CN204663743U - Fixed sealing expansion joint structure is installed in a kind of inner side - Google Patents
Fixed sealing expansion joint structure is installed in a kind of inner side Download PDFInfo
- Publication number
- CN204663743U CN204663743U CN201520316133.XU CN201520316133U CN204663743U CN 204663743 U CN204663743 U CN 204663743U CN 201520316133 U CN201520316133 U CN 201520316133U CN 204663743 U CN204663743 U CN 204663743U
- Authority
- CN
- China
- Prior art keywords
- primary seal
- ring
- fixed
- turbine chamber
- downstream
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Abstract
The utility model relates to a kind of turbine parts, particularly relate to a kind of inner side and fixed sealing expansion joint structure is installed, comprise the primary seal be fixed between turbine chamber and foundation ring, the upstream extremity of described primary seal is fixed on turbine chamber by a upstream extremity fixed pressure ring, the downstream of primary seal is fixed on foundation ring by a downstream fixed pressure ring, described primary seal is provided with supporting ring, described supporting ring side is fixed on foundation ring, supporting ring opposite side is fitted in turbine chamber and primary seal, guide plate is provided with below described primary seal.The beneficial effects of the utility model are, runner envelope and primary seal, between foundation ring and primary seal, all adopt fixing seal, make the sealing effect of primary seal can not vibrate with runner envelope, be out of shape and change, safe and reliable water-tight, thus make hydroelectric station operation safer.
Description
Technical field
The utility model relates to a kind of turbine parts, particularly relates to a kind of inner side and installs fixed sealing expansion joint structure.
Background technique
All slip joint is provided with between current tubular turbine runner envelope and foundation ring, existing slip joint sealing circular rubber bar or the molded rubber packing of adopting as seal element more, movable sealing structure is designed between Sealing and runner envelope or foundation ring, this expansion joint structure sealing effect with runner envelope vibration, distortion and worsen, there is water leakage phenomenon more, become the persistent ailment in tubular water power plant.
Model utility content
Adopt movable sealing structure to overcome current slip joint, easily produce the shortcoming of leaking, the utility model provide a kind of can prevent the sealing effect of slip joint with runner envelope vibration, distortion and change, thus avoiding the phenomenon that slip joint leaks, fixed sealing expansion joint structure is installed in the inner side of improving power station safety in operation.
The utility model solves the technological scheme that its technical problem adopts: fixed sealing expansion joint structure is installed in a kind of inner side, comprise the primary seal be fixed between turbine chamber and foundation ring, the upstream extremity of described primary seal is fixed on turbine chamber by a upstream extremity fixed pressure ring, the downstream of primary seal is fixed on foundation ring by a downstream fixed pressure ring, described primary seal is provided with supporting ring, described supporting ring side is fixed on foundation ring, supporting ring opposite side is fitted in turbine chamber and primary seal, guide plate is provided with below described primary seal.
Preferably, described supporting ring is in " L " shape, and its side is bolted on foundation ring by the 3rd, and another side is fitted in turbine chamber and primary seal, be provided with the first rubber strip between supporting ring and turbine chamber, between supporting ring and foundation ring, be provided with the second rubber strip.
Preferably, upstream extremity and the upstream extremity fixed pressure ring of described primary seal are bolted on turbine chamber by first, and downstream and the downstream fixed pressure ring of primary seal are bolted on foundation ring by second.
Preferably, fix after the upstream extremity of described first screw bolt passes turbine chamber, primary seal and upstream extremity fixed pressure ring, fix after the downstream of described second screw bolt passes downstream fixed pressure ring, primary seal and foundation ring.
This kind of structure facilitates the support of primary seal, makes the sealing effect of primary seal better simultaneously.
Preferably, described guide plate one end is bolted on turbine chamber by the 4th, and the position of the guide plate the other end is corresponding with the position of foundation ring.
Primary seal in the utility model is fixedly connected with adopting between turbine chamber, adopts and be fixedly connected with between primary seal with foundation ring.
The beneficial effects of the utility model are, runner envelope and primary seal, between foundation ring and primary seal, all adopt fixing seal, make the sealing effect of primary seal can not vibrate with runner envelope, be out of shape and change, safe and reliable water-tight, thus make hydroelectric station operation safer.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
In Fig. 1: 1. turbine chamber, 2. the first bolt, 3. the first rubber strip, 4. supporting ring, 5. upstream extremity fixed pressure ring, 6. primary seal, 7. downstream fixed pressure ring, 8. the second bolt, 9. foundation ring, 10. the second rubber strip, 11. the 3rd bolts, 12. guide plates, 13. the 4th bolts.
Embodiment
Below in conjunction with accompanying drawing, the utility model is described in further detail, but is not the restriction to the utility model protection domain.
As shown in Figure 1, fixed sealing expansion joint structure is installed in a kind of inner side, comprises supporting ring 4, primary seal 6, upstream extremity fixed pressure ring 5, downstream fixed pressure ring 7 and guide plate 12.Supporting ring 4 is in " L " shape, its side is fixed on foundation ring 9 by the 3rd bolt 11, another side is fitted in turbine chamber 1 and primary seal 6, is provided with the first rubber strip 3 between supporting ring 4 and turbine chamber 1, is provided with the second rubber strip 10 between supporting ring 4 and foundation ring 9.
The upstream extremity of primary seal 6 is fixedly connected with turbine chamber 1 with the first bolt 2 by upstream extremity fixed pressure ring 5, and the downstream of primary seal 6 is fixedly connected with foundation ring 9 with the second bolt 8 by downstream fixed pressure ring 7.Guide plate 12 one end is fixed on turbine chamber 1 by the 4th bolt 13, and the position of guide plate 12 the other end is corresponding with the position of foundation ring 9.
First bolt 2 is successively through fixing after turbine chamber 1, the upstream extremity of primary seal 6 and upstream extremity fixed pressure ring 5, and the second bolt 8 is successively through fixing after the downstream of downstream fixed pressure ring 7, primary seal 6 and foundation ring 9.
Primary seal of the present utility model can make whole coil structures, can overhaul, easy construction inside runner to primary seal.
The beneficial effects of the utility model are, primary seal two ends all adopt pressure ring, bolt is separately fixed at runner envelope and on foundation ring, have good followability thus sealing effect not with the vibration of runner envelope, distortion and changing, avoid the appearance of water turbine slip joint water leakage situation, be conducive to unit safety operation.
Claims (5)
1. fixed sealing expansion joint structure is installed in an inner side, comprise the primary seal be fixed between turbine chamber and foundation ring, it is characterized in that: the upstream extremity of described primary seal is fixed on turbine chamber by a upstream extremity fixed pressure ring, the downstream of primary seal is fixed on foundation ring by a downstream fixed pressure ring, described primary seal is provided with supporting ring, described supporting ring side is fixed on foundation ring, supporting ring opposite side is fitted in turbine chamber and primary seal, is provided with guide plate below described primary seal.
2. fixed sealing expansion joint structure is installed in a kind of inner side according to claim 1, it is characterized in that: described supporting ring is in " L " shape, its side is bolted on foundation ring by the 3rd, another side is fitted in turbine chamber and primary seal, be provided with the first rubber strip between supporting ring and turbine chamber, between supporting ring and foundation ring, be provided with the second rubber strip.
3. fixed sealing expansion joint structure is installed in a kind of inner side according to claim 1, it is characterized in that: upstream extremity and the upstream extremity fixed pressure ring of described primary seal are bolted on turbine chamber by first, downstream and the downstream fixed pressure ring of primary seal are bolted on foundation ring by second.
4. fixed sealing expansion joint structure is installed in a kind of inner side according to claim 3, it is characterized in that: fix after the upstream extremity of described first screw bolt passes turbine chamber, primary seal and upstream extremity fixed pressure ring, fix after the downstream of described second screw bolt passes downstream fixed pressure ring, primary seal and foundation ring.
5. fixed sealing expansion joint structure is installed in a kind of inner side according to claim 4, it is characterized in that: described guide plate one end is bolted on turbine chamber by the 4th, and the position of the guide plate the other end is corresponding with the position of foundation ring.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520316133.XU CN204663743U (en) | 2015-05-18 | 2015-05-18 | Fixed sealing expansion joint structure is installed in a kind of inner side |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520316133.XU CN204663743U (en) | 2015-05-18 | 2015-05-18 | Fixed sealing expansion joint structure is installed in a kind of inner side |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204663743U true CN204663743U (en) | 2015-09-23 |
Family
ID=54134132
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520316133.XU Expired - Fee Related CN204663743U (en) | 2015-05-18 | 2015-05-18 | Fixed sealing expansion joint structure is installed in a kind of inner side |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204663743U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107893727A (en) * | 2017-12-29 | 2018-04-10 | 东方电气集团东方电机有限公司 | A kind of tubular turbine collocation structure |
-
2015
- 2015-05-18 CN CN201520316133.XU patent/CN204663743U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107893727A (en) * | 2017-12-29 | 2018-04-10 | 东方电气集团东方电机有限公司 | A kind of tubular turbine collocation structure |
CN107893727B (en) * | 2017-12-29 | 2019-02-19 | 东方电气集团东方电机有限公司 | A kind of tubular turbine collocation structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204663743U (en) | Fixed sealing expansion joint structure is installed in a kind of inner side | |
CN204663741U (en) | Fixed sealing expansion joint structure is installed in a kind of novel outside | |
CN204663740U (en) | Fixed sealing expansion joint structure is installed in a kind of novel inner side | |
CN204663742U (en) | Fixed sealing expansion joint structure is installed in a kind of outside | |
CN201535266U (en) | Automatic coupling device of submersible pump | |
CN203357937U (en) | Hydraulic machine with high-pressure rubber oil tube | |
CN105156256A (en) | Air supplementing structure for runner blades for water turbine | |
CN202946829U (en) | Sand-preventing corrugated pipe expansion joint for hydropower station | |
CN202789837U (en) | Variable oil cylinder with glyd ring | |
CN203402551U (en) | Tank plugging device | |
CN203146210U (en) | Hydroelectric power building installation new structure | |
CN204283707U (en) | The Pelton wheel pipeline structure that lower cross road pipe is removable | |
CN203782661U (en) | Water-stopping device of wall-penetrating shaft sleeve of bottom cross shaft driving flip plate gate | |
CN217928318U (en) | Pipeline protection device for sluice pump station | |
CN204214609U (en) | A kind of coal mining motor water channel water test unit | |
CN204942827U (en) | A kind of Hermetical connecting structure of MBR membrane module | |
CN204225066U (en) | Hydropower station tail water gate in surge chamber hole doubles as impedance pore structure | |
CN204420446U (en) | Metal composite FlexbleJoint | |
CN204356748U (en) | With the gate of hydropower station of axial flow generating set | |
CN203742754U (en) | Novel water pipe connection structure of diesel engine | |
CN204329371U (en) | A kind of rotary type ceramic solar plate | |
CN203430687U (en) | Sealing device of water turbine main shaft | |
CN202900356U (en) | Inlet valve middle structure | |
CN204593915U (en) | The fixed structure of the secondary water tank of solar water heater | |
RU2019140090A (en) | ELECTRIC POWER PRODUCTION METHOD |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150923 |
|
CF01 | Termination of patent right due to non-payment of annual fee |