CN204626860U CN201520310827.2U CN201520310827U CN204626860U CN 204626860 U CN204626860 U CN 204626860U CN 201520310827 U CN201520310827 U CN 201520310827U CN 204626860 U CN204626860 U CN 204626860U
Authority
CN
China
Prior art keywords
keel
main muscle
muscle
tenon
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520310827.2U
Other languages
Chinese (zh)
Inventor
李新发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520310827.2U priority Critical patent/CN204626860U/en
Application granted granted Critical
Publication of CN204626860U publication Critical patent/CN204626860U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Have the floor of clamping pipeline keel, left keel square block forms tenon, shaping catching groove on right keel square block, catching groove is fastened on tenon; When left keel and right keel fasten, the main muscle of left keel and the main muscle of right keel form " ten " font, and piping clip is held in the receipts space of left keel and the formation of right keel; Plank block forms main muscle slot and auxiliary muscle slot, the main muscle of left keel and right keel main muscle sleeve are in main muscle slot, and the auxiliary muscle of left keel and right keel auxiliary muscle sleeve are in auxiliary muscle slot.Its left keel and right keel can carry out level to slotting installation, have sufficient elasticity simultaneously and allow the lateral deformation of plank block, so it can play the effect preventing the arch camber of plank block between left keel and right keel.

Description

There is the floor of clamping pipeline keel
Technical field:
The utility model relates to technical field of floor, more specifically to a kind of in keel, be clamped with pipeline and keel and plank block energy level to the floor of slotting installation.
Background technology:
As shown in Figure 1, there are a kind of clever button keel on the market at present, its structure is shaping main muscle A2 and auxiliary muscle A3 on square block A1, as shown in Figure 2, this keel installation on floor after, the main muscle A2 sleeve of keel is in the main muscle slot A41 of adjacent two plank block A4, and auxiliary muscle A3 sleeve is in the auxiliary muscle slot A42 of plank block A4.Its weak point is: 1, because clever button keel adopt hard material to manufacture, when producing larger lateral stress between adjacent two plank block A4, this stress cannot be eliminated, and causes the easy arch camber distortion of plank block.2, as shown in Figure 3, keel be interval sleeve on adjacent two plank block A4, such sleeve is extremely required great effort, because during sleeve, keel are subject to the double rub of main muscle slot A41 and auxiliary muscle slot A42, so very hard during sleeve.3, two adjacent plank blocks and keel are hard contact, easily send sound when people's walking is on floor.4, some client wishes to walk dim tracheae in the keel on floor, and the keel of this solid wood cannot install caliduct in centre, if this keel lower boreholes is walked caliduct, then the intensity of keel can be a problem.
Utility model content:
The purpose of this utility model is exactly the deficiency for prior art, and a kind of floor with clamping pipeline keel is provided, its left keel and right keel can carry out level to slotting installation, have sufficient elasticity between left keel and right keel simultaneously and allow the lateral deformation of plank block, so it can play the effect preventing the arch camber of plank block.
Technology solution of the present utility model is as follows:
There is the floor of clamping pipeline keel, comprise plank block and keel, keel are made up of left keel and right keel, the structure of left keel is: left keel square block forms the main muscle of left keel and the auxiliary muscle of left keel, the main muscle of left keel forms left keel lateral insert, and the opening part of left keel lateral insert forms left keel rib;
The structure of right keel is: right keel square block forms the main muscle of right keel and the auxiliary muscle of right keel, the main muscle of right keel is extended with right keel plug tenon, right keel plug tenon is made up of oblique section and traversing section, and traversing section sleeve is in left keel lateral insert, and oblique section of gear is built in the left side of left keel rib;
Left keel square block forms tenon, shaping catching groove on right keel square block, catching groove is fastened on tenon; When left keel and right keel fasten, the main muscle of left keel and the main muscle of right keel form " ten " font, and piping clip is held in the receipts space of left keel and the formation of right keel; Plank block forms main muscle slot and auxiliary muscle slot, the main muscle of left keel and right keel main muscle sleeve are in main muscle slot, and the auxiliary muscle of left keel and right keel auxiliary muscle sleeve are in auxiliary muscle slot.
Described left keel and right keel are aluminum alloy hollow body.
Described left keel are solid, and right keel are aluminum alloy hollow body.
Described tenon is triangle, and corresponding catching groove is the triangle catching groove matched with tenon.
Described tenon is square, and corresponding catching groove is the square catching groove matched with tenon.
Described oblique section is vertical shape, and traversing section is extended with crochet, and crochet is relative with left keel rib.
The beneficial effects of the utility model are:
Its keel are made up of left keel and right keel, and left keel and right keel can carry out level to inserting, and have sufficient elasticity simultaneously and allow the lateral deformation of plank block, so it can play the effect preventing the arch camber of plank block between left keel and right keel; It is provided with cap portion and can't see adjacent two interplate gaps of wood from floor surface simultaneously.
Its left keel and right keel can move horizontally, because exist between the hook of left keel and right keel certain can moving interval, so left keel and right keel can move horizontally, during such plank block generation bulking, between left keel and right keel, tolerable injury level moves, offset the lateral stress between adjacent two plank blocks, thus the arch camber of anti-floor.
Accompanying drawing illustrates:
Fig. 1 is the structural representation of clever button keel in prior art;
Fig. 2 is the structural representation of prior art;
Fig. 3 is the schematic perspective view of prior art;
Fig. 4 is the structural representation of embodiment 1;
Fig. 5 is the decomposing schematic representation of left keel and right keel in embodiment 1;
Fig. 6 is the structural representation of right keel plug tenon in embodiment 1;
Fig. 7 is the structural representation of embodiment 2;
Fig. 8 is the structural representation of embodiment 3;
Fig. 9 is the structural representation of embodiment 4;
Figure 10 is the structural representation of embodiment 5;
Figure 11 is the structural representation of embodiment 6;
Figure 12 is the structural representation of embodiment 1 when installing;
Figure 13 is the schematic perspective view of embodiment 1;
Figure 14 is the structural representation of embodiment 7;
Figure 15 is the structural representation of embodiment 8.
In figure: 1, plank block; 2, keel; 3, pipeline.
Detailed description of the invention:
Embodiment 1: see shown in Fig. 4 to 6,13, there is the floor of clamping pipeline keel, comprise plank block 1 and keel 2, keel 2 are made up of left keel 21 and right keel 22, the structure of left keel 21 is: left keel square block 211 forms the main muscle of left keel 212 and the auxiliary muscle 215 of left keel, the main muscle of left keel 212 forms left keel lateral insert 213, and the opening part of left keel lateral insert 213 forms left keel rib 214;
The structure of right keel 22 is: right keel square block 221 forms the main muscle of right keel 223 and the auxiliary muscle 222 of right keel, the main muscle of right keel 223 is extended with right keel plug tenon 224, right keel plug tenon 224 is made up of oblique section 2241 and traversing section 2242, traversing section 2242 sleeve is in left keel lateral insert 213, and oblique section 2241 gear is built in the left side of left keel rib 214;
Left keel square block 211 forms tenon 216, shaping catching groove 225 on right keel square block 221, catching groove 225 is fastened on tenon 216; When left keel 21 and right keel 22 fasten, the main muscle of left keel 212 and the main muscle 223 of right keel form " ten " font, and pipeline 3 is clamped in the receipts space 21-22 of left keel 21 and right keel 22 formation; Plank block 1 forms main muscle slot 11 and auxiliary muscle slot 12, the main muscle of left keel 212 and right keel main muscle 223 sleeve are in main muscle slot 11, and the auxiliary muscle of left keel 215 and right keel auxiliary muscle 222 sleeve are in auxiliary muscle slot 12.
Described left keel 21 and right keel 22 are aluminum alloy hollow body.
Described tenon 216 is triangle, and corresponding catching groove 225 is the triangle catching groove matched with tenon 216.
Embodiment 2, as shown in Figure 7, described tenon 216 is square, and corresponding catching groove 225 is the square catching groove matched with tenon 216.All the other are with embodiment 1.
Embodiment 3, as shown in Figure 8, described tenon 216 is square, and corresponding catching groove 225 is the square catching groove matched with tenon 216.All the other are with embodiment 1.The present embodiment difference from Example 2 be in the upper surface embodiment 2 of keel 2 with the upper surface of plank block 1 substantially in same level, in embodiment 3, the upper surface of keel 2 is lower than the upper surface of plank block 1.
Embodiment 4, as shown in Figure 9, described left keel 21 are solid, and right keel 22 are aluminum alloy hollow body.All the other are with embodiment 2.
Embodiment 5, as shown in Figure 10, described oblique section 2241 is vertical shape, traversing section 2242 is extended with crochet 2243, and crochet 2243 is relative with left keel rib 214.All the other are with embodiment 2.
Embodiment 6, as shown in Figure 11, described left keel 21 are solid, and right keel 22 are aluminum alloy hollow body.All the other are with embodiment 4.
Embodiment 7, as shown in Figure 14, right keel plug tenon 224 is 7 fonts, and all the other are with embodiment 5.
Embodiment 8, as shown in Figure 15, is formed with heating cable cable hole 4 between left keel 21 and right keel 22.All the other are with embodiment 1.
Operating principle: as shown in Figure 12, be first skewed as shown in Figure 12 by right keel 22, allow right keel plug tenon 22 facing in the left keel lateral insert 213 of oblique insertion, then downwards by right keel 22, then catching groove 225 is taken advantage of a situation and is fastened on tenon 216.So just, the level achieving left keel 21 and right keel 22 is to inserting, pipeline 3 is placed on left keel 21 in advance simultaneously, and pipeline 3 is also clamped between left keel 21 and right keel 22.
Due to the elasticity of keel 2, it also can in case make the arch camber of plank block be out of shape because of larger lateral stress between adjacent two plank blocks.

Claims (6)

1. there is the floor of clamping pipeline keel, comprise plank block (1) and keel (2), it is characterized in that: keel (2) are made up of left keel (21) and right keel (22), the structure of left keel (21) is: left keel square block (211) forms the main muscle of left keel (212) and the auxiliary muscle of left keel (215), the main muscle of left keel (212) forms left keel lateral insert (213), the opening part of left keel lateral insert (213) forms left keel rib (214);
The structure of right keel (22) is: right keel square block (221) forms the main muscle of right keel (223) and the auxiliary muscle of right keel (222), the main muscle of right keel (223) is extended with right keel plug tenon (224), right keel plug tenon (224) is made up of oblique section (2241) and traversing section (2242), traversing section (2242) sleeve is in left keel lateral insert (213), and oblique section (2241) gear is built in the left side of left keel rib (214);
Left keel square block (211) forms tenon (216), the upper shaping catching groove (225) of right keel square block (221), catching groove (225) is fastened on tenon (216); When left keel (21) and right keel (22) fasten, the main muscle of left keel (2120 and the main muscle of right keel (223) form " ten " font, pipeline (3) is clamped in the receipts space (21-22) that left keel (21) and right keel (22) are formed; Plank block (1) forms main muscle slot (11) and auxiliary muscle slot (12), the main muscle of left keel (212) and the main muscle of right keel (223) sleeve are in main muscle slot (11), and the auxiliary muscle of left keel (215) and the auxiliary muscle of right keel (222) sleeve are in auxiliary muscle slot (12).
2. the floor with clamping pipeline keel according to claim 1, is characterized in that: left keel (21) and right keel (22) are aluminum alloy hollow body.
3. the floor with clamping pipeline keel according to claim 1, it is characterized in that: left keel (21) are solid, right keel (22) are aluminum alloy hollow body.
4. the floor with clamping pipeline keel according to claim 1, it is characterized in that: tenon (216) is triangle, corresponding catching groove (225) is the triangle catching groove matched with tenon (216).
5. the floor with clamping pipeline keel according to claim 1, is characterized in that: tenon (216) is for square, and corresponding catching groove (225) is the square catching groove matched with tenon (216).
6. the floor with clamping pipeline keel according to claim 1, it is characterized in that: oblique section (2241) are vertical shape, traversing section (2242) is extended with crochet (2243), crochet (2243) is relative with left keel rib (214).
CN201520310827.2U 2015-05-14 2015-05-14 There is the floor of clamping pipeline keel Expired - Fee Related CN204626860U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520310827.2U CN204626860U (en) 2015-05-14 2015-05-14 There is the floor of clamping pipeline keel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520310827.2U CN204626860U (en) 2015-05-14 2015-05-14 There is the floor of clamping pipeline keel

Publications (1)

Publication Number Publication Date
CN204626860U true CN204626860U (en) 2015-09-09

Family

ID=54045900

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520310827.2U Expired - Fee Related CN204626860U (en) 2015-05-14 2015-05-14 There is the floor of clamping pipeline keel

Country Status (1)

Country Link
CN (1) CN204626860U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013718A (en) * 2016-05-31 2016-10-12 都匀市暖冬水暖地板有限责任公司 Aluminum alloy ground heating floor and manufacturing method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013718A (en) * 2016-05-31 2016-10-12 都匀市暖冬水暖地板有限责任公司 Aluminum alloy ground heating floor and manufacturing method thereof

Similar Documents

Publication Publication Date Title
CN203462714U (en) Heat-conducting floor capable of preventing arching with invisible contraction joints
CN204626860U (en) There is the floor of clamping pipeline keel
CN203334611U (en) Combined type keel decorative plate
CN203769249U (en) Latch type decorating plate
CN205012610U (en) Centre gripping has floor of pipeline ability level to inserting installation
CN204023974U (en) Anti-arch shrinkage crack-free is without the combined joist floor of sound
CN202789952U (en) Wedge-shaped fastening nail
CN204626872U (en) Level is to inserting combined type floor with elastic keel
CN104863337A (en) Floor capable of clamping pipeline and being installed in horizontal opposite insertion mode
CN203867112U (en) Dry-hanging wall tile structure
CN204186038U (en) Elastic keel stopping means
CN203856169U (en) Horizontally-butted locking floor
CN204186039U (en) A kind of both sides level is to the floor of slotting installation
CN203475763U (en) Anti-cambering floor
CN205134870U (en) Floor lock who exempts from to glue detains
CN202430956U (en) Noiseless latching floor without contraction joints
CN204370754U (en) A kind of with the convenient decorative panel installed of nail
CN203462701U (en) Aluminum alloy keel floor capable of preventing arching
CN204023961U (en) A kind of floor with elastic keel of anti-arch camber
CN202811724U (en) Spiral anti-loose nail
CN203878932U (en) Lock catch type floor mounted in horizontally and oppositely inserted manner
CN103422654B (en) Double-keel decorative plate
CN103452288A (en) Anti-bulging heat conducting floor without shrinkage cracks
CN204023975U (en) Anti-arch shrinkage crack-free is without the assembly combined keel floor of sound
CN203129464U (en) Stair armrest for rammed earth wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150909