Prior art keywords
operating head
operating
split pin
transmission line
puts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520314525.2U
Other languages
Chinese (zh)
Inventor
崔常青
张建功
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guo Wang Shanxi Electric Power Corp Xinzhou Power Supply Co
State Grid Corp of China SGCC
Original Assignee
Guo Wang Shanxi Electric Power Corp Xinzhou Power Supply Co
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guo Wang Shanxi Electric Power Corp Xinzhou Power Supply Co, State Grid Corp of China SGCC filed Critical Guo Wang Shanxi Electric Power Corp Xinzhou Power Supply Co
Priority to CN201520314525.2U priority Critical patent/CN204651848U/en
Application granted granted Critical
Publication of CN204651848U publication Critical patent/CN204651848U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Magnetic Treatment Devices (AREA)

Abstract

The utility model is a kind of transmission line split pin erecting device, when solving hot line maintenance construction opening pin, needs the problem of carrying out equipotential installation.This device comprises operating head, and the center, front end of operating head offers along the axis direction of operating head and puts cotter way, and puts between the periphery of cotter way and the periphery of operating head by inclined-plane gentle transition; The rear end of operating head is embedded with magnet, and the center of the rear end face of operating head is fixed with action bars along the axis direction of operating head and connects spiral shell button.The utility model structure is simple, easy to operate, can, in the charged situation of circuit, adopt indirect operating method to carry out installing the split pin of charged position.This method is simple to operate, and operating efficiency is high, and avoids the drawback in the past must carrying out equipotential installation, has very high promotional value.

Description

Transmission line split pin erecting device
Technical field
The utility model relates to transmission line specific purpose tool technical field, specifically a kind of transmission line split pin erecting device.
Background technology
Existing transmission line, when installing charged position split pin, must carry out, complicated operation, have certain danger in equipotential situation, is unfavorable for safety in production.At present, temporarily without indirect operating construction opening pin assembly.Therefore, a kind of transmission line split pin erecting device that is safe, convenient, that be suitable for is developed extremely important.
Summary of the invention
The purpose of this utility model is the problem needing to carry out equipotential installation in order to solve transmission line when live line working construction opening pin, and provides a kind of transmission line split pin erecting device.The utility model can complete construction opening pin under indirect operating, and structure is simple, and easy to operate, fail safe is high.
The utility model is achieved by the following technical solution:
A kind of transmission line split pin erecting device, comprises operating head, and the center, front end of operating head offers along the axis direction of operating head and puts cotter way, and puts between the periphery of cotter way and the periphery of operating head by inclined-plane gentle transition; The rear end of operating head is embedded with magnet, and the center of the rear end face of operating head is fixed with action bars along the axis direction of operating head and connects spiral shell button.
When charged construction opening pin, split pin can be positioned over puts in cotter way, the split pin of irony is stuck in operating head securely by magnet, thus prevent split pin from dropping, operating head connects spiral shell button by action bars and links with insulating bar, and earth potential personnel utilize action bars that operating head inner opening pin is installed on charged position.
The utility model structure is simple, easy to operate, can, in the charged situation of circuit, adopt indirect operating method to carry out installing the split pin of charged position.This method is simple to operate, and operating efficiency is high, and avoids the drawback in the past must carrying out equipotential installation, has very high promotional value.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the left view of Fig. 1.
In figure: 1-operating head, 2-put cotter way, 3-inclined-plane, 4-magnet, 5-action bars connection spiral shell button.
Embodiment
Below in conjunction with accompanying drawing, the utility model will be further described:
As shown in Figure 1, 2, a kind of transmission line split pin erecting device, comprise operating head 1, the center, front end of operating head 1 offers along the axis direction of operating head 1 and puts cotter way 2, operating head 1 is cylindric, the longitudinal section of putting cotter way 2 is rectangle, puts the size of size much smaller than operating head 1 of cotter way 2, so put between the periphery of cotter way 2 and the periphery of operating head 1 by inclined-plane 3 gentle transition; The rear end of operating head 1 is embedded with magnet 4, and the center of the rear end face of operating head 1 is fixed with action bars along the axis direction of operating head 1 and connects spiral shell button 5.

Claims (1)

1. a transmission line split pin erecting device, it is characterized in that: comprise operating head (1), the center, front end of operating head (1) offers along the axis direction of operating head (1) and puts cotter way (2), and puts between the periphery of cotter way (2) and the periphery of operating head (1) by inclined-plane (3) gentle transition; The rear end of operating head (1) is embedded with magnet (4), and the center of the rear end face of operating head (1) is fixed with action bars along the axis direction of operating head (1) and connects spiral shell button (5).
CN201520314525.2U 2015-05-16 2015-05-16 Transmission line split pin erecting device Active CN204651848U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520314525.2U CN204651848U (en) 2015-05-16 2015-05-16 Transmission line split pin erecting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520314525.2U CN204651848U (en) 2015-05-16 2015-05-16 Transmission line split pin erecting device

Publications (1)

Publication Number Publication Date
CN204651848U true CN204651848U (en) 2015-09-16

Family

ID=54104558

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520314525.2U Active CN204651848U (en) 2015-05-16 2015-05-16 Transmission line split pin erecting device

Country Status (1)

Country Link
CN (1) CN204651848U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104836180A (en) * 2015-05-16 2015-08-12 国家电网公司 Transmission line cotter pin mounting device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104836180A (en) * 2015-05-16 2015-08-12 国家电网公司 Transmission line cotter pin mounting device

Similar Documents

Publication Publication Date Title
CN204651848U (en) Transmission line split pin erecting device
CN104836180A (en) Transmission line cotter pin mounting device
CN104037662A (en) Special spanner for disassembling drainage wire clamp in electrified mode
CN204676781U (en) The mechanical quick-connect machanism of rod iron and nonprestressed reinforcement
CN202333599U (en) Split pin installer for hot-line work suspension clamp
CN204252623U (en) A kind of easy-to-mount bracing wire sheath
CN204512208U (en) A kind of fast disassembly type linkage structure
CN203674609U (en) Insulator pin removing device
CN205178434U (en) Device is recovered to last stockbridge damper of transmission line
CN201349110Y (en) Special tool for fastening suspension clamp of transmission line
CN205178446U (en) Last stockbridge damper of transmission line
CN202278544U (en) Pin detacher
CN204377291U (en) Electric appliance control box
CN203892360U (en) Support wheel convenient to assemble and disassemble
CN203548466U (en) Limiting type fast pluggable device
CN201946910U (en) V-shaped insulator chain ground potential electrification replacing tool
CN204413995U (en) A kind of device for installing fluid coupling
CN204481144U (en) A kind of earthing device
CN203491120U (en) Single pole disconnecting switch structure in tunnel
CN204793851U (en) Wire protection hook
CN103557213B (en) Limit-type fast insert-pull device
CN204651774U (en) The U-shaped ring of portable dam
CN204257532U (en) A kind of iron core on relay
CN204312493U (en) pin shaft connection structure
CN203521669U (en) Ground wire connecting device of power transmission line

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant