CN204665249U CN201520320885.3U CN201520320885U CN204665249U CN 204665249 U CN204665249 U CN 204665249U CN 201520320885 U CN201520320885 U CN 201520320885U CN 204665249 U CN204665249 U CN 204665249U
Authority
CN
China
Prior art keywords
pressure storehouse
valve
slow pressure
water
boiler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520320885.3U
Other languages
Chinese (zh)
Inventor
孔令斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520320885.3U priority Critical patent/CN204665249U/en
Application granted granted Critical
Publication of CN204665249U publication Critical patent/CN204665249U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pipeline Systems (AREA)

Abstract

The utility model discloses the unpowered water charging system of a kind of steam boiler, comprise Boiler High Pressure storehouse, it is characterized in that: described Boiler High Pressure storehouse is by being connected slow pressure storehouse with valve A with the pipeline of valve C, described slow pressure storehouse is by being connected water storing bin with valve B with the pipeline of valve D, water level limit switch under boiler water filling position limit switch and boiler is provided with in described Boiler High Pressure storehouse, described Boiler High Pressure storehouse is also by being connected slow pressure storehouse for subsequent use with valve A ' with the pipeline of valve C ', described slow pressure storehouse for subsequent use is by being connected water storing bin with valve B ' with the pipeline of valve D '.The utility model makes simple, and cost is low, easy for installation, takes up room little, stable performance, can better Serve the production, and meet low energy consumption standard, energy conservation, control system middle low power motor power (output) is little, and the working time is short.

Description

The unpowered water charging system of a kind of steam boiler
Technical field
The utility model relates to steam boiler field, specifically, relates to the unpowered water charging system of a kind of steam boiler.
Background technology
In the industrial production, Large Copacity high pressure steam boiler adopts motor-centrifugal water pump moisturizing, because in Boiler Furnace storehouse, pressure is large, water charging system long operational time, power consumption is very large, for 4T, 1.5MP steam boiler, and the supporting power 22.5KW of water charging system, working time is about steaming hour 1/3rd, its system electrisity consumption: W=pt=22.5 × 10 3× 365 × 24 × 1/3 ≈ 6.6 ten thousand degree.Existing high-pressure boiler water charging system expends waste mass energy, and efficiency is not high.This is the deficiencies in the prior art part.
Utility model content
The technical problems to be solved in the utility model is to provide the unpowered water charging system of a kind of steam boiler, and realize the unpowered automatic water supplement of high pressure steam boiler, automaticity is high.
The utility model adopts following technical scheme to realize utility model object:
The unpowered water charging system of a kind of steam boiler, comprise Boiler High Pressure storehouse, it is characterized in that: described Boiler High Pressure storehouse is by being connected slow pressure storehouse with valve A with the pipeline of valve C, described slow pressure storehouse is by being connected water storing bin with valve B with the pipeline of valve D, water level limit switch under boiler water filling position limit switch and boiler is provided with in described Boiler High Pressure storehouse, described Boiler High Pressure storehouse is also by being connected slow pressure storehouse for subsequent use with valve A ' with the pipeline of valve C ', and described slow pressure storehouse for subsequent use is by being connected water storing bin with valve B ' with the pipeline of valve D '.
As the further restriction to the technical program, described slow pressure storehouse is identical with slow pressure chamber structure for subsequent use, water level limit switch, lower water level limit switch and division board is all provided with in described slow pressure storehouse and slow pressure storehouse for subsequent use, described division board is provided with back-water valve (BWV), described division board connects driving cylinder, and the inside top in described slow pressure storehouse and slow pressure storehouse for subsequent use is provided with division board limit switch.
As the further restriction to the technical program, the periphery of described division board is provided with sealing ring.
As the further restriction to the technical program, the least significant end height of described water storing bin is greater than or equal to the tip height in described slow pressure storehouse and slow pressure storehouse for subsequent use.
As the further restriction to the technical program, the height in described slow pressure storehouse and slow pressure storehouse for subsequent use is greater than or equal to the height of described boiler water filling position limit switch.
Compared with prior art, advantage of the present utility model and good effect are: slow pressure storehouse of the present utility model utilizes the deadweight of water for the moisturizing of Boiler High Pressure storehouse, when supplementing complete but high-pressure chamber in slow pressure storehouse and also not reaching the full state of water, slow pressure storehouse for subsequent use is the moisturizing of Boiler High Pressure storehouse, slow pressure storehouse and slow pressure storehouse for subsequent use alternately complete the moisturizing work in Boiler High Pressure storehouse, motor need not be adopted to provide power, make simple, cost is low, easy for installation, take up room little, stable performance, can better Serve the production, meet low energy consumption standard, energy conservation, control system middle low power motor power (output) is little, working time is short.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the side view in slow pressure storehouse of the present utility model and slow pressure storehouse for subsequent use;
Fig. 3 is the top view of Boiler High Pressure storehouse of the present utility model, slow pressure storehouse, slow pressure storehouse for subsequent use and water storing bin;
Fig. 4 is the side view of Boiler High Pressure storehouse of the present utility model, slow pressure storehouse, slow pressure storehouse for subsequent use and water storing bin;
Fig. 5 is the structural representation in slow pressure storehouse of the present utility model;
Fig. 6 is the structural representation of division board of the present utility model;
Fig. 7 is the sectional view of division board of the present utility model.
In figure, 1, Boiler High Pressure storehouse, 2, valve A, 3, valve C, 4, slow pressure storehouse, 5, valve B, 6, valve D, 7, water storing bin, 8, boiler water level upper limit position switch, 9, boiler water level lower position switch, 10, water level upper limit position switch, 11, water level lower position switch, 12, division board, 13, back-water valve (BWV), 14, slow pressure storehouse for subsequent use, 15, valve A ', 16, valve C ', 17, valve B ', 18, valve D ', 19, drive cylinder, 20, division board limit switch, 21, sealing ring.
Detailed description of the invention
Below in conjunction with accompanying drawing and preferred embodiment, the utility model is further described in detail.
See Fig. 1-Fig. 7, the utility model comprises Boiler High Pressure storehouse 1, described Boiler High Pressure storehouse 1 is by being connected slow pressure storehouse 4 with valve A2 with the pipeline of valve C3, described slow pressure storehouse 4 is by being connected water storing bin 7 with valve B5 with the pipeline of valve D6, water level limit switch 9 under boiler water filling position limit switch 8 and boiler is provided with in described Boiler High Pressure storehouse 1, described Boiler High Pressure storehouse 1 is also by being connected slow pressure storehouse 14 for subsequent use with valve A ' 15 with the pipeline of valve C ' 16, and described slow pressure storehouse 14 for subsequent use is by being connected water storing bin 7 with valve B ' 17 with the pipeline of valve D ' 18.
Described slow pressure storehouse 4 is identical with slow pressure storehouse 14 for subsequent use structure, water level limit switch 10, lower water level limit switch 11 and division board 12 is all provided with in described slow pressure storehouse 4 and slow pressure storehouse 14 for subsequent use, described division board 12 is provided with back-water valve (BWV) 13, described division board 12 connects driving cylinder 19, and the inside top in described slow pressure storehouse 4 and slow pressure storehouse 14 for subsequent use is provided with division board limit switch 20.
The periphery of described division board 12 is provided with sealing ring 21.Sealing ring 21 plays sealing function, and control is slow presses the water in storehouse 4 and slow pressure storehouse 14 for subsequent use to overflow on the upside of division board 12.
The least significant end height of described water storing bin 7 is greater than or equal to the tip height in described slow pressure storehouse 4 and slow pressure storehouse 14 for subsequent use.
The height in described slow pressure storehouse 4 and slow pressure storehouse 14 for subsequent use is greater than or equal to the height of described boiler water filling position limit switch 8.
Valve A of the present utility model, valve C, valve B, valve D, valve A ', valve C ', valve B ', valve D ' and back-water valve (BWV) 13 are all adopt prior art, under boiler water filling position limit switch and boiler, water level limit switch is also adopt prior art, under boiler water filling position limit switch 8 and boiler, water level limit switch 9 sends triggering signal according to the water level height in boiler, upper water level limit switch 10 and lower water level limit switch 11 send triggering signal according to the water level height in slow pressure storehouse 4 and slow pressure storehouse 14 for subsequent use, division board limit switch 20 sends triggering signal by the shake-up of division board.This is prior art, does not repeat them here.
Utility model works flow process comprises the steps:
(1) opening: slow pressure storehouse 4 starts, open valve B5 and valve D6, the division board 12 in slow pressure storehouse 4 rises fast under the drive of the driving cylinder 19 in slow pressure storehouse simultaneously, gives storehouse 4 retaining of slow pressure, until the water level upper limit position switch 10 in slow pressure storehouse 4 sends the full signal i of water lh, slow pressure storehouse stops retaining, valve-off B5 and valve D6; Open valve B ' and valve D ', meanwhile, the division board in slow pressure storehouse 14 for subsequent use rises fast under the drive driving cylinder, to slow pressure storehouse 14 retaining for subsequent use, until the water level upper limit position switch in slow pressure storehouse 14 for subsequent use sends the full signal I ' of water lh, slow pressure storehouse for subsequent use stops retaining, valve-off B ' and valve D ';
(2) boiler water level lower position switch 9 sends early warning signal;
(3) if slow pressure storehouse 4 is in the full state of water, then the moisturizing of Boiler High Pressure storehouse is given in slow pressure storehouse 4;
(4) if the water level lower position switch in slow pressure storehouse 4 sends early warning signal and slow pressure storehouse 14 for subsequent use is in the full state of water, Boiler High Pressure storehouse 1 moisturizing is given in slow pressure storehouse 14 for subsequent use, and slow pressure storehouse 4 starts self-water replenishing;
(5) if the water level lower position switch in slow pressure storehouse 14 for subsequent use sends early warning signal, slow pressure storehouse 14 for subsequent use starts self-water replenishing;
(6) repeat step (3)-(5), until boiler water level upper limit position switch 8 sends early warning signal, moisturizing terminates.
In described step (3), slow pressure storehouse 4 comprises following process to blast furnace high-pressure chamber 1 moisturizing:
Valve A2 and valve C3 opens, valve B5 and valve D6 closes, slow pressure storehouse 4 manufactures high-pressure balancing, demineralized water in slow pressure storehouse 4 is used water-head and is utilized deadweight to flow in Boiler High Pressure storehouse 1 through valve A2, simultaneously, high steam flows into slow pressure storehouse 4 by valve C3, and pressurized gives the division board 12 in slow pressure storehouse, division board 12 is at driving cylinder 19 moved downward, drive cylinder 19 2 pressing aids, accelerate moisturizing speed, back-water valve (BWV) 13 has single-phase mobility, under the effect of division board 12, by aqueous water and high steam isolation, vapour-liquid can not be there is and inhale molten phenomenon, until the water level lower position switch in slow pressure storehouse 4 sends early warning signal, division board 12 stops moving downward.
The for subsequent use slow pressure storehouse 14 of described step (4) gives the process of Boiler High Pressure storehouse 1 moisturizing as follows:
Valve A ' 15 and valve C ' 16 opens, valve B ' 17 and valve D ' 18 closes, slow pressure storehouse 14 for subsequent use manufactures high-pressure balancing, in slow pressure storehouse for subsequent use, the demineralized water of 14 uses water-head utilization deadweight in valve A ' 15 inflow Boiler High Pressure storehouse 1, simultaneously, high steam flows into slow pressure storehouse 14 for subsequent use by valve C ' 16, and pressurized gives the division board 12 in slow pressure storehouse for subsequent use, division board 12 is at driving cylinder 19 moved downward, secondary pressing aid, accelerate moisturizing speed, back-water valve (BWV) 13 has single-phase mobility, under the effect of slow pressure storehouse for subsequent use division board 12, by aqueous water and high steam isolation, vapour-liquid can not be there is and inhale molten phenomenon, until the water level lower position switch in slow pressure storehouse 14 for subsequent use sends early warning signal, division board 12 stops moving downward.
The slow pressure storehouse 4 self-water replenishing process of described step (4) is as follows:
Valve B5 and valve D6 opens, valve A2 and valve C3 closes, slow pressure storehouse 4 manufactures normal-pressure balance, use water-head, water is utilized to conduct oneself with dignity, demineralized water flows to slow pressure storehouse 4 from water storing bin 7 through valve B5 and valve D6, simultaneously, the division board 12 in slow pressure storehouse 4 rises fast under the drive driving cylinder 19, when rising to slow pressure 4 top, storehouse, division board 12 triggers division board limit switch 20 and sends triggering signal, back-water valve (BWV) 13 is opened, division board 12 stops moving upward, moisturizing proceeds, until the water level upper limit position switch in slow pressure storehouse 4 sends the full signal of water, stop moisturizing, simultaneously, gas is discharged through valve D6, liquefaction water flows on the downside of division board 12 through back-water valve (BWV).
The for subsequent use slow pressure storehouse self-water replenishing process of described step (5) is as follows:
Slow pressure storehouse moisturizing for subsequent use: valve B ' 17 and valve D ' 18 opens, valve A ' 15 and valve C ' 16 closes, slow pressure storehouse 14 for subsequent use manufactures normal-pressure balance, use water-head, water is utilized to conduct oneself with dignity, demineralized water flows to slow pressure storehouse 14 for subsequent use from water storing bin 7 through valve B ' 17 and valve D ' 18, simultaneously, the division board 12 in slow pressure storehouse 14 for subsequent use rises fast under the drive driving cylinder, when rising to 14 top, slow pressure storehouse for subsequent use, division board 12 triggers division board limit switch 20 and sends triggering signal, division board 12 stops moving upward, back-water valve (BWV) 13 is opened, moisturizing proceeds, until water level upper limit position switch sends the full signal of water, stop moisturizing, simultaneously, gas is discharged through valve D ', liquefaction water flows on the downside of division board 12 through back-water valve (BWV).
The utility model can pass through without the technical characteristic described or adopt existing techniques in realizing; do not repeat them here; certainly; above-mentioned explanation is not to restriction of the present utility model; the utility model is also not limited in above-mentioned citing; the change that those skilled in the art make in essential scope of the present utility model, remodeling, interpolation or replacement, also should belong to protection domain of the present utility model.

Claims (5)

1. the unpowered water charging system of steam boiler, comprise Boiler High Pressure storehouse, it is characterized in that: described Boiler High Pressure storehouse is by being connected slow pressure storehouse with valve A with the pipeline of valve C, described slow pressure storehouse is by being connected water storing bin with valve B with the pipeline of valve D, water level limit switch under boiler water filling position limit switch and boiler is provided with in described Boiler High Pressure storehouse, described Boiler High Pressure storehouse is also by being connected slow pressure storehouse for subsequent use with valve A ' with the pipeline of valve C ', and described slow pressure storehouse for subsequent use is by being connected water storing bin with valve B ' with the pipeline of valve D '.
2. the unpowered water charging system of steam boiler according to claim 1, it is characterized in that: described slow pressure storehouse is identical with slow pressure chamber structure for subsequent use, water level limit switch, lower water level limit switch and division board is all provided with in described slow pressure storehouse and slow pressure storehouse for subsequent use, described division board is provided with back-water valve (BWV), described division board connects driving cylinder, and the inside top in described slow pressure storehouse and slow pressure storehouse for subsequent use is provided with division board limit switch.
3. the unpowered water charging system of steam boiler according to claim 2, is characterized in that: the periphery of described division board is provided with sealing ring.
4. the unpowered water charging system of steam boiler according to claim 1, is characterized in that: the least significant end height of described water storing bin is greater than or equal to the tip height in described slow pressure storehouse and slow pressure storehouse for subsequent use.
5. the unpowered water charging system of steam boiler according to claim 1, is characterized in that: the height in described slow pressure storehouse and slow pressure storehouse for subsequent use is greater than or equal to the height of described boiler water filling position limit switch.
CN201520320885.3U 2014-11-18 2015-05-19 The unpowered water charging system of a kind of steam boiler Expired - Fee Related CN204665249U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520320885.3U CN204665249U (en) 2014-11-18 2015-05-19 The unpowered water charging system of a kind of steam boiler

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201420693863 2014-11-18
CN2014206938637 2014-11-18
CN201520320885.3U CN204665249U (en) 2014-11-18 2015-05-19 The unpowered water charging system of a kind of steam boiler

Publications (1)

Publication Number Publication Date
CN204665249U true CN204665249U (en) 2015-09-23

Family

ID=54135627

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520320885.3U Expired - Fee Related CN204665249U (en) 2014-11-18 2015-05-19 The unpowered water charging system of a kind of steam boiler

Country Status (1)

Country Link
CN (1) CN204665249U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104406156A (en) * 2014-11-18 2015-03-11 孔令斌 Steam boiler unpowered water charging system and control method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104406156A (en) * 2014-11-18 2015-03-11 孔令斌 Steam boiler unpowered water charging system and control method thereof

Similar Documents

Publication Publication Date Title
CN204665249U (en) The unpowered water charging system of a kind of steam boiler
CN203730246U (en) Energy-saving noise reduction air compression system
CN105782947A (en) Unpowered water replenishing control method for steam boiler
CN104406156B (en) A kind of unpowered water charging system of steam boiler and control method
CN203497734U (en) Additionally-arranged blowing assisting device of exhaust pipe of pneumatic ash conveying bin pump
CN201394781Y (en) Double-cylinder continuous sand blasting machine used in sand blasting room
CN204042919U (en) Be convenient to the garbage burning boiler ash bucket of pine ash
CN204107207U (en) Environment friendly dedusting device
CN202808339U (en) Down discharging device
CN103185397B (en) Full-automatic water-supplying case
CN205475466U (en) Two -way pressure regulating tower of hammer disappears
CN204073713U (en) The deduster of sand preparing system equipment
CN202645621U (en) Negative-pressure automatic water discharger
CN202530507U (en) Programmable logic controller (PLC)-based frequency conversion constant pressure water supply system
CN202401526U (en) Intelligent relay variable frequency water supply device
CN204419714U (en) A kind of centrifugal pump irrigation device
CN202064400U (en) Household surface water supply device
CN203823424U (en) Mechanical interlocking device for opening gas holder safety releasing pipe valve
CN201991787U (en) Water pump with automatic water-absorbing device
CN202625391U (en) Thermal power plant adjacent furnace negative pressure powder bin emptying device
CN207363809U (en) A kind of hydro-generating Unit secondary draining power generating equipment
CN102352645B (en) Intelligent relay variable frequency water supply equipment
CN204085199U (en) Blast furnace slag chute device
CN203214459U (en) Novel fire pump
CN204200589U (en) From carrying water suction device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150923

Termination date: 20170519

CF01 Termination of patent right due to non-payment of annual fee