entrainment system for water delivery valve of high-lift ship lock

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant