CN204646249U - 一种预防单线隧道岩爆的高地应力释放结构 - Google Patents
一种预防单线隧道岩爆的高地应力释放结构 Download PDFInfo
- Publication number
- CN204646249U CN204646249U CN201520302144.2U CN201520302144U CN204646249U CN 204646249 U CN204646249 U CN 204646249U CN 201520302144 U CN201520302144 U CN 201520302144U CN 204646249 U CN204646249 U CN 204646249U
- Authority
- CN
- China
- Prior art keywords
- tunnel
- water injection
- injection hole
- release water
- stress release
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
本实用新型涉及一种预防单线隧道岩爆的高地应力释放结构。高地应力所引起的岩爆问题显著,不考虑将围岩的地应力进行逐步释放,会威胁到施工安全。本实用新型于隧道上台阶、掌子面开挖轮廓线内侧环向均匀设置多个伸入围岩的环向超前应力释放注水孔,环向超前应力释放注水孔与隧道纵向成小角度并向掌子面开挖轮廓线外侧延伸;于隧道上台阶掌子面沿隧道纵向设置多个掌子面超前应力释放注水孔,掌子面超前应力释放注水孔位于环向超前应力释放注水孔内圈。本实用新型施工方法简单,不影响隧道掘进的其他工序,不增加其他设备,投资增加少,安全可靠,利用超前应力释放注水孔,软化围岩,提前使高地应力得以释放。
Description
技术领域
本实用新型属于交通工程技术领域,具体涉及一种预防单线隧道岩爆的高地应力释放结构。
背景技术
在拉萨至日喀则铁路经过的西藏仁布雅鲁藏布江北岸中高山区,该区域位于冈底斯-念青唐古拉山板块南缘、喜马拉雅板块北缘间的雅鲁藏布江缝合带,新构造运动较活跃,加上隧道的较大埋深(最大埋深1080m),高地应力所引起的岩爆问题显著。为了保证隧道的安全施工和施工质量,最大限度地减少岩爆的影响,需要采取措施将高地应力逐步释放,降低岩爆的严重程度。传统的隧道开挖掘进方式在高地应力地段未考虑将围岩的地应力进行逐步释放,造成在高地应力地段产生岩爆,危及施工人员安全,影响隧道施工进度。
发明内容
本实用新型的目的是提供一种预防单线隧道岩爆的高地应力释放结构,提前使高地应力得以释放,降低岩爆的严重程度。
本实用新型所采用的技术方案是:
一种预防单线隧道岩爆的高地应力释放结构,其特征在于:
于隧道上台阶、掌子面开挖轮廓线内侧环向均匀设置多个伸入围岩的环向超前应力释放注水孔,环向超前应力释放注水孔与隧道纵向成小角度并向掌子面开挖轮廓线外侧延伸;
于隧道上台阶掌子面沿隧道纵向设置多个掌子面超前应力释放注水孔,掌子面超前应力释放注水孔位于环向超前应力释放注水孔内圈。
隧道上台阶拱墙设置网喷钢纤维混凝土,并向围岩内打设径向锚杆。
掌子面超前应力释放注水孔于环向超前应力释放注水孔内圈的掌子面上设置两处,对称设置于隧道中线两侧。
本实用新型具有以下优点:
本实用新型施工方法简单,不影响隧道掘进的其他工序,不增加其他设备,投资增加少,安全可靠。利用超前应力释放注水孔,软化围岩,提前使高地应力得以释放;采用台阶法开挖,高约3.5m的上台阶形成“小导洞”效应使高地应力逐步释放;上台阶拱墙范围用锚杆和网喷钢纤维混凝土加固围岩,锚杆钻孔完成后先注水软化围岩,使高地应力进一步释放,然后注入砂浆完成锚杆的施工。
附图说明
图1为本实用新型横断面图。
图2为本实用新型纵剖面图。
图3为本实用新型上台阶拱墙范围锚杆布置图。
图中,1-围岩,2-开挖轮廓线,3-网喷钢纤维混凝土,4-环向超前应力释放注水孔,5-掌子面超前应力释放注水孔,6-上台阶,7-锚杆。
具体实施方式
下面结合具体实施方式对本实用新型进行详细的说明。
本实用新型涉及的一种预防单线隧道岩爆的高地应力释放结构,于隧道上台阶6、掌子面开挖轮廓线2内侧环向均匀设置多个伸入围岩1的环向超前应力释放注水孔4,孔径50mm,环向间距1.0m。环向超前应力释放注水孔4与隧道纵向成10°的外插角并向掌子面开挖轮廓线2外侧延伸。
于隧道上台阶6掌子面沿隧道纵向设置多个掌子面超前应力释放注水孔5,掌子面超前应力释放注水孔5位于环向超前应力释放注水孔4内圈,设置两处,对称设置于隧道中线两侧,孔径50mm,距开挖底面高1.5m,隧道中线两侧1.0m,深度均为5~7m。
隧道上台阶6拱墙设置网喷钢纤维混凝土3,并向围岩1内打设径向锚杆7。
掌子面超前应力释放注水孔5成孔后向孔内压水,持续时间10min左右,使高地应力提前释放。采用台阶法开挖隧道,上台阶6高度控制在3.5m,控制爆破进尺,使应力逐步释放,降低岩爆的严重程度。在上台阶6拱墙范围用径向锚杆7和网喷钢纤维混凝土3加固围岩,径向锚杆7钻孔完成后先向孔内注水软化围岩,持续时间10min左右,使高地应力进一步释放,然后注入砂浆完成锚杆的施工。
本实用新型的内容不限于实施例所列举,本领域普通技术人员通过阅读本实用新型说明书而对本实用新型技术方案采取的任何等效的变换,均为本实用新型的权利要求所涵盖。
Claims (3)
1.一种预防单线隧道岩爆的高地应力释放结构,其特征在于:
于隧道上台阶(6)、掌子面开挖轮廓线(2)内侧环向均匀设置多个伸入围岩(1)的环向超前应力释放注水孔(4),环向超前应力释放注水孔(4)与隧道纵向成小角度并向掌子面开挖轮廓线(2)外侧延伸;
于隧道上台阶(6)掌子面沿隧道纵向设置多个掌子面超前应力释放注水孔(5),掌子面超前应力释放注水孔(5)位于环向超前应力释放注水孔(4)内圈。
2.根据权利要求1所述的一种预防单线隧道岩爆的高地应力释放结构,其特征在于:
隧道上台阶(6)拱墙设置网喷钢纤维混凝土(3),并向围岩(1)内打设径向锚杆(7)。
3.根据权利要求2所述的一种预防单线隧道岩爆的高地应力释放结构,其特征在于:
掌子面超前应力释放注水孔(5)于环向超前应力释放注水孔(4)内圈的掌子面上设置两处,对称设置于隧道中线两侧。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520302144.2U CN204646249U (zh) | 2015-05-12 | 2015-05-12 | 一种预防单线隧道岩爆的高地应力释放结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520302144.2U CN204646249U (zh) | 2015-05-12 | 2015-05-12 | 一种预防单线隧道岩爆的高地应力释放结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204646249U true CN204646249U (zh) | 2015-09-16 |
Family
ID=54099013
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520302144.2U Active CN204646249U (zh) | 2015-05-12 | 2015-05-12 | 一种预防单线隧道岩爆的高地应力释放结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204646249U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106930766A (zh) * | 2017-03-21 | 2017-07-07 | 中国电建集团成都勘测设计研究院有限公司 | 大埋深tbm施工隧洞岩爆处理结构 |
CN112797860A (zh) * | 2020-12-30 | 2021-05-14 | 西南交通大学 | 一种高地温隧道岩爆防治的施工方法 |
-
2015
- 2015-05-12 CN CN201520302144.2U patent/CN204646249U/zh active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106930766A (zh) * | 2017-03-21 | 2017-07-07 | 中国电建集团成都勘测设计研究院有限公司 | 大埋深tbm施工隧洞岩爆处理结构 |
CN112797860A (zh) * | 2020-12-30 | 2021-05-14 | 西南交通大学 | 一种高地温隧道岩爆防治的施工方法 |
CN112797860B (zh) * | 2020-12-30 | 2022-01-28 | 西南交通大学 | 一种高地温隧道岩爆防治的施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205895312U (zh) | 用于富水地段隧道防排水系统 | |
CN102155232B (zh) | 地形偏压条件下大跨不对称双连拱铁路隧道施工方法 | |
CN103362515B (zh) | 盾构土仓高压水冲刷系统 | |
CN109209472A (zh) | 一种冲孔、爆破、注水相互耦合的煤层卸压防突方法 | |
CN105041344B (zh) | 一种微裂隙围岩预切槽高压气体扩缝注浆堵水方法 | |
CN106761778A (zh) | 一种适用于上软下硬地层的地铁车站暗挖施工工艺 | |
CN103277106A (zh) | 公路隧道三台阶五步开挖施工方法 | |
CN207073410U (zh) | 向煤层循环注入热水和液氮的增透系统 | |
CN206888992U (zh) | 一种水底矿山盾构隧道组合对接结构形式 | |
CN105114098A (zh) | 引水隧洞不良地质洞段处理方法及大直径引水隧洞结构 | |
CN104895072A (zh) | 一种预应力锚索以及预应力锚索一次成型施工方法 | |
CN107237638A (zh) | 一种下穿既有线的暗挖隧道结构及其施工方法 | |
CN104405411A (zh) | 超大变断面隧道支护结构 | |
CN201695407U (zh) | 有盾构隧道下穿的地铁车站基坑围护结构 | |
CN103867209A (zh) | 一种地铁竖井分层、分段转横通道施工开挖进洞的方法 | |
CN103573280A (zh) | 一种多孔洞软泥入侵复合顶板巷道支护方法 | |
CN104141500A (zh) | 一种板结砂砾石地层洞室施工方法 | |
CN204646249U (zh) | 一种预防单线隧道岩爆的高地应力释放结构 | |
CN109209443A (zh) | 一种破碎围岩隧道结构的修建方法 | |
CN104457461B (zh) | 一种爆破增渗的方法及其应用 | |
CN204716253U (zh) | 圆形大直径引水隧洞结构 | |
CN104532855A (zh) | 一种深厚泥炭质土层中的组合桩支护结构 | |
CN204492831U (zh) | 地铁暗挖隧道横通道施工构件 | |
CN103628890A (zh) | 软弱千枚岩隧道开挖变形控制方法 | |
CN205475257U (zh) | 一种用于加深开挖的复合桩锚支护结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |