CN204632954U - A kind of earth connection connects gold utensil - Google Patents
A kind of earth connection connects gold utensil Download PDFInfo
- Publication number
- CN204632954U CN204632954U CN201520347312.XU CN201520347312U CN204632954U CN 204632954 U CN204632954 U CN 204632954U CN 201520347312 U CN201520347312 U CN 201520347312U CN 204632954 U CN204632954 U CN 204632954U
- Authority
- CN
- China
- Prior art keywords
- rod
- conductive plate
- gold utensil
- grounding wire
- earth connection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Manufacturing Of Electrical Connectors (AREA)
Abstract
本实用新型公开了一种接地线连接金具,包括并沟线夹,所述并沟线夹设有两个分别用于连接主接地导线和副接地导线的固定孔,其中一固定孔中连接有导电杆体,所述导电杆体上连接有导电板,所述导电板上间隔设置有至少一个可与副接地导线连接的连接孔。该接地线连接金具结构简单,使用方便,能将多根副接地导线同时连接到主接地导线上且可单独拆卸每根副接地导线。
The utility model discloses a grounding wire connection fitting, which comprises a parallel ditch clamp, and the parallel ditch clamp is provided with two fixing holes respectively used for connecting the main grounding wire and the auxiliary grounding wire, and one of the fixing holes is connected with a The conductive rod body is connected with a conductive plate, and the conductive plate is provided with at least one connection hole which can be connected with the auxiliary ground wire at intervals. The grounding wire connecting fitting has a simple structure and is convenient to use, and can simultaneously connect a plurality of secondary grounding wires to the main grounding wire and each secondary grounding wire can be separately detached.
Description
技术领域 technical field
本实用新型涉及一种接地线连接金具。 The utility model relates to a grounding wire connection fitting.
背景技术 Background technique
接地是为了保障电力设备或电力系统正常工作而采取的一种安全措施,目前常用的接地手段是利用并沟线夹将终端设备的的副接地导线连接在主接地导线上,而常用的并沟线夹一般只能现一对一连接即只能夹紧一根副接地导线和一根主接地导线,但是近年来在配电网建设过程中,由于配电自动化终端的应用和新型配电设备的大量使用或者电力杆塔上再次增加电力设备,并且该类终端设备都需要通过自身的副接地导线与相应主接地导线连接,保证终端设备有效接地,因此就需要使用大量的并沟线夹将多种终端设备的副接地导线连接在主接地导线上,同时还需要对主接地导线外皮进行多次剥皮从而连接并沟线夹,因此导致主接地导线上形成多个“疙瘩”,既不美观,又降低工作效率,并且需要使用多个并沟线夹,造成严重浪费;有时施工人员为了节省并沟线夹使用数量,便直接使用绝缘胶带将多股副接地导线与主接地导线缠绕在一起,而这种连接方法导致连接处不能牢固连接,胶带易开散,造成副接地导线从主接地导线上脱落。因此有必要设计一种能通过一个并沟线夹既能将多根副接地导线连接到主接地导线上,且可单独拆卸每根副接地导线,并且能再次在该金具上进行扩充可连接导线数量的金具。 Grounding is a safety measure taken to ensure the normal operation of power equipment or power systems. At present, the commonly used grounding method is to use parallel trench clamps to connect the auxiliary ground wire of the terminal equipment to the main ground wire, and the commonly used parallel trench Generally, the clamp can only be connected one-to-one, that is, it can only clamp one auxiliary grounding wire and one main grounding wire. However, in the process of distribution network construction in recent years, due to the application of distribution automation terminals and new distribution equipment A large number of use or power equipment is added again on the power tower, and this type of terminal equipment needs to be connected to the corresponding main grounding wire through its own secondary grounding wire to ensure effective grounding of the terminal equipment, so it is necessary to use a large number of parallel trench clamps. The auxiliary grounding wire of this terminal equipment is connected to the main grounding wire. At the same time, it is necessary to peel off the outer skin of the main grounding wire several times to connect the parallel clamps. As a result, multiple "pimples" are formed on the main grounding wire, which is not beautiful. It also reduces work efficiency and requires the use of multiple parallel trench clamps, resulting in serious waste; sometimes in order to save the number of parallel trench clamps used, construction workers directly use insulating tape to wrap multiple strands of auxiliary grounding wires and main grounding wires together. However, this connection method leads to the inability to firmly connect the joint, and the adhesive tape is easy to scatter, causing the auxiliary grounding wire to fall off from the main grounding wire. Therefore, it is necessary to design a method that can connect multiple auxiliary grounding wires to the main grounding wire through a parallel trench clamp, and can separately remove each auxiliary grounding wire, and can expand the connectable wires on the fitting again. Quantity of hardware.
实用新型内容 Utility model content
本实用新型要解决的技术问题是提供一种结构简单,使用方便,能将多根副接地导线同时连接到主接地导线上且可单独拆卸每根副接地导线的接地线连接金具。 The technical problem to be solved by the utility model is to provide a grounding wire connecting hardware with simple structure and convenient use, which can simultaneously connect multiple secondary grounding wires to the main grounding wire and can disassemble each secondary grounding wire individually.
为解决上述技术问题,本实用新型包括并沟线夹,所述并沟线夹设有两个分别用于连接主接地导线和副接地导线的固定孔,其结构特点是:其中一固定孔中连接有导电杆体,所述导电杆体上连接有导电板,所述导电板上间隔设置有至少一个可与副接地导线连接的连接孔。 In order to solve the above-mentioned technical problems, the utility model includes a parallel ditch clamp, which is provided with two fixing holes for connecting the main grounding wire and the auxiliary grounding wire respectively, and its structural features are: one of the fixing holes is A conductive rod body is connected, and a conductive plate is connected to the conductive rod body, and at least one connection hole that can be connected to the secondary ground wire is arranged at intervals on the conductive plate.
所述导电杆体为圆柱形金属杆,所述金属杆的一端可插装在并沟线夹固定孔中,所述金属杆的另一端一侧连接有矩形导电板。 The conductive rod body is a cylindrical metal rod, one end of the metal rod can be inserted into the fixing hole of the parallel groove clamp, and the other end of the metal rod is connected to a rectangular conductive plate.
所述导电杆体为圆柱形金属杆,所述金属杆通过中部安装在并沟线夹固定孔中,所述金属杆的两端相同一侧分别连接有矩形导电板。 The conductive rod body is a cylindrical metal rod, and the metal rod is installed in the fixing hole of the parallel groove clamp through the middle part, and the two ends of the metal rod are respectively connected to the same side of a rectangular conductive plate.
两片导电板之间还设置有副导电杆体。 A secondary conductive rod body is also arranged between the two conductive plates.
所述副导电杆体的上、下端分别与上方导电板下端和下方导电板的上端连接,所述副导电杆体与导电杆体平行且间隔设置。 The upper and lower ends of the auxiliary conductive rod are respectively connected to the lower end of the upper conductive plate and the upper end of the lower conductive plate, and the auxiliary conductive rod is arranged parallel to and spaced from the conductive rod.
所述导电杆体为圆柱形金属杆,所述金属杆通过中部安装在并沟线夹固定孔中,所述金属杆的两端分别向同一侧折弯形成上折弯部和下折弯部,所述上折弯部与下折弯部之间连接有与金属杆平行设置的导电板。 The conductive rod body is a cylindrical metal rod, and the metal rod is installed in the fixing hole of the parallel groove clamp through the middle part, and the two ends of the metal rod are respectively bent to the same side to form an upper bending part and a lower bending part, A conductive plate parallel to the metal rod is connected between the upper bent part and the lower bent part.
所述连接孔沿导电杆体的轴线方向均匀间隔设置。 The connection holes are evenly spaced along the axial direction of the conductive rod body.
所述连接孔中安装有用于固定副接地导线的螺栓。 Bolts for fixing the auxiliary grounding wire are installed in the connection hole.
本实用新型的有益效果是:由于并沟线夹设有两个分别用于连接主接地导线和副接地导线的固定孔,而本实用新型中用于连接副接地导线的固定孔却直接连接导电杆体,该导电杆体上连接有导电板,该导电板上间隔设置有至少一个可与副接地导线连接的连接孔,因此该并沟线夹可通过导电杆体上的导电板连接至少一根副接地导线,结构简单、使用方便、能有效节约并沟线夹的使用数量且提高作业效率;由于在施工作业时不同施工地点的副接地导线的数量有多又少,因此可通过开设有不同数量连接孔的导电板与导电杆体的连接结构实现合理搭配使用:首先,当施工地点的副接地导线数量较少时,该导电杆体为圆柱形金属杆,该导电杆体选用圆柱形的金属杆是由于并沟线夹的固定孔均为圆形通孔,因此方便金属杆在并沟线夹中被充分夹紧,该金属杆的一端可插装在并沟线夹固定孔中,该金属杆的另一端一侧连接有矩形导电板,因此可通过该金属杆另一端连接的矩形导电板连接副接地导线;其次,当施工地点的副接地导线数量较多时,该金属杆通过中部安装在并沟线夹固定孔中,该金属杆的两端相同一侧分别连接有矩形导电板,因此可通过该金属杆两端连接的矩形导电板连接副接地导线;再次,当施工地点的副接地导线数量非常多时,上述两片导电板之间还设置有副导电杆体,该副导电杆体上还可连接并沟线夹,然后再通过并沟线夹的另一端继续连接导电杆体与导电板结构从而继续扩充连接副接地导线的连接数量;最后,该金属杆还可通过中部安装在并沟线夹固定孔中,该金属杆的两端分别向同一侧折弯形成上折弯部和下折弯部,该上折弯部与下折弯部之间设置有与金属杆平行设置的导电板,因此通过导电板连接一定数量的副接地导线。上述连接孔沿导电杆体的轴线方向均匀间隔设置,方便安装和拆卸副接地导线,该连接孔中安装有用于固定副接地导线的螺栓,方便有效固定副接地导线。 The beneficial effects of the utility model are: since the parallel ditch line clamp is provided with two fixing holes for connecting the main grounding wire and the auxiliary grounding wire respectively, while the fixing holes for connecting the auxiliary grounding wire in the utility model are directly connected to the conductive Rod body, a conductive plate is connected to the conductive rod body, and at least one connection hole that can be connected to the secondary ground wire is arranged at intervals on the conductive plate, so the parallel trench clamp can be connected to at least one secondary ground wire through the conductive plate on the conductive rod body Conductors, simple in structure, easy to use, can effectively save the number of parallel trench clamps used and improve work efficiency; since the number of secondary grounding conductors at different construction sites is more or less during construction operations, it can be connected by opening different numbers The connection structure of the conductive plate of the hole and the conductive rod body can be reasonably matched and used: first, when the number of secondary grounding wires at the construction site is small, the conductive rod body is a cylindrical metal rod, and the cylindrical metal rod is selected for the conductive rod body. The fixing holes of the trench line clamp are all circular through holes, so that the metal rod can be fully clamped in the parallel trench line clamp. One end of the metal rod can be inserted into the fixing hole of the parallel trench line clamp, and the other end of the metal rod One end is connected to a rectangular conductive plate, so the secondary grounding wire can be connected through the rectangular conductive plate connected to the other end of the metal rod; secondly, when the number of secondary grounding wires at the construction site is large, the metal rod is installed in the parallel trench line through the middle In the fixing hole of the clip, the two ends of the metal rod are respectively connected with rectangular conductive plates on the same side, so the secondary grounding conductors can be connected through the rectangular conductive plates connected at both ends of the metal rod; again, when the number of secondary grounding conductors at the construction site is very large For a long time, there is a secondary conductive rod body between the above two conductive plates, which can also be connected to the parallel groove clamp, and then continue to connect the conductive rod body and the conductive plate structure through the other end of the parallel groove clamp to continue to expand The number of connections to connect the auxiliary grounding wire; finally, the metal rod can also be installed in the fixing hole of the parallel ditch clamp through the middle part, and the two ends of the metal rod are respectively bent to the same side to form an upper bending part and a lower bending part, A conductive plate parallel to the metal rod is arranged between the upper bent part and the lower bent part, so a certain number of auxiliary grounding wires are connected through the conductive plate. The above-mentioned connecting holes are evenly spaced along the axial direction of the conductive rod body to facilitate the installation and removal of the auxiliary grounding wire. Bolts for fixing the auxiliary grounding wire are installed in the connecting holes to facilitate and effectively fix the auxiliary grounding wire.
综上所述,本实用新型结构简单,使用方便,能将多根副接地导线同时连接到主接地导线上且可单独拆卸每根副接地导线。 To sum up, the utility model has a simple structure and is easy to use, and can simultaneously connect multiple secondary grounding wires to the main grounding wire and each secondary grounding wire can be individually detached.
附图说明 Description of drawings
下面结合附图和具体实施方式对本实用新型作进一步详细说明: Below in conjunction with accompanying drawing and specific embodiment the utility model is described in further detail:
图1为本实用新型第一种实施方式连接并沟线卡时的结构示意图; Fig. 1 is a schematic diagram of the structure of the first embodiment of the present invention when connecting the parallel groove line card;
图2为本实用新型第二种实施方式连接并沟线卡时的结构示意图; Fig. 2 is a schematic diagram of the structure of the second embodiment of the present invention when connecting parallel groove line cards;
图3为本实用新型第三种实施方式连接并沟线卡时的结构示意图; Fig. 3 is a schematic diagram of the structure of the third embodiment of the present invention when connecting the parallel channel line card;
图4为本实用新型第四种实施方式连接并沟线卡时的结构示意图; Fig. 4 is a schematic diagram of the structure of the fourth embodiment of the present invention when connecting the parallel groove line card;
图5为本实用新型第一种实施方式正常使用时的结构示意图。 Fig. 5 is a schematic structural view of the first embodiment of the present invention in normal use.
具体实施方式 Detailed ways
参照附图所示,该接地线连接金具包括并沟线夹1,并沟线夹1是在电力系统中经常使用的一种金属附件,因此属于公知技术,该并沟线夹1设有两个分别用于连接主接地导线7和副接地导线8的固定孔,其中一固定孔中连接有导电杆体2,该导电杆体2上连接有导电板3,该导电板3上间隔开设有至少一个可与副接地导线8连接的连接孔4,因此该并沟线夹1可通过导电杆体2上的导电板3连接至少一根副接地导线8,其结构简单、能有效节约并沟线夹1的使用数量且提高作业效率。 Referring to the accompanying drawings, the grounding wire connection hardware includes a parallel groove clamp 1, which is a metal accessory often used in power systems, and therefore belongs to the known technology. The parallel groove clamp 1 is equipped with two Two fixing holes for connecting the main grounding wire 7 and the auxiliary grounding wire 8 respectively, wherein a conductive rod body 2 is connected in one of the fixing holes, and a conductive plate 3 is connected on the conductive rod body 2, and at least one is arranged at intervals on the conductive plate 3 The connection hole 4 that can be connected with the auxiliary ground wire 8, so the parallel ditch clamp 1 can be connected to at least one auxiliary ground wire 8 through the conductive plate 3 on the conductive rod body 2. It has a simple structure and can effectively save the parallel ditch clamp 1 usage quantity and improve work efficiency.
由于在电力施工作业时不同施工地点的副接地导线8的数量有多又少,因此需要搭配使用自身设有不同数量连接孔4的地线连接金具,因此该导电杆体2与导电板3的连接结构具体可分为以下几种实施方式:如图1所示,该接地线连接金具的第一种实施方式为:该导电杆体2为圆柱形金属杆,该导电杆体2选用圆柱形的金属杆是由于并沟线夹1的固定孔均为圆形通孔,因此方便金属杆在并沟线夹1中被充分夹紧,该金属杆的一端可插装在并沟线夹1固定孔中,该金属杆的另一端一侧焊接有矩形导电板3,该矩形导电板3上开设有四个用于连接副接地导线8的连接孔4,当然该连接孔4的数量也可以增多或较少。 Since the number of auxiliary ground wires 8 at different construction sites is more or less during electric power construction operations, it is necessary to use ground wire connection fittings that are provided with different numbers of connection holes 4. Therefore, the connection between the conductive rod body 2 and the conductive plate 3 Specifically, the structure can be divided into the following several implementations: as shown in Figure 1, the first implementation of the grounding wire connection fittings is: the conductive rod body 2 is a cylindrical metal rod, and the conductive rod body 2 is a cylindrical metal rod Because the fixing holes of parallel groove clamp 1 are all circular through holes, it is convenient for the metal rod to be fully clamped in parallel groove clamp 1, and one end of the metal rod can be inserted into the fixing hole of parallel groove clamp 1 , the other end side of the metal rod is welded with a rectangular conductive plate 3, and the rectangular conductive plate 3 is provided with four connecting holes 4 for connecting the secondary grounding wire 8, of course, the number of the connecting holes 4 can also be increased or relatively few.
如图2所示,该接地线连接金具的第二种实施方式为:该导电杆体2为圆柱形金属杆,该金属杆通过中部安装在并沟线夹1固定孔中,该金属杆的两端相同一侧分别焊接有矩形导电板3,该矩形导电板3上分别开设有4个用于连接副接地导线8的连接孔4,当然该连接孔4的数量也可以增多或减少,因此该结构可以实现连接两倍于第一种实施方式所连接的副接地导线数量。 As shown in Figure 2, the second embodiment of the grounding wire connection fitting is as follows: the conductive rod body 2 is a cylindrical metal rod, and the metal rod is installed in the fixing hole of the ditch clamp 1 through the middle, and the two ends of the metal rod Rectangular conductive plates 3 are respectively welded on the same side of the terminal, and four connecting holes 4 for connecting the auxiliary grounding wire 8 are respectively opened on the rectangular conductive plates 3. Of course, the number of the connecting holes 4 can also be increased or decreased, so the The structure can achieve twice the number of auxiliary ground wires connected in the first embodiment.
如图3所示,该接地线连接金具的第三种实施方式是在接地线连接金具的第二种实施方式的两片导电板3之间焊接副导电杆体5,该副导电杆体5的上、下端分别与上方导电板3下端和下方导电板3的上端连接,该副导电杆体5与导电杆体2平行且间隔设置,该副导电杆体5的作用在于可以再次连接并沟线夹1,然后再通过此并沟线夹1继续连接导电杆体2与导电板3结构从而继续扩充连接副接地导线8的连接数量。 As shown in Figure 3, the third embodiment of the grounding wire connecting hardware is to weld a secondary conductive rod body 5 between the two conductive plates 3 of the second embodiment of the grounding wire connecting hardware, and the upper part of the secondary conductive rod body 5 , the lower ends are respectively connected with the upper end of the upper conductive plate 3 and the upper end of the lower conductive plate 3, the secondary conductive rod body 5 is parallel and spaced apart from the conductive rod body 2, the role of the secondary conductive rod body 5 is to be able to connect again and ditch the line clamp 1, and then Then continue to connect the structure of the conductive rod body 2 and the conductive plate 3 through the parallel ditch clamp 1 so as to continue to expand the connection quantity of the secondary grounding wire 8 .
如图4所示,该接地线连接金具的第四种实施方式为:该导电杆体2为圆柱形金属杆,该金属杆通过中部安装在并沟线夹1固定孔中,该金属杆的两端分别向同一侧折弯形成上折弯部21和下折弯部22,该上折弯部21与下折弯部22之间连接有与金属杆平行设置的导电板3,该导电板3体上开设有14个用于连接副接地导线8的连接孔4,当然该连接孔4也可以增多或减少。 As shown in Figure 4, the fourth embodiment of the grounding wire connection fitting is: the conductive rod body 2 is a cylindrical metal rod, and the metal rod is installed in the fixing hole of the parallel groove clamp 1 through the middle part, and the two ends of the metal rod The ends are respectively bent to the same side to form an upper bent part 21 and a lower bent part 22, and a conductive plate 3 arranged parallel to the metal rod is connected between the upper bent part 21 and the lower bent part 22, and the conductive plate 3 The body is provided with 14 connection holes 4 for connecting the auxiliary ground wire 8, and of course the number of connection holes 4 can also be increased or decreased.
如图1、图2、图3和图4所示,该导电板3上的连接孔4均沿导电杆体2的轴线方向均匀间隔设置,目的在于方便连接副接地导线8,并避免副接地导线8布线时干涉主接地导线7。 As shown in Figure 1, Figure 2, Figure 3 and Figure 4, the connecting holes 4 on the conductive plate 3 are evenly spaced along the axial direction of the conductive rod body 2, the purpose is to facilitate the connection of the secondary grounding wire 8, and avoid the secondary grounding wire 8 Interfering with the main ground wire 7 during wiring.
如图5所示,连接孔4中安装有用于固定副接地导线8的螺栓6,因此在连接副接地导线8时可直接通过螺栓6将副接地导线8的末端部或者副接地导线8的末端线鼻夹紧在导电板3上;由于导电板3为平板结构,因此可以通过螺栓6将副接地导线8夹紧在导电板3前后两侧面上,即虽然导电板3上开设有4个连接孔4,但是可以连接8根副接地导线。 As shown in Figure 5, bolts 6 for fixing the auxiliary grounding conductor 8 are installed in the connection hole 4, so when connecting the auxiliary grounding conductor 8, the end of the auxiliary grounding conductor 8 or the end of the auxiliary grounding conductor 8 can be directly connected The wire lug is clamped on the conductive plate 3; since the conductive plate 3 is a flat plate structure, the secondary grounding wire 8 can be clamped on the front and rear sides of the conductive plate 3 through the bolt 6, that is, although the conductive plate 3 is provided with 4 connections Hole 4, but you can connect 8 secondary ground wires.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520347312.XU CN204632954U (en) | 2015-05-27 | 2015-05-27 | A kind of earth connection connects gold utensil |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520347312.XU CN204632954U (en) | 2015-05-27 | 2015-05-27 | A kind of earth connection connects gold utensil |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204632954U true CN204632954U (en) | 2015-09-09 |
Family
ID=54051949
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520347312.XU Expired - Fee Related CN204632954U (en) | 2015-05-27 | 2015-05-27 | A kind of earth connection connects gold utensil |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204632954U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106299732A (en) * | 2016-09-29 | 2017-01-04 | 国网山东省电力公司烟台供电公司 | A kind of device preventing the outdoor full pre-fabricated dry cable termination heating of 110kV and installation method thereof |
| CN106998616A (en) * | 2017-06-07 | 2017-08-01 | 河南省亚安绝缘材料厂有限公司 | A kind of flexible composite insulation material production static release device |
| CN112018670A (en) * | 2020-07-20 | 2020-12-01 | 国家电网有限公司 | A dual-purpose device for disassembling a cable T-type terminal |
-
2015
- 2015-05-27 CN CN201520347312.XU patent/CN204632954U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106299732A (en) * | 2016-09-29 | 2017-01-04 | 国网山东省电力公司烟台供电公司 | A kind of device preventing the outdoor full pre-fabricated dry cable termination heating of 110kV and installation method thereof |
| CN106998616A (en) * | 2017-06-07 | 2017-08-01 | 河南省亚安绝缘材料厂有限公司 | A kind of flexible composite insulation material production static release device |
| CN112018670A (en) * | 2020-07-20 | 2020-12-01 | 国家电网有限公司 | A dual-purpose device for disassembling a cable T-type terminal |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204632954U (en) | A kind of earth connection connects gold utensil | |
| CN207542734U (en) | A kind of fire-type bus duct | |
| CN205583183U (en) | Take binding post's improvement type parallel groove clamp | |
| CN206947555U (en) | A kind of soft graphite downlead device | |
| CN203983518U (en) | Substation equipment ground structure | |
| CN207021396U (en) | A lightning arrester T connection wire fitting | |
| CN201699145U (en) | Copper bar by utilizing fastening knurled nut to connect conducting wire and bus | |
| CN206313190U (en) | A kind of adjustable pitch pipe bus telescoping wire clamp | |
| CN203377382U (en) | Connection structure of grounding wires and grounding lead wire | |
| CN203839780U (en) | Angle variable connector wire clamp applied to transformer station high-voltage power equipment | |
| CN202834409U (en) | Tail wire fixing clip of three-phase four-wire electric energy meter | |
| CN201549606U (en) | Screen top small bus bar jumper connector | |
| CN202216980U (en) | Special wire clamp for TA test | |
| CN202009097U (en) | Multifunctional plug | |
| CN201352602Y (en) | Unit for wiring bus bar | |
| CN203895640U (en) | Grounding point switching device of secondary neutral grounding wire of voltage transformer | |
| CN206931721U (en) | A kind of multipurpose splicing fitting | |
| CN204577661U (en) | Communication distributes screen negative pole by DC power supply and extends row's component | |
| CN205376793U (en) | Distribution lines overhauls ground wire earthing terminal | |
| CN204481418U (en) | Wire clamp | |
| CN206135347U (en) | Horizontal cross elbow of cross | |
| CN204142799U (en) | A kind of electric energy meter standard termination | |
| CN206401717U (en) | A kind of high-voltage board of stackable bus | |
| CN205385122U (en) | Air wire gold utensil that continues | |
| CN204947119U (en) | The insulated platform earth connection of improvement |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150909 Termination date: 20180527 |