CN204663521U - Fully-mechanized digging machine second conveyor - Google Patents
Fully-mechanized digging machine second conveyor Download PDFInfo
- Publication number
- CN204663521U CN204663521U CN201520350711.1U CN201520350711U CN204663521U CN 204663521 U CN204663521 U CN 204663521U CN 201520350711 U CN201520350711 U CN 201520350711U CN 204663521 U CN204663521 U CN 204663521U
- Authority
- CN
- China
- Prior art keywords
- conveyor
- fully
- digging machine
- mechanized digging
- oil cylinder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model relates to excavation face in coal mine transport field, specifically a kind of fully-mechanized digging machine second conveyor, comprise six joint middle frames, be connected by brace between adjacent two middle frames, holder is respectively equipped with below first segment middle frame and second section middle frame, telescopic oil cylinder is hinged with between two holders, telescopic oil cylinder is provided with hydraulic lock, the fully-mechanized digging machine be connected with second conveyor is provided with three position four-way directional control valve and operates the control stick of hydraulic system, described three position four-way directional control valve is connected by high-pressure rubber pipe with between hydraulic lock.Fully-mechanized digging machine second conveyor described in the utility model compared with prior art, improved second conveyor solve former second conveyor in tunnel uneven place transport difficult on the impact of driving speed, the demand to transport when meeting the digging laneway under second conveyor what geological conditions in office; Only need driver of roadheader manipulation bar to control the telescopic oil cylinder length on second conveyor during operation.
Description
Technical field
The utility model relates to excavation face in coal mine transport field, specifically a kind of fully-mechanized digging machine second conveyor.
Background technology
Technique of producing coal in the digging laneway of existing colliery mainly relies on fully-mechanized digging machine first conveyor to second conveyor (second conveyor utilizes connecting axle and fully-mechanized digging machine 1 to link together), and then second conveyor overlap joint belt conveyer 2 completes operation of producing coal (as shown in Figure 1).
The length of second conveyor is about 18 meters, is divided into six joint middle frames 3, and the junction of every two joint middle frames 3 is all use the brace 4 of regular length to connect.When running into upward slope in actual tunneling process, second conveyor height goes up a slope with fully-mechanized digging machine 1 and improves constantly, and causes middle frame 3 to contact with back, causes second conveyor normally not run, there is great potential safety hazard.When running into descending in tunneling process, second conveyor height constantly reduces with fully-mechanized digging machine 1 descending, causes middle frame 3 to contact with the belt conveyer 2 of its overlap joint, causes second conveyor and belt conveyer 2 all can not normally run, and impact is produced.Mainly change the height that brace 4 adjusts second conveyor at present.During replacing, use bottle gouard moved by hands to be lifted by crane at the two ends of middle frame 3, personnel dismantle former brace in the below of middle frame 3, and the height then adjusting middle frame 3 changes suitable brace, personnel have many unsafe factors when middle frame 3 times operations, and waste time and energy.
Summary of the invention
The utility model, in order to solve the inconvenience using at present and exist in second conveyor process, provides a kind of fully-mechanized digging machine second conveyor.
The utility model is achieved through the following technical solutions: fully-mechanized digging machine second conveyor, comprise six joint middle frames, be connected by brace between adjacent two middle frames, holder is respectively equipped with below first segment middle frame and second section middle frame, telescopic oil cylinder is hinged with between two holders, telescopic oil cylinder is provided with hydraulic lock, the fully-mechanized digging machine be connected with second conveyor is provided with three position four-way directional control valve and operates the control stick of hydraulic system, described three position four-way directional control valve is connected by high-pressure rubber pipe with between hydraulic lock.
During concrete use, the hydraulic power supply provided by fully-mechanized digging machine drives three position four-way directional control valve work, and operating personnel realize second conveyor middle frame hydraulic lifting function by operation three position four-way directional control valve and telescopic oil cylinder.When fully-mechanized digging machine is in tunnel uphill, downhill section, frequent demolition, installation when the belt conveyer that second conveyor and back and its overlap contacts, are not needed to change brace again.Only need operating personnel just can be adjusted the height of middle frame in real time by control stick, for fully-mechanized digging machine provides favourable condition by when uphill, downhill section and other the abnormal geological structures smoothly, improve driving progress, avoid potential safety hazard.The hydraulic control of three position four-way directional control valve, hydraulic lock and telescopic oil cylinder is that those skilled in the art easily realize.
Fully-mechanized digging machine second conveyor described in the utility model compared with prior art, has following beneficial effect:
1) meet the demands: improved second conveyor solve former second conveyor in tunnel uneven place transport difficult on the impact of driving speed, the demand to transport when meeting the digging laneway under second conveyor what geological conditions in office;
2) easy to operate: during operation, only to need driver of roadheader manipulation bar to control the telescopic oil cylinder length on second conveyor;
3) potential safety hazard and labour intensity: eliminate the place that former second conveyor is upper and lower at geological conditions base plate and convex-concave is more anxious, utilize personnel to carry out demolition, installation and change the hidden danger brought of brace, greatly reduce the labour intensity of personnel's demolition, installation simultaneously;
4) efficient: drivage efficiency is by the bad place of original geological conditions, and 0.2 meter ∕ work rises to 0.4 present meter ∕ work, improves 200%;
5) cost: the transformation of fully-mechanized digging machine second conveyor all uses waste and old Hydraulic Elements, and the leftover pieces etc. scrapping steel process, and significantly reduce cost, has saved a large amount of funds.
Accompanying drawing explanation
Fig. 1 is the connection diagram of technique of producing coal in the digging laneway of existing colliery.
Fig. 2 is the connection diagram of fully-mechanized digging machine second conveyor described in the utility model and fully-mechanized digging machine and belt conveyer.
Fig. 3 is the principle schematic of the utility model hydraulic system.
In figure: 1-fully-mechanized digging machine, 2-belt conveyer, 3-middle frame, 3a-first segment middle frame, 3b-second section middle frame, 4-brace, 5-holder, 6-telescopic oil cylinder, 7-hydraulic lock, 8-three position four-way directional control valve, 9-control stick, 10-high-pressure rubber pipe, 11-oil pump, 12-fuel tank, 13-equalizing valve.
Detailed description of the invention
Fully-mechanized digging machine second conveyor, comprise six joint middle frames 3, be connected by brace 4 between adjacent two middle frames 3, holder 5 is respectively equipped with below first segment middle frame 3a and second section middle frame 3b, telescopic oil cylinder 6 is hinged with between two holders 5, telescopic oil cylinder 6 is provided with hydraulic lock 7, the fully-mechanized digging machine 1 be connected with second conveyor is provided with three position four-way directional control valve 8 and operates the control stick 9 of hydraulic system, described three position four-way directional control valve 8 is connected by high-pressure rubber pipe 10 with between hydraulic lock 7.
The utility model further provides its hydraulic system principle figure, see Fig. 3, the oil-in of oil pump 11 is connected with fuel tank 12, oil pump 11 oil-out be connected with the oil-in of equalizing valve 13, the oil-out of equalizing valve 13 connects the P1 oil-in of three position four-way directional control valve 8, T1 oil recirculating port connecting tank 12, A1, B1 hydraulic fluid port of three position four-way directional control valve 8 connects A2, B2 hydraulic fluid port of hydraulic lock 7 respectively, and A3, B3 hydraulic fluid port of hydraulic lock 7 is connected on rodless cavity and the rod chamber of telescopic oil cylinder 6 respectively.
Claims (1)
1. fully-mechanized digging machine second conveyor, comprise six joint middle frames (3), be connected by brace (4) between adjacent two middle frames (3), it is characterized in that, first segment middle frame (3a) and second section middle frame (3b) below are respectively equipped with holder (5), telescopic oil cylinder (6) is hinged with between two holders (5), telescopic oil cylinder (6) is provided with hydraulic lock (7), the fully-mechanized digging machine (1) be connected with second conveyor is provided with three position four-way directional control valve (8) and operates the control stick (9) of hydraulic system, be connected by high-pressure rubber pipe (10) between described three position four-way directional control valve (8) with hydraulic lock (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520350711.1U CN204663521U (en) | 2015-05-28 | 2015-05-28 | Fully-mechanized digging machine second conveyor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520350711.1U CN204663521U (en) | 2015-05-28 | 2015-05-28 | Fully-mechanized digging machine second conveyor |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204663521U true CN204663521U (en) | 2015-09-23 |
Family
ID=54133913
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520350711.1U Expired - Fee Related CN204663521U (en) | 2015-05-28 | 2015-05-28 | Fully-mechanized digging machine second conveyor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204663521U (en) |
-
2015
- 2015-05-28 CN CN201520350711.1U patent/CN204663521U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202108528U (en) | Protection locking device of operation handle for hydraulic support operation valve | |
CN102259394B (en) | Splitter | |
CN204646284U (en) | A kind of roadway support equipment of gob side entry retaining | |
CN108547655B (en) | One kind facing upward the universal auxiliary process apparatus of reversed of mining working faces end head equipment and method | |
CN201705603U (en) | Portable single pillar dust-proof water booster pump for mine | |
CN201746022U (en) | Tail self-advancing device for belt conveyor | |
CN204663521U (en) | Fully-mechanized digging machine second conveyor | |
CN202174655U (en) | Splitting machine | |
CN204299601U (en) | Pier stud type advance timbering | |
CN204960960U (en) | Speedy drivage temporary support device | |
CN205023519U (en) | Novel two trailers | |
CN204024702U (en) | Small drift drive hoeing machine | |
CN204344162U (en) | A kind of crawler-type traveling filling machine | |
CN203594358U (en) | Full-hydraulic anchor rod drill carriage | |
CN208982050U (en) | A kind of major diameter TBM circular section pilot tunnel step device | |
CN209369853U (en) | A kind of hydraulic support component | |
CN208040444U (en) | A kind of shifting and the supporting mechanism certainly of the fully mechanized mining auxiliary fortune equipment vehicle group of hydraulic pressure automatic moving type | |
CN204402532U (en) | End hydraulic support push-pull device at fixed | |
CN204646275U (en) | A kind of hydraulic automatism prop raising tool | |
CN205399520U (en) | Eneering mechanical basket apparatus | |
CN204827488U (en) | Automatic ratio prop raising tool of hydrodynamic force | |
CN204140119U (en) | Down-hole hydraulic prop Quick transport device | |
CN204113307U (en) | A kind of hydraulic pressure of the colliery bracing or strutting arrangement | |
CN203729353U (en) | Anti-explosion mining loading and unloading slagging-off machine | |
CN209892269U (en) | Improved tunnel gangue backfilling machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150923 Termination date: 20180528 |