CN204626396U CN201520163873.4U CN201520163873U CN204626396U CN 204626396 U CN204626396 U CN 204626396U CN 201520163873 U CN201520163873 U CN 201520163873U CN 204626396 U CN204626396 U CN 204626396U
Authority
CN
China
Prior art keywords
anchor
soil nailing
soil
bearing structure
channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520163873.4U
Other languages
Chinese (zh)
Inventor
贾金青
黄强
杨志银
曾宪明
程良奎
涂兵雄
柳建国
范景伦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian University of Technology
Original Assignee
Dalian University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian University of Technology filed Critical Dalian University of Technology
Priority to CN201520163873.4U priority Critical patent/CN204626396U/en
Application granted granted Critical
Publication of CN204626396U publication Critical patent/CN204626396U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

A kind of foundation ditch composite soil nailed wall, comprise soil nailing, anchor pole, keep off native surface layer, soil nailing interval in one deck is arranged, and anchor pole interval in another layer is arranged, bearing structure under nail is installed below soil nailing ailhead and between steel mesh reinforcement, be provided with bearing structure under anchor below anchor head and between steel mesh reinforcement, soil nailing ailhead is screw rod and is furnished with nut, and anchor head is screw rod and is furnished with nut.Small pre-stress is applied to soil nailing, by nut, soil nailing is locked on the lower bearing structure of nail; Lower-prestressed is applied to anchor pole, to lock the rock bolt in the under anchor on bearing structure by nut.Under the nail of soil nailing ailhead, overcome cannot to soil nailing Shi Hanzhang for bearing structure, and the shortcoming of ailhead easily because destroying at surface layer generation " piercing through "; Under the anchor of anchor head, bearing structure solves the problem of channel-section steel buckling failure and anchor head punching failure; Small pre-stress is applied to soil nailing and lower-prestressed is applied to anchor pole, soil nailing and anchor pole work inharmonic shortcoming when overcoming traditional soil nailing and combining anchor supporting.

Description

A kind of foundation ditch composite soil nailed wall
Technical field
The utility model relates to a kind of plate brad supporting and bolt support structure of foundation ditch compound, in the reinforcing of various foundation ditch, side slope and underground construction and supporting.
Background technology
In the reinforcing and support technology of foundation ditch, side slope and underground construction, Concrete-Nail Bracing Technology Used application is extremely extensive, but is out of shape large serious problems because plate brad supporting foundation ditch exists, and its engineer applied is subject to certain restrictions.In order to solve the large engineering problem of plate brad supporting foundation pit deformation, the working measure adopting prestressed anchor to combine with soil nailing in Practical Project more, by controlling foundation pit deformation to anchor pole Shi Hanzhang, during design, press the general safety of soil nailing and anchor pole cooperative bearing common guarantee foundation ditch.But thereby produce four new large critical defects:
(1) ailhead welds with strengthened connection bar or under ailhead, welds well cabinet frame reinforcing bar by the many employings of traditional soil nailing, therefore cannot to soil nailing Shi Hanzhang, soil nailing can only be passive stressed, cause foundation ditch earth's surface Vertical Settlement and horizontal distortion all very large thus, easily cause foundation ditch periphery pipe network or construction cracking.
(2), because ailhead is weaker with surfacing steel bar net junction, when in-situ test is excessive, " piercing through " easily occurs ailhead in sprayed mortar surface layer destroys, and causes soil nailing bearing capacity to lose efficacy.
(3) when soil nailing and combining anchor supporting, generally in anchor head, one channel-section steel is installed, its web is close to facing concrete, and the web position perforate at corresponding anchor head place is so that anchor pole can carry out prestressed stretch-draw and locking through channel-section steel.On the one hand because installed channel-section steel rigidity is less, easily there is buckling failure.On the other hand, because rockbolt stress is general comparatively large, channel-section steel web is thinner, very easily draws at web drill hole generation punching failure and wears web, directly cause anchor-holding force of anchor bolt to lose efficacy, then foundation pit collapse accident occurs.
(4) soil nailing belongs to passive protecting technology, namely only has foundation ditch to deform, and soil nailing just starts passive stressedly to play a role.And prestressed anchor belongs to active support technology, namely to after anchor pole Shi Hanzhang, can produce compressive stress district in the certain limit soil body under foundation pit side-wall, the soil body is had the initiative pressured state, foundation pit side-wall distortion reduces greatly.Because soil nailing needs foundation ditch to produce distortion competence exertion effect, and the object of prestressed anchor is to reduce even to eliminate foundation pit deformation, and cause the stressed inharmonious of soil nailing and prestressed anchor thus, the bearing capacity of the two can not be not fully exerted simultaneously.The phenomenon often caused is prestressed anchor first stressed failure damage, and soil nailing is owing to cannot support separately the stable failure damage then of foundation ditch subsequently.
Summary of the invention
For these reasons, the utility model provides a kind of foundation ditch composite soil nailed wall, can realize soil nailing Shi Hanzhang; Prevent from soil nailing from concrete, producing " piercing through " to destroy; Solve the problem of channel-section steel buckling failure and anchor head punching failure.The purpose of this utility model is to provide a kind of brand-new foundation ditch composite soil nailed wall.
A kind of foundation ditch composite soil nailed wall of the present utility model, has the soil nailing be fixed in foundation ditch cinclides, is fixed on the anchor pole in foundation ditch cinclides, lays the gear soil surface layer that Spraying of reinforcement mat with concrete is formed on the surface of foundation pit walls; Soil nailing is for interval is arranged in one deck, and anchor pole is interval setting in another layer; Bearing structure under nail is installed below soil nailing ailhead and between steel mesh reinforcement, the lower bearing structure of nail comprises two of being arranged on steel mesh reinforcement channel-section steel arranged side by side, be placed on backing plate above two channel-section steel centres arranged side by side, two channel-section steels arranged side by side are linked as overall connecting reinforcement, in the middle part of backing plate with connecting hole; Soil nailing ailhead is through the connecting hole of backing plate, and soil nailing ailhead is screw rod and is furnished with nut; Bearing structure under anchor is installed below anchor head and between steel mesh reinforcement, under anchor, bearing structure comprises two of being arranged on steel mesh reinforcement channel-section steel arranged side by side, be placed on the backing plate above two channel-section steel centres arranged side by side, two channel-section steels arranged side by side are connected for overall horizontal batten plate, the stiffening rib arranged between every root channel-section steel edge of a wing, be placed in the taper liner plate on backing plate, with connecting hole in the middle part of taper liner plate, backing plate; Anchor head is through the connecting hole of taper liner plate, backing plate, and anchor head is screw rod and is furnished with nut.
Preferably every layer of soil nailing is arranged at a certain distance at same layer, and every layer of anchor pole is arranged at a certain distance at same layer, and soil nailing, anchor pole are vertically pressing layer interlaced arrangement.
Described soil nailing is welded by the body of rod and ailhead and forms, and the body of rod is made up of reinforcing bar or hollow steel pipe.
A kind of foundation ditch composite soil nailed wall described in the utility model, preferred soil nailing is applied with the small pre-stress of its axial tension standard value 20-30%, and is locked on the lower bearing structure of nail by nut by soil nailing; Anchor pole is applied with the lower-prestressed of anchor pole axial tension standard value 50%, and locks the rock bolt in the under anchor on bearing structure with nut, forms small pre-stress Soil-Nailing Wall Structure and lower-prestressed bolt support structural stratification distributes.Anchor pole and soil nailing collaborative work can be realized well, the respective bearing capacity of synchronous common performance, ensure monolithic stability and the safety of foundation ditch
A kind of foundation ditch composite soil nailed wall described in the utility model, be filled with concrete in the channel-section steel edge of a wing preferably under anchor in bearing structure and be connected as a single entity with the concrete of the native surface layer of gear, be filled with concrete in the channel-section steel edge of a wing in the lower bearing structure of nail and be connected as a single entity with the concrete of the native surface layer of gear, more can play the synergy of monolithic stability supporting.
Channel-section steel under described nail between bearing structure is elongated connection in the horizontal direction, or disconnect in the horizontal direction or vertical direction install separately.
Channel-section steel under described anchor between bearing structure is elongated connection in the horizontal direction, or disconnect in the horizontal direction or vertical direction install separately.
Preferably between every root channel-section steel edge of a wing, arrange stiffening rib, prevent the distortion that channel-section steel edge of a wing free end is larger, a nearly step increases stability.
Described anchor head is when the body of rod is made up of reinforcing bar, and anchor head is made up of lead screw and nut; When the body of rod is made up of steel strand, anchor head is made up of jig.Nut and jig are two parallel concepts, are referred to as ground tackle.
Spilled water hole is installed in the lower end of described concrete pavement.
A kind of foundation ditch composite soil nailing method, is divided into plate brad supporting work progress and bolt support work progress:
A. plate brad supporting work progress: it is dark that foundation ditch excavates l-2 rice downwards, adopts auger to hole obliquely towards meeting native face; Put into soil nailing in the borehole, then to grouting in boring; Surface layer reinforced mesh is laid on the surface of foundation pit walls; Sprayed mortar is to covering surface layer steel mesh reinforcement; Bearing structure under soil nailing ailhead place pilot nail, after the grouting in boring reaches design strength more than 75%, applies its axial tension standard value 20-30% small pre-stress to soil nailing, and with nut locking; Sprayed mortar surface layer forms the native surface layer of gear, completes one deck plate brad supporting;
B. bolt support work progress: it is dark that foundation ditch excavates 2-3 rice downwards, adopts auger to hole obliquely towards meeting native face; In hole, put into anchor pole, be then in the milk in hole; Surface layer steel mesh reinforcement is laid on the surface of foundation pit walls; Sprayed mortar is to covering surface layer steel mesh reinforcement, and bearing structure under anchor is installed at anchor pole anchor head place, after the grouting in boring reaches design strength more than 75%, applies the lower-prestressed of its axial tension standard value 50% to anchor pole, and with nut locking; Sprayed mortar surface layer forms the native surface layer of gear, completes one deck bolt support;
C. repeat above-mentioned plate brad supporting work progress or bolt support work progress, until bottom foundation ditch, complete whole foundation pit support construction.
Under described anchor, bearing structure and nail descend fill concrete in the channel-section steel edge of a wing in bearing structure and are connected as a single entity with the concrete of the native surface layer of gear.
Channel-section steel under described nail between bearing structure is elongated connection in the horizontal direction, or disconnect in the horizontal direction or vertical direction install separately.
Channel-section steel under described anchor between bearing structure is elongated connection in the horizontal direction, or disconnect in the horizontal direction or vertical direction install separately.
Described plate brad supporting work progress and bolt support work progress, can by the staggered construction of layer; Also can to construct arbitrarily one deck or two-layer above plate brad supporting work progress then construct one deck or two-layer above bolt support work progress, also can alternately construct.The utility model foundation ditch composite soil nailed wall of such formation, is exactly that one deck or two-layer above Soil-Nailing Wall Structure and one deck or two-layer above bolt support are executed structure and distributed alternatively up and down, forms support system alternately, more can play collaborative support action.Described soil nailing is preferably welded by the body of rod and ailhead and forms, and the body of rod is made up of reinforcing bar or hollow steel pipe.
Soil nailing is applied to the small pre-stress of its axial tension standard value 20-30%, with nut, soil nailing is locked on the lower bearing structure of nail after stretch-draw; Anchor pole is applied to the lower-prestressed of anchor pole axial tension standard value about 50%, to lock the rock bolt in the under anchor on bearing structure with nut after stretch-draw.So just can form a kind of foundation ditch composite soil nailed wall described in the utility model is that small pre-stress Soil-Nailing Wall Structure and lower-prestressed bolt support structural stratification distribute, and collaborative formation stabilizes prestressing force support system mutually.
Foundation ditch composite soil nailed wall feature of the present utility model is: (1) soil nailing ailhead and surfacing steel bar net junction install one follow closely under bearing structure, in soil nailing end, bolt and nut structure is installed simultaneously, can realize soil nailing Shi Hanzhang, soil nailing is being applied to the small pre-stress of its axial tension standard value 20-30%, at soil nailing end mounting nuts, soil nailing is locked simultaneously, form small pre-stress soil nailing, realize the active support of small pre-stress soil nailing; (2) strengthen soil nailing ailhead by bearing structure under pilot nail to connect, prevent ailhead from destroying because of " piercing through " and losing efficacy; (3) bearing structure under anchor head installs an anchor, horizontal batten plate is welded with in flange surfaces, stiffening rib is provided with inside the edge of a wing, not only there is good rigidity and compressive property, prevent anchor pole at anchor head generation punching failure, and can effectively the pulling force of anchor pole is delivered in the foundation pit side-wall soil body by sprayed mortar surface layer; (4) by applying the small pre-stress of its axial tension standard value 20-30% to soil nailing, anchor pole is applied to the lower-prestressed of anchor pole axial tension standard value about 50%, with this coordinate anchor pole synchronous with soil nailing, give full play to respective bearing capacity and synergy, realize best supporting effect, greatly improve deep pit monitor stability; (5) by fill concrete in the channel-section steel edge of a wing in bearing structure under anchor and with gear native surface layer concrete be connected as a single entity, fill concrete in the channel-section steel edge of a wing in bearing structure descended to nail and is connected as a single entity with the concrete of the native surface layer of gear, more can play the synergy of monolithic stability supporting.
A kind of foundation ditch composite soil nailed wall and method, specifically can comprise the following steps:
1, face down from ground excavation 1-2 rice;
2, use machine drilling obliquely towards meeting native face, aperture is 100-150mm;
3, in hole, put into soil nailing, and by its centering, be then in the milk in hole; According to the parameter situation of Rock And Soil, slip casting can adopt common pressure grouting or slip casing by pressure;
4, lay steel mesh reinforcement at foundation pit side-wall surface level and vertical direction, and itself and foundation pit walls are kept the distance of about about 30-50mm;
5, sprayed mortar is to covering surface layer steel mesh reinforcement, bearing structure under the pilot nail of soil nailing ailhead position, ensures that soil nailing ailhead stretches out the length of following closely lower bearing structure and meets tensioning construction requirement;
6, mechanical wrench or hydraulic jack is adopted to apply small pre-stress to soil nailing, and with nut locking;
7, on foundation pit side-wall, sprayed mortar forms the native surface layer of gear, completes the construction of one deck plate brad supporting;
8, above-mentioned 1 downward excavation construction process is repeated, until anchor bolt construction absolute altitude;
9, use machine drilling obliquely towards meeting native face, aperture is 100-150mm;
10, at free section parcel plastics free segment sleeve pipe, and boring is put into after locating support being installed by 1-2m, then to grouting in boring; According to the parameter situation of Rock And Soil, slip casting can adopt common pressure grouting or slip casing by pressure;
11, lay steel mesh reinforcement at foundation pit side-wall surface level and vertical direction, and itself and foundation pit walls are kept the distance of about about 30-50mm;
12, sprayed mortar is to covering surface layer steel mesh reinforcement, bearing structure under anchor head installs anchor, ensures that anchor head is stretched out the length of bearing structure under anchor and met tensioning construction requirement;
13, adopt hydraulic jack to apply lower-prestressed to anchor pole, and lock with nut or jig;
14, on foundation pit side-wall, sprayed mortar forms the native surface layer of gear, completes one deck bolt support construction;
15, repeat above-mentioned steps 1-7 nail Construction process or 9-14 anchor bolt construction process, until substrate, complete whole foundation pit support construction.
The connecting reinforcement that under nail in said method, bearing structure is welded by channel-section steel, backing plate, top flange and two ends, bottom flange is formed, and generally shaped steel is select between No. 6 to No. 8.
The connection batten plate that under anchor in said method, bearing structure is welded by channel-section steel, backing plate, top flange and two ends, bottom flange, vertical stiffening rib, taper liner plate are formed, and generally shaped steel is select between No. 10 to No. 18.
Under nail in said method, under bearing structure and anchor, bearing structure arrangement mode is for laterally installing or vertically installing, and when laterally installing, channel-section steel can elongated connection or install separately, and vertical employing when installing is installed separately.Its length desirable 0.5-0.8m when the lower bearing structure of nail is installed separately.Its length desirable 1.0-1.5m when bearing structure is installed separately under anchor.
In said method, soil nailing is welded by the body of rod and ailhead and forms, and the body of rod is made up of reinforcing bar or hollow steel pipe, and ailhead is made up of lead screw and nut.
In said method, anchor pole is made up of the body of rod and anchor head, and when the body of rod is made up of reinforcing bar, anchor head is made up of screw and stem nut; When the body of rod is made up of steel strand, anchor head is with jig; Ground tackle is referred to as by nut and jig.
In said method, soil nailing and anchor pole adopt slip casting in length range.
Soil nailing in said structure and method and anchor pole can orthogonal arrangement or plum blossom-shaped cross arrangements;
In said method, in-situ test is general less, and the 20%-30% of its axial tension standard value is very little relative to anchor rod prestress, therefore is called small pre-stress;
In said method, rockbolt stress is relatively large, national regulation specifies that anchor rod prestress lock value should get the 75%-90% of anchor pole axial tension standard value, the utility model patent synchronously plays a role better for making anchor pole and soil nailing, anchor rod prestress is reduced to 50% of about anchor pole axial tension standard value, therefore is called lower-prestressed.
The foundation ditch composite soil nailed wall that the utility model proposes there is four outstanding serious problems and critical defect based on traditional soil nailing and combining anchor support technology: (1) cannot to soil nailing body of rod Shi Hanzhang, soil nailing can only be passive stressed, cause foundation ditch earth's surface Vertical Settlement and horizontal distortion all very large thus, easily cause foundation ditch periphery pipe network or construction cracking; (2) the soil nailing body of rod generally adopts and to be welded to connect with cross reinforcing or to adopt well cabinet frame reinforcement welding to be connected, and junction is very weak, easily produces concrete and " pierces through " destruction, cause soil nailing bearing capacity to lose efficacy; (3) channel-section steel that anchor pole generally adopts web to be close to surface layer is made, and rigidity is poor, easily occurs buckling failure, and anchor head easily produces punching failure at web and lost efficacy; (4) soil nailing is passive stressedly contradicts with anchor pole active force, the two can not synchronous working, ordinary circumstance is anchor pole first stressed performance bearing capacity effect, it is stressed that the comparatively large rear soil nailing of foundation pit deformation just starts passive protecting, therefore anchor pole and soil nailing bearing capacity separately can not be given full play to, easily there is the first tensile failure of anchor pole, the engineering accident that after soil nailing, tension lost efficacy.
The utility model compares traditional soil nailing and combining anchor support technology has following remarkable advantage: (1) is by bearing structure under the pilot nail of soil nailing ailhead position, adopt nut locking soil nailing, solving traditional soil nailing cannot the problem of Shi Hanzhang, by achieving the active support of soil nailing to soil nailing Shi Hanzhang, reduce foundation pit deformation; (2) under the nail installed, bearing structure efficiently solves the transmission of ailhead pulling force, prevents in concrete, produce " piercing through " and destroys; (3) by bearing structure under anchor head installation anchor, the problem of channel-section steel buckling failure and anchor head punching failure is solved; (4) by applying the small pre-stress of the 20%-30% of about soil nailing axial tension standard value to soil nailing, anchor pole is applied to the lower-prestressed of anchor pole axial tension standard value 50%, make lower-prestressed anchor pole and small pre-stress soil nailing can synchronous, coordinate, give full play to respective bearing capacity, significantly improve deep pit monitor stability; (5) by fill concrete in the channel-section steel edge of a wing in bearing structure under anchor and with gear native surface layer concrete be connected as a single entity, fill concrete in the channel-section steel edge of a wing in bearing structure descended to nail and is connected as a single entity with the concrete of the native surface layer of gear, more can play the synergy of monolithic stability supporting.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the utility model first floor soil nailing dado structure.
Fig. 2 is the schematic diagram of the utility model second layer Anchor-Bar Wall-Protection structure.
Fig. 3 is the schematic diagram of the overall dado structure of the utility model.
Fig. 4 is soil nailing and the schematic diagram following closely lower bearing structure node.
Fig. 5 is the schematic diagram of bearing structure node under anchor pole and anchor.
Fig. 6 is the schematic diagram of the lower bearing structure of nail.
Fig. 7 is the A-A sectional drawing of Fig. 6.
Fig. 8 is bearing structure schematic diagram under anchor.
Fig. 9 is the B-B sectional drawing of Fig. 8.
Figure 10 is the schematic diagram of welding node between soil nailing ailhead and steel mesh reinforcement in prior art.
Figure 11 is the C-C sectional drawing of Figure 10.
In Fig. 1-Fig. 9, 1 is concrete pavement, 2 is steel mesh reinforcements, 3 is spilled water holes, 4 is soil nailing boring, 5 is soil nailing grouting bodies, 6 is soil nailings, 7 is armature borings, 8 is anchor pole grouting bodies, 9 is free section sleeve pipes, 10 is anchor poles, 11 is the lower bearing structure channel-section steels of nail, 12 is nuts, 13 is the lower bearing structure backing plates of nail, 14 is nail lower bearing structure bottom flange connecting reinforcements, 15 is bearing structure channel-section steels under anchor, 16 is bearing structure channel-section steel top flange batten plates under anchor, 17 is bearing structure backing plates under anchor, 18 is jig or nut, 19 is stiffening ribs, 20 is bearing structure bottom flange batten plates under anchor, 21 is the lower bearing structure backing plate holes of nail, 22 is nail lower bearing structure top flange connecting reinforcements, 23 is bearing structure backing plate holes under anchor.
In Figure 10-Figure 11,24 is soil nailings, and 25 is intersecting parallels reinforced frames, and 26 is reinforced mesh.
Detailed description of the invention
A kind of foundation ditch composite soil nailed wall that the utility model proposes, has the soil nailing 6 be fixed in foundation pit walls soil nailing boring 4, is fixed on the anchor pole 10 in foundation pit walls armature boring 7, lays steel mesh reinforcement 2 sprayed mortar and the gear soil surface layer formed on the surface of foundation pit walls; Soil nailing is for interval is arranged in one deck, and anchor pole is interval setting in another layer; Bearing structure under nail is installed below soil nailing ailhead and between steel mesh reinforcement 2, the lower bearing structure of nail comprises two of being arranged on steel mesh reinforcement 2 channel-section steel 11 arranged side by side, be placed on backing plate 13 above two channel-section steel centres arranged side by side, it is overall for being connected with top flange connecting reinforcement 22 with bottom flange connecting reinforcement 14 between two channel-section steels 11 arranged side by side, with connecting hole 21 in the middle part of backing plate 13; Soil nailing ailhead is through the connecting hole 21 of backing plate, and soil nailing ailhead is screw rod and is furnished with nut; Below anchor pole and between steel mesh reinforcement, 2 are provided with bearing structure under anchor, under anchor, bearing structure comprises two channel-section steels 15 arranged side by side, is placed on backing plate 17 above two channel-section steel centres arranged side by side, it is overall for being connected with top flange batten plate 16 with bottom flange batten plate 20 between two channel-section steels arranged side by side, between every root channel-section steel edge of a wing, stiffening rib 19 is set, taper liner plate is placed on backing plate 17, with connecting hole in the middle part of taper liner plate, backing plate; Anchor head is through the connecting hole of taper liner plate, the connecting hole 23 of backing plate, and anchor head is screw rod and is furnished with nut.Soil nailing 6 is welded by the body of rod and ailhead and forms.The free segment parcel free segment sleeve pipe 9 of anchor pole 10, under anchor, bearing structure and nail descend in the channel-section steel edge of a wing in bearing structure to be filled with concrete and are connected as a single entity with the concrete of the native surface layer of gear, soil nailing is applied with the small pre-stress of its axial tension standard value 20-30%, and is locked on the lower bearing structure of nail by nut 12 by soil nailing; Anchor pole is applied with the lower-prestressed of anchor pole axial tension standard value about 50%, and to lock the rock bolt in the under anchor on bearing structure with nut 18, formation small pre-stress Soil-Nailing Wall Structure and lower-prestressed bolt support structural stratification distribute, and spilled water hole 3 is installed in the lower end of described concrete pavement 1.See Fig. 1-Fig. 9, wherein Fig. 3 is the schematic diagram of the overall dado structure of the utility model.
Foundation ditch composite soil nailing method, first face down from ground excavation l-2 rice, adopts auger to hole 4 obliquely towards meeting native face; In boring 4, put into soil nailing 6, then in boring 4, be in the milk 5; Lay surface layer steel mesh reinforcement 2 on the surface of foundation pit walls, and itself and foundation pit walls are kept the distance of about about 30-50mm; Sprayed mortar is to covering surface layer steel mesh reinforcement 2, bearing structure under soil nailing ailhead place pilot nail, the connecting reinforcement that the lower bearing structure of nail is welded by channel-section steel, backing plate, top flange and two ends, bottom flange is formed, and following closely lower bearing structure horizontal full-length can connect or disconnect installation separately; After the grouting 5 in boring 4 reaches design strength more than 75%, small pre-stress is applied to soil nailing 6, and lock with nut 12; Sprayed mortar surface layer 1 forms the native surface layer of gear, completes the construction of one deck plate brad supporting; Repeat above-mentioned nail Construction process, until anchor bolt construction absolute altitude carries out anchor bolt construction; Auger is adopted to hole 7 obliquely towards meeting native face; Free segment sleeve pipe 9 is installed within the scope of the freedom length of anchor pole 10, then anchor pole 10 centering is put into boring 7; 8 are in the milk in boring 7; Lay surface layer steel mesh reinforcement 2 on the surface of foundation pit walls, and itself and foundation pit walls are kept the distance of about about 30-50mm; Sprayed mortar is to covering surface layer steel mesh reinforcement 2, bearing structure under anchor head installs anchor, under anchor, bearing structure comprises two channel-section steels arranged side by side, is placed on backing plate above two channel-section steel centres arranged side by side, is connected by two channel-section steels arranged side by side for overall horizontal batten plate, the stiffening rib arranged between every root channel-section steel edge of a wing, is arranged on taper liner plate on backing plate, with connecting hole in the middle part of taper liner plate, backing plate; Under anchor, bearing structure horizontal full-length can connect or disconnect installation separately; After in boring 7, grouting 8 reaches design strength more than 75%, to anchor pole 10 Shi Hanzhang, and lock with ground tackle nut 18; Sprayed mortar surface layer 1, completes one deck bolt support construction; Repeat above-mentioned soil nailing or anchor bolt construction process, until complete whole foundation pit support construction bottom foundation ditch.
Under nail in said method, bearing structure is welded by two channel-section steels, the optional use of channel-section steel model [6-[8, two channel-section steels are welded by level connection joint muscle, and level connection joint muscle distance two ends are about 100mm, and the secondary screw-thread steel muscle of employing diameter 14-22mm or width are the steel plate of the thick 6-10mm of 20-30mm.The lower bearing structure of nail in the elongated connection in same layer soil nailing elevation place, also can disconnect independent installation, when installing separately, and the lower desirable 0.5-0.8m of bearing structure length of nail.
Under anchor in said method, bearing structure is welded by two channel-section steels, the optional use of channel-section steel model [10-[18, two channel-section steels are welded by batten plate, batten plate distance two ends are about 150mm, adopt the steel plate of the thick 10-20mm of width 30-50mm, welding stiffening rib in channel-section steel web, ribbed stiffener adopts the secondary screw-thread steel muscle of diameter 22-32mm.Under anchor, bearing structure in the elongated connection in same layer anchor pole elevation place, also can disconnect independent installation, when installing separately, and the desirable 0.8-1.2m of bearing structure length under anchor.
The Specific construction step of this method is: (1) is suitable for along foundation trench excavating sideline inner edge excavation the foundation trench that panelling construction facilitates the degree of depth, at foundation trench sidewall longitudinally apart from certain depth place under ground level, adopt auger to become 10 °-20 ° with horizontal plane obliquely and hole 4, aperture is 110-150mm, (2) inside boring 4, centering puts into soil nailing 6, the soil nailing body of rod can adopt diameter to be the secondary reinforcing bar of Φ 16-25 or the hollow steel pipe of diameter about 48mm wall thickness 3-8mm, ailhead screw diameter is by configuring with soil nailing body of rod the principle of equal strength, and with plastic sheeting parcel ailhead screw rod so that later stage mounting nuts 12, then grout injection or cement mortar in boring 4, (3) assembling reinforcement net 2 on foundation pit side-wall, reinforcing bar adopts the one-level plain bar of diameter 6.5 or 8mm, and level and vertical spacing are 100-250mm, (4) sprayed mortar is to covering surface layer steel mesh reinforcement 2, bearing structure under soil nailing ailhead place pilot nail, (5), after the grouting in hole to be drilled 4 reaches more than 75% of design strength, adopt jack or mechanical wrench to apply small pre-stress to soil nailing, prestressing force size can be the 20%-30% of soil nailing axial tension standard value, (6) sprayed mortar surface layer 1, concrete grade is C20-C30, thickness 100-150mm, completes the construction of one deck plate brad supporting.(7) above-mentioned nail Construction operation is repeated to anchor bolt construction elevation; (8) adopt auger to become 10 °-30 ° with level obliquely and hole 7, aperture is 110-150mm; (9) inside boring 7, centering puts into the anchor pole 10 installing free segment sleeve pipe 9, anchor pole can adopt many diameters to be the secondary reinforcing bar of Φ 22-25 or the steel strand of diameter 12.7-15.2mm, adopt during reinforcing bar and press the principle of equal strength welding lead screw at head, and by plastic sheeting parcel anchor head lead screw so that later stage mounting nuts; When adopting steel strand, with plastic sheeting parcel anchor head steel strand so that later stage installation ground tackle (jig), then grout injection or cement mortar in boring 7; (10) assembling reinforcement net 2 on foundation pit side-wall, reinforcing bar adopts the one-level plain bar of diameter 6.5 or 8mm, and level and vertical spacing are 100-250mm; (11) sprayed mortar is to covering surface layer steel mesh reinforcement, bearing structure under anchor is installed at anchor head place; (12), after the grouting in hole to be drilled 7 reaches more than 75% of design strength, adopt hydraulic jack to apply lower-prestressed to anchor pole, prestressing force size can be 50% of anchor pole axial tension standard value; (13) sprayed mortar surface layer 1, concrete grade is C20-C30, thickness 100-150mm, completes one deck bolt support construction; (14) repeat the working procedure of above-mentioned soil nailing or anchor pole by working drawing, complete each layer retaining wall below, until substrate, complete whole foundation pit support construction.
Below be only example of the present utility model, protection domain of the present utility model is not constituted any limitation.The technical scheme that all employing equivalents or equivalence are replaced and formed; or the lower bearing structure of nail described in any conversion the utility model, the mounting means of bearing structure or installation form under anchor; or the arrangement of conversion soil nailing and anchor pole; or adopt other method to apply small pre-stress to soil nailing; or adopt other method to apply lower-prestressed to anchor pole, all drop within the utility model rights protection scope.
An embodiment of the present utility model is certain base pit engineering, degree of depth 15m, the vertical spacing 1.5m of soil nailing, and level interval is 1.5m, and soil nailing design is the 1st, 6,7,8 rows; Anchor pole level interval and vertical spacing are 2.0m, and Soil Anchor Design is the 2nd, 3,4,5 rows.During construction, first in this region along the foundation trench excavating dark 2m in excavation of foundation pit sideline, at foundation trench sidewall longitudinally apart from 1.5m place boring 4 under ground level, dip angle of hole becomes angle 15 ° with horizontal plane, diameter is that Φ 25 soil nailing 6 centering puts into boring 4, 0.5MPa normal pressure is adopted to pour into M25 cement paste 5 in boring 4, assembling reinforcement net in foundation pit walls, its specification is diameter is 6.5mm, level and vertical spacing are 200mm, steel mesh reinforcement and foundation pit side-wall soil body distance keep about 30mm, then sprayed mortar is to just covering steel mesh reinforcement, sprayed mortar label is C20, bearing structure under pilot nail again, the lower bearing structure of nail adopts 2 No. 6.5 channel-section steels compositions, its length is 0.6m, level is installed, treat that soil nailing strength of cement grout reaches 15MPa, when surfacing steel bar concrete strength reaches 10MPa, small-size jack is adopted to apply 30kN prestressing force to soil nailing and use nut locking, and then sprayed mortar is to design thickness 100mm, namely first floor plate brad supporting is completed.Excavate 2.0m downwards again, in sidewall fore-and-aft distance ground level 3.5m place's boring 7, dip angle of hole becomes angle 15 ° with horizontal plane, adopt the steel strand manufacturing anchor pole 10 of two diameter 12.7mm, its centering is put into boring 7, 0.5MPa normal pressure is adopted to pour into M25 cement paste 8 in boring 7, form anchor pole, assembling reinforcement net in foundation pit walls, its specification is diameter is 6.5mm, level and vertical spacing are 200mm, steel mesh reinforcement and foundation pit side-wall soil body distance keep about 30mm, then sprayed mortar is to just covering steel mesh reinforcement, sprayed mortar label is C20, bearing structure under anchor is installed again, under anchor, bearing structure adopts 2 No. 18 channel-section steels compositions, its length is 1.2m, level is installed, treat that bolt cement slurry intensity reaches 15MPa, when surfacing steel bar concrete strength reaches 10MPa, jack pair soil nailing is adopted to apply 100kN prestressing force and lock with jig, and then sprayed mortar is to design thickness 100mm, namely second layer bolt support is completed.Repeat above-mentioned working procedure, complete each layer anchor pole and plate brad supporting below, anchor pole and soil nailing press quincunx interlaced arrangement on vertical, until substrate, form whole composite soil nailing system.
A contrast of the present utility model authorizes patent of invention to be " supporting and protecting method for base pit, side slope, flat anchor and spray net ", and the patent No. is 95119432.1, and the feature of this patented technology is: boring adopts luoyang spade manual work; Bolthole becomes horizontal distribution mode to arrange; Anchor head intersecting parallels reinforcing bar (as shown in Figure 10 and Figure 11) and steel mesh reinforcement are welded into one.Compared with this patented technology, the art of this patent has following innovation and advantage: (1) adopts machine drilling, and efficiency of construction is high, and hole quality is good; (2) soil nailing and horizontal plane form an angle, and construct more convenient, can directly be in the milk in aperture, convenient and easy, and grouting is fuller; (3) bearing structure under soil nailing ailhead place pilot nail, can transmit better than intersecting parallels reinforcing bar and share ailhead pulling force, and avoid ailhead produce in facing concrete " piercing through " destroy; (4) under the nail installed of the utility model bearing structure efficiently solve adopt intersecting parallels reinforcing bar and steel mesh reinforcement welded and cannot the technical barrier of Shi Hanzhang, small pre-stress can be applied to soil nailing; (5) combine employing prestressed anchor and carry out supporting, and lower-prestressed is applied to anchor pole, and and to apply the soil nailing of small pre-stress synchronous and give full play to respective bearing capacity, significantly can reduce horizontal distortion and the Vertical Settlement of foundation pit side-wall, improve the security and stability of foundation ditch.

Claims (9)

1. a foundation ditch composite soil nailed wall, there is the soil nailing (6) be fixed in foundation pit walls soil nailing boring (4), be fixed on the anchor pole (10) in foundation pit walls armature boring (7), lay the gear soil surface layer that steel mesh reinforcement (2) sprayed mortar is formed on the surface of foundation pit walls; It is characterized in that: soil nailing for interval is arranged, is provided with bearing structure under following closely in one deck below soil nailing ailhead and between steel mesh reinforcement (2), form one deck Soil-Nailing Wall Structure; The lower bearing structure of nail comprises two of being arranged on steel mesh reinforcement (2) channel-section steel (11) arranged side by side, be placed on backing plate (13) above two channel-section steel centres arranged side by side, two channel-section steels arranged side by side are connected for overall connecting reinforcement, backing plate (13) middle part with connecting hole (21); Soil nailing ailhead is through the connecting hole (21) of backing plate, and soil nailing ailhead is screw rod and is furnished with nut (12); Anchor pole is interval setting in another layer; Below anchor head and between steel mesh reinforcement, (2) are provided with bearing structure under anchor, form one deck bolt support structure; Under anchor, bearing structure comprises two channel-section steels (15) arranged side by side, be placed on the backing plate (17) above two channel-section steel centres arranged side by side, two channel-section steels arranged side by side are connected for overall horizontal batten plate, the stiffening rib (19) arranged between every root channel-section steel edge of a wing, be placed in the taper liner plate on backing plate (17), with connecting hole in the middle part of taper liner plate, backing plate; Anchor head is through the connecting hole of taper liner plate, backing plate, and anchor head is screw rod and is furnished with nut (18).
2. a kind of foundation ditch composite soil nailed wall as claimed in claim 1, it is characterized in that: every layer of soil nailing is arranged at a certain distance at same layer, every layer of anchor pole is arranged at a certain distance at same layer, and soil nailing, anchor pole are vertically pressing layer interlaced arrangement.
3. a kind of foundation ditch composite soil nailed wall as claimed in claim 1, is characterized in that: soil nailing is welded by the body of rod and ailhead and forms, and the body of rod is made up of reinforcing bar or hollow steel pipe.
4. a kind of foundation ditch composite soil nailed wall as claimed in claim 1, is characterized in that: soil nailing is applied with the small pre-stress of its axial tension standard value 20-30%, and is locked on the lower bearing structure of nail by nut (12) by soil nailing; Anchor pole is applied with the lower-prestressed of its axial tension standard value 50%, and locks the rock bolt in the under anchor on bearing structure with nut (18), forms small pre-stress Soil-Nailing Wall Structure and lower-prestressed bolt support structural stratification distributes.
5. a kind of foundation ditch composite soil nailed wall according to any one of claim 1-4, is characterized in that: under anchor, bearing structure and nail descend in the channel-section steel edge of a wing in bearing structure to be filled with concrete and be connected as a single entity with the concrete of the native surface layer of gear.
6. a kind of foundation ditch composite soil nailed wall as claimed in claim 1, is characterized in that: the channel-section steel elongated connection in the horizontal direction between the lower bearing structure of nail, or disconnect in the horizontal direction or vertical direction install separately.
7. a kind of foundation ditch composite soil nailed wall as claimed in claim 1, is characterized in that: the channel-section steel under anchor between bearing structure is elongated connection in the horizontal direction, or disconnect in the horizontal direction or vertical direction install separately.
8. a kind of foundation ditch composite soil nailed wall as claimed in claim 1, is characterized in that: arrange stiffening rib between every root channel-section steel edge of a wing.
9. a kind of foundation ditch composite soil nailed wall as claimed in claim 1, is characterized in that: one deck or two-layer above Soil-Nailing Wall Structure and one deck or two-layer above bolt support are executed structure and distributed alternatively up and down.
CN201520163873.4U 2015-03-23 2015-03-23 A kind of foundation ditch composite soil nailed wall Withdrawn - After Issue CN204626396U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520163873.4U CN204626396U (en) 2015-03-23 2015-03-23 A kind of foundation ditch composite soil nailed wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520163873.4U CN204626396U (en) 2015-03-23 2015-03-23 A kind of foundation ditch composite soil nailed wall

Publications (1)

Publication Number Publication Date
CN204626396U true CN204626396U (en) 2015-09-09

Family

ID=54045440

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520163873.4U Withdrawn - After Issue CN204626396U (en) 2015-03-23 2015-03-23 A kind of foundation ditch composite soil nailed wall

Country Status (1)

Country Link
CN (1) CN204626396U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104727318A (en) * 2015-03-23 2015-06-24 大连理工大学 Foundation ditch composite concrete nail supporting structure and method
CN105839644A (en) * 2016-02-23 2016-08-10 北京工业大学 Foundation pit fixed foot drainage device and method
CN108166492A (en) * 2018-01-30 2018-06-15 青岛市市政工程设计研究院有限责任公司 A kind of multi-functional high corrosion resistant anchor head system
CN108677941A (en) * 2018-06-08 2018-10-19 常州工学院 A kind of steel plate and channel steel band combined type face layer soil nail wall
CN108914954A (en) * 2018-08-22 2018-11-30 中国电建集团成都勘测设计研究院有限公司 Slope support method of the pre support in conjunction with permanent support

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104727318A (en) * 2015-03-23 2015-06-24 大连理工大学 Foundation ditch composite concrete nail supporting structure and method
CN104727318B (en) * 2015-03-23 2016-06-08 大连理工大学 A kind of foundation ditch composite soil nailed wall and method
CN105839644A (en) * 2016-02-23 2016-08-10 北京工业大学 Foundation pit fixed foot drainage device and method
CN108166492A (en) * 2018-01-30 2018-06-15 青岛市市政工程设计研究院有限责任公司 A kind of multi-functional high corrosion resistant anchor head system
CN108166492B (en) * 2018-01-30 2019-03-05 青岛市市政工程设计研究院有限责任公司 A kind of multi-functional high corrosion resistant anchor head system
CN108677941A (en) * 2018-06-08 2018-10-19 常州工学院 A kind of steel plate and channel steel band combined type face layer soil nail wall
CN108914954A (en) * 2018-08-22 2018-11-30 中国电建集团成都勘测设计研究院有限公司 Slope support method of the pre support in conjunction with permanent support
CN108914954B (en) * 2018-08-22 2020-04-14 中国电建集团成都勘测设计研究院有限公司 Slope supporting method combining pre-supporting and permanent supporting

Similar Documents

Publication Publication Date Title
CN104727318B (en) A kind of foundation ditch composite soil nailed wall and method
CN102042019B (en) Two-stair five-step excavation construction method for shallow-buried large-span soft plastic clay tunnel
CN101614125B (en) Construction method of V-level surrounding rock tunnel
CN204626396U (en) A kind of foundation ditch composite soil nailed wall
CN101736760A (en) Prestressed anti-floating anchor rod and construction method thereof
CN108612110B (en) Combined type supporting construction method for deep foundation pit of subway station
CN103032080A (en) Support method of weak and broken surrounding rock tunnel
CN103485794B (en) Composite ingate supporting structure and construction method thereof
CN112081154B (en) Method for reinforcing and lifting high-rise building with raft foundation
CN106988333B (en) Prefabricated bearing platform with dowel bar filling core and construction process thereof
CN103437493B (en) Connecting node of prefabricated reinforced concrete beam and construction method of connecting node
CN1167857C (en) Foundation pit side-wall flexible support method
CN109706941B (en) Construction method and anchoring device for foundation pit composite supporting technology
CN100473787C (en) Connecting structure for use in piled anchor supporting system and construction method thereof
CN106522982A (en) Method for constructing anti-floating anti-sinking anti-hydraulic pressure damping tunnel in water-rich unconsolidated stratum
CN104711981B (en) A kind of foundation pit soil nailing structures and methods
CN102002942A (en) Hollow drilling pile and piling construction process for steel tube-cement soil composite pile
CN102286979A (en) Construction method for deep foundation pit supporting by adopting steel pipe piles-self-drilling prestressed anchor bars
CN212506231U (en) Opposite-pulling anchor cable structure capable of reducing bias load
CN204626398U (en) A kind of foundation pit soil nailing structure
CN210106749U (en) Counter-force structure of soft soil foundation super large section push pipe jacking operation
CN103132531A (en) Foundation pit supporting system construction method
CN103711130B (en) Portal frame type bamboo joint mortar pile enclosure structure and construction method thereof
CN202989911U (en) Post-grouting pile of precast concrete
CN211395698U (en) Stiff core curtain pile and dado stake anchor combined supporting construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20150909

Effective date of abandoning: 20160608

C25 Abandonment of patent right or utility model to avoid double patenting