CN204660490U - Building materials packing material operative installations - Google Patents
Building materials packing material operative installations Download PDFInfo
- Publication number
- CN204660490U CN204660490U CN201520222737.8U CN201520222737U CN204660490U CN 204660490 U CN204660490 U CN 204660490U CN 201520222737 U CN201520222737 U CN 201520222737U CN 204660490 U CN204660490 U CN 204660490U
- Authority
- CN
- China
- Prior art keywords
- chamber
- packing material
- building materials
- heating
- heating chamber
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Specific Sealing Or Ventilating Devices For Doors And Windows (AREA)
Abstract
The utility model relates to a kind of building materials packing material operative installations, comprise base, base top is provided with supply chamber, and the supply chamber left and right sides is respectively arranged with left support post and right support post, and left support post top is provided with hinge pillar, hinge pillar upper hinge is connected with cover plate, cover plate bottom is provided with support chamber, and support chamber midway location is provided with air suctiton ventilator, and air suctiton ventilator bottom is connected with into dirt chamber, air suctiton ventilator top is connected with dust outlet tube, and dust outlet tube top is provided with dust-collecting cavity; Supply chamber bottom is provided with the first heating chamber, and the first heating chamber left and right sides is all connected with the second heating chamber, and the first heating chamber top is provided with storage chamber.This utility model device can store for building materials packing material effectively, improves its result of use, and facilitates dedusting and preserve dry environment, and is convenient to damping, and convenient unlatching building materials packing material.
Description
Technical field
The utility model belongs to building material technical field, is specifically related to a kind of building materials packing material operative installations.
Background technology
At present, in use, some building materials performance is special for building materials, need to be packed process at special occasions, transport uses simultaneously also needs to carry out under appropriate circumstances, and general building materials packaging is mostly comparatively random, and it is not very convenient to use, cause result of use not good enough, the needs of people cannot be met, to this, need to be improved, to use for packing material better, improve result of use.
Utility model content
The purpose of this utility model is to provide a kind of building materials packing material operative installations, to store for building materials packing material better, and convenient mobile and unlatching, easy to use.
To achieve these goals, the technical solution of the utility model is as follows.
A kind of building materials packing material operative installations, comprise base, base top is provided with supply chamber, and the supply chamber left and right sides is respectively arranged with left support post and right support post, left support post top is provided with hinge pillar, hinge pillar upper hinge is connected with cover plate, and cover plate bottom is provided with support chamber, and support chamber midway location is provided with air suctiton ventilator, air suctiton ventilator bottom is connected with into dirt chamber, enter bottom, dirt chamber be provided with multiple enter dirt hole, air suctiton ventilator top is connected with dust outlet tube, and dust outlet tube top is provided with dust-collecting cavity; Supply chamber bottom is provided with the first heating chamber, and the first heating chamber left and right sides is all connected with the second heating chamber, and the first heating chamber top is provided with storage chamber, and first left and right sides, heating chamber top is provided with stay bearing plate, and stay bearing plate top is provided with shockproof sponge; Base upper right is provided with the chamber that gathers materials, and the top, chamber that gathers materials is provided with the chamber entrance that gathers materials, and base upper left-hand is provided with supporting seat, and left support post midway location chain connection has transverse slat, and transverse slat left side hinge is connected with pipe link, and pipe link bottom is connected with cutting blade.
Further, chassis left side is provided with power interface, and the first heating chamber inside is provided with multiple heating pipe, and the second heating chamber inside is provided with heating rod, power interface is provided with power lead and is connected with heating rod with heating pipe respectively.
Further, the second heating chamber top is respectively arranged with left support block and right support block.
Further, be threaded on the right side of cover plate bolt of rear end plate.
Further, the left and right sides, base bottom is provided with roller.
In this device, unscrew bolt of rear end plate, raise cover plate, building materials packing material is put into storage chamber and stores, cover cover plate, recycling bolt of rear end plate is fixed, and reduces external environment condition to the impact of building materials packing material.In course of conveying, stay bearing plate supports building materials packing material, and shockproof sponge can reduce the vibrations that building materials packing material is subject to, and avoids the breakage of building materials packing material to cause waste.Under the effect of air suctiton ventilator, the dust in storage chamber is inhaled into into dirt chamber from entering dirt hole, and dust enters dust-collecting cavity from dust outlet tube again and collects, and building materials packing material is stored under dustfree environment.Power interface connects external power supply, and heating pipe and heating rod start heating, makes to keep suitable temperature in storage chamber, avoids the liquid in building materials packing material to go bad.Utilize roller moving apparatus, building materials packing material is transported to the place of needs.When needing to use building materials packing material, unscrew bolt of rear end plate, raise cover plate, building materials packing material is taken out and is placed on supporting seat, utilize pipe link to drive cutting blade to move, building materials packing material is opened.Rubbish thing is thrown away from the chamber entrance that gathers materials and collects into the chamber that gathers materials, keep the clean and tidy of environment.
The beneficial effect of this utility model is: this utility model device can store for building materials packing material effectively, improves its result of use, and facilitates dedusting and preserve dry environment, and is convenient to damping, and convenient unlatching building materials packing material.
Accompanying drawing explanation
Fig. 1 is institute's operative installations structural representation in the utility model embodiment.
Description of symbols in figure: 1, power interface; 2, the first heating chamber; 3, heating pipe; 4, stay bearing plate; 5, shockproof sponge; 6, base; 7, gather materials chamber; 8, gather materials chamber entrance; 9, heating rod; 10, right support post; 11, right support block; 12, storage chamber; 13, air suctiton ventilator; 14, dust outlet tube; 15, dust-collecting cavity; 16, support chamber; 17, hinge pillar; 18, supply chamber; 19, left support block; 20, the second heating chamber; 21, pipe link; 22, transverse slat; 23, cutting blade; 24, left support post; 25, supporting seat; 26, roller; 27, bolt of rear end plate; 28, cover plate; 29, dirt chamber is entered; 30, dirt hole is entered.
Detailed description of the invention
Below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is described, better to understand the utility model.
Building materials packing material operative installations as shown in Figure 1, comprise base 6, base 6 top is provided with supply chamber 18, supply chamber 18 left and right sides is respectively arranged with left support post 24 and right support post 10, left support post 24 top is provided with hinge pillar 17, hinge pillar 17 upper hinge is connected with cover plate 28, cover plate 28 bottom is provided with support chamber 16, support chamber 16 midway location is provided with air suctiton ventilator 13, air suctiton ventilator 13 bottom is connected with into dirt chamber 29, enter bottom, dirt chamber 29 be provided with multiple enter dirt hole 30, air suctiton ventilator 13 top is connected with dust outlet tube 14, dust outlet tube 14 top is provided with dust-collecting cavity 15, supply chamber 18 bottom is provided with the first heating chamber 2, first heating chamber 2 left and right sides is all connected with the second heating chamber 20, first heating chamber 2 top is provided with storage chamber 12, and first left and right sides, heating chamber 2 top is provided with stay bearing plate 4, and stay bearing plate 4 top is provided with shockproof sponge 5, base 6 upper right is provided with the chamber 7 that gathers materials, the top, chamber 7 that gathers materials is provided with the chamber entrance 8 that gathers materials, and base 6 upper left-hand is provided with supporting seat 25, and left support post 24 midway location chain connection has transverse slat 22, transverse slat 22 left side hinge is connected with pipe link 21, and pipe link 21 bottom is connected with cutting blade 23.Be provided with power interface 1 on the left of base 6, the first heating chamber 2 inside is provided with multiple heating pipe 3, second heating chamber 20 inside and is provided with heating rod 9, power interface 1 is provided with power lead and is connected with heating rod 9 with heating pipe 3 respectively.Second heating chamber 20 top is respectively arranged with left support block 19 and right support block 11.Be threaded on the right side of cover plate 28 bolt of rear end plate 27.The left and right sides, base 6 bottom is provided with roller 26.
This device in the specific implementation, unscrews bolt of rear end plate 27, raises cover plate 28, building materials packing material is put into storage chamber 12 and stores, cover cover plate 28, and recycling bolt of rear end plate 27 is fixed, and reduces external environment condition to the impact of building materials packing material.In course of conveying, stay bearing plate 4 pairs of building materials packing materials support, and shockproof sponge 5 can reduce the vibrations that building materials packing material is subject to, and avoid the breakage of building materials packing material to cause waste.Under the effect of air suctiton ventilator 13, the dust in storage chamber 12 is inhaled into into dirt chamber 29 from entering dirt hole 30, and dust enters dust-collecting cavity 15 from dust outlet tube 14 again and collects, and building materials packing material is stored under dustfree environment.Power interface 1 connects external power supply, and heating pipe 3 and heating rod 9 start heating, makes to keep suitable temperature in storage chamber 12, avoids the liquid in building materials packing material to go bad.Utilize roller 26 mobile device, building materials packing material is transported to the place of needs.When needing to use building materials packing material, unscrew bolt of rear end plate 27, raise cover plate 28, building materials packing material is taken out and is placed on supporting seat 25, utilize pipe link 21 to drive cutting blade 23 to move, building materials packing material is opened.Rubbish thing is thrown away from the chamber entrance 8 that gathers materials and collects into the chamber 7 that gathers materials, keep the clean and tidy of environment.
The above is preferred implementation of the present utility model; it should be pointed out that for those skilled in the art, under the prerequisite not departing from the utility model principle; can also make some improvements and modifications, these improvements and modifications are also considered as protection domain of the present utility model.
Claims (5)
1. a building materials packing material operative installations, comprise base, it is characterized in that: described base top is provided with supply chamber, the described supply chamber left and right sides is respectively arranged with left support post and right support post, described left support post top is provided with hinge pillar, described hinge pillar upper hinge is connected with cover plate, described cover plate bottom is provided with support chamber, described support chamber midway location is provided with air suctiton ventilator, described air suctiton ventilator bottom is connected with into dirt chamber, described enter bottom, dirt chamber be provided with multiple enter dirt hole, described air suctiton ventilator top is connected with dust outlet tube, described dust outlet tube top is provided with dust-collecting cavity, described supply chamber bottom is provided with the first heating chamber, the described first heating chamber left and right sides is all connected with the second heating chamber, described first heating chamber top is provided with storage chamber, and described first left and right sides, heating chamber top is provided with stay bearing plate, and described stay bearing plate top is provided with shockproof sponge, described base upper right is provided with the chamber that gathers materials, the described top, chamber that gathers materials is provided with the chamber entrance that gathers materials, described base upper left-hand is provided with supporting seat, described left support post midway location chain connection has transverse slat, described transverse slat left side hinge is connected with pipe link, and described pipe link bottom is connected with cutting blade.
2. building materials packing material operative installations according to claim 1, it is characterized in that: described chassis left side is provided with power interface, described first heating chamber inside is provided with multiple heating pipe, described second heating chamber inside is provided with heating rod, described power interface is provided with power lead and is connected with heating rod with heating pipe respectively.
3. building materials packing material operative installations according to claim 1, is characterized in that: described second heating chamber top is respectively arranged with left support block and right support block.
4. building materials packing material operative installations according to claim 1, is characterized in that: be threaded on the right side of described cover plate bolt of rear end plate.
5. building materials packing material operative installations according to claim 1, is characterized in that: the left and right sides, described base bottom is provided with roller.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520222737.8U CN204660490U (en) | 2015-04-14 | 2015-04-14 | Building materials packing material operative installations |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520222737.8U CN204660490U (en) | 2015-04-14 | 2015-04-14 | Building materials packing material operative installations |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204660490U true CN204660490U (en) | 2015-09-23 |
Family
ID=54130902
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520222737.8U Expired - Fee Related CN204660490U (en) | 2015-04-14 | 2015-04-14 | Building materials packing material operative installations |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204660490U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105644898A (en) * | 2016-03-24 | 2016-06-08 | 刘瑞 | Classified storage and conveying device for logistics goods |
-
2015
- 2015-04-14 CN CN201520222737.8U patent/CN204660490U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105644898A (en) * | 2016-03-24 | 2016-06-08 | 刘瑞 | Classified storage and conveying device for logistics goods |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204384031U (en) | Computer equipment stores conveying arrangement | |
CN204548923U (en) | Drug stock control conveying arrangement | |
CN204363367U (en) | There is the storage cabinet of dedusting functions/drying | |
CN204660490U (en) | Building materials packing material operative installations | |
CN207774132U (en) | A kind of express parcel sorting robot based on Internet of Things | |
CN204368756U (en) | Communication electronic component stores conveying arrangement | |
CN204548927U (en) | Infusion bottle stores opening auxiliary device | |
CN204659763U (en) | building article carrying auxiliary device | |
CN206994906U (en) | A kind of insect prevention archives material storage cabinet | |
CN204488848U (en) | Conveying arrangement preserved by equipment for hydroelectric station device | |
CN204415454U (en) | Accounting book stores conveying arrangement | |
CN204368207U (en) | The dry conveying arrangement of computer motherboard dedusting | |
CN204453330U (en) | The damping of blood bag stores conveying arrangement | |
CN204580461U (en) | Health education classification of documents storage device | |
CN204660489U (en) | Building materials article feedway | |
CN204410090U (en) | There is the Mobile bookshelf of moistureproof dedusting function | |
CN204567730U (en) | Communication Electronic Element stores ancillary system | |
CN204440247U (en) | The portable storage device of computing machine components and parts | |
CN204896065U (en) | Conveyer is stored to packing article | |
CN208114420U (en) | A kind of brake block sample display device | |
CN202582086U (en) | Glass drying and dust-extraction device | |
CN104971929A (en) | Dust absorption device for spinning workshop | |
CN207245301U (en) | A kind of environment protection coal canopy mechanism based on main building | |
CN204580459U (en) | A kind of Multifunctional file shelf | |
CN204727198U (en) | The filling Storing and conveying device of food processing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150923 Termination date: 20160414 |
|
CF01 | Termination of patent right due to non-payment of annual fee |